100% found this document useful (1 vote)
360 views1 page

SM 27

This document is a schematic smoke riser diagram for a proposed 33-story commercial and residential building in Jumeirah Village. It shows the layout of the building from the 3rd basement level up to the roof, including the location of masonry shafts on various floors. The diagram was prepared by National Engineering Bureau for a detailed design application submitted to the owner, Waleed Mohammad.

Uploaded by

MUBASHIR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
360 views1 page

SM 27

This document is a schematic smoke riser diagram for a proposed 33-story commercial and residential building in Jumeirah Village. It shows the layout of the building from the 3rd basement level up to the roof, including the location of masonry shafts on various floors. The diagram was prepared by National Engineering Bureau for a detailed design application submitted to the owner, Waleed Mohammad.

Uploaded by

MUBASHIR
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

N

Q
11°
UPPER ROOF

ROOF

34TH FLOOR

REVISED
33RD FLOOR
MASONRY SHAFT

MASONRY SHAFT
32ND FLOOR

31ST FLOOR

30TH FLOOR

TYPICAL(5-29)

4TH FLOOR

3RD FLOOR

TYPE OF APPLICATION
MASONRY SHAFT

MASONRY SHAFT

2ND FLOOR
DD Detailed Design Application

DEVELOPMENT NAME
1ST FLOOR

JUMEIRAH VILLAGE
PLOT ID
4TH PODIUM

JVC14PHRA005
3RD PODIUM
PROJECT NAME
PROPOSED 3B+G+4P+33+M+ROOF
COMMERCIAL / RESIDENTIAL
2ND PODIUM
BUILDING
OWNER

1ST PODIUM
WALEED MOHAMMAD
MOHAMMAD
CONSULTANT

GROUND FLOOR

ational ngineering ureau


Architectural & Engineering Consultants
P.O. Box : 26644 Dubai - United Arab Emirates Tel + 971 3242020 Fax: +971 4 3244255 w.w.w . n e b . a e

CONSULTANT
1ST BASEMENT

2ND BASEMENT

Sheet Title

3RD BASEMENT
SMOKE
SCHEMATIC RISER DIAGRAM

Scale: N.T.S @A1 Date: FEB.2018


Sheet No. SM-201

You might also like