Rante 2019 Solman
Rante 2019 Solman
Exercise 1-3
1.      hfajkak
2.     P0.125
3.     Highest: 3750       Lowest: 1500
4.     15000
Exercise 1-4
1.     a, P 352820               d. P 314711
       b. 1. P 140000            e. P 472067
          2. P 113205            f. P 157356
          3. P 84904
       c. P 339615
2. Journal Entries
      2. (Financial Statement)
Exercise 1-5               Exercise 1-6             Test Material 1.1 Multiple Choice Theories
a.        P 86 500         a. P600 000              1. B                    11. D            21. C
b.        P 12 500         b. P 252 000             2. B                    12. D            22. D
c.        P7 500           c. P 682 000             3. C                    13. C            23. C
d.        P80 500          d. P190 960              4. C                    14. D            24. D
e.        P24 500                                   5 A                     15. A            25. A
f.        P11 000          Exercise 1-7             6. B                    16. D            26. C
g.        P55 000          (below, Table 1.3)       7. B                    17. C            27. D
h.        P15 000                                   8. B                    18. C            28. A
i.        P148 500                                  9. B                    19 .D            29. C
                                                    10. C                   20. D            30. D
______________________________________________________________________________
COMPUTATIONS:
Exercise 1-1 Ex 1-1. Cost classification. Classify the following as direct materials (DM) , direct
labor (DL) , factory overhead (FOH) , administrative (AD) ,and selling (SE) expenses by putting a
check on the appropriate column.
                                                                       DM   DL   FOH   AD   SE
     Wages of company officials other the plant
1    supervisor.                                                                       ∕
Ex 1-2 Cost Classification. Classify each cost as product cost or period cost by putting a check
mark on the appropriate column. If the item is not appropriate to be the product or period costs ,
write N/A to both columns.
                                                                              Product   Period
                                                                               Cost      Cost
Dagupan Trans Inc. has incurred the following bus maintenance costs during the past six months.
Required: Using high-low method to separate mixed cost, estimate the total fixed costs component
of the maintenance costs.
During the month of July, the following transactions were completed and reported by Bubbles
Manufacturing Company.
Additional Information:
REQUIRED:
   e. (Journal Entries)
   f.
                                  Bubbles Manufacturing Company
                                  Statement of Cost of Goods Sold
                                           July 31, 2012
 Raw Materials Used:
     RM iventory, July 1                                                            P 80000
     Add: Purchases                                                                  240000
     Raw Materials                                                                 P 320000
     Less: Inventory, July 31                                           P 140000
     Indirect Materials Used                                               12000    152000 P 168000
 Direct Labor                                                                                120000
 Manufacturing Overhead
     Indirect Materials Used                                                        P 12000
     Indirect Labor                                                                   30000
     Depreciation                                                                     12000
     Insurance                                                                         4320
     others                                                                            6500       64820
 Total Manufacturing Costs                                                                    P 352820
 Add: Work in Process, July 1                                                                    100000
 Total Cost of work put into Process                                                          P 452820
 Less: Work in Process, July 31                                                                 -113205
 Cost of Goods Manufactured                                                                   P 339615
 Add: Finished Goods, July 1                                                                      60000
 Goods Available for sale                                                                     P 399615
 Less: Finished Goods, July 31                                                                    84904
 Cost of Goods Sold                                                                            P 314711
EXERCISE 1-5
EXERCISE 1-6
EXERCISE 1-7
Test Material 4
1.                                 Machine hours                              Power costs
     Highest                          1200                                      14400
     Lowest                            400                                       12800
     Difference                        800                                     1600
VC/unit = 1600/800 = P 2
          VC/unit         = 3380/760
                                  = P4.447368421
        Fixed cost:
        (highest)                   = 3360 x 4.447368421
                                    = P 14943.16
Overhead P12000
8. Materials                                                                      P264000
   Direct labor                                                                    143000
Test Material 5
3. d.
 Materials (3200000-180000)                                                   P 3020000
 Labor [6900000+(2040000-320000)-2040000=6580000]
       [6580000+(800000 x 90%)-800000=6500000-3020000 / 160%]                 P 1275000
 Overhead (2175000 x 60%)                                                     P1305000
 7. c.
   Work in process inventory:
         {[7920000 / (38.50-30.80)] x 30.80} = 3520000
         3520000 + 13680000 – 17400000             = decrease of 200000
    Finished goods inventory:
         (17400000+1500000-16800000) = 2100000
        2100000-1500000                            = increase of 600000
9. Beginning:
   Materials (50000+30000)                                                    P 80000
   Labor (80000+60000)                                                         140000
   OH (120000+90000)                                                          210000
Cost added:
   Materials (80000+50000+75000)                                              P 205000
   Labor (100000+80000+110000)                                                  290000
   OH (290000 x (120000/80000)                                                  435000
Finished goods, end                                                           P1010000 c.
17. b.
Direct material (P 15000+ 33000 – 19000 – 1000)                                 P 28000
MC (P 12000+30000-40000)                                                        P 110000
FG, June 30 (P 190000-140000)                                                   P 50000
18. Materials (P 380000-20000)                                                  P 360000
    Direct labor (P 420000-40000)                                                 380000
    Prime costs                                                                 P740000 b.
Summary of Answers
EXERCISE 2-1
   1. Raw Materials Inventory                                               541000
             Accounts payable                                                          510000
Exercise 2-5
Journal Entries
1. Raw and in Process                                                                200 000
        Accounts Payable                                                                       200 000
     Test Material 2-1 Supply the         Test Material 2-1 MC               Test material 2-3
               Answer                          Problems
 1. 1,294,000         11. P 600,000    1. B        1. B                  1. C
 2. 1,292,000         12. P 200,100    2. D        2. 129700             2. C         11. B
 3. 4,640,000         13. P 131,400    3. C        3. A                  3. D         12. B
 4. 301,429           14. P            4. D        4. C                  4. D         13. D
 5. 285,000           1,160,000        5. D        5. C                  5. A         14. D
 6. 708,750           15. P            6. D        6. B                  6. B         15. A
 7. 156,200           1,637,000        7. A        7. A                  7. B         16. C
 8. 41,700            16. P            8. B        8. D                  8. C         17. C
 9. 423,100           1,629,000        9. A        9. C                  9. A         18. C
 10.      1,625,000 17. P(1000)        10. A       10.36000              10. B
                                                   11.B
Exercise 2-3
1. Economic Order Quantity or EOQ = 2 x annual demand x cost per order
                                       Annual carrying cost per unit
4. Total ordering cost = Number of orders per year x Cost per order
                           = 69.28 x 150 = 10 392
Exercise 2-4
1. Economic Order Quantity or EOQ = 2 x annual demand x cost per order
                                        Annual carrying cost per unit
Exercise 2-5
1. Raw and in Process                                                       200 000
       Accounts Payable                                                               200 000
3. Work in Process
Summary of Answers
Exercise 1
Exercise 3-2
                                                    Shift                         Night
                No.of Reg       Basic      OT Prem.
