Inspection and Test Plan For Pipe Rack and Piping Painting Works

This inspection and test plan outlines quality control activities for pipe rack and piping painting works. Key steps include: 1. Reviewing painting procedures and verifying all materials have valid test certificates. 2. Checking ambient conditions like temperature and humidity daily before surface preparation and painting. 3. Performing daily visual inspections of surface preparation work, air quality, and dust removal before primer application. 4. Conducting monthly inspections and daily checks of water jetting pumps used in cleaning activities.

Uploaded by

Ranjan Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
634 views2 pages

Inspection and Test Plan For Pipe Rack and Piping Painting Works

This inspection and test plan outlines quality control activities for pipe rack and piping painting works. Key steps include: 1. Reviewing painting procedures and verifying all materials have valid test certificates. 2. Checking ambient conditions like temperature and humidity daily before surface preparation and painting. 3. Performing daily visual inspections of surface preparation work, air quality, and dust removal before primer application. 4. Conducting monthly inspections and daily checks of water jetting pumps used in cleaning activities.

Uploaded by

Ranjan Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

INSPECTION AND TEST PLAN FOR PIPE RACK AND PIPING PAINTING WORKS

Contractor : Narmada Offshore Constructions Pvt. Ltd. Rev : 0

Project Title : Pipe Rack and Piping Painting Works Date : 18.03.2021

Client : Idemitsu Lube India Pvt. Ltd. Pages : 2

ITP No : W467-NOCPL-SPP-ITP-01 Purchase Order No./Date : 3000335478/15.03.2021

Item No. Quality Control Activity Frequency of Tests Technique/ Instrument Reference Acceptance Criteria NOCPL ILIN

PREPARATION ACTIVITIES

1 Painting Procedure Document Review Job Procedure for Painting Works Shall be as per paint manufaturer's recommendation P R
and relevant standard.

All materials shall have valid MTC as per relevant


2 Material receiving at site For all materials Visual & Certificates verification Inspection Reports & Material Test Certificate. standards. P R

Visual & Calibration Certificates


3 Calibration list For all instruments verification Inspection Reports & Calibration Certificates. All instruments shall have valid calibration certificates. P R

*Air & temperature temp :10-50ºC


Ambient conditions & surface *RH < 85%
4 temperature
Daily Dew meter BS 7079-B4 / ISO 8502-4 P RW
*Surface Temp at least 3°C above the dew
point

*100% of surface
*Manual tool cleaning using emery paper of
5 Surface Preparation grade60 ( Silicone carbide) , power tool Visual SSPC SP1 Removal of all visible grease & oil. P S
cleaning should be carried out on bare metal
or peel coating.

Before start of each shift or change in Free from oil, grease & moisture and pressure at
6 Air Quality compressed air source Absorbent or nonabsorbent collector ASTM D4285 blasting nozzle is as 7 bars. P RW

Prior to primer
7 Dust removal
application
Visual ISO 8502‐3 No visible dust P S

WATER JETTING ACTIVITIES

1 Inspection of water Jetting Pump Once in a month Fitness certificate verification Fitness certificate shall be verified on monthly basis. P W

*All cables shall be free from insulation damages.


* Watering Jetting Pressure shall be monitored
2 Inspection of water Jetting Pump Daily Visual regularly. P RW
* No water leakage shall be acceptable.

*Low pressure water cleaning (2000-5000 PSI) should


Cleaning of Structure & Piping by be done for removal of dust and foreign
3 Water Jetting Daily Visual Inspection Report contamination before surface preparation. P W
*Water mopping is suggested wherever water wash is
not possible.

PAINTING ACTIVITIES
INSPECTION AND TEST PLAN FOR PIPE RACK AND PIPING PAINTING WORKS

Contractor : Narmada Offshore Constructions Pvt. Ltd. Rev : 0

Project Title : Pipe Rack and Piping Painting Works Date : 18.03.2021

Client : Idemitsu Lube India Pvt. Ltd. Pages : 2

ITP No : W467-NOCPL-SPP-ITP-01 Purchase Order No./Date : 3000335478/15.03.2021

Item No. Quality Control Activity Frequency of Tests Technique/ Instrument Reference Acceptance Criteria NOCPL ILIN

Relative humidity should be less than 85% while


1 Paint Starting Notification Prior to Start Painting / System application & post application. P W

Product label matches product name in


2 Painting material Visual (label) Prior to paint application Technical Submittal technical submittal P S

3 Material mixing Visual During mixing Product Application Guide Homogenous color , no lumps P S
4 Proper thinning Visual During mixing Technical Submittal Type & amount as per Technical Datasheet P S
Maximum local DFT ≤120% of the required reading &
6 Painting dry thickness Dry film thickness gauge After each coat when dry SSPC PA 2 / ASTM D7091 Minimum local DFT ≥80% of the P W
required reading

7 Repaint intervals Visual Prior to each successive coat Technical data sheet Technical data sheet P W

POST PAINTING ACTIVITIES

1 Final appearance Visual After application of final coat ISO 4628 No runs, drips, sags or misses P W

According to DFT defined in technical


2 Verify Total DFT Dry film thickness gauge After each coat when dry SSPC PA 2 / ASTM D7091
submittal
P W

3 Adhesion Pull Off Adhesion Test After full curing ISO 4624 Minimum 3 MPa P W

* Inspection type:
H: Hold point
S: Surveillance
W: Witness
RW: Random Witness
N/A: Not Applicable
R: Review

* Material safety data sheet MSDS will be available and followed on site.

FOR NOCPL FOR ILIN

SIGNATURE: SIGNATURE:

NAME: NAME:

DATE: DATE: