BW Treasure Hunt Planner 0

This document contains a work breakdown structure and schedule for planning a treasure hunt event to take place at an unspecified date in the future. It outlines tasks to be completed 5, 4, 3, 2 and 1 weeks prior to the event, including site preparation, inviting attendees, finalizing teams and logistics, and other planning activities. Percentages indicate progress towards completing each task on schedule.

Uploaded by

Eino J I Mbango
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views4 pages

BW Treasure Hunt Planner 0

This document contains a work breakdown structure and schedule for planning a treasure hunt event to take place at an unspecified date in the future. It outlines tasks to be completed 5, 4, 3, 2 and 1 weeks prior to the event, including site preparation, inviting attendees, finalizing teams and logistics, and other planning activities. Percentages indicate progress towards completing each task on schedule.

Uploaded by

Eino J I Mbango
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

Treasure Hunt date <-----Enter your target TH date here

Event Lead:

Today is: (Sat) (vertical red line)

Planning Start Date: (Sat) 0

Days Remaining
Duration (Days)

Days Complete
Working Days
% Complete
WBS Tasks Task Lead Start End

Pre-planning (5 weeks out)


1 Site Work to be completed TBD 11/26/99 12/02/99 7 100% 5 7 0
1.1 Ensure site management support of time, resources and hosting of external resources 11/26/99 12/02/99 7 100% 5 7 0
1.2 Lock in dates for the event 11/26/99 12/02/99 7 100% 5 7 0
1.3 Set-up Internet connection for external participants 11/26/99 12/03/99 8 100% 5 8 0
1.4 NDAs in Place 0%
2 Pre-planning visit and preparation (4 weeks out) N/A 12/03/99 12/09/99 7 92% 5 6 1
2.1 Pre-Planning Meeting with site (see Energy Action Work-out Pre-Planning Sheet) 12/03/99 12/09/99 7 100% 5 7 0
2.2 Set up weekly Event Planning Calls 12/03/99 12/09/99 7 100% 5 7 0
2.3 Complete Preparation Checklist Template (use throughout the planning process) 12/03/99 12/09/99 7 75% 5 5 2

3 Outside and inside attendee planning (4 weeks out) TBD 12/03/99 12/09/99 7 100% 5 7 0
3.1 Identify outside resources (Lights, motors, steam traps, VFDs, HVAC, etc) 12/03/99 12/09/99 7 100% 5 7 0
3.2 Send out invitations to the event to GE attendees. 12/03/99 12/03/99 1 100% 0 1 0
3.3 Send invitations to outside resources, including travel information (timing, airport, hotels) 12/03/99 12/03/99 1 100% 0 1 0
3.4 Send out info on preferred hotels with directions from hotel to/from the site 12/03/99 12/03/99 1 100% 0 1 0

Site planning (3 weeks out)


1 Site hours, utilities, current projects, utility cost overview TBD 12/10/99 12/16/99 7 94% 5 6 1
Prepare site and process overview for kickoff training; include discussion of operating/occupancy hours in
1.1 different areas 12/10/99 12/16/99 7 95% 5 6 1
Prepare overview of site utilities, including where used, how purchased and/or generated, and how/where
1.2 metered 12/10/99 12/16/99 7 100% 5 7 0
As part of utilities overview, include discussion of utilities projects (both in place and planned) and awareness
1.3 programs 12/10/99 12/16/99 7 100% 5 7 0
1.4 Prepare utility cost overview and standard assumptions/costs to use for kaizen payback calcs 12/10/99 12/16/99 7 80% 5 5 2

Teams (2 weeks out)


1 Finalize teams, prepare training, confirmations 12/17/99 12/23/99 7 95% 5 6 1
1.1 Finalize team leaders and external attendees and resources 12/17/99 12/23/99 7 80% 5 5 2

Prepare additional training/information for teams (e.g. more detailed process and utility usages specific to each
1.2 treasure hunt team; known problems, issues, opportunities and complete/planned projects) 12/17/99 12/23/99 7 100% 5 7 0
1.3 Send detailed directions to plant from airport and hotels to confirmed attendees 12/17/99 12/23/99 7 100% 5 7 0
1.4 Set up report out meeting with teams and plant management. Include call in number if needed. 12/17/99 12/23/99 7 100% 5 7 0