                                                    Prem                          Prem            Total      WHT       Net Pay
                hrs   Rate      Pay        (10%)
                                                    (5%)                          (10%)
 6am-2pm
Tibo, (S)         40      52      2080                                                            2080       129.38     1950.6
Jason, (ME)       47      52      2444        36.4                                                2480.4     197.94     2282.5
 2pm-10pm
Rica, (Z)         40      52      2080                                      104                   2184       310.26     1873.7
Princess,
(S1)              43      52      2236       16.38                  111.8                         2364.2      99.86     2264.3
 10pm-6am
Bianca, (S)       40      52      2080                                                208         2288       160.58     2127.4
Toni, (M)         44      52      2288       22.88                                    228.8       2539.7      209.8     2329.9
Total                            13208       75.66                  215.8             436.8     P13,936.26   1107.82 12828.44
    4. Journal Entries:
       Factory Payroll                              13,936.26
               WHT Payable                                                            1107.82
               Cash                                                                         12,828.44
Exercise 3-3
          6am-2pm
  Tibo, (M1)                      2280            2280                             2300               2080            8940
  Jason, (S)                      2250            2150                             2150              2480.4          9030.4
  Willie, (ME)                    2300            2250                             2190              2308.8          9048.8
          2pm-10pm
  Rica, (S1)                      2500            2400                             2380               2184            9464
  Princess, (M1)                  2480            2450                             2280              2364.18         9574.18
  Kathy, (S)                      2300            2300                             2300              2544.36         9444.36
          10pm-6am
  Bianca, (S)                     2600            2570                              2580              2288            10038
  Toni, (S1)                      2750            2400                              2450             2539.68         10139.7
  Yeng, (Zero)                    2600            2300                              2480             2539.68         9919.68
            Total                22060           21100                             21110             21329.1         85599.1
*4th week
1st Shift
       Jason (S)
Basic Pay (52*47)                            2,444
OT Prem (5.2*7)                                36.4
Total                                        2,480.8
       Willie, (ME)
Basic Pay (52*44)                  2,288
OT Prem (5.2*4)                     20.8
Total                              2,308.8
       Princess (M1)
Basic Pay (54.6*43)                2,347.8
OT Prem (5.46*3)                      16.38
Total                              2,364.18
       Kathy (S)
Basic Pay (54.6*46)                2,511.6
OT Prem (5.46*6)                      32.73
Total                              2,544.36
       Toni (S1)
Basic Pay (57.2*44)                2516.8
OT Prem (5.72*4)                     22.88
Total                              2539.68
       Yeng, (Zero)
Basic Pay (57.2*44)                2516.8
OT Prem (5.72*4)                     22.88
Total                              2539.68
                     Gross
                                                                                                      Total
                   Payroll for     WHT            SSS                        PhilHealth    Pag-ibig                Net Payroll
                                                                                                      Deductions
                   the month
       SSS
       Range of Compensation (8,250-8,749.99)
       Amount Due to SSS: if SSS ER P610.70
                              if SSS EE     P283.30
       Philhealth
       Range of Compensation (8,000-8,499.99)
       Amount Due to Philhealth: if Employer’s Share                             P100.00
                                       If Personal Share                                P100.00
    2. Direct Laborers
       Basic Pay – No. of worked hours                                    268
                   Multiply by: Rate/hr.                                  40        P10,720
        Supervisor
        Basic Pay – No. of worked hours                                   42
                    Multiply by: Rate/hr.                                 50        P2, 100
10. OT Premium
    No. of hours worked                                                300
    Multiply by: OT premium rate (P18*50%)                               9     P2,700
           Add: OT Basic
                  OT hours                           1000
                  Rate/hr.                             35                          35,000
Add: OT Premium
                     OT hours                        1000
                     Rate/hr. (P35*50%)                17.5                        17,500
                Total Payroll                                                     P630,000 B
                                          Summary of Answers
     Exercise 4-1       Exercise 4-3                       Exercise 4-6                          Exercise 4-9
     a. P10/DLH         1. SD- 60.8               AA2      A. P130 000                           1. P237 500
                        TD- 35              Budg OH        B. P390 000                           2.P465000
                                            P1800000                                             3.P309 266
     b. P5450           2. SD –P4864        Actual OH      C. P310 000                           4.P50742
                        TD- P13300          P1717200       D. P288 000
     c. P44875          3. P18 164                                                               Test Material 1
     d. P58337.5        4. SD- 28.04             AA3                         Exercise 4-7        1.P8 571
                        TD-13 459.2         App OH                           1.P596 000          2.P62 200
                                            P1550000                         2.P1015000          3.P64 000
                                            Budg LOA                         3.P6100             4.P5/MH
                                            P600000                          4. P1029500         5.P1 375 000
______________________________________________________________________________
COMPUTATIONS:
Exercise. 4-1
(a)     Total estimated overhead (110000+84000+6000)              P 200000
Divided by: Total estimated DLH (4000+14000+2000)                    20000
Overhead application rate                                         P 10DLH
(d)
Total cost of the job                                                                  P 44875
Multiply by:                                                                              130%
Billing price                                                                        P 58337.50
Exercise. 4-2
(a) Manufacturing overhead for the year                                               P 550000
Exercise 4-3
Treating department
Total budgeted overhead                                                           P 182000
Divided by: direct labor hours                                                        5200
Overhead rate                                                                     P      35
Exercise 4-4
AA1 Co.
Budgeted manufacturing OH                                                             P1600000
Budgeted level of activity                                                              500000
OH rate                                                                               P    3.20
Applied OH                                                                           P 1715200
Divided by: OH rate                                                                        3.20
Actual level of activity                                                           P 536000DLH
Actual OH                                                                             P1744000
Applied OH                                                                             1715200
Under applied                                                                         P 28800
AA2 Co.
Applied OH                                                                            P 1764000
Divided by: actual level of activity                                                 392000DLH
Multiplied by: budgeted level of activity                                            400000DLH
Budgeted OH                                                                           P 1800000
Applied OH                                                                             P 1764000
Over applied OH                                                                            46800
Actual OH                                                                              P 1717200
AA3 Co.
Actual OH                                                                             P 1486000
Over applied OH                                                                           64000
Applied OH                                                                            P 1550000
Applied OH                                                                            P 1550000
Divided by: actual level of activity                                                 620000DLH
OH rate                                                                               P     2.50
Budgeted OH                                                                           P 1500000
Divided by: OH rate                                                                         2.50
Budgeted level of activity                                                           600000DLH
Exercise 4-5
Department 2
Overhead cost (budgeted data)                                                       2 040 000
Machine labor hours (budgeted data)                                                   / 40 000
Total                                                                                       51
Units produced                                                                      * 56 000
Total                                                                                2 856 000
Machine hours per unit (43 000/56 000)                                              *       .77
Overhead applied                                                                     2 199 120
Total overhead applied = Overhead rate * Units produced * Direct labor per unit
                        = 23.70 * 65 500 * 3.07
                        = 4 763 700
Ex. 4-6.
