Inspection and Test Plans (ITP) – MUM-07
Pipework Insulation Installation Checklist
      Client:                                              Project Name:                                                        Project No:
      Area:                                                Drawing No’s:                                         Date:                                     Sheet: 1 of 2
      Check Conducted By:                                  Signature:                               Check Approved By:                        Signature:
        INSPECTION CHECKLIST FOR: PIPEWORK INSULATION
        The below checks are to be completed by the Mechanical Contractor
                                                                                      INSPECTION HISTORY
NO:    DESCRIPTION:                                                     INSPECTION:
                                                                                      ACCEPTABLE:      DATE:        COMMENTS:
       Quality Control
1      Insulation material approved for use                             Yes   No      Yes    No
2      Fixing methods approved for installation                         Yes   No      Yes    No
       All materials not being used are correctly stored
3                                                                       Yes   No      Yes    No
       Installation
4      Drawings on site are the latest issue                            Yes   No      Yes    No
       Confirm pipework is clear of external rust, debris is dry
5      and is free from damage prior to commencing insulation           Yes   No      Yes    No
       installation
       Confirm pipework has been pressure tested prior to
6                                                                       Yes   No      Yes    No
       insulation installation
       Confirm pipework insulation sections are firmly butted
7      together and the longitudinal seam of the vapour barrier         Yes   No      Yes    No
       is cemented
       Confirm all fittings, valves, equipment are insulated as per
8                                                                       Yes   No      Yes    No
       the specification
       Confirm all insulation designated as requiring metal
9      sheathing has been and that sheathing has moisture               Yes   No      Yes    No
       barrier seam locks
                                                                                                                                                                           1
                                                                           INSPECTION HISTORY
NO:   DESCRIPTION:                                           INSPECTION:
                                                                           ACCEPTABLE:   DATE:   COMMENTS:
      Sheathed insulation box provided at pumps with
10                                                           Yes   No      Yes    No
      removable panels to allow maintenance
      Confirm all chilled water pipework insulation has a
11                                                           Yes   No      Yes    No
      continuous vapour barrier
      Mark alterations, sizes + final location on As Built
12
      drawings for record purposes
      ADDITIONAL COMMENTS: