TO BE ACCOMPLISHED BY THE PROCESSING & EVALUATION DIVISION
BOX 6
RECEIVED BY: DATE:
FIVE (5) SETS OF ELECTRICAL DOCUMENTS
ELECTRICAL PLANS AND SPECIFICATIONS EXPECTED DATE OF COMPLETION/INSTALLATION/CONSTRUCTION
SPECIAL FIXTURES AND EQUIPMENT ___________________________________________________________
PROPOSED STARTING DATE OF INSTALLATION/CONSTRUCTION OTHERS (Specify)____________________________________________
___________________________________________________________ ___________________________________________________________
BOX 7
PROGRESS FLOW
IN OUT PROCESSED BY:
DATE TIME DATE TIME
ELECTRICAL
ELECTRICAL ENGINEER
OTHERS (Specify) (Signature Over Printed name)
PRC Reg. No.:_________________
Validity:_______________________
AMOUNT DUE ASSESSED BY O.R. NUMBER DATE PAID REVIEWED BY:
ELECTRICAL
OTHERS (Specify)
CHIEF, PROCESSING AND EVALUATION DIVISION
ACTION TAKEN:
PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:
1. That the proposed electrical works shall be in accordance with the electrical plans filed with this Office and in conformity with
the provisions of the latest Philippine Electrical Codes, the National Building Code and its IRR.
2. That for installed electrical capacity of 200 amperes and above at 230 volts nominal and above, a specialty electrical contractor
duly licensed by the Philippine Contractors Accreditation Board (PCAB) shall be required.
3. That a duly licensed electrical practitioner shall be in-charge of the installation, and that upon completion of the electrical works,
he shall submit the entry of the logbook duly signed and sealed to the OBO including as-built plans and other documents. He
shall also accomplish the Certificate of Completion stating that the electrical works conform to the provisions of the Philippine
Electrical Codes, the National Building Code and its IRR.
4. That this permit is null and void unless accompanied by the building permit except for projects involving purely electrical works
in which case only the building permit number of the existing building/structure shall be required.
5. That a Certificate of Final Electrical Inspection (CFEI) shall be secured prior to the actual occupancy of the building.
6. That this permit shall be posted at the door or site of work.
PERMIT ISSUED BY:
AUREA M. PASCUAL, DM, MBA, CE, GE, ENP, REB
CITY BUILDING OFFICIAL
(Signature Over Printed Name)
Date _________________________