[Type text]
Capacity
     Station                                    Status
                  (MW)
                            Operational, proposed extension project to
 Tarbela Dam     3,478
                            increase electricity generation by 1410 MW
 Ghazi-Barotha
 Hydropower      1,450      Operational; Run-of-the-river
 Project
                            Operational, plan to increase generation by 120
 Mangla Dam      1,000
                            M
                            Dam completely silted up; Power generation
 Warsak Dam      243
                            by Run of the river. Extension is being planned
 Chashma
                 184        Operational
 Barrage
 New Bong
                 84         Operational. Privately owned hydropower plant
 Escape
 Khan Khwar
 hydropower      72         Operational 
 project
 Jagran-I Dam    30.4       Operational
 Rasul Barrage   22         Operational
 Malakand
                 22         Operational
 Dam
 Dargai Dam      20         Operational
 Shadiwal Dam    14         Operational
 Chihoki Dam     14         Operational
 Nadipur Dam     13         Operational
 Kuram Garhi
                 4          Operational
 Dam
 Renala Dam      1          Operational
 Chitral Dam     1          Operational
 Gomal Zam       17         Under construction; Hydropower station and
[Type text]
                Capacity
     Station                                     Status
                 (MW)
                           dam is completed but irrigation system is 40%
 Dam                       complete due to poor security in area. Expected
                           to be completed by Dec 2012
 Allai
                           Under construction; To be completed in Feb
 hydropower     121
                           2012 
 project
 Duber Khwar
 hydropower     130        Under construction; to be completed by 2012
 project
                           The first unit has already been synchronized
                           with the National Grid. All other units will be
 Jinnah
                           synchronized by December 2012.The under
 hydropower     96
                           construction plant was damaged when it
 project
                           submerged during 2010 Pakistan floods which
                           delayed its progress.
                           Under construction. To be completed by 2016,
 Neelum–
                           two years ahead of schedule since WAPDA has
 Jhelum
                969        purchase 2 TBM,s which will become functional
 Hydropower
                           by July 2012. Wapda is also in process of
 Plant
                           purchasing diesel engines to run these TBM,s.
                           Under construction; expected to be completed
 Satpara Dam    17.3
                           in 2012
 Golen Gol                 To be completed by the end of 2015.cost
                106
 project                   estimate $130 million 
                           Privately owned hydropower plant. Under
 Patrind Dam    150
                           construction. expected to be completed in 2016;
 Darawat Dam    0.45       Under construction 
 Kohala                    Tender given. Construction will be started once
 Hydropower     1100       funds are available. Cost estimate $2.155
 Project                   billion 
                           Ready to be constructed. Engineering study
 Kalabagh
                3600       completed but project is currently at pause due
 Dam
                           to lack of consensus between provinces.
 Kurram Tangi              Ready to be constructed. Engineering study
                83.4
 Dam                       completed.
[Type text]
               Capacity
     Station                                   Status
                (MW)
                          Ready to be constructed. Engineering study
                          completed. Construction of a new bridge at
                          Thakot, on River Indus and 323 km of
 Diamer-                  Karakorum Highway (KKH) from Havalian to
               4,500
 Bhasha Dam               Dam site is required since currently no
                          infrastructure exists for transportation of heavy
                          machinery & equipment. To be completed in 8
                          years from commencement of project i.e. 2020.
 Bunji
                          Run-of-the-riverFeasibility studies in
 Hydropower    7,100
                          progress.,cost estimate $6.8 billion
 Project
 Phandar                  Detailed engineering design or tender of
 Hydropower    80         documents under process, cost estimate $4.4
 Project                  billion
                          Detailed engineering design or tender of
 Basho         28         documents under process
                          Proposed, cost estimate $40 million 
                          Detailed engineering design or tender of
 Keyal Khwar   122        documents under process,cost estimate 180
                          million euro 
                          Detailed engineering design or tender of
 Lawi          70         documents under process,cost estimate $120
                          million 
                          Detailed engineering design or tender of
 Harpo         33         documents under process, cost estimate $46
                          million
                          Under engineering study,cost estimate $1.149
 Munda Dam     740
                          billion
                          Feasibility study stage, cost estimate $4.4
 Akhori Dam    600
                          Billion 
 Bara Dam      5.8        under construction or under engineering study
 Dasu
                          Feasibility studies ongoingcost estimate $5.3
 Hydropower    4,320
                          billion
 Project
 Lower Spat    496        Feasibility studies ongoing,cost estimate $697
[Type text]
               Capacity
     Station                                   Status
                (MW)
 Gah                      million
 Lower Palas              Feasibility studies ongoing,cost estimate $763
               665
 Valley                   million
                          Feasibility studies ongoing, cost estimate $6
 Thakot        2,800
                          billion 
                          Feasibility studies ongoing,cost estimate $6
 Patan         2,800
                          billion 
 Tank Zam
               25.5       Proposed, cost estimate $234 million
 Dam
 Mahl
 Hydropower    600        Proposed, Run-of-the-river 
 Project
 Kotli
 Hydropower    100        Proposed, Run-of-the-river 
 Project
 Taunsa        120        Proposed
 Guddu         33         Proposed
 Karot,
               720        Proposed
 Pakistan
 Azad Pattan   650        Proposed
 Harighel      53         Proposed
 Sehra         130        Proposed
 Chakotti
               500        Proposed
 Hattian
                          Proposed; Run-of-the-river;France has
 Jagran-II     48         promised to fund part the construction.
                          Construction expected to start in 2015.
 Jabban        22         Proposed
 Sharmai       115        Proposed
 Madian,
               157        Proposed
 Pakistan
[Type text]
                Capacity
     Station                           Status
                 (MW)
 Asrit Kedam    215        Proposed
 Kalam Asrit    197        Proposed
 Gabral Kalam   101        Proposed
 Karang         458        Proposed
 Kaigha         548        Proposed
 Shogo-Sin      132        Proposed
 Shushgai
                144        Proposed
 Zhendoll
 Yogo,
                500        Proposed
 Pakistan
 Naltar-3       16         Proposed
 Naltar-5       18         Proposed
 Thor
 Hydropower     3.6        Proposed 
 Project
 Yulbo
 Hydropower     3000       Proposed 
 Project
 Shyok
 Hydropower     520        Proposed 
 Project
 Tungus
 Hydropower     2200       Proposed 
 Project
 Skurdo Dam     1600       Proposed 
 Dudhnial
 Hydropower     960        Proposed 
 Project
 Suki Kinari
 Hydropower     840        Proposed 
 Project
[Type text]
                Capacity
     Station                                   Status
                 (MW)
 Kundal Shahi
 Hydropower     960        Proposed 
 Project
 Trappi
 Hydropower     32         Proposed 
 Project
 Rajdhani
 Hydropower     132        Proposed
 Project
 Tangir
 Hydropower     15         Proposed, cost estimate $30.967 million 
 Project
 Matiltan
 Hydropower     84         Proposed 
 Project
 Gulpur
 Hydropower     100        Proposed 
 Project
 Winder Dam     0.3        Proposed, cost estimate $148 mill 
 Naulong Dam    4.4        Proposed, cost estimate $377 million
 Hingol Dam     3.5        Proposed, cost estimate $311 million 
 Garuk Dam      0.3        Proposed, cost estimate $21 million 
 Pelar Dam      0.3        Proposed, cost estimate $20 million
 Nal Gaj Dam    0.3        Proposed, cost estimate $332 million 
 Daraban Zam
                0.75       Proposed, cost estimate $69 million
 Dam
 Tank Zam
                25.5       Proposed, cost estimate $234 million 
 Dam
 Bara Dam       5.8        Proposed, cost estimate $167 million 
 Ghabir Dam     0.15       Proposed, cost estimate $121 million 
 Papin Dam      0.2        Proposed, cost estimate $101 million 
[Type text]
What is potential of Hydro Electric Power Generation and where?
In Pakistan, the hydel resources are mainly in the north; the resources in the south being scarce.
The hydel potential of Pakistan can be divided into six sectorial regions namely:
• NWFP
• Punjab
• Azad Jammu & Kashmir
• Northern Areas
• Sindh
• Balochistan
Pakistan is endowed with a hydel potential of approximately 41722 MW, most of which lies in the
North West Frontier Province, Northern Areas, Azad Jammu and Kashmir and Punjab. However,
an abundant hydel potential is still untapped which needs to be harnessed.
The total installed capacity of the hydropower stations in the country is about 6595 MW, out of
which 3767 MW is in NWFP, 1698 MW in Punjab, 1036 MW in AJK and 93 MW in the Northern
Areas. Table-2-1 depicts a comparative summary of the hydel projects in various stages of
implementation in various regions of Pakistan. Table-2-2 shows a list of existing hydropower
plants ranging from 1 MW to 3478 MW.
[Type text]