Pge Pel PJK 037

The document is a transmittal sheet for engineering drawings and documents related to a design and build project for temporary LPG terminal facilities at Pelabuhan Tanjung Mas-Semarang. It lists 6 attached documents, including calculations for various structures and foundations, piping specifications, and a cable power layout drawing.

Uploaded by

Fahmy Flip
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views1 page

Pge Pel PJK 037

The document is a transmittal sheet for engineering drawings and documents related to a design and build project for temporary LPG terminal facilities at Pelabuhan Tanjung Mas-Semarang. It lists 6 attached documents, including calculations for various structures and foundations, piping specifications, and a cable power layout drawing.

Uploaded by

Fahmy Flip
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TRANSMITTAL 

SHEET Project Code :‐
Pekerjaan Design and Build Fasilitas Penerimaan  Date : 06 May 2021
Temporary LPG Terminal di Pelabuhan Tanjung  No : PGE‐PEL‐PJK‐037
Mas‐Semarang Page : 1 of 1

To PT. Pamitra Jaya Konstruksi From PT PURI GANESHA ENGINEERING

Cc. PT. Pelindo Energi Logistik

Dear Sir
We are pleased to submit the following drawings and documents for review
No Doc. Number Status * Rev Qty Title Remarks
1 CIV‐03‐LPG‐SMRG‐CAL A 2 1 Kalkulasi Struktur Jembatan Pipa
2 CIV‐04‐LPG‐SMRG‐CAL A 1 1 Kalkulasi Struktur dan Pondasi Rumah Pengisian
3 CIV‐05‐LPG‐SMRG‐CAL A 1 1 Kalkulasi Struktur dan Pondasi Rumah Pompa, Genset & Compressore
4 CIV‐06‐LPG‐SMRG‐CAL A 1 1 Kalkulasi Struktur dan Pondasi Rumah Marchaptan
5 PIP‐01‐LPG‐SMRG‐SPC A 1 1 Specification ‐ Piping & Valve
6 ELE‐02‐LPG‐SMRG‐DWG RC 2 1 Cable Power Layout

* Submission Status PT PURI GANESHA ENGINEERING
A : Approved
AC : Approved with Comments ttd
RC : Reviewed / Commented
I : For Information Only Farid Affandi
Engineering Manager

Please sign the transmittal and resend to us
Signature :
Name :
Position :
Date :

2020 PGE‐PEL‐PJK‐037 Page 1