0% found this document useful (0 votes)
1K views1 page

Architectural Facade Detail Guide

This document contains general notes for a construction project. It specifies that all dimensions are in millimeters and are to be read not measured. It notes that unfinished levels and surfaces are indicated. Floor slopes must be tested and certified. Any ambiguities between drawings must be brought to the architect's attention before work begins. The civil contractor must check service drawings for issues. This drawing is the property of the listed architects.

Uploaded by

yash mistry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Architectural Facade Detail Guide

This document contains general notes for a construction project. It specifies that all dimensions are in millimeters and are to be read not measured. It notes that unfinished levels and surfaces are indicated. Floor slopes must be tested and certified. Any ambiguities between drawings must be brought to the architect's attention before work begins. The civil contractor must check service drawings for issues. This drawing is the property of the listed architects.

Uploaded by

yash mistry
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES

01. All dimensions are in MM.


02. All dimensions are to be read and not to be measured.
03. Refer detail drawings wherever mentioned.
04. All levels are unfinished levels.
05. All dimensions are of unfinished surfaces.
06. All flooring slopes indicated with the floors should be tested and
certified by the site supervision team.
07. In case there is any ambiguity/discrepancy between the Architectural
drawings and other consultant drawings, this ambiguity/discrepancy to be
brought to the notice of the Architect before commencement of the work.
08. The civil contractor shall cross check all service drawings. And any
ambiguity there-in shall be brought to the notice of the Architect before
commencement of work on site.
09. This drawing is the property of XXXXX Architects. It should not be
used without the prior permission of the Architect.

KEY PLAN
10 MM THICK
INNER DETAIL C
PLASTER SHOWING
THE
DETAIL D ARRANGEMENT
ABOUT THE
WALL AND
BEAM
ALLUMINIUM
JUNCTION
PANELS FOR
PANELLING LEGEND
RCC BEAM WOOD LEVEL DIFFERENCE

EXTENDED RCC M.S. GRILL


FLOOR-LINE
FROM RCC S.S RAILING
RWP
WALL TO
EXTRA
SUPPORT OF

DETAIL C FACADE REFERENCES


SR.NO.

01
ITEM
DRAWING NO./
REFERENCE NO. REMARKS

10 MM THICK
02
12 MM THICK
03
STONE
10 MM THICK FLOORING
10 MM THICK
WOODEN MORTAR
STRIPS
30 MM REVISION

INNER
REVISION DATE DESCRIPTION
DETAIL C THICK
10 MM THICK R1 25-6-'19 Change in Toilet Layout

BASE
INNER
PLASTER
DETAILC
1. Last revised drawing shall supersede all previous drawings.
2AC.PANELS 2. On receipt of the revised drawing, relevant previous drawing shall
be returned to the Architect's office.
ARE FITTED AC.PANELS
PRINTS ISSUED FOR:
WITH EACH ARE FITTED DATE REVISION CLIENT SITE CONSULTANT OFFICE COPIES SIGN
DETAIL B OTHER BY ON RCC DETAIL D 15-5-'19 R0 -- E -- -- 05 YP

SCREW WALL SHOWING 25-6-'19 R1 -- E -- -- 05 YP

THE
INTERLOCK
12 MM THICK OF WOODEN T-TENDER, R- REFERENCE, I- INFORMATION, E- EXECUTION

STONE PLANKS PROJECT -


FLOORING
10 MM THICK WOODEN DRG.TITLE FACADE DETAIL
MORTAR PLANKS ARE DRG. NO. -

30 MM FITTED ON DETAIL A DATE 10-07-2020

AC SHEET DRN. BY YASH MISTRY


THICK
WOODEN CHK. BY PROF.HARDIK GANDHI
10 MM THICK BASE PLANKS ARE APPROVED BY PROF.HARDIK GANDHI
DETAIL A INNER SCALE 1:5, 1:50,
DIRECTLY
PLASTER

DETAIL B
N
STUCK ON GRAPHICAL SCALE
DETAILB RCC WALL
0
0.5 1
3

@ BOTTOM NAME: YASH MISTRY CODE : 59


B.ARCH-lll SEM-V
DETAIL A A.A.E.R.T. & THE S.S.B.,

FACADE DETAIL
FACULTY OF ARCHITECTURE,
SCET, SURAT.
DETAILD

You might also like