Inspection Format Road
Inspection Format Road
1.4. District :
1.5. Block :
Road
1.14. Parameters: Link Through route Population Served:
2. CONTRACT DETAILS:
2.1. Date of Tendering:
2.2. Date of Work Order:
2.3. Tendered Cost: For construction Rs. Lakh. In case of % rate tender,
accepted rates are ……. above/below SOR
Tendered Cost For 5 years maintenance:
Year 1 Rs. Year 2 Rs.
Year 3 Rs. Year 4 Rs. Year 5 Rs.
1
2.4. Date of Start of the Work:
2.5. Stipulated Date of Completion:
2.6. Name of Contractor:
2.7. Mobilization Advance: Amount: Rs……………Lakh Date:
2.8. Machinery Advance: Amount: Rs……………Lakh Date:
2.9. Whether Subcontracting Permitted: Yes No
Name of Sub Contractor:
Details of Items & Quantities Sub contracted:
Work Programme
First Revision
Second Revision
Third Revision
…………….
…………….
2
3. PHYSICAL PROGRESS:
4.1. Delays:
4.1.1. Information regarding achievement of milestones by the contractor:
a) % of work completed upto 1/4 period allowed for completion: %
b) % of work completed upto 1/2 period allowed for completion: %
c) % of work completed upto 3/4 period allowed for completion: %
3
4.2.2 Whether delay is because of the Contractor Yes No (If yes) give details of the
action taken by the PIU:
S. Details of delay Action Taken by PIU (give details of notices to
No. Contractor and details of penalty amount imposed/
withheld)
4.2.3 Whether any delay because of the Employer ( If yes) give details: Yes No
S. Details of delay Action Taken by PIU (give details of notices from
No. Contractor etc.)
4.2.4 Whether any delay is because of other Reasons (Give Details): Yes No
S. Details of delay Action Taken by PIU (give details of notices etc.)
No.
4
5. QUALITY CONTROL TESTS:
5.1. What is the % of the tests conducted in presence of/by JE level officer: %
5.2. What is the % of the tests conducted in presence of/by AE level officer: %
5.3. What is the % of the tests conducted in presence of/by EE level officer: %
(Note: Details should be with reference to Quality Control Register/ Measurement
Book)
6. INSPECTIONS:
5
6.3 Whether the State Quality Monitor (or officer of the State Quality Control Agency)
has inspected this work. Yes No
Give details of the observations made by SQM and the compliance carried out by
PIU:
Date of Inspected By Observations Action Taken by PIU with
Visit Date
6.4 Whether State Quality Monitor has earlier visited this site. Yes No
Give details of the observations and compliance carried out by PIU:
Date of Inspected Observations Action Taken by PIU with
Visit By Date
6
7. Quality Control Monitoring
Indicate the number of letters/ notices sent to the contractor for bad quality of material/
workmanship not meeting with the requirement. Its follow up action at PIU Level or higher
level for rectification or rejection of works, reduction in rate and or other administrative
action initiated/ taken.
8. OTHER ISSUES (If required, the head of PIU may bring other important issues to
the notice of the SQM, for advice/ clarification):
Grading: Grade: S SRI U If this item is graded SRI/U, write clear reasons and
suggestions for improvement:
# Whether Clearing and Whether the material Name the reusable material
Grubbing being done available from obtainable from clearance or
as per DPR and scarifying existing work scarification and indicate
Material obtained is or clearing operations approximate quantity and its
being disposed off can be salvaged and re-use by the PIU.
