3t Monorail Provision Crane

This document provides product information and instructions for an EMC30 electric monorail provision crane. Key details include: - The crane has a 3 ton SWL, 12m/min hoisting speed, and is powered by an 11kW hoist motor. - Scope of supply includes the traveling mechanism, hoist mechanism, traveling beam, electric control box, hanging control button, and spare parts. - Installation instructions cover mounting the crane on the runway beam and adjusting limit switches. - Operating instructions emphasize safety precautions like keeping the area clear before startup.

Uploaded by

sridhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views21 pages

3t Monorail Provision Crane

This document provides product information and instructions for an EMC30 electric monorail provision crane. Key details include: - The crane has a 3 ton SWL, 12m/min hoisting speed, and is powered by an 11kW hoist motor. - Scope of supply includes the traveling mechanism, hoist mechanism, traveling beam, electric control box, hanging control button, and spare parts. - Installation instructions cover mounting the crane on the runway beam and adjusting limit switches. - Operating instructions emphasize safety precautions like keeping the area clear before startup.

Uploaded by

sridhar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 21

PRODUCT DESCRIPTION:

EMC30 ELECTRIC MONORAIL PROVISION CRANE


EMC30 ⬉ࡼऩ䔼կᑨ৞
(DWG.NO: ZJM330-00)

FINAL DRAWING

Ship-name:57000DWT BULK CARRIER

Customer: Domestic Trade Ministry Kouan Shipbuilding Co.

Hull No.:TK0101/0102/03/04/05/06/07/08/09/10

Date: 10,Apr. 2009

Contract No.:07GNT K0101/0102/03/04/05/06/07/08/09/10

ZHENJIANG JUST MARINE EQUIPEMENT CO., LTD

䬛∳Ꮦ䞥㟳㠍㠊ᬥ⫳䆒໛᳝䰤݀ৌ

Tel˖ 0086-511-88898178˗ Fax˖ 0086-511-88883211


CONTENT

ITEM DESCRIPTION DRAWING NO.

1. Specification

2. Instruction and operation ZJM330-00SM

3. EMC30 Electric monorail provision crane (G.A.) ZJM330-00

4. Overall drawing of control box ZJM330-00WXT

5.Electric principle diagram ZJM330-00DYL

6.Electric connection diagram ZJM330-00DJX

7. Overall drawing of button box ZJM330-00ANB

8. List of delivery ZJM330-00GMX

9. Test program ZJM330-00SY

10. Electrical appliance spares

11. Installationǃuse and service manual


䆒໛ৡ⿄˖ EMC30 ⬉ࡼऩ䔼կᑨ৞
Equipment Description: EMC30 ELECTRIC MONORAIL PROVISION CRANE

ϔǃЏ㽕ᡔᴃখ᭄ Main parameters


ᅝܼᎹ԰䋳䕑 3t
SWL

৞䩽䗳ᑺ 12 m/min
HOISTING SPEED

䍋छ⬉ᴎࡳ⥛ 11kw
POWER OF HOIST MOTOR

䍋৞催ᑺ 30 m
LIFT HEIGHT

Ԍߎ㠋໪䎼䎱 3m
OUTREACH FROM MAX. SHIPBOARD

῾৥㸠䍄䗳ᑺ 15 m/min
TRAVERSE TRAVELLING SPEED

㸠䍄⬉ᴎࡳ⥛ 2.2kw
POWER OF TRAVELLING MOTOR

㸠䍄ṕ䭓ᑺ 28.5m
LENGHT TRAVELLING BEAM

 ᣖᣝ䪂Ⲧ⬉㓚䭓ᑺ 12m
CABLE LENGTH OF HANGING BUTTON

⬉࡯կᑨ 440 V 60 HZ 3 Phase


MAIN POWER SUPPLY

㞾䞡 5900kg
SELF WEIGHT

Ѡǃկ䋻㣗ೈ Scope of our supply


ϔ༫ᅠᭈⱘկᑨ৞ࣙ৿˖
1(one) set complete provision crane including:
ϔ༫῾৥㸠䍄ᴎᵘ˄ࣙ৿㸠䍄⬉ᴎ੠Ӵࡼ㺙㕂˅
1 set traverse travelling mechanism (incl. Electric motor and gearing)

ϸ༫䍋छᴎᵘ˄ࣙ৿䍋छ㺙㕂੠⬉ᴎˈ䩶ϱ㓇੠৞䩽˅
2 sets hoist mechanism (incl. hoisting gear and electric motor, wire-rope and hook )

