Tie Beam Reinforcement Detail

The document outlines the reinforcement schedule for columns and tie beams in a construction project, specifying the concrete grade as M20 and steel grade as Fe500. It details the dimensions and reinforcement types for various floors, including the use of 2-legged stirrups for each column. Additionally, it provides specific measurements for the plinth beam's edge and mid-section dimensions.

Uploaded by

Rajib Maharjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
104 views1 page

Tie Beam Reinforcement Detail

The document outlines the reinforcement schedule for columns and tie beams in a construction project, specifying the concrete grade as M20 and steel grade as Fe500. It details the dimensions and reinforcement types for various floors, including the use of 2-legged stirrups for each column. Additionally, it provides specific measurements for the plinth beam's edge and mid-section dimensions.

Uploaded by

Rajib Maharjan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COLUMN REINFORCEMENT SCHEDULE CONCRETE GRADE = M20 STEEL GRADE = Fe500

LATERIAL TIES
COLUMNS GROUND FLOOR FIRST FLOOR SECOND FLOOR THIRD FLOOR TOP FLOOR
IN(h+z) IN(H-2h)
12" 12" 12" 12" 12"

C1
12"

12"

12"

12"

12"
2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS

12" 12" 12" 12" 12"


12"

12"

12"

12"

12"
C2

2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS

12" 12" 12" 12" 12"

C3
12"

12"

12"

12"

12"
2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS

12" 12" 12" 12" 12"

C4
12"

12"

12"

12"

12"

2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS

12" 12" 12" 12"

C5
12"

12"

12"

2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS 2 LEGGED STIRRUPS

TIE BEAM REINFORCEMENT DETAIL


CONCRETE
S. No. BEAM SIZE EDGE SECTION MID SECTION
GRADE
9'' 9''

1. Plinth 12"x9"
M 20
1'

1'

Beam