Isolation Coach

This document outlines the key steps and safety requirements for isolations: 1) Only accredited and authorized personnel can plan, coordinate, and perform isolations, which must always be planned in advance, even if there are no written procedures. 2) Isolations require permission from the plant supervisor and strictly following written procedures. 3) Verifying tests must be included to check that equipment is properly isolated before work begins, and personal danger tags or locks must be applied by all working within isolation boundaries.

Uploaded by

Mukesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views1 page

Isolation Coach

This document outlines the key steps and safety requirements for isolations: 1) Only accredited and authorized personnel can plan, coordinate, and perform isolations, which must always be planned in advance, even if there are no written procedures. 2) Isolations require permission from the plant supervisor and strictly following written procedures. 3) Verifying tests must be included to check that equipment is properly isolated before work begins, and personal danger tags or locks must be applied by all working within isolation boundaries.

Uploaded by

Mukesh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ISOLATION

• TAKE 2
• SCOPE
Coach To ensure your safety all
• BOUNDARIES
• EQUIPMENT Isolations must be Planned and
• ENERGIES Verified
• HAZARDS
DEPARTMENTAL Accreditation - Authorisation
1
REGISTER
1 You must be accredited and authorised
to plan, co-ordinate and carry out
isolations.
2
3 5 Planning
2 Isolations must always be planned,
8 even those without written procedures.
"Take 2"

3 Written Procedures
Always include the minimum
requirements.
100 200

0 300
Permission to Isolate
6 4 Obtain permission from the Plant
Supervisor.
Test
Equipment
Following a written procedure
Group Isolation Board No:
5 All steps must be followed.
Department or Process
Isolation Verifying
Coordinator
Isolated Equipment
6 Verifying tests must be included in
ISOLATED
Operations EQUIPMENT every Isolation. Isolating Persons must
carry out verifying tests.
Mechanical Isolation Procedure
8
Tagging or Locking
Electrical
ISOLATION 7 To ensure personal safety, everyone
PROCEDURE
working within the isolation boundaries
must attach a Personal Danger Tag or
Lock to all isolators or to the Group
7 Isolation Board.

CLOSED Isolation Boundaries


DANGER
8 Work only within these boundaries to be
THIS DEVICE
MUST NOT
BE OPERATED

DO NOT REMOVE
THIS PERSONAL
7 protected under an Isolation.
DANGER TAG
(SEE OTHER SIDE)

9 If you can't meet these requirements;


STOP the job and ask your
Supervisor.