Number: CHKLST-001
Revision:
Date: 25-09/05
Page: 1 of 1
SUBJECT: MZ PACKER CHECKLIST
• CLIENT: REPSOL ________________________________________________
________________________________ ________________
7 • WELL No. & LOCATION: SIRARI
9 • PRE-
PRE -INVENTORY _________ or PRE
PRE -JOB __________
• STENCILED INFORMATION (Visual inspection & record)
4
1. Description:__MZ-PACKER 7”_____________________Casing size and
Range:__ _23-29#______________
3 5 2. Part No.: 35289272 ___________________________________________________
3. Material Grade:: 4140 ______________________________________________
________________________________ ______________
4. P.O. No.: N/A _________________________ Serial No. N/A _________________
6 5. Work Order No.: N/A _________________________________________________
6. Heat No.: N/A _____________ Supplier: ________________________________
• DIMENSIONS (Visual inspection, measure & record) Follow numbers on
2 1
dwg.
1. Total Length: _1.38__mts) ,
2. Cup Support Length:__0.71_____(mts).
3. Cup Support OD:__5.00___(in)
4. Mandrel ID:__2.750___(in).
5. Elastomer OD:___6.375__(in). Type:_Nitrilo__Durometer:____80________
6. Cup OD:___5.890__(in).
7. Collar OD:__4.062____(in).
8. Shunt tubes: Qty:__2___, Type:__AllPAC__, Orientation:__62 deg._________
10 9. Top of collar to top of shunt:___0.3____(m)
10. Bottom of shunt to top of pin: 0.13 (m)
11. Thread Description: 3-1/2” 10 rd_______.
• VISUAL & MAKE-
MAKE -UP INSPECTION (Record & Inspector initials)
MZ PACKER
1. Assembly ID: Clean, rust free and no scratches : si ________________________
2. Print: Requested _____ Dwg.No___________________________ Rev.________
NOTES:
1. Description example: 3. Packer Bore: 2.75 __________________ (in) _____________________________
Casing Size X Packer Bore, 4. Screws: Remove & inspect for deformation, reinstall & snug in proper groove
Packer Weight Range : si ______________________________________________________________
2. PRE-
PRE-JOB: 5. Set & Torque Screws: Apretados ______________________________________
Attach CHKlist to Job File 6. All connections throughout packer: Apretado _____________________________
3. PRE-
PRE-INVENTORY: 7. Thread protectors installed: si ________________________________________
Attach CHKlist to file 8. Thread guaged with right connection to ensure proper make up: ______________
9. Inspection Date: 25-09-05.
10. Inspected By: A. Sánchez, E. Padilla.
SCHLUMBERGER WCP