Exercise 4-7
Exercise 4-8
(1) Overhead                                                                        2 750 000
Machine hours (budgeted)                                                           / 125 000
Overhead rate                                                                            22
Machine hours worked (10 000 + 120 0000                                            * 130 000
Overhead applied to production                                                     2 860 000
  Cost Formula
    Personnel Cost= 200 000 + 4%A
    Administration Cost= 500 000 + 7%P
Problem 4-1:
1st step:
          a) Repairs and Maintenance costs = P 870,000 + 20%HR
          b) Human Resource costs = P 990,000 + 16%RM
2nd step:
          a) Repairs and Maintenance costs = P 870,000 + 20% (990,000 + 16%RM)
                                                 = P 870,000 + 198,000 + 0.032RM
                                                 = P 1,103,306
          b) Human Resource costs = P 990,000 + 16% (1103,306)
                                        = P 1,166,529
 rd
3 step:
                                                  Department 1                    Department 2
  Repairs & Maintenance costs:
         Dept. 1: 44% x 1,103,306                 P 485,454.64
          Dept. 2: 40% x 1,103,306                                                P 441,322.40
  Human Resource costs:
          Dept. 1: 32% x 1,166,529                 373,289. 28
          Dept. 2: 48% x 1,166,529                                                 559,933.92
 Problem 4-2:
    a. Direct method
                                     Service Departments                               Producing Departments
                                   Gen. Factory Employee                          Mixing    Fabricating Finishing
                                     Office       Relations
   Est. Dept. OH costs              P 43,000      P 79,000                      P 233,000     P 266,000      P 320,000
   Gen. Factory Office costs:       (43,000)
    Mixing: (23,200 / 68,000) x                                                   14,671
               43,000
    Fabricating: (25,600 /                                                                      16,188
         68,000) x 43,000
   Finishing: (19,200 / 68,000)                                                                               12,141
              x 43,000
   Employee Relations costs:                          (79,000)
   Mixing: (144 / 540) x 79,000                                                   21,067
   Fabricating: (228 / 540) x                                                                   33,356
               79,000
     Finishing: (168 / 540) x                                                                                 24,577
               79,000
   Total est. factory overhead                                                  P 268,738     P 315,544      P 356,718
     b. Step method
                               Service Departments                                 Producing Departments
                             Gen. Factory Employee                            Mixing    Fabricating   Finishing
                               Office      Relations
Est. Dept. OH costs           P 43,000     P 79,000                          P 233,000     P 266,000      P 320,000
Gen. Factory Office costs:    (43,000)
 Employee Relations:                         6,450
(12,000 / 80,000) x 43,000
 Mixing: (23,200 / 80,000)                                                    12,470
          x 43,000
   Fabricating: (25,600 /                                                                   13,760
      80,000) x 43,000
     Finishing: (19,200 /                                                                                  10,320
      80,000) x 43,000
Employee Relations costs:                         85,450
     Mixing: (144 / 540)                                                      22,787
          x 85,450
  Fabricating: (228 / 540)                                                                  36,079
          x 85,450
   Finishing: (168 / 540)                        (85,450)                                                  26,584
          x 85,450
c. Algebraic method
1st step:
2nd step:
3rd step:
= P 262,500 = P 87,500
2)
         2)
                                                      Dept. 1                     Dept. 2            Total
               Direct Materials                      P 175,000                   P 50,000         P 225,000
               Direct Labor costs                      300,000                    125,000           425,000
               Factory Overhead costs                  135,000                      64,275          199,275
                                                     P 610,000                   P 239,275        P 849, 275
Test Material 1
                                                    Service Departments                         Producing Department
                                                                                               Department Department
                                               Maintenace                       Utilities
                                                                                                   1            2
Estimated Overhead Costs                          20 000                        10 000
Cost Formula
  Maitenance Cost= 20 000 + 10%U
  Utilities Cost= 10 000 + 20%M
7. Budgeted Overhead
     (1 149 500 + 590 500)                                                     1 740 000
   Divide by: Estimated DLH
     (110 000 + 10 000)                                                          120 000
   Overhead rate                                                               14.50/DLH
   Applied FOH
     (28 000hrs + 2 800hrs) x 14.50                                              446 600
   Actual Direct Labor
8. Department 1
    Budgeted Overhead                                                          1 149 500
    Divide by: Estimated DLH                                                     110 000
    Overhead rate                                                             10.45/DLH
    Multiply by: Actual DLH                                                       28 000
    Applied Overhead                                                             292 600
   Department 2
   Budgeted Overhead                                                            590 500
   Divide by: Estimated MH                                                      100 000
   Overhead rate                                                                5.91/MH
   Multiply by: Actual MH                                                          6 800
   Applied Overhead                                                               40 188
    Direct Materials
     (20 500 x 20)+(11 000 x 24)                                                674 000
    Direct Labor
     (28 000 x 48)+(2 800 x 50)                                               1 484 000
    Applied Overhead
     (292 600 + 40 188)                                                         332 788
    Total Manufacturing Cost                                                  2 490 788
Cost Formula
  Repair Cost = 48 000 + 20%P
  Power Cost = 250 000 + 10%R
Direct Overhead Cost                            950 000                  630 000       1 800 500   5 260 470
Sevices provided by:                           (950 000)
  Administration
    Maintenance 950 000 x 8/89                                           85 393
    Freight 950 000 x 30/89                                                            320 225
    Passenger 950 000x 51/89                                                                        544 382
  Maintenance                                                           (715 393)
    Freight 715 393 x 80/280                                                           204 398
   Passenger 715 393 x 200/280                                                                      510 995
Cost Formula
  Maintenance Cost = 630 000 + +9%A
  Administration Cost = 950 000 + 15%M
Test Material 2
1. Applied Overhead
     Direct Labor
       (14 000 x 76.50) + (800 x 76.50)                                        1 132 200
     Multiply by: OH rate                                                           80%     905 760
    Actual Overhead
     Incurred                                                                  2 556 000
     Special night premium
        (14 000 x 76.50 x 10%)                                                  107 100
     OT premium
        (800 x 76.50 x 30%)                                                      18 360 (2 681 460)
    Underapplied OH                                                                       1 775 700
  Direct Labor
   14 000hrs x 76.50                                                           1 071 000
         800hrs x 76.50                                                           61 200   1 132 200
  Applied Overhead
    1 132 200 x 80%                                                                          905 760
  Total Manufacturing Costs                                                                3 775 680
   Applied Overhead
     3 600MH x 53.50/MH                                                                         192 600
                                                                                            50 000        25 000
Space occupied                                          4 500 sqm              7 000 sqm     sqm           sqm
Services provided by:
   Administration                                                          *     17%          66%           17%
   Maintenance                                                            6%      *           63%           31%
Cost Formula
   Administration Costs = 1 800 000 + 6%M
   Maintenance Costs = 800 000 + 17%A
Test Material 3
1. B
Applied OH component of:
     Work in process                                                                            460 000
