Bill of Materials

This document is a bill of quantities for renovations to the living room of Mrs. Linda Favila's residence. It includes costs for dismantling existing walls and ceilings, installing new walls, ceilings, electrical work, a sliding door, and painting. The total cost for all materials and labor is estimated to be PHP 239,999.51.

Uploaded by

Olivia Cano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
427 views5 pages

Bill of Materials

This document is a bill of quantities for renovations to the living room of Mrs. Linda Favila's residence. It includes costs for dismantling existing walls and ceilings, installing new walls, ceilings, electrical work, a sliding door, and painting. The total cost for all materials and labor is estimated to be PHP 239,999.51.

Uploaded by

Olivia Cano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Project: Mrs.

Linda Favila Residence (for Renovation)


Subject: Bill of Quantity
Location: # 3 Interior 1 Lt. J. Francisco St., Katipunan UP Quezon City
Date: April 30, 2018

Item Description Unit Cost TOTAL TOTAL TOTAL


Qty Unit MAT MAT LABOR AMOUNT
LIVING ROOM RENOVATION
A. MOBILIZATION OF TOOLS, MATERIALS and EQUIPMENT 1 lot 15,000.00
Gasoline, Service (back and forth ) 2 a week

B. DISMANTLING OF WALLS AND CEILING 1 lot 15,000.00


Preparation of area 6,000.00
Lona 2 pcs 500.00 1,000.00 400.00
Coco Lumber 2 x 3 x 12 20 pcs 194.00 3,880.00 1,552.00
Coco Lumber 2 x 32 x 12 6 pcs 131.60 789.60 315.84
Plactic 1 roll 758.56 758.56 303.42
6,428.16 8,571.26
C. SITE CLEARING 1 lot 10,000.00

D. INSTALLATION OF WALLS 59,290.00


a. Metal Stud (0.5mm x 20') 36 pcs 110.00 12,100.00 4,840.00
b. Channel Track (4mm x 20') 28 pcs 105.00 2,940.00 1,176.00
c. Channel Stud (4mm x 20') 14 pcs 300.00 4,200.00 1,680.00
d. Hardiflex (4.5mm x 4' x 8') 36 pcs 500.00 18,000.00 7,200.00
e. Accessories -
W Clips 100 pcs 6.00 600.00 240.00
Rivets (1/2 x 1/8 ) 2 box 220.00 440.00 176.00
Black Screw (2") 1000 pcs 1.60 1,600.00 640.00
Tape Mesh 10 rolls 135.00 1,350.00 540.00
Drillbit Stainless 1/2 x 1/8 1 box 800.00 800.00 320.00
conrete Nail 1" 2 kl 80.00 160.00 64.00
conrete Nail 2" 2 kl 80.00 160.00 64.00
42,350.00 16,940.00
E. INSTALLATION OF CEILING - 62,236.00
a. Metal Furring ( 19mm x 50mm) 26 pcs 100.00 2,600.00 1,040.00
b. Carrying Channel (12mm x 38mm) 12 pcs 120.00 1,440.00 576.00
c. Wall angle (25mm x 25mm ) 35 pcs 50.00 1,750.00 700.00
d. Hardiflex (4.5mm x 4' x 8') 14 pcs 500.00 7,000.00 2,800.00
e. Accessories -
W Clip 80 pcs 6.00 480.00 192.00
Rivets (1/2 x 1/8 ) 5 box 220.00 1,100.00 440.00
Black Screw ( 2" ) 1000 pcs 1.60 1,600.00 640.00
Threaded Rod with Nuts 80 pcs 120.00 9,600.00 3,840.00
Expansion Shield 350 pcs 25.00 8,750.00 3,500.00
f. Hardiflex Panel Board -
3/4 " x 6" x 4m 4 pcs 1,200.00 4,800.00 1,920.00
3/4" x 8" x 6m 4 pcs 1,200.00 4,800.00 1,920.00
conrete Nail 1" 2 kl 80.00 160.00 64.00
conrete Nail 2" 2 kl 80.00 160.00 64.00
Stainless Blade Cutter 8" 2 pcs 150.00 300.00
44,540.00 17,696.00
Project: Mrs. Linda Favila Residence (for Renovation)
Subject: Bill of Quantity
Location: # 3 Interior 1 Lt. J. Francisco St., Katipunan UP Quezon City
Date: April 30, 2018

