UNIVERSITY OF PITESTI                           SCIENTIFIC BULLETIN
Faculty of Mechanics and Technology         AUTOMOTIVE series, year XXV, no. 29
Application of 8d methodology - an effective problem solving
tool in automotive industry
                Cristina – Florena BANICA, Nadia BELU*
                University of Pitesti, Pitesti, Romania
                *Corresponding   author e-mail: nadia.belu@upit.ro
                  Article history
                        Received        20.06.2019
                        Accepted        15.08.2019
                               DOI      https://doi.org/10.26825/bup.ar.2019.005
                Abstract: Quality plays an important role in an organization from automotive industry to
                become more efficient and effective in the global market. In this sector there are many
                requirements to problem solving process using standardized methodologies, according to
                international standards. 8D methodology has become very popular among manufacturers
                because it is effective to use. The aim of this paper is to apply the 8D methodology and to
                analyze its effectiveness. In order to apply the 8D methodology and to analyze its effectiveness
                a case study was conducted in a company from automotive industry. The results can be used
                by the management in continuous improvement as additional motivation for more effective
                use.
                Keywords: 8D, QRQC methodologies, problem solving, quality improvement
1. Introduction
The automotive industry is one of the most important sectors of the global economy. Improvement in
quality of product and process is necessary for any company from this sector in order to survive and to
grow in competitive market. For this, problem solving techniques are required by the quality
management in the automotive industry. Regarding quality management, problem solving is fostered
by the Measurement Systems Analysis work group [1], [2] and the standard IATF 16949:2016 of
International Automotive Task Force [3], [4], [5] for automotive industry. The goal of this QMS
standard is the development of a quality management system that provides for continual improvement,
emphasizing defect prevention and the reduction of variation and waste in the supply chain. According
this standard, the organization shall have a documented process for problem solving including: root
cause analysis, methodology used, analysis and results. One of the methods used is 8D methodology
based on Quick Response Quality Control (QRQC) tool. The 8D method (also called G8D, Global 8D,
TOPS 8D) is one of the most widely used problem-solving tools related to nonconformities
reoccurrence prevention in the manufacturing process, commonly used for complaints management in
automotive industry. It consist of 8-steps to be followed by quality improvement team for problem
solving as well as for product and process improvement [6]. QRQC is described as a quick and
comprehensive problem-solving process for the industrial and services sectors that ensures problems
do not reoccur while at the same time establishing dynamics of continuous improvement and
modifying management culture. This paper presents the 8D methodology through case study for
improving of quality in the automotive industry for powder painting processes.
2. 8d methodology
The 8D methodology is effective in developing proper actions in order to eliminate root causes and in
implementing the permanent corrective actions to eliminate them. It also contributes to explore the
system of control that allowed the escape of the problem [7], [8], [9]. The 8D methodology involves
teams working together in order to solve quality problems, using a structured 8 phases, table 1 [9].
QRQC is a quality tool support of the 8D methodology. The basis of QRQC is the quick answer to a
quality / manufacturing issue no matter if it's an external / internal customer or a supplier.
                                                                                Table 1. Phases of 8D Methodology
         Phase of the
  No.         8D                                                    Description
         methodology
   1     Problem         To identify the problem, the 8D team tries to acquire more information as possible from the
         description     customer, which constitutes the first analysis performed in the problem-solving process. The
                         location and nature of problem must be given along its effects. Another important information
                         is whether the problem included is intermittent or whether it could happen on similar products
                         or processes. While depicting the problem, the 5W (Who, What, Where, When, Why) And 2h
                         (How, How Many/Much) method should be used, where the accompanying inquiries must be
                         addressed completely and efficiently and WHY for each question. The responses to these
                         inquiries help us clarify the background and connections.
   2     Reference to    This phase is done with the purpose to detect other products with the same nonconformity risk.
         similar         The subsequent aspects must be taken into consideration: the list of the detected problems, the
         products        place of their detection, the technological process in question, what other parts are realised in
                         the same process, whether here is also a nonconformity risk in what they are concerned, where
                         these parts are used.