properly (Y/N) reused (Y/N)
Grading: Grade: S SRI U If this item is graded SRI/U, write clear reasons and
suggestions for improvement:
8
3. QUALITY ARRANGEMENTS AND ATTENTION TO QUALITY - For all
stages of work
Observations about Field Laboratory:
Observations about Mandatory Tests - Detail out the quantities of various items of
works and list the tests required. (Refer to abstract of QC Register Part-I)
Grading: Grade: S SRI U If this item is graded SRI/U, write clear reasons and
suggestions for improvement:
9
4. GEOMETRICS: The SQM should take at-least two measurements in 1 Km length
and if it is found that the roadway and carriageway is inadequate SQM may take more
observations:
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
11
Observations - Earth work in Hilly/Rolling terrain or high Embankments:
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
6. Sub-Base:
Observations - Quality of Material and Workmanship:
# Location Confirms Suitable Whether Observed Prescribed
(RD) to from compaction Thickness Thickness
Grading. plasticity is adequate. of Layer provided
(Y/N) angle. (Y/N) (in mm) (Y/N)
(Y/N)
12
Grade: S U If this item is graded U, write clear reasons and suggestions
for improvement:
7. Base Course:
Observations- Quality of Material and Workmanship of WBM:
# Location Thickness Thickness Aggregate Filler Volume of Whether
of each is confirms to material is filler adequate
(RD) layer of adequate. Grading non-plastic material compaction
WBM (Y/N) (Y/N) to desired percent of is done.
(mm) extent. course (Y/N)
(Y/N) aggregate
Observations - Surface evenness: Surface evenness in about 200 m critical
representative length of completed WBM:
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
13
8. Bituminous Course: Premix Carpet/Surface Dressing/ BM/ MPM etc including
Seal Coat: Observations - Quality of Material and Workmanship of BT Layer (in
case of ongoing works):
Observations about Quality of Prime Coat and Tack Coat with respect
to quality of material and workmanship - Visual Observation - if work is
ongoing:
14
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
15
10. Cross Drainage Works: Observations - Quality of CDs:
# RD at which Type of CD Whether quality of the Whether quality of
CD is located material is acceptable. workmanship is
(Y/N) acceptable. (Y/N)
Grade: S SRI U If this item is graded SRI/U, write clear reasons and suggestions for
improvement:
16
12. CC/ Semi-Rigid (SR) Pavements and Associated Pucca Side Drains:
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
17
13. Road Furniture and Markings
Observations - Item No. 14 a: Quality Road Furniture and Markings:
Main Informatory Board Fixed: Yes No
Citizen Information Board Fixed: Yes No
Grade: S U If this item is graded U, write clear reasons and suggestions for
improvement:
14. General Observations of SQM, (including the observations made during the
interaction with PIU staff and Contractor’s/ Consultant’s Engineers):
14.3. Whether the work has been completed within the sanctioned cost, if not,
what is the action taken by the PIU (in case of complete works):
14.4. Observations about the action taken by the PIU on the observations of
inspecting officers including SQMs and NQMs. (Clearly offer comments about
the action taken on the observations of Departmental Officers, State Quality
Monitors and National Quality Monitors).
Awardable Awarded
# Sub Item for Observation Stage of Work Grades Grades
1 2 3 4 5
Item 1 – Setting Out and Working Drawing
a Bench Mark and Centre Line All Stages S/SRI/U
Availability of Working
b All Stages S/SRI/U
Drawing
Item Grade S/SRI/U
Item 2 – Site Clearance and Grubbing
a Site Clearance and Grubbing Stage-I S/SRI/U
b Re-use of Salvageable Material Stage-I S/SRI/U
Item Grade S/SRI/U
Item 3 - Quality Arrangements
a Quality Arrangements All Stages S/SRI/U
Number of Mandatory Tests as
b All Stages S/SRI/U
per prescribed frequency
c Maintenance of QC Registers All Stages S/SRI/U
Item Grade S/SRI/U
Item 4 – Geometrics
2 per Km in every
a Road way width S/U
inspection
2 per Km in every
b Carriageway width S/U
inspection
c Camber 2 per km S/U
Super-elevation & Extra
d 1 curve in each km S/U
Widening at Curves
b Plasticity km S/U
In Stage- II or III, 1 per
c Compaction S/U
km
d Total Thickness of Layer 2 per Km S/U
Awarded
Item No. Sub Item for Observation
Grade
Item No 1 Setting Out and Working Drawing
Item No 2 Site Clearance and Grubbing
Item No 3 Quality Arrangements
Item No 4 Geometrics
Earth Work and Sub-grade in Embankment/
Item No 5 A
Cutting
Item No 5 B Earth Work in Cutting in Hilly/ Rolling Terrain
Item No 6 Sub-Base
Item No 7 Base Course – Water Bound Macadam
Bituminous Layer – Premix Carpet (PMC)/
Item No 8
Surface Dressing (SD)
Item No 9 Shoulders
Cross Drainage Works – Causeways of all
Item No 10
spans and Culverts upto 6 m. span.