     Cost of Goods Sold                                                                       1 440 000
     Finished Goods                                                                             500 000
Total Budgeted Overhead                                                                       2 400 000
Divide by: Budgeted MH                                                                           50 000
Predetermined OH rate                                                                            48/MH
2. A
Sales for August
     (500 000 x 1.2)                                                                           600 000
Gross Margin                                                                                   190 000
Cost of Goods Sold                                                                             410 000
Finished Goods, end                                                                              60 000
Finished Goods, beg                                                                            (81 000)
Cost of Goods Manufactured                                                                     389 000
Work in process, end                                                                             85 000
Work in process, beg                                                                           (78 000)
Cost of Goods put into process                                                                 396 000
Prime cost
      (48 000 + 294 000)                                                                      (342 000)
Applied Overhead                                                                                 54 000
Divide by: Actual DLH usage                                                                      45 000
Overhead rate                                                                                 1.20/DLH
3. C
Budgeted cost after allocation
     Producing                                                                    1 510 439
     Finishing                                                                    1 315 561
Total                                                                                         2 826 000
Divide by: Budgeted DLH
     Producing                                                                      35 000
     Finishing                                                                      15 000      50 000
4. A
Assembly estimated budgeted cost                                                        1 000 000
Service provided by:
   Maintenance cost (300 000 x 500/800)                                       187 500
   Personnel cost (400 125 x 50/75)                                           266 750
   Finance cost (150 875 x 30/70                                              64 661    518 911
Total                                                                                   1 518 911
Divide by: Budgeted DLH                                                                 35 000
Factory Overhead rate                                                                   43.40/DLH
5. C
Sewing Department OH rate
    (76 000/1 250 MH)                                                                    60.80/MH
Treating Department
    (182 000/5 200 DLH)                                                                    35/DLH
Applied Overhead
   Sewing Department (80 x 60.80)                                                            4 864
   Treating Department (380 x 35)                                                           13 300
Total                                                                                       18 164
6. C
Sewing Department                                                                           76 000
Treating Department                                                                       182 000
Total Budgeted OH                                                                         258 000
Divide by: Total DLH                                                                         9 200
Factory Overhead rate                                                                   28.04/DLH
Overhead Applied
     480 DLH x 28.04/DLH                                                                    13 459
7. C
Factory Overhead rate
     266 400/18 500 MH                                                                    14.4/MH
Applied Overhead
      190 050 MH x 14.4/MH                                                                 270 320
8. D
Estimated Factory Overhead                                                       7 350 000
Divide by: Budgeted DLH
     [(80 000x2.5) + (20 000 x 4)]                                                280 000
FOH rate                                                                        26.25/DLH
Car Wheels
Direct Labor (190 000hrs x 38.50)                                                7 315 000
Factory Overhead (190 000hrs x 26.25)                                            5 035 000
Conversion Cost                                                                 12 350 000
Divide by: Units produced                                                           75 000
Conversion Cost per unit                                                            164.67
Trucks
Direct Labor (82 500hrs x 38.50)                                                 3 176 250
Factory Overhead (82 500hrs x 26.25)                                             2 186 250
Conversion cost                                                                  5 362 500
Divide by: Units produced                                                           18 000
Conversion cost per unit                                                            297.92
9. A
Goods put into process
   (341 000 + 324 500 + 259 600)                                                   925 100
Goods manufactured                                                               (825 400)
Cost of goods still in process                                                      99 700
10. B
Budgeted total variable OH                                                                                180 000
Budgeted fixed OH
    Factory rent                                                                             2 15 000
    Factory equipment                                                                          38 000      253 000
Estimated FOH                                                                                              433 000
Divide by: Estimated MH                                                                                     80 000
FOH rate                                                                                                5.4125/MH
Applied Overhead
    70 000 MH x 5.4125                                                                                     378 875
Actual Overhead                                                                                          (387 875)
Underapplied Overhead                                                                                        9 000
11. D
                                                                                   Product
                                                                             A                B          TOTAL
Prime cost
    A (800 units x 35)                                                       28 000
    B (8 000 units x 22)                                                                     176 000      204 000
Overhead
  Function 1
    A (800 units x 2hrs x 10)                                                16 000
    B (8 000 units x 1hr x 10)                                                                80 000       96 000
  Function 2
    A (800 units x 1hr x 7)                                                      5 600
    B (8 000 units x 8hrs x 7)                                                               448 000      453 600
  Function 3
    A (800 units x 5hrs x 18)                                                72 000
    B (8 000 unitsx 1 hr x 18)                                                               144 000      216 000
Total Factory Costs                                                                                       969 600
12. B
Estimated FOH                                                                                             255 000
Applied FOH
   (105 000 x 2.55/DLH)                                                                   267 750
Actual FOH                                                                              (265 500)
Overapplied Overhead                                                                        2 250
*accounted as a deduction to CGS
13. C
Assembly Department: (direct method)
  Service provided by:
    General Factory Administration
      (90 000 + 70 000) x 437.5/1000                                                       70 000
14. D
Cost of Goods Sold, June                                                                   84 000
Finished Goods, end                                                                        16 000
Finished Goods, beg                                                                      (11 000)
Cost of Goods Manufactured, June                                                           89 000
 16. B
 Choco Bar (ABC method)
 Budgeted Overhead Cost component
    Act. Center 1 (25 000 x 150/250)                                                                 15 000
    Act. Center 2 (65 000 x 800/1000)                                                                52 000
    Act. Center 3 (90 000 x 1000/3000)                                                               30 000
 Total                                                                                               97 000
 Divide by: Annual production(in units)                                                              10 000
 Overhead cost per unit                                                                            9.70/unit
