Inspection Checklist For: Pipework Insulation

This document provides a checklist for inspecting pipework insulation installation with 12 items to check: 1) The quality and approval of insulation materials and fixing methods. 2) That drawings on site are the latest issue and pipework is clear of debris and damage before insulation. 3) That pipework has been pressure tested and insulation sections are firmly joined with sealed seams. 4) That all fittings, valves and equipment are insulated correctly. 5) That insulation requiring metal sheathing has it installed with sealed seams.

Uploaded by

Muquequ@
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (3 votes)
2K views2 pages

Inspection Checklist For: Pipework Insulation

This document provides a checklist for inspecting pipework insulation installation with 12 items to check: 1) The quality and approval of insulation materials and fixing methods. 2) That drawings on site are the latest issue and pipework is clear of debris and damage before insulation. 3) That pipework has been pressure tested and insulation sections are firmly joined with sealed seams. 4) That all fittings, valves and equipment are insulated correctly. 5) That insulation requiring metal sheathing has it installed with sealed seams.

Uploaded by

Muquequ@
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Inspection and Test Plans (ITP) – MUM-07

Pipework Insulation Installation Checklist

Client: Project Name: Project No:

Area: Drawing No’s: Date: Sheet: 1 of 2

Check Conducted By: Signature: Check Approved By: Signature:

INSPECTION CHECKLIST FOR: PIPEWORK INSULATION


The below checks are to be completed by the Mechanical Contractor

INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:

Quality Control
1 Insulation material approved for use Yes No Yes No
2 Fixing methods approved for installation Yes No Yes No
All materials not being used are correctly stored
3 Yes No Yes No

Installation
4 Drawings on site are the latest issue Yes No Yes No
Confirm pipework is clear of external rust, debris is dry
5 and is free from damage prior to commencing insulation Yes No Yes No
installation
Confirm pipework has been pressure tested prior to
6 Yes No Yes No
insulation installation
Confirm pipework insulation sections are firmly butted
7 together and the longitudinal seam of the vapour barrier Yes No Yes No
is cemented
Confirm all fittings, valves, equipment are insulated as per
8 Yes No Yes No
the specification
Confirm all insulation designated as requiring metal
9 sheathing has been and that sheathing has moisture Yes No Yes No
barrier seam locks

1
INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
Sheathed insulation box provided at pumps with
10 Yes No Yes No
removable panels to allow maintenance
Confirm all chilled water pipework insulation has a
11 Yes No Yes No
continuous vapour barrier
Mark alterations, sizes + final location on As Built
12
drawings for record purposes