ϔ༫῾৥㸠䍄ṕ˄ࣙ৿Ӵࡼ啓ᴵ˅
1 set traverse traveling beam (incl. rack )

ϔ༫⬉᥻ㆅ˄IP56˅
1 set electric control box (IP56)

ϔ༫ ᣖᣝ䪂˄IP56˅
1 set hanging control button (IP56)

ϸ༫छ䰡䰤ԡ㺙㕂
2 sets up/down limit switch

ϸ༫䖛䕑䰤ԡ㺙㕂
2 sets overload limit switch

ϸ༫㸠䍄䰤ԡ㺙㕂
2 sets travelling limit switch

ϔ༫⬉㓚㒲Ⲭ(৿⬉㓚)
1 set cable reel(incl. Cable)

ϔ༫ᴎẄ੠⬉⇨໛ӊ
1set spare parts of mechanical and electrical

ϝǃ䴲կ䋻㣗ೈ Items excluded from our supply


3.1 ⬉⑤⬉㓚
Cable of power supply
3.2 ᴎẄ⊍੠⍺⒥⊍
Lubricating oil and mechanical oil
3.3 㠍Ϟᅝ㺙ˈ䆩偠
Assemble on the ship and proof test

ಯǃ݊ᅗ㽕∖ Other requirements

4.1 ⬉᥻ㆅ㺙೼կᑨ৞Ϟˈ䱣䔺ϔ䍋⿏ࡼDŽ䆒໛⊼ᯢᅝܼᎹ԰䋳䕑DŽ
Electric control box assembled on crane and moved together with crane.
The provision crane marked the S.W.L.
4.2 ᴀ䆒໛ᦤկ GL 䆕кDŽ
The crane to be provided the GL certificate.

4.3 ⬉⇨᥻ࠊㆅ䰆ᡸㄝ㑻Ў IP56 DŽ


Electric control box protection class: IP56 .

4.4 Џ㽕⬉⇨‫ܗ‬ӊ䞛⫼䖯ষѻક(བ㒻⬉఼ǃ⛁㒻⬉఼ǃ❨ᮁ఼ㄝ)DŽ
Main elements of electric adopt import (as: relay, thermal relay and breaker etc.)

4.5 ⬉ᴎ㒱㓬ㄝ㑻: F ˈ⬉ᴎ䰆ᡸㄝ㑻˖ IP56


Motor insulation class: F ˈMotor protection class: IP56

4.6 䫁⠠: ⫼㣅᭛៪Ё㣅᭛(ᴤ᭭˖ϡ䫜䩶)


NAMEPLATE: In English or in English and Chinese (material: stainless steel)

4.7 ⦃๗⏽ᑺ˖-20ć~45ćˈ⑓ᑺ˖90%
Ambient temperature: -20ć~45ć, environment humidity. 90%.

Ѩǃ㸼䴶໘⧚ Surface treatment


5.1 ஋ⷖ⏙⧚᠔᳝䩶㒧ᵘ㸼䴶㟇 SA2.5
Shot blast cleans of all structure to SA2.5.

5.2 ᠔᳝㒧ᵘⱘᑩⓚᣝ㠍ॖᦤկᷛ‫ޚ‬ᠻ㸠DŽ
Primer of the structure is according to standard supplied by yard.

5.3 ໪ሖ⊍ⓚ买㡆Ꮖᣝ✻㠍ϰ䗔ᅵ䅸ৃ೒ⱘ㽕∖ࠊ䗴DŽ
Surface paint ˖HEMPEL CRÈME 20380

݁ǃ䋼䞣ֱ䆕 Quality guarantee


䋼ֱᳳЎѸ㠍ৢϔᑈˈ䆒໛ᣝ✻䇈ᯢкℷ⹂ᅝ㺙ǃ᪡԰੠㓈ᡸDŽ䋼ֱࣙᣀ⬅Ѣ䆒䅵༅䇃ǃᴤ
᭭៪Ꮉ㡎༅䋹ᓩ䍋ⱘৢᵰDŽ
Time of guarantee is one year after ship delivery, subject to correct installation and to operation
and maintenance in accordance with the instruction manual. The guarantee covers defects resulting from
faulty design, materials or workmanship.
EMC30ELECTRIC MONORAIL PROVISION CRANE

3.0t ԨՎӦ‫ڥ‬٢࿫Զ
----------------------------------------------

˄ZJM330-00SM˅

䇈ᯢк

INSTRUCTION

䬛∳Ꮦ䞥㟳㠍㠊ᬥ⫳䆒໛᳝䰤݀ৌ
ZHENJIANG JUST MARINE EQUIPMENT CO; LTD.

