US Regional Airport Cost Model Benchmarks: (USA Mid-West Location) : 2016 Cost Basis: Open Shop Construction

This cost model provides construction cost estimates for various airport infrastructure projects located in the US Midwest, including: 1) Construction of new runways and taxiways ranging from $1,550 to $2,600 per lineal foot. 2) Construction of new aircraft parking ramps and stands of $15 to $25 per square foot. 3) Demolition and removal of existing concrete slabs ranging from $0.25 to $0.40 per square foot.

Uploaded by

Suhail Ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
246 views2 pages

US Regional Airport Cost Model Benchmarks: (USA Mid-West Location) : 2016 Cost Basis: Open Shop Construction

This cost model provides construction cost estimates for various airport infrastructure projects located in the US Midwest, including: 1) Construction of new runways and taxiways ranging from $1,550 to $2,600 per lineal foot. 2) Construction of new aircraft parking ramps and stands of $15 to $25 per square foot. 3) Demolition and removal of existing concrete slabs ranging from $0.25 to $0.40 per square foot.

Uploaded by

Suhail Ahamed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

US Regional Airport Cost Model Benchmarks: (USA Mid-West location): 2016 Cost Basis:

I N T E R N AT I O N A L I N C .
Open Shop Construction:
This cost model itemizes +/- 15% cost estimating data on the costs of constructing and or upgrading / revamping airport runways, taxiways and aircraft parking stands and
ramps. The cost benchmark model also includes square foot / square meter unit costs for constructing new terminals and departure gates and costs associated with , escala-
ctors for Two Story College Add On Project:
tors, baggage carousels, aircraft fueling systems & waste disposal systems. The cost model is based on a (6) gate(s) 650,000 to 850,000 passengers per year terminal operating
in the order of 15 to 25 departures per day.
n with 16 Laboratory Work Areas
ound Floor
# & 23,400 SF on 2nd Floor
Description U of M $ Low $ High Remarks
hs; Construction - 12 months Union Construction
New commercial main runway 7,000 Lineal Foot (LF) to Construction costs include 12” to 18” of excavation, imported engineered fill, 95%
Located in
1 Central New
10,000 Lineal Jersey,
Foot (LF), 10” USA
deep on 4” deep asphalt / tar- LF 2,100 2,600 compaction of fill and necessary grading, lighting, signs and marking, complete with
mac and 6”deep of reinforced concrete. associated drainage systems. (To determine a meter value multiply $ value by 3.28).
GORY New secondary runway 3,500 LinealSF
Foot (LF) toCOST
7,000PER SF TOTAL $ COST Construction costs include 12” to 18” of excavation, imported engineered fill, 95%
2 Lineal Foot (LF), 8” deep on 2” deep asphalt
n place, not part of this project) 59,800
/ tarmac and
6.06
LF
362,657
1,550 2,050 compaction of fill and necessary grading, lighting, signs and marking, complete with
minaries / Division6”deep
1 of reinforced concrete. 59,800 13.59 812,515 associated drainage systems. (To determine a meter value multiply $ value by 3.28).
59,800 3.76 225,057 Construction costs include 9” to 12” of excavation, imported engineered fill, 95% com-
New taxiway construction 8” deep on 2” deep asphalt
59,800 2.01/ 120,416
3 SF 20 30 paction of fill and necessary grading, lighting, signs and marking, complete with associ-