2 Personnel logistics (2 weeks out) 12/17/99 12/23/99 7 100% 5 7 0

2.1 Send out note on required ppe to bring. (Safety shoes, hard hat, safety glasses, flame retardant clothing, etc) 12/17/99 12/23/99 7 100% 5 7 0
2.2 Inform people to bring laptops if they have them. (Each team will need at least one lap top) 12/17/99 12/23/99 7 100% 5 7 0
Have the visitors pre-registered with Security. Have Security to have visitor’s badges and car passes already
2.3 prepared. Have site maps to hand out. 12/17/99 12/23/99 7 100% 5 7 0
2.4 Need conference room with enough Internet ports and electrical outlets. 12/17/99 12/22/99 6 100% 5 6 0
2.5 Need conference room that has a speakerphone and a computer projector. 12/17/99 12/22/99 6 100% 5 6 0
Need a few smaller conference rooms for teams to use when consolidating data. They need to be very close
2.6 to the main conference room. 12/17/99 12/22/99 6 100% 5 6 0
2.7 Have IT support available to assist in computer issues. 12/17/99 12/22/99 6 100% 5 6 0
2.8 Have teams already formed before the people arrive. 12/17/99 12/21/99 5 85% 4 4 1
2.9 Train team leaders on Energy Event process. 12/17/99 12/21/99 5 50% 4 2 3
2.10 Make sure the team has at least one local person on it. 12/17/99 12/21/99 5 50% 4 2 3
2.11 Determine food/catering needs 12/17/99 12/21/99 5 75% 4 3 2
Load all of the site specific cost data into the spreadsheets prior to the meeting and perform test examples to
2.12 insure that all the links and calculations work. 12/17/99 12/21/99 5 90% 4 4 1
2.13 Have some local area experts available to answer process questions. 12/17/99 12/21/99 5 100% 4 5 0
2.14 Are there special rules around having non – US citizens as part of the team? 12/17/99 12/21/99 5 100% 4 5 0
Need the network address of a few printers in the general vicinity. People can map to the printer and print out
2.15 documents to use as they are out in the plant. 12/17/99 12/21/99 5 100% 4 5 0
2.16 Have someone selected to combine the different files to use in the report out presentation. 12/17/99 12/21/99 5 N/A 4 ### ###
2.17 Have someone available that can explain the Greenhouse Gas Reduction effort. 12/17/99 12/21/99 5 N/A 4 ### ###
2.18 Make sure that you have technicians and maintenance people involved. 12/17/99 12/21/99 5 75% 4 3 2

3 Final preparations (1 week out) 12/24/99 12/30/99 7 75% 5 5 2

3.1 Need to determine who will be the spokesperson for each team at the beginning of the meeting. 12/24/99 12/24/99 1 100% 0 1 0
3.2 Make sure arrangements have been made for using cameras on site. 12/24/99 12/24/99 1 100% 0 1 0
3.3 Have notepads or tablets to hand out for people to use in recording the data. 12/24/99 12/24/99 1 100% 0 1 0
Finalize kaizen sheet(s), teams and process information - send to team members ahead of time with directions
3.4 for use of sheets, focus of team, etc. 12/24/99 12/24/99 1 N/A 0 ### ###
3.5 Have the proper tools available. (Example: flashlights, light meters, amp probes, etc) 12/24/99 12/24/99 1 100% 0 1 0
Have a process in place on how you will identify areas in the plant. In other words how will people be able to
3.6 find the item at a later date when they have to go back and fix it. 12/24/99 12/24/99 1 75% 0 0 1
Have site maps marked up to show the teams the areas they are to search to prevent over laps and
3.7 duplication of opportunities. 12/24/99 12/24/99 1 80% 0 0 1
Make sure that the food caterers are cleared by the guards and know exactly what time to deliver the food to
3.8 prevent wasted time. 12/24/99 12/24/99 1 80% 0 0 1
Print out copies of the Kaizen numbering scheme ahead of time to prevent people from having to bounce back
3.9 and forth in the spreadsheet. 12/24/99 12/24/99 1 N/A 0 ### ###
3.10 Have several memory sticks available to transfer files between computers. 12/24/99 12/24/99 1 N/A 0 ### ###
3.11 Have someone that has keys to get into locked areas. 12/24/99 12/24/99 1 100% 0 1 0
3.12 Prepare GHG information (including 1-30-30 plan) for kickoff 12/24/99 12/24/99 1 N/A 0 ### ###

Event start
1 Show Time! 12/30/99 1/01/00 3 0% 1 0 3
1.1 Have EHS explain Safety rules at the beginning of the meeting. 12/30/99 1/01/00 3 0% 1 0 3
Explain to people, before they go out into the plant searching for opportunities, exactly what data they will need
1.2 to obtain to be able to complete the spreadsheets. 12/30/99 1/01/00 3 0% 1 0 3
1.3 Have clipboards and printed kaizen sheets and process information available 12/30/99 1/01/00 3 0% 1 0 3
1.4 Take time at the end of the EAW to discuss what you could have done better. 12/30/99 1/01/00 3 0% 1 0 3
BW-TREASURE HUNT COMPETITION (Action Workout Agenda)

LOGISTIC A
10:00 AM
11:30 AM
12:00 AM
12:30 PM
1:00 PM
1:30 PM
1:30 PM

LOGISTIC B
12:00 PM
1:30 PM
3:00 PM
3:30 PM
4:00 PM
W-TREASURE HUNT COMPETITION (Action Workout Agenda)

Consist of (two) 2 people


Welcome and Intriduction Presentation --Site and Lean Leader
Split into Teams -- 4 GROUPS -- 8 PARTICIPANTS
Shuffling of the Clue Cards
Game Rules Explanation
Positioning of Groups at Start Points (north, west, east, south)
Start Time (Groups Grab their TAXIs )
Game in Process

Positioning of Coordinating Team Leaders at the 16 BW ATMS (WHK)


Registration of Phase 2 participants
Receiving of 1st, 2nd and 3rd place arrivers
Evaluation of Groups based on mistakes, cheats and arrival time
Awarding Winners of Phase 1 and Announcement of Phase 2 Qualifiers