Summary of Answers
TM 3
3. P177.16 12.
5. P514.32
7. P5 132 762.80
9.31.03/37.60
COMPUTATIONS
Exercise 5-1
Standard
Overhead P 4,625,000
x 20%
Deluxe
Overhead P 471,250
x 20%
Exercise 5-2
ABC
44,500
/2,000
Traditional
31.25
x 500
15,625
P 7,81
ABC
Traditional
Test Material 1
Test Material 2
    2. Direct cost
       54,000
       Overhead
       29,000
       Manufacturing cost of product Instrument                                      83,000
    3. Direct cost
       85,000
       Overhead:
               Materials Handing (30,000÷1,000) × 600                    18,000
               Machine setups (27,000÷450) × 300                         18,000
               Quality inspection (24,000÷600) × 400                     16,000      52,000
       Manufacturing cost
       137,000
       Units produced                                                                 ÷ 300
       Manufacturing cost per unit of product Gauge                                     457
    4. Overhead:
              Widgets (1,920,000÷160,000) × 40,000                                  480,000
              Gadgets (1,920,000÷160,000) × 30,000                                  360,000
              Targets (1,920,000÷160,000) × 90,000                                1,080,000
Test Material 3
9. Prime cost
   820,000
   Overhead (2,000,000×280,000/1,000,000)
   560,000
   Total cost for Camella Prestige Corporation
   1,380,000
Test Material 1   9.P1 860 000       Test Material 2                          11.P9 500          P332140
1.P315.6          10/11.P1 216.58    1.P45 500                                12.P1 932 750      P396560
2.P78 000         12.entry           2.P4 320 000                             13.P10 180         18.P448071.43
P130 000          13.P3193           3.P1 995 000                             14.P30/11          P474485.71
P90 000           14.P642 500        4.P449 333                               15.P281795         P566514.29
3. 1.6            15.P36 000         5.P2333.33                               P316 440           19-20 Entries
4.P32 000         16.P50             6.P490 800                               P378700
5.P60 700         17.P52.65          7.P98 800                                16. P31765
6.P98 600         18.P61 440         8.P4 130 000                             P15700
7.P81 500         19.P128 640        9.P5 114 286                             P17860
8.P777 995        20.P136.32         10.P1 184 286                            17.P313650
Exercise 6-2.
Finishing Department
   Job Alpha ( 6500 x 8 )                                                            52,000
   Job Beta ( 11000 x 8 )                                                            88,000
   Job Charlie ( 10000 x 8 )                                                         80,000
   Job Delta ( 7500 x 8 )                                                            60,000
   Job Echo ( 3000 x 8 )                                                             24,000       304,000
Total                                                                                             796,000
Finishing
Gross Profit assuming the jobs are sold at cost + 40% mark - up :
               Job Alpha    Job Beta Job Charlie Job Delta                           Job Echo      Total
Assembly       165,000      275,000      197,500       155,000                       95,500        888,000
Finishing      73,900       124,000      129,250       79,600                        44,400        451,150
Total          238,900      399,000      326,750       234,600                       139,900       1,339,150
Add:
Beginning
Balance        35,000       50,000            -              -                             -
Balance        273,900      449,000      326,750       234,600                       139,900       1,424,150
Multiply by x               x                          x                             x
Mark-up        1.4          1.4          x        1.4 1.4                            1.4
Sales Price 383,460         628,600      457,450       328,440                            -
Cost of
Sales          273,900      449,000      326,750             -
Gross Profit 109,560        179,600      130,700             -                              -      419,860
Exercise 6 - 3
Exercises 6 - 4
                                                                                        Cost of Sales
                Work in Process                                         Jobs Sold- 1,374,500
 Beg. Bal.- 232,000 1,082,000 - Completed
 Materials- 475,000
Direct Labor- 250,000
Overhead- 375,000
                                                                                                           Factory
                                                                      Direct Materials    Direct Labor    Overhead
Beginning Balances                                                               15,000          30,000         45,000
Add: Direct Materials (500,000 x 30%)                                          150,000
     Direct Labor (250,000 x 30%)                                                               75,000
     Factory Overhead (75,000 x 150%)                                                                         112,500
Total                                                                          165,000         105,000        157,500
                                                                                        Finished
 (c.)                                                               Work in Process      Goods          Cost of Sales
        Balances                                                             250,000        427,500          1,374,500
                                                                         /                             /
        Divided by                                    /       2,052,000 2,052,000                      2,052,000
                                                                                 0.                             0.
        Percentage                                               0. 1218 2083                          6698
                                                      x                  x                             x
        Multiply by Overapplied Overhead              105,000            105,000                       105,000
        Adjusted Amount                                           12,789         21,872                          70,329
3.)
                                       Manila Manufacturing Company
                                  Statement of Cost Manufactured and Sold
                                            September 30, 2012
Exercises 6-5
Entries:
(1) Raw Materials                                                        18,500
            Cash                                                                         18,500
Exercise 6-6
CASE A
(a)   Work in Process                                                                 720,000
Raw Materials                                                                        300,000
              Payroll                                                                             180,000
              Manufacturing Overhead                                                              240,000
CASE B
(b)
Work in Process                                                                   4,840,000
        Material                                                                                1,320,000
        Direct Labor                                                                            1,600,000
        MOH                                                                                     1,920,000
Spoild                                                                                 50,000
         Work in Process                                                                        50,000
EXERCISE6-8
Work in Process                                                            158,750
        Material                                                                           40,000
        Labor                                                                              56,250
        MOH                                                                                62500
MOLDING PAINTING
                     20,800              +      11,200
            OVERHEAD 13,200              +       7,000
= 1.6
7.)                                                                               JOB #
                                        105                              106               107               TOTAL
        June Costs:
        Direct Materials                --------        8,200                              21,300 29,500
        Direct Labor                    4,000           6,000                              10,000 20,000
        Overhead                        6,400           9,600                              10,000 32,000
        Total Amount Debited to Work in Process in June                                           81,500
                                                                                                  =====
13.)
BAKER COMPANY
========
Test Material 2
1.)
       Fixed Overhead                                                            320,000
       Add: Over applied Overhead                                                  44,000
       Applied Overhead                                                          364,000
       Divide By:                                                                      8
       Machine Hrs Worked during the Period                                       45,500
                                                                                 ======
2.)    Total Hours                                                          4,000
       Less: Not Billable to Clients                                          400
       Number of Hours                                                      3,600
       Multiply: Amount Billed to Clients                                   1,200
       Revenue                                                           4,320,000
                                                                         =======
15.)
                                 JOB 100                JOB 200                                    JOB 300
Direct Materials         237,000                 294,400                                 350,000
        Direct Labor Hours
                 (450 x 48)       21,600
                 (230 x 48)                                              11,040
                 (300 x 48)                                                                   14,400
                                 258,600                                305,440                     364,400
        Add: (425 x 55)           23,375
                 (200 x 55)                                              11,000
                 (260 x 55)                                                                          14,300
        Prime Cost               281,975                                316,440                    378,700
============================================
16.)
                                       JOB#100                          JOB#200          JOB#300
               Overhead Rate-Dept.2            11                                11           11
                                               4,675                          2,200         2,860
      Add: Machine Hrs.-Dept. 1
           x Predetermined OH Rate
              (900 x 30)            27,000
              (450 x 30)                          13,500
              (500 x 30)                                                                      15,000
Overhead Applied to Each Job 31,675        15,700                                            17,860
17.)
                                  JOB#100                                   JOB#200                   JOB#300
       Prime Cost                 281,975                                   316,440                   378,700
       Add: OH Applied
              To Each Job          31,675                                     15,700                   17,860
       Total Cost                        313,650                            332,140         396,560
                                               STANDARD                                    ACTUAL
       Direct Labor                              .40 Hours                                 1,975
       Multiply: Cost/Hour                       12                                         12.20
                                                 4.8                               Payroll 24,095
       Multiply: Units Produced                5000
       Work in Process                         24,000
20.)
       Work in Process (10,000 x 3.25)                                                      32,500
       Material Quantity Variance                                                            1,625
               Material Inventory (10,500 x 3.15)                                                     33,075
               Material Price Variance                                                                 1,050
TEST MATERIAL 3
2.)    DEPARTMENT 1
Manufacturing OH                 429
       Divide By:                          1.5
       Direct Labor Cost                  286
       Add: Direct Materials             1,590
             MOH                            429                          2,305
DEPARTMENT 2
     Machine Time                         15
     Multiply:                                                            18
     MOH                                                                 270
     Add: Direct Materials               580
          Direct Labor Cost               48                               898
     Total Cost of Job-H200                                              D. 3,203
                                                                         =====
4.)      B101
Direct Labor Cost                                                        26,350
Multiply:                                                                  120%
Total Amt. Of OH Apllied to Job B-101                                    D. 31,620
                                                                                 ======
5.)    Direct Materials         ( 120 000 x 80%)                                                  96 000
       Direct Labor     ( 2 500 + 3 100 + 4 200) x 8.50                                           33 300
       Prime Costs                                                                               179 300
                                                                                           =======
6.)                                             JOB 300
Manufacturing Overhead                           7,200
Divide By:                                         120%
Direct Labor-Job 300                            A. 6,000
                                                =======
          15.
           Office Salaries                                                           42 200
Utilities Cost                   ( 17 400 x 40%)                                     6 960
Depreciation                                                                         10 000
Rent Expense                     (24 000 x 40%)                                       9000
          Period Costs incurred - July                                                     B. 68 760
           16.
           Direct Materials                                                          42 400
Direct Labor                                                               100 000
Factory Overhead
    Indirect Materials                              5 000
    Indirect Labor                                 14 000
    Utilities Cost          (17 400 x 60%)         10 440
    Depreciation                                   18 000
    Rent                    (24 000 x 60%)         14 400                   61 840
           Total Factory Costs                                                              C. 204 240
17.        Total Factory Costs                                                       204 240
Work in Process, beg.                                                                 26 000
Work in Process, end.                                                                 16 600
Cost of Goods Manufactured                                                           213 640
Finished Goods, beg.                                                                  10 000
Finished Goods, end.                                                                  19 800
`Cost of Goods Sold                                                                   203 840
         18.
         Raw Materials Requisitioned                                             148 500
Indirect Materials                                                                 19 00
         Direct Materials issued to production                                 C. 129 500
21. A.
               24..
                                                                                          Job 100:
Materials used                                                                              7 440
Direct Labor                   ( 3 600 x 30)                                              108 000
Overhead                       ( 3 600 x 37.50)                                           135 000
Total Cost of Job 100                                                                     250 440
Gross Margin rate                                                                         x 25%
Gross Margin                                                                              A. 62 610
TEST MATERIAL 4
     8.        Job B4:
               Direct Materials      (14 000 + 3 000)                            17 000
               Direct Labor Costs           (14 400 + 17 500)                    31 900
               Overhead:        Machining                                        6 617
                                Finishing                                        2 408. 50          9 025.50
Machining:
Manufacturing OH                                   11 200 000
Machine Hours                                       ÷ 220 000
OH rate                                                 50.91
Actual Machine Hours                                 x      130
OH applied                                                 6 617
Finishing:
Manufacturing OH                                     7 900 000
DL costs                                              4 100 000
OH rate                                                  1.9268
Actual DL costs                                           1 250
OH applied                                             2 408.50
10.
From Tanning Dept.           (10 sq .ft. x P3) x 200                           6 000
From Assembly Dept. (3MH x P9) x 200                                           5 400
From Saddle Dept.           (10 DLH x P4) x 200                                8 000
Total OH applied to Job 305                                                D.19 400
 11.
Direct Labor          (10 DLH x P8) x 200                                    25 000
OH applied                                                                   19 400
        Conversion Costs                                                                    A.35 400
 12..
Direct Materials (10 sq. ft. x P12.50) x 200                                 25 000
Direct Labor Cost                                                            16 000
        Prime Costs                                                                         B.41 000
 13..
 Direct Materials                                                                      25 000
Direct Labor Cost                                                                      16 000
OH applied                                                                             19 400
Total Manufacturing costs                                                              60 400
No. of sets                                                                               200
Manufacturing Costs per set                                                            B. 302
14.
Material cost :
Material related OH                                                        1 280 000
Cost of materials used on jobs                                             3 200 000
OH rate                                                                         .40
Machine Time:
Machine related OH                                                         2 200 000
Machine hours                                                               400 000
OH rate                                                                          5.5
Budgeted overhead
       (42000 + 16400 + 78 000) x .40              113600
       (17000 + 9000 + 5800) x 5.5                 174900                  288 500
Actual Overhead                                                            118400
                                                    185600                 304 000
Total amount of OH variance (underapplied)                                 B.15 500
  18.
  Direct Materials                (10 000 + 20 000 + 15 000)                      45000
  Direct Labor                   (5 000 + 4 000 + 2 500)                          11500
  Applied Overhead                (11 500 x 2)                                    23000
  Total Factory Costs                                                             79500
                                                                            120%
      Total applied Overhead                                               B. 99 960
PROBLEMS
Problem 6-1 JOURNAL ENTRIES
a. Raw Materials                                                                    826,000
                Accounts Payable                                                                 826,000
i. Expenses                                                                            56,000
                  Cash                                                                              56,000
    T – ACCOUNTS
                 Raw Materials Inventory                                                     Work in Process Inventory
2,490,000
Balance 209,000
182,000 116,000
2,490,000 190,000
                                       1,345,000                                                                               800,000
  Balance          1,145,000
                                                                                         40,000
500,000
Underapplied 76,000
182,000 254,800
1,345,000 1,883,000
Total 555,000
To FG (555,000)
Total 590,000
To FG (590,000)
To FG (600,000)
To FG (745,000)
                                     __________________ Company
                                Statement of Cost of Goods Manufactured
                                          For the Month Ended
 Exercise 7-1
 1.M 25000           3. 29.97            6.A                            16.A                 4.B
 L 23400             4. 1 285 000        7.D                                                 5.B
 O 23400             5.1 075 175         8.A                            Problems 7-1 to      6.E
 2. 4.07                                 9.C                            .Problem 7-4         7.D
______________________________________________________________________________
COMPUTATIONS:
EXERCISE 7-1
                                                               EUP
       1                     Actual Units                      Materials         Labor      Overhead
Assignment of Costs
Work in process, beginning cost                                                         P 8325
Materials (500x10x18)                                                    P    90000
Conversion                                                                    40000              130000
Total Costs                                                                                      138325
Work in process, end.
Materials (800x10x18)                                                         144000
Conversion (800x75%x80)= 3000/2                                               15000              159000
Total Costs as Accounted                                                                         297325
        2. A
               Transferred Out                                         10,000
               WIP,
               end                                                      7,000
               Total units to be accounted for                         17,000
                                                                                   Material
        3. C                                                                          s          CC
               Beginning Invty.                                           -
               Started                                                 10,000
               Total Units to account for                              10000
                                                                                   Material
        4. C                                                                          s          CC
               WIP,
               beg                                                     40,000
               Started                                                 240,000
                                                                          Material
5. B                                                                         s
       WIP, beg.                                                17,000
       Started                                                  82,000
       Units Account to for                                     99,000
                                                                 Cost
       Beginning                                                12,800
       Current                                                  69,700
       Total                                                    82,500
       Divide by:                                               99,000
       Cost per EUP                                              0.833
6. D                                                                        CC
       WIP, beg.                                                15,000
       Started                                                  42,000
       Units to account for                                     57,000
7. D
       Materials ( 0*100)                                          0
       CC (4,000*40%*30)                                         4,800
       Transferred In (4,000*5)                                 20,000
       Costs assigned to WIP, end                               24,800
         8.C
                WIP, beg.                                                7,000
                Started                                                 32,000
                Units to account for                                    39,000
                less: WIP, end                                           2,500
                Transferred out                                         36,500
                                                                                 Material
9. B & 10. A                                                                        s        CC
                WIP, beg.                                                7,000
                Started                                                 32,000
                Units Account to for                                    39,000
                WIP,beg
                .                                                        7,000      -        4,200
                Transferred Out                                         29,500   29,500     29,500
                WIP,
                end                                                      2,500    2,500      625
                Units accounted for                                     39,000    32,00     34,325
                WIP,beg
                .                                                        700        -        490      280
                Transferred Out                                         1,500     1,500     1,500    1,500
                WIP,
                end                                                      500       500       250      400
                Units accounted for                                     2,700     2,000     2,240    2,180
Problem1
                                                                                                 EUP
                       Actual Units                 Materials                                  Labor              Overhead
                                                  WA       FIFO                          WA       FIFO         WA      FIFO
WIP, beg                 3600
Started                  7800
Units accounted for     11400
FIFO method:
      Mat                                              8143
      Labor                                            7350
      OH                                               1126
      WIP, end                                        16619
PROCESS 2
                                                                                       EUP
                       Actual Units              Materials                           Labor          Overhead
                                            WA       FIFO                     WA       FIFO    WA       FIFO
WIP, beg                1200
Started                 9600
Units accounted for    10800
Cost added                                59500      59500                   154560 154560 302380 302380 374016 343447
Total                                     67500                              171060        335380        421316
EUP                                        8800      8400                     9200   8960   9000   8700   8800   8400
Cost/EUP               111.4     103.55    7.67      7.08                     18.59  17.25  37.26  34.47  47.88  44.46
WA method:
FIFO method:
    WIP, end
          Mat. (400x7.08)                                                                                  2832
          Labor (800x17.25)                                                                               13800
          OH( 600x 34.76)                                                                                 20856
                                                                                                          37488
Problem 7-4
Solution:
(1-5)
                                                                           Materials                 CC
 F&T: IP, beg                      18 000                                      0                    4500
 Started & Completed               55 800                                   55 800                 55 800
 IP, end                           6 000                                     6000                   1500
 Spoiled Units: normal              4500                                     3 090                  3 090
  Test Material 1.
     1. B                                                                       Materials     CC
           Completed and Transferred                                            190,000     190,000
           IP, end                                                               30,000      24,000
           EUP                                                                  220,000     214,000
            Costs:                                                              Materials
               IP, beg.                                                          67,800
               Current                                                          579,000
            Total                                                               646,800
               Divide by: EUP                                                   220,000
            Cost per EUP                                                          2.94
            Multiply: Units transferred                                         190,000
            Costs associated with Units
            transferred                                                          558,600
     2. B
            Costs:                                                                 CC
               IP, beg.                                                           29,300
               Current                                                           248,900
            Total                                                                278,200
               Divide by: EUP                                                    214,000
            Cost per EUP                                                           1.3
            Multiply: Units in Ip, end                                            24,000
            Costs associated with Units
            transferred                                                          31,200
     3. A
            Cost to account for                                                  925,000
       End
          Less:DM (40,000*75%*3)                                         90,000
          CC (40,000*60%*1.31)                                           31,440
       Transferred out                                                  803,560
                                                                        Materials     CC
       EUP
       (WA)                                                             220,000     214,000
       Less: Beg                                                         27,000      24,000
       EUP (FIFO)                                                       193,000     190,000
       Divide by: IP, beg                                               578,000     248,900
       Cost per EUP(FIFO)                                                  3          1.31
4. A                                                                                  CC
       Beg.                                                               2,000
       Started                                                            8,000
       Units to Account for                                              10,000
       Costs:
           Started                                                       72,250
       Divide: EUP                                                        8,500
       Cost per EUP                                                        8.5
       Multiply: units completed                                          7,000
       CC transferred to next department                                 59,500
5. B                                                                                 Cloth
       WIP, beg.                                                          500
       Started                                                           3,300
       Units Account to for                                              3,800
 6. E                                                                             Materials    CC
        WIP, beg.                                                         2,000
        Started                                                          23,000
        Units to account for                                             25,000
                                                                                                       Transferred
 7. E                                                                             Materials   CC            In
        Beg.                                                                          -      5,450        17,050
        Current                                                                    34,000 104,000        184,000
        Total                                                                      34,000 109,450        201,050
        Divide by: EUP                                                             20,000   22,000        25,000
        Cost per EUP                                                     14.72      1.7      4.975         8.04
 8. B
        Beg                                                               22500
        Trans. In                                                         34000
        Materials                                                         94000
        CC                                                               144000
        Cost of Units                                                    294500
 9. C
        Finished and transferred                                          40000
        WIP-End                                                           10000
        total                                                             50000
10. D
        WIP, beg.                                                         5,000
        Started                                                          24,250
        Units Account to for                                             29,250
        21,750*11.26                                                     244,905
        3,250*4.22                                                        13,715
        3,250*5.56                                                        18,070
        3,250*1.48                                                         4,810
        Total                                                            281,500
                                                                          16,000
        Cost of goods transferred to Molding Dept.                       297,500
11. D
        2000*4.22                                                         8,440
        2000*5.56                                                        11,120
        2000*1.48                                                         2,960
        Cost of IP, end in Mixing
        Dept.                                                            22,520
12. C
        40,000 - 8,000                                                   32,000
        43,000 - 11,000                                                  32,000
13. D                                                                               DM         CC        TI
        WIP, beg.                                                         50,000
        Started                                                          150,000
        Units Account to for                                             200,000
14. B                                                                                DM          CC      TI
        WIP, beg.                                                          40
        Started                                                            80
        Units to account for                                              120
        Transferred out                                                    90         90         90       90
        WIP, end                                                           30         0          15       30
        Units accounted for                                               120         90        105      120
15. D
        TI (30*1060)                                                     31,800
        DM (0*400)                                                          0
        CC (15*645)                                                       9,675
        TOTAL                                                            41,475
16. A                                                                              Materials     CC
        WIP, beg.                                                           -
        Started                                                          475,000
        Units to account for                                             475,000
        DM
        (895000/475000)                                                   1.88
        CC
        (4225000/450000)                                                  9.39
        TOTAL                                                             11.27
17. A
        Materials (50000*1.88)                                            94,000
        CC (25000*9.39)                                                  234,750
        TOTAL                                                            328,750
18. C                                                                                M        CC        TI
        WIP, beg.                                                         4,000
        Started                                                          16,000
        Units to account for                                             20,000
19. D
20. D
21. A
22. B
        WIP, beg.                                                         94,000    44,400
        Started                                                          164,000   272,800
        TOTAL                                                            258,000   317,200
        Divide: EUP                                                       60,000    52,000
        Cost per EUP                                                       4.3       6.1      10.4
23. C
        Total costs accounted for
                     (94000+ 44400+ 164000+272800)                       575,200
        End                                                               53,400
        Costs of units transferred                                       521,800
24. A                                                                     DM         CC
        Transferred Out                                                  50,000    50,000
        EUP                                                              60,000    52,000
        IP, end                                                          10,000     2,000
        DM (10000*4.3)                                                   43,000
        CC (2000*6.1)                                                    12,200
        Cost allocated to IP, end
        (WA)                                                             55,200
25. B
        DM (10000*4.1)                                                   41,000
        CC (2000*6.2)                                                    12,400
        Cost allocated tp IP, end
        (FIFO)                                                           53,400
26. A
        M (2,500*80%*20)                                                 40,000
        CC (2500*60%*18)                                                 27,000
        Cost of the 2500 units                                           67,000
27. D                                                                                M       CC
        WIP, beg.                                                         2,500
        Started                                                          15,000
        Units Account to for                                             17,500
        Materials
        (15125*10)                                                       151,250
28. B
        F&T (14500*22)                                                   319,000
        M (500*10)                                                         5,000
        CC (1000*12)                                                      12,000
                                                                          67,000
        Total cost
        transferred                                                      403,000
29. C
        DM-ingredients (7,200*100%*0.35)                                  2,520
        DM- package (7200*0%*0.05)                                          -
        DL (7200*30%*0.07)                                                151.2
        OH (7200*30%*.13)                                                 280.8
        IP, beg bal.                                                      2,952
  30. B
                          7,200
                         144,000
                          151,
                           200
                            -
                         147,960
            IP, end       3,240
Test Material 2.
 1. E
                                        A          B
          Beg-WIP                                  3500
          Started                      7500        7500
          End-WIP                      2500        1250
          EUP                         10000       12250
 2. A                                                                                     EUP
          WIP, beg.                                                            20,000
          Started                                                              120,000
          Units Account to for                                                 140,000
          WIP,beg.                                                             20,000       -
          Transferred Out                                                      90,000    90,000
          WIP, end                                                             30,000    30,000
          Units accounted for                                                  140,000   120,000
(3.1*30,000) 93,000
3. A                                                                               EUP
       WIP, beg.                                                         5,000
       Started                                                          24,250
       Units Account to for                                             29,250
4. D                                                                               EUP
       WIP, beg.                                                        18,500
       Started                                                          84,400
       Units to account for                                             102,900
5. C
       Completed & Transferred:
                   Beginning                                            13,875
                   Started                                              71,600
       End                                                               2,560
                                                                        88,035
6. D                                                                               DM        CC
       WIP, beg.                                                        10,000
       Started                                                             -
       Units to account for                                             10,000
 7. D
        Transferred out                                                 71,840    71,840    71,840
        Completed & on hand                                              4,160     4,160     4,160
        WIP, end                                                        24,000    24,000    18,000
        Units accounted for                                             100,000   100,000   94,000
 8. C
        EUP,WIP-beg                                                      12000
        Units,WIP-beg                                                    20000
        Ratio                                                             60%
        Total                                                             100%
        Converted                                                          60%
        WIP-Beg                                                            40%
 9. D
        Started & completed
        (50000- 20000)                                                  30,000
10. B
        Cost assigned to unit transferred out
                     started & completed (77000*2.50)                             192,500
        Added costs: DM (0*1)                                                        -
                     CC (13000*1.50)                                              19,500
        Normal spoilage: DM (3,500*1)                                              3,500
                     CC
                     (3500*75%*1.50)                                               3,938
11. C
        Abnormal Spoilage:
                     (5000*100%*1)                                                 5,000
                     (5000*75%*1.50)                                               5,625
        cost assigned to abnormal spoilage                                        10,625
12. C
        Cost of IP, end
                      Material (14,500*1)                                         14,500
                      CC
                      (14500*70%*1.5)                                             15,225
        Cost of IP, end                                                           29,725
13. B
        same solution as in no. 10
14. B
        same solution as in no.11
15. C                                                                               CC
        WIP, beg.                                                         2,000
        Started                                                           8,000
        Units to account for                                             10,000
        CC (7000*9)                                                      63,000
        Normal Spoilage (500*9)                                           4,500
        CC transferred to next department                                67,500
16. A                                                                              DM       CC
17. D WIP, beg.                                                          30,000
          Started                                                                  80,000
          Units Account to for                                                     110,000
                                                                                              160,000     120,000
                                                                                              80,000      78,000
          Cost per eup                                                                           2        1.5355
  18. B
          Cost associated with normal spoilage:
                       DM
                       (2,580*100%*2)                                                          5,160
                       CC (2,580*100%*1.5355)                                                  3,962
          TOTAL                                                                                9,122
  19. D
          Cost associated With abnormal spoilage
                       DM (1420*100%*2)                                                        2,840
                       CC (1420*100%*1.5355)                                                   2,180
          TOTAL                                                                                5,020
3. Total Cost per EUP       1.44                                    8. Cost assigned to Units Transferred out:
                                                                       = 263 750 / Not given
    15. Finished and Transferred out 307 500                                  17. Transferred in cost           4260000
        Normal Spoilage               2 500                                       Add: (351000*14.5)            5089500
        IP, ending                   45 000                                       Total cost charged to WIP     9349500
                                                                           Completed        72000
16. N/A                                                                    WIP end           5600
17. N/A                                                                    EUP for DM       80800