s tarmac and 6”deep of reinforced concrete.
59,800 6.71 401,138
ated drainage systems. (To determine a square meter value multiply $ value by 10.76).
59,800 4.67 279,281
59,800 6.46 386,562 Construction costs include 9” to 12” of excavation, imported engineered fill, 95%
59,800
New ramps/ aircraft stands / apron construction 6”5.03
deep on 300,854 compaction of fill and necessary grading, lighting, signs and marking, complete with
ural Floors 4 2” deep asphalt / tarmac and 4”deep59,800 12.51
of reinforced concrete.
SF
748,053 15 25
associated drainage systems. (To determine a square meter value multiply $ value by
59,800 4.08 243,715 10.76).
in interior partitions) 59,800 $6.47 $387,145
k & P.C.C. Wall5 Panels)
Scarify and resurfacing (2” asphalt / 59,800
tarmac) $15.27 SF
$913,056 5 10 (To determine a square meter value multiply $ value by 10.76).
59,800 $6.80 $406,386
59,800 $0.58 $34,400 Construction costs include 6” to 12” of excavation, imported engineered fill, 95%
nt Canopy 6 New concrete hard
standings
4” thick reinforced
59,800 concrete
$1.65 $98,535
SF 10 15
compaction of fill and necessary grading, lighting, signs and marking, complete with
on 6” imported stone / hardcore base. 59,800 $4.52 $270,535 associated drainage systems. (To determine a square meter value multiply $ value by
59,800 $3.30 $197,071 10.76).
59,800 $3.27 $195,322
s / Handicap needs 59,800 Construction costs include 6” to 12” of excavation, imported engineered fill, 95% com-
Scarify and resurfacing concrete hard standings 4” $1.94thick $116,027
7 59,800/ hardcore $0.77 SF
$46,061 5 10 paction of fill and necessary grading, lighting, signs and marking, complete with associ-
reinforced concrete on 6” imported stone base.
59,800 $4.88 $292,108 ated drainage systems. (To determine a square meter value multiply $ value by 10.76).
ooms / Lunch Room Cabinets 59,800 $3.46 $206,983
Demolish and remove 4” thick slab on grade reinforced
8 59,800 $0.25 SF
$15,159 2.75 3.75 (To determine a square meter value multiply $ value by 10.76).
rdwood & Tile)
with mesh 59,800 $6.80 $406,386
Boards Demolish and remove 6” thick slab on 59,800
grade reinforced $0.40 $23,905
9 59,800 $4.17 SF
$249,294 3.15 4.15 (To determine a square meter value multiply $ value by 10.76).
with mesh
1 # Freight) 59,800 $2.16 $129,437
& Downspouts 10 / Roof
Concrete cleaning
Equipment Padsusing sandblasting
& Walkways equipment $1.70
59,800 SF
$101,451 2.35 2.85 (To determine a square meter value multiply $ value by 10.76).
ng) 59,800 $5.41 $323,593
11 Tarmac cleaning using sandblasting59,800
s - Extinguisher’s equipment $4.02 SF
$240,217 2.15 2.65 (To determine a square meter value multiply $ value by 10.76).
New Terminal Building (2 story building59,800
70,000 SF to $19.38 $1,159,103
ems 12 59,800 $2.86 SF
$170,834 190 240 (To determine a square meter value multiply $ value by 10.76).
140,000 SF)
rgency Generator 59,800 $18.41 $1,100,798
ard readers 59,800 – New$2.85
Revamp Terminal Building Minimal upgrade $170,251
Rooms / Benches / Seating/ &
13 Flooring Stage Painting,
Carpet, Area / Upgrade59,800
MEP Systems /$14.51 New $867,578 25
SF 50 (To determine a square meter value multiply $ value by 10.76).
ghting Ceilings & Signage.
electric, water, gas 59,800 $18.17 $1,086,805
w lab equipment, case work, gases, sinks, 59,800 23.38 $1,398,154

/ Lockers 59,800 $5.44 $325,342


US Regional Airport Cost Model Benchmarks: (USA Mid-West location): 2016 Cost Basis:
I N T E R N AT I O N A L I N C .
Open Shop Construction:

# Description U of M $ Low $ High Remarks

ctors 14forRevamp
Two Story
Terminal Building College
Medium upgrade Add
– New On Project:
Flooring / Carpet, Painting, Upgrade MEP Systems / New SF 50 100 (To determine a square meter value multiply $ value by 10.76).
n with 16 Laboratory Work Areas
Ceilings & Signage.
ound Floor & 23,400 SF on 2nd Floor
Revamp Terminal Building Major upgrade – New Flooring
hs; Construction
15 / Carpet,- Re-Configure
12 months Union
internal Construction
walls, Painting, New MEP SF 75 150 (To determine a square meter value multiply $ value by 10.76).
Located in Central New Jersey, USA Ceilings & Signage.
Systems / New Bathrooms, F/P, New
16 Baggage Carousel c/w with electrical work EACH 375,000 850,000 Cost range.
GORY SF COST PER SF TOTAL $ COST
17 Escalator 30’ – 60’ length EACH 175,000 470,000 $5,850 to $7,833 per LF
n place, not part of this project) 59,800 6.06 362,657
18 Moving Walkway 100’ – 250’ length EACH 125,000 375,000 $1,250 to $1,750 per LF
minaries / Division 1 59,800 13.59 812,515
19 Elevator 10 passenger (2 stops) 59,800 3.76 225,057 75,000
EACH 175,000 Cost range.
59,800 2.01 120,416
s 20 New Jet Bridge
Similar building as above constructed in following Countries:
59,800
59,800
6.71
4.67
EACH
401,138 610,000
279,281
960,000 Cost range.
21 Used – 2nd hand Jet Bridge 59,800 6.46
EACH
386,562
380,000 650,000 Cost range.
# COUNTRY
59,800 CITY
5.03 LOCATION FACTOR
300,854 $ COST PER SQUARE FOOT $ COST PER M2
Construction costs includes: excavation, sand base, foundations, tank steel material,
ural Floors 22 100,000 Gallon Tank 1 Brazil59,800 12.51
Uberaba 748,053
EACH 0.88320,000 470,000 tank
$248erection, piping, pumps, electrical $2,670
systems, metering system, insulation and
2 China59,800 4.08
Wuhan 243,715
0.85 painting
$240 & testing. $2,579
in interior partitions) 3 France59,800 $6.47
Nantes $387,145
0.97 $274 $2,943
k & P.C.C. Wall Panels) 4 59,800
Germany $15.27
Bremen $913,056
0.98 Construction
$276 costs includes: excavation,$2,974
sand base, foundations, tank steel material,
23 250,000 Gallon Tank 5 India59,800 $6.80
Jamshedpur $406,386
EACH 0.86510,000 660,000 tank
$243erection, piping, pumps, electrical $2,610
systems, metering system, insulation and
6 Italy 59,800 $0.58
Turin $34,400
0.94 painting
$265 & testing. $2,852
nt Canopy 7 Mexico59,800 $1.65
Tampico $98,535
0.85 $240 $2,579
8 Norway59,800 $4.52
Bergen $270,535
1.05
Construction
$296
costs includes: excavation,$3,186
sand base, foundations, tank steel material,
24 500,000 Gallon Tank 9 Spain59,800 $3.30
Bilbao EACH 0.92800,000
$197,071 950,000 tank
$259erection, piping, pumps, electrical $2,792
systems, metering system, insulation and
10 Sweden59,800 $3.27
Malmo $195,322
1.05 painting
$296 & testing. $3,186
s / Handicap needs 11 59,800
Switzerland $1.94
Fribourg $116,027
1.06 $299 $3,216
59,800 $0.77 $46,061 Construction costs include 3” to 6” of excavation, imported stone, 95% compaction of
12 Turkey Izmir 0.90 $254 $2,731
stone and necessary grading, lighting, signs and marking, complete with associated
25 Passenger Parking Areas 13 UK 59,800 $4.88
Bristol $292,108
SF 1.02 2.5 4.5 $288 $3,095
ooms / Lunch Room Cabinets 14 USA 59,800 $3.46
Trenton, NJ $206,983
1.00
drainage
$282
systems and 2” deep asphalt / tarmac
$3,036
top coat. (To determine a square meter
59,800 $0.25 $15,159 value multiply $ value by 10.76).
rdwood & Tile) 59,800 $6.80 $406,386
Boards
For additional
26 Architectural / Engineering location factors
Scope &59,800
Fees $0.40
refer to$23,905
%Compass International’s
6.25% 8.50% 2015 GlobalofConstruction
Percentage Construction CostYearbook (15th Edition)
or visit http://www.compassinternational.net/product/2015-global-construction-costs-yearbook/
59,800 $4.17 $249,294
27 Construction ManagementPlease send us an e mail if$2.16 %
you would $129,437 3.75% spreadsheet
like an excel 5.50% for
Percentage
this costofmodel.
Construction Cost
1 # Freight) 59,800
& Downspouts / RoofGeneral Conditions
Equipment Pads/&
Preliminaries
Walkways / 59,800
Division 1 costs$1.70
are $101,451
28 % 5% 9.50% Percentage of Construction Cost: For guidance purposes only.
ng) included in above construction values59,800 $5.41 $323,593
s - Extinguisher’s 59,800 $4.02 $240,217
59,800 $19.38 $1,159,103
ems 59,800 $2.86 $170,834
rgency Generator 59,800 $18.41 View our annual cost
$1,100,798 COMPASS INTERNATIONAL
ard readers 59,800 $2.85 estimating
$170,251 yearbooks at (215) 504 9777
Rooms / Benches / Seating & Stage Area / 59,800 $14.51 $867,578 www.compassinternational.net
www.compassinternational.net
ghting sales@compassinternational.net
electric, water, gas 59,800 $18.17 $1,086,805
w lab equipment, case work, gases, sinks, 59,800 23.38 $1,398,154

/ Lockers 59,800 $5.44 $325,342