100% found this document useful (1 vote)
178 views1 page

MZ Packer Checklist

This checklist is for inspecting an MZ packer used at the SIRARI well located in REPSOL. The packer is 7 inches in diameter, weighs between 23-29 pounds, and is made of 4140 material. Key dimensions are checked including total length, cup support length and diameters, mandrel ID, elastomer OD and type, cup OD, collar OD, and shunt tube details. A visual and make-up inspection is also conducted to check the assembly ID, packer bore size, screws, torque on screws and connections, installed thread protectors, and thread gauging. The inspection was completed on 25-09-05 by A. Sanchez and E. Padilla.

Uploaded by

Rodolfo Rider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
178 views1 page

MZ Packer Checklist

This checklist is for inspecting an MZ packer used at the SIRARI well located in REPSOL. The packer is 7 inches in diameter, weighs between 23-29 pounds, and is made of 4140 material. Key dimensions are checked including total length, cup support length and diameters, mandrel ID, elastomer OD and type, cup OD, collar OD, and shunt tube details. A visual and make-up inspection is also conducted to check the assembly ID, packer bore size, screws, torque on screws and connections, installed thread protectors, and thread gauging. The inspection was completed on 25-09-05 by A. Sanchez and E. Padilla.

Uploaded by

Rodolfo Rider
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Number: CHKLST-001

Revision:
Date: 25-09/05
Page: 1 of 1
SUBJECT: MZ PACKER CHECKLIST

• CLIENT: REPSOL ________________________________________________


________________________________ ________________
7 • WELL No. & LOCATION: SIRARI
9 • PRE-
PRE -INVENTORY _________ or PRE
PRE -JOB __________
• STENCILED INFORMATION (Visual inspection & record)
4
1. Description:__MZ-PACKER 7”_____________________Casing size and
Range:__ _23-29#______________
3 5 2. Part No.: 35289272 ___________________________________________________
3. Material Grade:: 4140 ______________________________________________
________________________________ ______________
4. P.O. No.: N/A _________________________ Serial No. N/A _________________
6 5. Work Order No.: N/A _________________________________________________
6. Heat No.: N/A _____________ Supplier: ________________________________
• DIMENSIONS (Visual inspection, measure & record) Follow numbers on
2 1
dwg.

1. Total Length: _1.38__mts) ,


2. Cup Support Length:__0.71_____(mts).
3. Cup Support OD:__5.00___(in)
4. Mandrel ID:__2.750___(in).
5. Elastomer OD:___6.375__(in). Type:_Nitrilo__Durometer:____80________
6. Cup OD:___5.890__(in).
7. Collar OD:__4.062____(in).
8. Shunt tubes: Qty:__2___, Type:__AllPAC__, Orientation:__62 deg._________
10 9. Top of collar to top of shunt:___0.3____(m)
10. Bottom of shunt to top of pin: 0.13 (m)
11. Thread Description: 3-1/2” 10 rd_______.
• VISUAL & MAKE-
MAKE -UP INSPECTION (Record & Inspector initials)
MZ PACKER
1. Assembly ID: Clean, rust free and no scratches : si ________________________
2. Print: Requested _____ Dwg.No___________________________ Rev.________
NOTES:
1. Description example: 3. Packer Bore: 2.75 __________________ (in) _____________________________
Casing Size X Packer Bore, 4. Screws: Remove & inspect for deformation, reinstall & snug in proper groove
Packer Weight Range : si ______________________________________________________________
2. PRE-
PRE-JOB: 5. Set & Torque Screws: Apretados ______________________________________
Attach CHKlist to Job File 6. All connections throughout packer: Apretado _____________________________
3. PRE-
PRE-INVENTORY: 7. Thread protectors installed: si ________________________________________
Attach CHKlist to file 8. Thread guaged with right connection to ensure proper make up: ______________
9. Inspection Date: 25-09-05.
10. Inspected By: A. Sánchez, E. Padilla.

SCHLUMBERGER WCP

You might also like