Ё ढ Ҏ ⇥ ݅ ੠ ೑

THE PEOPLE’S REPUBLIC OF CHINA

Sheet 1 of 6
INSTRUCTION FOR INSTALLATION
1. General

The complete assembled crane is to be delivered in one piece and additional equipment
to be mounted at site after mounting the runway beam structure as follows:

g 2 pcs of actuator for limit switch


g 2 pcs of junction box with terminals, earth clamps and cable glands
g 4 pcs of travel stoppers

Before installation of crane be started, the runway arrangement has to be manufactured


and mounted according to drawing.
Special precaution should be taken to ensure that the runway beam will be straight.

2. Install crane on runway

Remove crane drive shaft w/pinion/bearing from side plate. Crane can now be lifted into
beam. Replace the shaft w/pinion and bearing.

It is important to secure the crane to runway until end stops are installed acc. to drawing.

Check that the backlash between pinion and rack is correctly in full length of the runway
beam.

General rule: The pinion should be in properly engagement, but check by hand that it is
free to move.

Connect the crane electrically to the power source on ship and assemble on a plug for
push button station on each side.

Mount the limit switch actuators, and adjust limit switches!

Check the following:

g That the crane has the specified outreach.

g7KDWWKHOLPLWVZLWFKDFWXDWRUVSURSHUO\HQJDJHVDQGDFWXDWHVWKHOLPLW
VZLWFKHV

g7KDWWKHVZLWFKHVVWRSWKHFUDQHEHIRUHLWWRXFKHVWKHWUDYHOHQGVWRSV

&KHFNWKDWWKHOLPLWVZLWFKIRUKRRNLQWRSSRVLWLRQRSHUDWHVSURSHUO\

Sheet 2 of 6

7DNHFDUHLILWLVQRWRSHUDWHGSURSHUO\GDPDJHPD\RFFXU

7KHWRSOLPLWVZLWFKHVDUHRQO\GHVLJQHGIRUHPHUJHQF\VWRSLQWRSSRVLWLRQ
DQGVKRXOGQRWEHXVHGIUHTXHQWO\


$GMXVWPHQWRIWKHRYHUORDGVZLWFK

7KHRYHUORDGVZLWFKLVLQLWLDOO\DGMXVWHGIURPWKHIDFWRU\WR6:/RI7

7KHFUDQHKDVWREHORDGWHVWHGZLWK6:/EHIRUHWDNHQLQWRXVH$IWHUWKH
WHVWLVILQLVKHGWKHRYHUORDGVZLWFKPXVWEHDGMXVWHGWRKDQGOH6:/EHIRUH
WDNHQLQWRXVH

Check clearance between item 1 and limit switch (see fig next page), adjust if necessary
(clearance setting 1-2mm).

If necessary adjust the bolt item 2(see fig below), until the limit switch is activated.

Re-tighten the lock nut.

OVERLOAD SWITCH

Before use

Check that all functions of the crane is operating properly.

Run the crane carefully full length of the runway, and check that there is no obstacles,

Sheet 3 of 6
and that the travel wheels and guide rollers runs easily over full length of travel, and that
the backlash between pinion and gear rack is correctly.

Also; check that the limit switches for travelling is being activated at both ends of the
runway.

Care should be taken to ensure that suspended cable on the crane, does not fault, or get
caught on brackets, or building obstacles.

Make a final check of oil connection bolts for tightness.

Overload test

Overload test to be carried out by using 125%SWL=3.75 ton.

As stated before, the crane is adjusted to handle 125%SWL from factory. After the overload
test is completed both overload switches must be adjusted to handle SWL.

Runway beam installation

Runway beam shall be made and installed according to dwg no D330-02-0 and under the
inspection of a competent person.

