0% found this document useful (0 votes)
2K views1 page

IOH-POH of ART-ARME Coaches

Uploaded by

Saptarshi Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

IOH-POH of ART-ARME Coaches

Uploaded by

Saptarshi Pal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 1
aARg ROR GOVERNMENT OF INDIA Yet HATER MINISTRY OF RAILWAYS (aa 4S RAILWAY BOARD) No.2007/M(C)/1441/4 New Delhi, dated 3.11.08 The Chief Mechanical Engineer, E.C.Raiway, Hajipur Sub: [OH/POH periodicity of ICF design OCVs. Ref: (i) Board's letter of even No. dated 26.9.08 (ii) ECR's letter No. ECR/MEC/CHG/416 Pt.ll dated 30.10.08 In terms of Board's letter referred to above, it has been legislated that OCVs which form a part of standard rake composition of M/E trains shall be dealt with for lOH/POH at an interval of 9/18 months. The scope of activities during IOH has also been stipulated therein. Accordingly, OCVs like WGCB (Pantry Car), VPVPH/IVPHX/VPU/VPR(various categories of Parcel Vans), PP (Postal Vans) etc. are required to be dealt with under this category. : All other OCVs shall follow an IOH/POH periodicity of 12/24 months as has also been mentioned in Board's letter referred to above. Only as a matter of exception, a as communicated vide Board's letter No. 2003/M(M&P)/7/DM(79) dated 3.6.2003, may be continued with. An IOH may however be cartied out at regular intervals of 6 months for such ART coaches, re gumd (Arvind Nautiyal Dir Mech Engg (Coaching) Railway Board Copy for information to: The Chief Mechanical Engineers, All Indian Raitways Scanned with CamScanner

You might also like