Item Description Unit Cost TOTAL TOTAL TOTAL


Qty Unit MAT MAT LABOR AMOUNT
F. INSTALLATION OF ELECTRICAL - 33,467.00
1.1 20mm flexible hose 100 mtrs 10.00 1,000.00 400.00
mica tube 30 mtrs 25.00 750.00 300.00
1.2 Wires -
# 12 Gauge 3.5 1 box 3,366.00 3,366.00 1,346.40
# 14 1 box 2,295.00 2,295.00 918.00
30 Amperes 2 pc 552.00 1,104.00 441.60
Full box or splicing box 1 pc 530.00 530.00 212.00
1.3 Lighting Fixtures
Pin Light 12 pcs 229.00 2,748.00 1,099.20
Cove Light 20 lm 500.00 10,000.00 4,000.00
1.4 Switches
3 gang switch 6 pcs 139.75 838.50 335.40
1.5 Convenience Outlet 6 pcs 169.75 1,018.50 407.40
1.6 Electrical Tape 3 pcs 85.00 255.00 102.00
23,905.00 9,562.00
-
G. INSTALLATION OF SLIDING DOOR - 22,743.00
SLIDING DOOR 1.40 m x 2.0 m 1 PC 12,850.00 12,850.00 5,140.00
Cornice 7 lm 335.00 2,345.00 938.00
Paint QDE 7 lm 150.00 1,050.00 420.00
16,245.00 6,498.00

LIVING ROOM RENOVATION


H. PAINTING WORKS 39,120.25
1.1 Masonry Putty (20sqm/4L) 3 gal 345.50 1,036.50 414.60
1.2 Stuc - O Life Flat Latex White (no need to neutralize) 9 gal 692.00 6,228.00 2,491.20
1.3 Elastomeric (colored approved) walls 6 pail 2,408.00 14,448.00 5,779.20
1.4 Elastomerc (colored approved) columns 2 pail 2,408.00 4,816.00 1,926.40
Tinting Color (colored approved) 1 lt 452.65 452.65 181.06

26,981.15 10,792.46
less 10% 2,698.12 1,079.25

24,283.04 9,713.21

Sanding Paper # 50 pcs 20.00 1,000.00 400.00


Stripsole 2 gal 380.00 760.00 304.00
Brush 4" 4 pcs 75.00 300.00
Roller 4 pcs 90.00 360.00
Basahan 80 pcs 5.00 400.00
Palette 4 pairs 150.00 600.00
Mesh 5 roll 200.00 1,000.00
4,420.00 704.00
Project: Mrs. Linda Favila Residence (for Renovation)
Subject: Bill of Quantity
Location: # 3 Interior 1 Lt. J. Francisco St., Katipunan UP Quezon City
Date: April 30, 2018

Item Description Unit Cost TOTAL TOTAL TOTAL


Qty Unit MAT MAT LABOR AMOUNT

STAIRS INSTALLATION 41,966.25


Tubular 2" x 4" x 6m 1.5 7 pcs 1,140.00 7,980.00 2,793.00
Tubular 1" x 1" x 6m 0.2 10 pcs 250.00 2,500.00 875.00
Steel Plate 150 X 600 4x8 2.0 2 pcs 2,150.00 4,300.00 1,505.00
plate 450 x 600 x 1/4" 6mm steel - -
Railings 1" X 8' steel pipe BI scd 40 525 7 pcs 685.00 4,795.00 1,678.25
1 1/2 BI scd 685 900 7 pcs 900.00 6,300.00 2,205.00
Epoxy Primer Gray 1 gal 800.00 800.00 280.00
Weldng Rod 20kl - 450/500, 1/8 400- 6 box 450.00 2,700.00 945.00
Rope 18 m 20.00 360.00
Pulley 1 pcs 350.00 350.00
Anchor bolt M8 (95-T) 8 pcs 200.00 1,600.00
31,685.00 10,281.25

193,856.20 79,965.73 298,822.50


Project: Mrs. Linda Favila Residence (for Renovation)
Subject: Bill of Quantity
Location: # 3 Interior 1 Lt. J. Francisco St., Katipunan UP Quezon City
Date: April 30, 2018

SUMMARY COST
A. MOBILIZATION OF TOOLS, MATERIALS and EQUIPMENT ₱15,000.00
B. DISMANTLING OF WALLS AND CEILING ₱15,000.00
C. SITE CLEARING ₱10,000.00
D. INSTALLATION OF WALLS ₱59,290.00
E. INSTALLATION OF CEILING ₱62,236.00
F. INSTALLATION OF ELECTRICAL ₱33,467.00
G. INSTALLATION OF SLIDING DOOR ₱22,743.00
H. PAINTING WORKS ₱39,120.25
STAIRS INSTALLATION ₱41,966.25
PROJECT COST ₱298,822.50

PROFESSIONAL FEE:

TOTAL PROJECT COST ₱298,822.50