INSTRUCTION FOR OPERATION

1. Safety precautions

Prior to start up and operation of the crane, the following safety precautions have to be
adhered to:

g Check that unauthorised personnel keep clear of the area before start up. This is also valid
during all crane operations.
g&KHFNWKHUXQZD\DUHDIRUIRUHLJQREMHFWVZKLFKFDQOLPLWVWKHFUDQH’VDFFHVV
g&KHFNWKHFUDQHIRUYLVLEOHGDPDJHV
g%HIRUHWDNLQJWKHFUDQHLQWRXVHPDNHVXUHWKDWWKHSDUNLQJDUUDQJHPHQW
LVXQORFNHG
g0DNHVXUHWKDWWKHFKRVHQOLIWLQJFDSDFLW\RQWKHSXVKEXWWRQVWDWLRQLV
DFFRUGLQJWRWKHDFWXDOORDG
g&KDQJHRIOLIWLQJFDSDFLW\QRWDOORZHGGXULQJKRLVWLQJORZHULQJ

Sheet 4 of 6
2. Cleaning and drying prior to start up

All parts must be inspected and the required cleaning must be carried out.
Special attention must be paid to the electrical system.

If the heating elements have not been activated, electrical motors and panels must be
heated and dried before start up.
The heating must be continued uninterrupted for 48 hrs. Before the motors should be
driven.

3. Crane operation

The crane is completely operated from a pendant control push button station.
All crane movement symbols are shown on the push button station.

STOP Pushbutton for main power and emergency switch to the crane
Main power on by turning and pull
Main power off/emergency stop by push
START Push button to start operation of the crane
HOIST Port and starboard hoists controlled by which side of the ship you are
connected to
TRAVEL Port and starboard travel of the crane by two separate push buttons

4. Crane shut down/restart

The provision crane should be shut down after use, only from the push button station by
pushing the STOP button.
This is to ensure operation of the hearing elements in the motors and in the electrical
panel.
Failure to shut down, or by disconnecting the power to the crane supplied from ship, the
cleaning and drying procedure prior to start up must be repeated to ensure dried conditions.
Restart the crane by turning/pulling the STOP button.

Important Note:
The motors and el. panel are equipped with heater elements to prevent water
condensation. This is therefore very important to keep the main switch in on position
all the time.

5. Consequences of misuse

It is of great importance that the crane is operated in accordance with the operating
procedure.

Sheet 5 of 6
Any misuse may cause damages, and will always be a hazard to personnel safety!!

6. Do and Don’ts for safe operation

While operating the crane you should do:



g,VRODWHSRZHUVXSSO\DQGUHPRYHIXVHVEHIRUHPDLQWHQDQFHZRUNLVFDUULHG
RXWRQWKHFUDQHRUUXQZD\
g&OHDQWKHWUROOH\GHFNUHJXODUO\
g6HFXUHDOOSDQHOGRRUVFRYHUVHWFDIWHUPDLQWHQDQFHZRUN
g&KHFNOLPLWVZLWFKDFWLRQSHULRGLFDOO\
g/XEULFDWHUHJXODUO\
g2SHUDWHWKHFUDQHZLWKLQWKHGHVLJQHGGXW\FODVV
g)LOOWUDYHOLQJJHDUOXEULFDWH,629* && /
g)LOOKRLVWLQJJHDUOXEULFDWH,629* && /[


While operating the crane, what should NOT be done:

g([FHHGVDIHZRUNLQJORDGIRUWKHFUDQH
g$WWHPSWWRXVHERWKZLQFKHVDWWKHVDPHWLPH
g8VHWKHOLPLWVZLWFKHVD+XOOQRUPDOZRUNLQJOLPLWVZLWFKHV
g/LIWORDGVDWDQDQJOHRUWU\WRSXOOORDGVVLGHZD\V7KLVZLOOFDXVH
DGGLWLRQDOZHDUWRWKHZLUHURSH
g/HDYHKRRNDWKHDGKHLJKW
g/HWWKHORZHUEORFNOLHRQWKHJURXQGFDXVLQJWKHKRLVWURSHWREHFRPHORRVH
RQWKHGUXP7KHZLUHURSHPD\WKHQMXPSRIIWKHVKHDYHDQGEHFRPHGDPDJHG
g/HDYHWRROVRUSDUWVRQWKHJLUGHURUKRLVWDIWHUPDLQWHQDQFH
g,QFKWKHFUDQHDVWKLVZLOOVKRUWHQPRWRUOLIHDQGFDXVHH[FHVVLYHZHDU
RQWKHEUDNHV$OZD\VWU\WRNHHSDOOPRWRUVWDUWVDWDPLQLPXP
g7UDQVSRUWORDGRYHUWKHKHDGRIZRUNPHQ
g$WWHPSWWRFDUU\RXWPDLQWHQDQFHZRUNRQWKHFUDQHZKLOHWKHSRZHUVXSSO\
LVRQ
g+DYHDORDGVXVSHQGHGLQPLGDLUXQDWWHQGHG
g8VHKRLVWLQJPDFKLQHU\WRIUHHVWXFNORDGV

Sheet 6 of 6
PRODUCT DESCRIPTION:

EMC30 ⬉ࡼऩ䔼կᑨ৞

EMC30 ELECTRIC MONORAIL PROVISION CRANE

կ䋻ᯢ㒚㸼
LIST OF DELIVERY

˄ZJM330-GMX˅

Customer˖ Domestic Trade Ministry Kouan Shipbuiding Co.

Hull No. : TK0101/0102/03/04/05/06/07/08/09/10

Contract No. :07GNTK0101/0102/03/04/05/06/07/08/09/10

䬛∳Ꮦ䞥㟳㠍㠊ᬥ⫳䆒໛᳝䰤݀ৌ
ZHENJIANG JUST MARINE EQUIP. CO., LTD.

㓪 ࠊ˖ ᷵ ᇍ˖ ᅵ Ḍ˖
Complied Checked Verified

㄀ 1 义 ݅ 4义
NO:
կ䋻ᯢ㒚㸼
ZJM330-00GMX
LIST OF DELIVERY
ᑣো ৡ⿄ ҷো ㅔ೒ ᭄䞣 ໛⊼
NO NAME CODE SKETCH QTY NOTE
ϔ ǃ Џ ԧ MAIN PART

1
1 կ ᑨ ৞ ZJM330-01-0
Provision
Crane

1 ݅ϝ
2 㸠䍄ṕ ZJM330-02-0 ↉ˈ
Travelling ᘏ䭓
Beam 28.5m

Ꮖ㒥
೼㸠
啓ᴵ䞣㾘 䍄ṕ
3 Rack 1
˄ᅝ
ga ug e
㺙㸠
䍄ṕ
⫼˅

4
‫ذ‬䔺ᦦ䫔 ZJM330-01-5
Parking 1
Bolt

Ꮖᅝ
⬉᥻ㆅ 㺙೼
1 կᑨ
Electric
5 ৞Ϟ
control
box

㄀ 2 义 ݅ 4义
NO:
կ䋻ᯢ㒚㸼
ZJM330-00GMX
LIST OF DELIVERY
ᑣো ৡ⿄ ҷো ㅔ೒ ᭄䞣 ໛⊼
NO NAME CODE SKETCH QTY NOTE
Ѡ ǃ ࣙ 㺙 ӊ PACKING PARTS

ᩲഫ
6 Stopper 2

7 䰤ԡᩲ
ഫ 2
Limit
block

8 ⬉㓚ᠬ ZJM330-04-0
ᶊ 12
Support
of cable

⬉㓚ᇐ
9 ZJM330-03-0 1

Guider
of cable

ᣝ䪂Ⲧ
10 1
Box of
push
button

᥹㒓Ⲧ
11 Junction 1
box

ҹϞЎϔ༫䆒໛ⱘ᭄䞣DŽ
The qua ntity o f list is o ne set cra ne.

㄀ 3 义 ݅ 4义
NO:
໛ӊᯢ㒚㸼
ZJM330-00BMX
LIST OF SPARE PARTS
ᑣো ৡ⿄ ҷো ㅔ೒ ᭄䞣
NO NAME CODE SKETCH QTY

❨㢃
1 Fuse core / $ %  4

ᣝ䪂
2 Push button RL98-16 4A 1

ҹϞЎϔ༫䆒໛ⱘ᭄䞣DŽ
The qua ntity o f list is o ne set cra ne.

㄀ 4 义 ݅ 4义
TEST PROGRAM OF SWL3T PROVISION CRANE
DRAWING NO: ZJM330-00SY

N Test item Test load Test Requirement Result


o
1 Hoisting & traveling test A test load is to be hoisted to continually hoisting, lowering,
on port traveling and brake at full speed without power for twice through
3T
Hoisting & traveling test one complete operating cycle.
on starboard
Hang the load from the ground, keep for five minutes. As a result
Test of 1.25 times 1.25h3
2 of the test there should be no any evidence of permanent
working load =3.75T deformation and other damage.
Hoisting & travelling Work effectively.
3 limit test

NOTE: S.W.L OF PROVISION CRANE =3T

CHECKER: SURVEYOR: DATE: