Production Log
Unit 10 Fictional Film Production
DATE LOCATION TASK PROBLEMS/CONSTRAINTS OUTCOMES
08/06/21 Dad’s house Full day filming. Actor showed up 3 hours late, so shooting started Filming was completed and successful, will re-film
later than expected, house was loud, meaning if needs be.
shooting had till it was quiet.
Dad’s house Re-filming one scene. Actor moved away, so had to buy a wig and Filming went as well as it could.
pretend to be one of the characters.
15/06/21 School Started to edit my film, put all Wasn’t sure how to start editing, so took some Went well, got to upload all clips easily.
clips onto final cut pro. time and assistance from teachers.
17/06/21 school Added music into the opening Spent a long time looking for a song that was not Added and cut down the song, went well.
and continued to cut down the copyrighted, had to get someone else to upload
clips. the song on their phone, couldn’t do it on mine.
18/06/21 school Added in a credit scene to Didn’t have much choice of credit scenes that fit Fits well with the film.
introduce film and actors. my genre.
22/06/21 school Done last bits of cutting clips and Other people were booked on macs, so had to Finished editing for now.
matching lighting. share them.