   3     The first       In this step identification of genuine cause and determination of restorative measures aimed to
         analysis        solve the problem permanently. To obtain root cause, all the causes which are found wrong are
                         wiped out. Both the manufacturing process and the control process are taken into account. The
                         point where the problem has escaped the control system (escape point) must be sought for and
                         detected, as well as the moment when it could have been detected.
   4     Immediate       Measurements are carried by two means, it is carried out by
         action plans          •    means of control devices (digital data and outputs are associated to computers)
                               •    means is carried out by using statistical methods: statistical Process Control, Process
                                    Capability (cp), Process Capability index (Cpk), histograms, and Pareto diagrams.
   5     Final           This phase is carried out with the purpose of obtaining a real and complete of the situation in
         analysis        order to find the root causes and to decide the optimum actions required for the treatment of the
                         causes. This phase aims at finding the causes, not the solutions. Final analysis implies a
                         detailed analysis of the data. For this purpose, multidisciplinary team work is used; such teams
                         go on the respective site in order to understand the problem. It must be noted that most of the
                         complex problems usually have more than one root cause that interact with each other.
                         The validity of these causes should be verified because it is essential to treat the real causes.
   6     Final action    Establishing an implementation plan for permanent corrective actions. Permanent actions are
         plans           analysed and applied in order to prevent the recurrence of the problem permanently. The final
                         elimination action must be focused on the real main root causes (phase 5) and on the escape
                         point (phase 3). Thus the aim is to solve both the root causes of the problem, as well as the root
                         causes of the failure to detect the problem. In order to prevent the recurrence of the problem, a
                         number of actions are applied: updating procedures, training the personnel.
   7     Confirmation    Phase 7 of the 8D method is very important due to the fact that it allows for the closing of the
         of the action   action plans. The effectiveness of the final action plans is checked. It is a key stage meant to
         plans           avoid the recurrence of the quality problem.
                         The Supplier Quality Service will require evidence of the effectiveness of the action plans and,
                         in order to be able to validate the 8D, may also perform an audit if it finds that the effectiveness
                         of such actions is not trustworthy. So long as the effectiveness of the actions is not proven, the
                         supplier should make sure that it supplies 100% good parts by carrying out checks.
                         The Supplier Quality Service will be notified in what the results of such checks are concerned.
   8     Preventing a    In this step the 8D team analyse whether the corrective action executed would avoid or enhance
         recurrence of   the quality of similar products and processes.
         the problem
                                                                                                                                2
3. Case study
In our paper, we have focused on the use of 8D methodology to solve the various problems
encountered in the production of automotive components. In our case it was a problem that occurred
during powder painting processes, Figure 1. The problem was identified in the Quality Wall by an
operator. Powder painting is the application of solid powder to create industrial coatings.
The powder is applied by an electrostatic process to a substrate, usually metal, and acquires excellent
properties when the particles are heated and polymerise on the substrate. This method is widely used
to protect surfaces and ensure a pristine finish that cannot be achieved with regular paints.
 Date: 30.09.2019
 Part name : Bar HJD PH3 ROOF BAR
 Part number : 112240
 Impurities and cavities on the surface of the bars
 Quantity: 229 parts
              Nonconforming part                                             Conforming part
                                  Figure 1. Nonconforming painted parts
This problem was solved by using 8D and QRQC methods. The stages of the methodologies are
shown below in the table 2 - 9.
                                                              Table 2. Problem description
             Reference Number: 112240                        Issued by:       Validated by :
             Parts name: Bar HJD PH3 ROOF BAR                Function         Function
                                                             Date             Date: 30.09.2019
                                                             30.09.2019
             1. Details of the problem                          Date:
             Report N°: 6102-3339                               Affected quantity: 229
             Description: Impurities and cavities on the surface of the bars
             Why is it a problem? Visual problem.
             Who detected the problem? Customer
             Who generated the problem? Supplier
             How was the problem detected? Customer production line visual control
             When did the problem occur? 30.09.19
             When the part has been produced? 18.09.19
             How many? 128 Nonconforming bars and 229 Nonconforming painted bars
                                                                                   Yes      No
                                                               Recurrence                   √
                                                                                                     3
                                                                                  Table 3. Reference to similar products
                 2. Other concerned similar products?
                 Can this defect appear on other similar parts?
                                                              Yes            No         Comments / Results
                 Other pieces                                     √
                 Products same family                             √
                 Left / Right                                     √
                 Symmetric product                                            √
                 Front / Back                                                 √
                 Others                                                       √
                                                                                                Table 4. The first analysis
3. First analysis
At this step we used QRQC methodology, a tool for quick resolution no repletion the problems. It uses tools as
Ishikawa diagram and 5 Why.
5W1H method allows the problem to be broken down and determine a root cause.
                     Description of the problem                                               Results
    What is the problem?                                              Impurities and cavities on the surface of the bars
    Who detected the problem?                                         Operator
    Where was the problem detected?                                   Quality Wall
    When was the problem created?                                     30.09.2019
    How many?                                                         229 parts
    Why is it a problem?                                              The client's requirements are not respected
The cause of this problem will be further investigated using the Ishikawa diagram, figure 2 (which is also named Fishbone).
That constitutes a significant point in the topic of methods for problem solution is actuating as a key tool to solve assembly
and maintenance troubles in the automotive and transport sectors. It is used to identify possible causes of a specific
problem.
                      Figure 2. Fishbone for impurities and cavities on the bars surface
                                                                                                                                 4
5 Why it is a simple approach to explore the causes until the root cause is reached.
                Why?                                       Why?                                     Why?
 Parts have small scratches, which       The raw material had scratches, which         Operators were not enough
 can be seen after painting process.     stay even after the surface treatment         informed about the surface
                                         processes. The parts with small surface       criteria.
                                         failures were not detected.
The non-detection actions for the pallet support product in the table 2 are identified below.
                                   Non-detection actions                                           Department
  Elaboration of the pickling verification method                                                      Methods
  Instruction sheet for checking the bars support after pickling                                       Methods
  Identification of the defect in critical board                                                       Quality
  Instruction sheet for checking rust on the bars support                                              Methods
                                               Figure 3. Failures evolution
Before the analysis, the average of the failures was 4.6, figure3, after the analysis the results obtained will be analyzed.
                                                                                          Table 5 Immediate action plans
     4. Immediate action plan
     Which are the actions began to prevent the delivery of not corresponding products to customer?
                                                         Actions          Quantity            Quantity
                                                                          conform           Not conform
     During the manufacture process                                           0                  0
     Current stock                                                            0                  0
     Stocking in Shop                                                         0                  0
     Spare pieces                                                             0                  0
     Others                                                                   0                  0
     How are OK products identified?
     Labeled: Checked 100%
     Expedition date / Remarks
                                                                                                      Table 6 Final analysis
  5. Final analysis                   End date of analysis                                             20.10.2019
  Indicate the real causes on the whole Process:
  * Man, Material, Machine, Methods
  * Who, Where, When, Why, How
  * Changement de fabrication. Processus de Retouches
  * Maintenance
  Causes:                                                                        Responsibility             Department
  Nonconforming self-control                                                           D.G.                  Production
  New products, undisclosed by operators                                               P.R.                  Production
  The hanging of parts on the carriers is nonconforming                                P.R.                  Production
  The available conditioning does not protect the parts against
                                                                                       C.A.                      Quality
  scratching due to contact between them
  The instruction sheet about the parts hanging is missing                              P.R.                 Production
                                                                                                                               5
                                                                                         Table 7 Final action plans
      6. Definitive action plans                              W49
      Actions                                                                            Service /        Date
                                                                                       Responsibility
      Realization of a Quality Alert                                                      Quality         W48
      Sorting in the customer plant                                                     Production        W48
      Sorting in the logistics platform                                                 Production        W48
      Sorting in lorries being loaded or on the road                                    Production        W48
      Training of the operators about the failures and the company control criteria     Production        W48
      Visual control and marking has been implemented after bending process to
                                                                                         Production       W46
      increase awareness on surface failures at polishing operation
      Training of the operators concerning the parts hanging on the carriers             Production       W48
      Visual control has been improved after painting process by adding
                                                                                         Production       W48
      additional visual control
      Defining, with the customer, the conditionings to protect the parts during
                                                                                           Quality        W49
      transportation
      100% Control and labeling of the first three deliveries                            Production       W48
                                                                       Table 8 Confirmation of the action plans
   7. Action Plans Confirmation                              Validation date                   20.10.2019
   The begun actions were confirmed like effectives?                     Yes                           No
                                                                          √
   Comment?