Item No 11 Side Drain and Catch Water Drain
CC/ Semi Rigid Pavements and Associated
Item No 12
Pukka Drains
Item No 13 Road Furniture and Markings
Overall Grading
Signature:
Name:
Date: ..……….
25
Annexure 2
Statement Showing Sub-Item and Item wise Observations to be made, their Method, Frequency
and Awardable Quality Grade
Sub Item for
# Observation Method of Observation Frequency Grades
1 2 3 4 5
Item 1 – Setting Out and Working Drawing
Bench Mark and
a Centre Line Visual All Stages S/SRI/U
Availability of
b Working Drawing Visual All Stages S/SRI/U
Item Grade S/SRI/U
Item 2 – Site Clearance and Grubbing
Site Clearance and
a Visual Stage-I S/SRI/U
Grubbing
Re-use of Salvageable
b Material Visual Stage-I S/SRI/U
Item Grade S/SRI/U
Item 3 - Quality Arrangements
a Quality Arrangements Visual All Stages S/SRI/U
Number of Mandatory
b Tests as per prescribed Examination of Record All Stages S/SRI/U
frequency
Maintenance of QC Verification of QC
c Registers Register I and II All Stages S/SRI/U
Item Grade S/SRI/U
Item 4 – Geometrics
2 per Km in every
a Road way width Measurements S/U
inspection
2 per Km in every
b Carriageway width Measurements inspection S/U
c Camber Measurement 2 per km S/U
Super-elevation &
d Extra Widening at Measurement 1 curve in each km S/U
Curves
Item Grade S/U
Item 5A - Earth Work and Sub-grade in Embankment/ Cutting
Quality of Material for
Visual Classification of In Stage-I, 1 per km/
a Embankment/ Sub- S/U
Soils In Stage- II or III, 1 per km
grade
Field Density Test by
In Stage-I, 2 per km/
b Compaction sand replacement/core- S/U
In Stage- II or III, 2 per km
cutter method.
27
Sub Item for Method of
# Observation Observation Frequency Grades
1 2 3 4 5
Item 8 - Bituminous Layer – Premix Carpet (PMC)/ Surface Dressing (SD)
Visual Observation - if
Level of cleanliness of work is ongoing observe
a WBM surface prior to the surface. If BT layer 1 per Km S/U
application of
laid assess by carefully
bituminous layer
removing the BT layer
Quality of Prime Coat/
Tack Coat with
Visual Observation - if 1 observation on the day of
b respect to quality of S/U
material and work is ongoing. inspection
workmanship
Gradation Test for
Course Aggregate (if
the work in the item is
Grain Size Analysis 1 test on the day of
c ongoing)/visual S/U
observation in case of (Gradation Test). inspection
completed item of
work
Grade of bitumen and
temperature at the Measurement of
1 test on the day of
d time of mixing and temperature by S/U
laying (if the work in thermometer. inspection
the item is ongoing)
Bitumen Extraction
e Test if PMC is Bitumen Extraction Test 1 test per Km S/U
complete
Measurement by taking
f Thickness of layer 2 per Km S/U
pit
Surface Evenness in
g case of completed BT By straight edge 2 per Km S/U
work
Item Grade S/U
Item 9 – Shoulders
Quality of material for In Stage- II or III, 1 test
a shoulders Visual Observation S/SRI/U
per Km
Field Density Test by
In Stage- II or III, 1 test
b Degree of compaction sand replacement/core- S/SRI/U
per Km
cutter method.
In Stage- II or III, 2 tests
c Thickness of layer Measurement S/SRI/U
per km
Item Grade S/SRI/U
Item 10 - Cross Drainage Works – Causeways of all spans and Culverts upto 6 m. span.
Quality of Material –
Visual observation ( for
Concrete, Stone/ brick
a CC verify cube test All Stages S/SRI/U
masonry, Hume pipes
results from records)
including size etc.
28
Sub Item for
# Observation Method of Observation Frequency Grades
1 2 3 4 5
Quality of
Workmanship such as
b positioning of pipes, Visual observation All Stages S/SRI/U
wing walls, cushion
over H Pipes etc.
Item Grade S/SRI/U
Item 11 - Side Drain and Catch Water Drain
General quality of
Side Drains/ Catch
Water Drains and their Visual observation All Stages S/SRI/U
integration with CDs.
Item Grade S/SRI/U
Item 12 - CC/ Semi Rigid Pavements and Associated Pukka Drains
Quality of Material –
In Stage- II or III, 1 per
Concrete, Stone/
a Visual Observation 100 m. Length of S/U
Concrete Block
Pavement
Pavement etc.
Strength using
Strength of CC in
appropriate rebound
Concrete Pavement/ In Stage- II or III,1 per 100
b hammers/ verification of S/U
Concrete Block m. Length of Pavement
cube test results from
Pavement
test records.
Quality of
Workmanship –
Wearing surface
c texture, Adequacy of Visual observation In Stage- II or III S/U
setting of concrete,
Joints, Edges etc.
In Stage- II or III, 1 per
d Thickness of Layer Measurements 100 m. Length of S/U
Pavement
Item Grade S/U
Item 13 - Road Furniture and Markings
Citizen Information
Board, Main
Informatory Board,
a Quality and whether Visual observation Stage-I S/U
fixed during
construction.
Logo boards, 200 m
stones and Km stones,
b quality and whether Visual observation Stage-III S/U
fixed after completion.
Whether the
information in boards
c is given in local Visual observation Stage-I and III S/U
language.
Item Grade S/U
29
Annexure 3
3. Based on the stage of inspection and the items inspected, the SQM shall
select any of the gradings out of awardable grades, otherwise, select the
option NA and the web would generate overall grading.
4. On the same page, option for uploading digital photographs would appear
and the SQM shall upload maximum 10 digital photographs for each
inspection.
1. Role of SQC and PIU: It would be the responsibility of the PIU to arrange for
appropriate digital photography of observations on quality of material and workmanship
of the road work by the SQMs. The SQM would be responsible for giving appropriate
directions for the photography of critical observations during the inspection. The
photographs should be of fair quality and the print on plain paper. In case of any
difficulty, the SQM would contact the SQC and it would be responsibility of SQC to
ensure that proper arrangements in this regard are made by the PIU.
(a) Starting Point of the Road: First of all, the photograph of the starting point
showing signage such as informatory board, Citizen Information Board and
other signage could be taken. It would also be appropriate to take photographs
of the roads with actual traffic and road users. Examples of such photographs
are given below:
1
Photographs showing starting point of the road with signage
(a) Geometrics: The photography for documenting the geometrics may be done
in the following manner:
2
Photographs showing a field and a mobile laboratory
3
Observations:
Results of little effort by
spade. Earth work not
compacted at all, only
superficial dressing done on
slopes.
Agency: NHPC
Distt: East Champaran
Name: Dhangartoli Chowk to Nonparwa
Length: 1.5 Km.
Cost: Rs. 49.11 Lakhs
Date of Inspection: 17.01.06
Photographs showing poor WBM and example of good WBM with good compaction
(a) Rigid Pavement, CD Works and Drainage: Joints, Riding quality, cracks or various
other failures of rigid payment can be photographed easily. Good or bad features of
various components of cross drainage work such as Hume-pipes, cushion, slab,
abutments, approaches etc can be photographed easily. Examples of such
photographs are given below.
5
Observations: General quality of
CD is good but D/S protection
needs to be strengthened.
Downstream retrogression needs
to be taken note of.
(a) Protection Works: In case of roads in hilly and rolling terrain, protection of
road furniture is an important element. Appropriate photographs may be
taken. In case of roads in plain areas also sometimes protection work is carried
out in cases of high embankments or presence of water body just by the side
of the road, appropriate photographs may be taken.
2. Reporting: After taking photographs, the PIU is required to get appropriate hard
as well as soft copies and handover to the SQM for recording in the report. The SQM
would be expected to attach photographs with the report with analysis in appropriate
item of the prescribed format. The SQM would also upload these photographs on
OMMAS website.
……………………………………………………………………………………………
6