   8D audit performed to demonstrate if the actions are sustainable and effective.
                                                               Table 9 Preventing a recurrence of the problem
8. Preventing a recurrence of the problem                                  Closing Date:
    After the update of the actions, the following subjects require one updated?
                                                                        Yes      Responsibility           Date
   All actions validated and put in place                                √            Production        04.11.2019
   Product FMEA and/or Process updated                                   √             Quality          04.11.2019
   Control plan updated                                                  √             Quality          04.11.2019
   Update procedures                                                     √            Production        04.11.2019
   Instructions (control monitoring plans)                               √            Production        04.11.2019
   Specifications adapted (only in project)                              √                                  n/a
   Product / process design guide updated (only in project)              √                                  n/a
   Lessons learned created and shared                                    √                              04.11.2019
  The audit performed by Quality and manufacturing at the                √
 maintenance operation level 1
  Each month, an information session on customer complaints and          √
 internal complaints will be organized within the welding workshop
  The final stage of the 8D report aims to summarize all the experience and knowledge of the team, as
  well as the documentation used to prepare the 8D report. After taking the permanent corrective and
  preventive actions and closing the 8D activity through quality planning, the average of the failures
  reduces to 4.6 from 2.4.
  4. Conclusions
  The 8D methodology used in this paper is an excellent tool for solving the problem as well as for
  preventing defects from reoccurring. It is practical and simple sheet, which use isn´t allwasy easy.
  Appear as one of the basic problem solving methodology, 8D offers an essential solution from
  identifying the root cause until the implementation of preventive action. When solving a complaint,
  8D reports are always demanded form suppliers. A future work can be suggested for other production
                                                                                                                     6
cases in which the 8D methodology to be used like a support for Failure Mode & Effect Analysis or
Quality Assurance Matrix - tools for quality improvement in the automotive industry.
References
[1] Measurement Systems Analysis work group: Reference Manual Third Edition 2002 Daimler-Crysler. Ford
Motor Company and General Motors, Copyright protected by AIAG, 2002.
[2] Suarez-Warden, F. & González Mendívil, E., Problem solving in transference of procedural knowledge aided
by AR to support aeronautical transportation decisions, Int J Interact Des Manuf 2018, 12: 337.
https://doi.org/10.1007/s12008-017-0384-1.
[3] International Automotive Task Force. IATF 16949:2016 Automotive Quality Management System standard.
Quality Management System requirements for automotive production and relevant service parts organizations.
1st Edition, 1 Octomber 2016.
[4] Gruszka, J., Misztal, A., The new IATF 16949:2016 standard in the automotive supply chain, Research in
Logistics & Production, Vol. 7, No. 4, 311-318, 2017.
[5] Gaikwad, L.M., Sunnapwar, V.K., Teli, S.N. et al. Application of DMAIC and SPC to Improve Operational
Performance of Manufacturing Industry: A Case Study, J. Inst. Eng. India Ser. C (2019) 100: 229.
https://doi.org/10.1007/s40032-017-0395-5.
[6] P. S. Atigre, A. P. Shah, V. R. Patil, Application of 8D Methodology for Minimizing the Defects in
Manufacturing Process: A Case Study, International Journal of Engineering Research & Technology (IJERT),
Vol. 6 Issue 09, 123-126, 2017.
[7] C. A. Riesenberger, S. D. Sousa, The 8D Methodology: An Effective Way to Reduce Recurrence of
Customer Complaints? Proceedings of the World Congress on Engineering 2010, Vol III WCE 2010, ISBN:
978-988-18210-8-9, June 30 - July 2, 2010, London, U.K., 2010.
[8] Korenko M., et al: Application 8D method for problems solving, Вісник Львівського національного
аграрного університету. Сер: Агроінженерні дослідження, (17) pp. 330-339, 2013.
[9] Misztal A., Grecu I., N. Belu, Customer Satisfaction in the Automotive Industry, Faima Business &
Management Journal VoL.4, Issue 1, March 2016.