Concrete Production
Concrete Production
GRADE
M10 URCC
M15 URCC
M35 URCC
M15 SITE
M40 SITE
RC CONSTRUCTION PVT LTD
Apr-19
STRUCTURE STRCTURE ID SITE
229.00
229
URC CONSTRUCTION PVT LTD
May-19
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRCTURE ID SITE SITE/URC MIX
1 5/2/2019 RAJA ETU FOOTING C6,C7,B7,A5,A4,C11 VANAZ SITE RCC
2 5/2/2019 RAJA ETU COLUMN E11,B11,C1 VANAZ SITE RCC
3 5/2/2019 ANANDHAN DECK-1 FOOTING Q17 VANAZ SITE PCC
4 5/2/2019 SAKTHI RAMESH ETU FOOTING 1E,1F,1H RANGE SITE PCC
5 5/3/2019 ANANDHAN DECK-1 FOOTING N17 VANAZ SITE PCC
6 5/3/2019 RAJA ETU FOOTING A12,B11 VANAZ SITE RCC
7 5/3/2019 RAJA ETU COLUMN E12,D11,C11 VANAZ SITE RCC
8 5/3/2019 RAJA ETU FOOTING B1,B9 VANAZ SITE PCC
9 5/3/2019 SAKTHI RAMESH ETU FOOTING 6H,7H RANGE SITE RCC
10 5/4/2019 ANANDHAN DECK-1 FOOTING P17 VANAZ SITE PCC
11 5/4/2019 RAJA ETU FOOTING B12,C6,C7 VANAZ SITE RCC
12 5/4/2019 RAJA ETU COLUMN C5 VANAZ SITE RCC
13 5/4/2019 SAKTHI RAMESH ETU FOOTING 3H,2F,2G,5E RANGE SITE PCC
14 5/5/2019 JOTHISH LABOUR SHED FLOORING ESTHABLISHMENT VANAZ URC PCC
15 5/5/2019 KEERTHI BATCHING PLANT SILO-2 BEAM VANAZ URC RCC
16 5/5/2019 RAJA ETU FOOTING A1 VANAZ SITE PCC
17 5/6/2019 KEERTHI MECHANIC ROOM FLOORING ESTHABLISHMENT VANAZ URC PCC
18 5/6/2019 RAJA ETU FOOTING E7,E10,C10,C7 VANAZ SITE RCC
19 5/7/2019 JOTHISH LABOUR SHED FLOORING ESTHABLISHMENT VANAZ URC PCC
20 5/7/2019 RAJA ETU COLUMN C6,B5 VANAZ SITE RCC
21 5/8/2019 RAJA ETU COLUMN C7,E7,B3 VANAZ SITE RCC
22 5/8/2019 SAKTHI RAMESH ETU FOOTING 6E,7E,8E RANGE SITE RCC
23 5/9/2019 RAJA ETU FOOTING A11-A7 B10,B9 VANAZ SITE RCC
24 5/9/2019 ASHIK ALI LABOUR SHED FLOORING 1 RANGE URC PCC
25 5/10/2019 RAJA ETU FOOTING A2,A3,B8 VANAZ SITE RCC
26 5/10/2019 ASHIK ALI LABOUR SHED FLOORING 2 RANGE URC PCC
27 5/10/2019 MATHAN BATCHING PLANT FOOTING RANGE URC RCC
28 5/11/2019 ANANDHAN DECK-1 FOOTING Q17,N17,P17 VANAZ SITE RCC
29 5/11/2019 ASHIK ALI LABOUR SHED FLOORING RANGE URC PCC
30 5/12/2019 RAJA SITE OFFICE FLOORING VANAZ URC PCC
31 5/13/2019 RAJA ETU COLUMN B10,B11,C5 VANAZ SITE RCC
32 5/14/2019 RAJA ETU FOOTING A6 VANAZ SITE RCC
33 5/14/2019 RAJA ETU COLUMN B7 VANAZ SITE RCC
34 5/14/2019 SAKTHI RAMESH ETU COLUMN 6H,7H RANGE SITE RCC
35 5/15/2019 ANANDHAN DECK-1 COLUMN Q17 VANAZ SITE RCC
36 5/15/2019 RAJA ETU COLUMN A4,A8,B11 VANAZ SITE RCC
37 5/15/2019 RAJA ETU PLINTH BEAM PCC VANAZ SITE PCC
38 5/16/2019 VINITH OPPOSITE LABOUR SHED STEEL YARD PCC VANAZ URC PCC
39 5/16/2019 RAJA ETU PLINTH BEAM PCC 1-2 C-E VANAZ SITE PCC
40 5/16/2019 RAJA ETU COLUMN A12,B12, B10 VANAZ SITE RCC
41 5/16/2019 SAKTHI RAMESH ETU FOOTING H4,E4 RANGE SITE RCC
42 5/17/2019 ANANDHAN DECK-1 COLUMN P17 VANAZ SITE RCC
5/17/2019 RAJA ETU PLINTH BEAM PCC C-E 4-5 VANAZ SITE RCC
44 5/17/2019 ANANDHAN DECK-1 FOOTING R17,17 VANAZ SITE RCC
45 5/17/2019 SAKTHI RAMESH ETU FOOTING F4,F3 RANGE SITE RCC
46 5/17/2019 SAKTHI RAMESH QC LAB PEDASTAL RANGE HILL RANGE URC RCC
47 5/18/2019 RAJA ETU PLINTH BEAM PCC C-E 4-6 VANAZ SITE RCC
48 5/18/2019 RAJA ETU PLINTH BEAM PCC C-E 4-7 VANAZ SITE RCC
49 5/18/2019 RAJA ETU PLINTH BEAM PCC C-E 4-8 VANAZ SITE PCC
50 5/18/2019 ANANDHAN DECK-1 FOOTING 17' VANAZ SITE RCC
51 5/18/2019 ANANDHAN DECK-1 COLUMN N17 VANAZ SITE RCC
52 5/18/2019 SAKTHI RAMESH ETU FOOTING 3H,E5 RANGE SITE RCC
53 5/18/2019 RAJA ETU COLUMN B12,A6,B9 VANAZ SITE RCC
54 5/20/2019 RAJA ETU PLINTH BEAM PCC VANAZ SITE RCC
55 5/20/2019 RAJA ETU COLUMN B9 VANAZ SITE RCC
56 5/20/2019 SAKTHI RAMESH ETU FOOTING 2G,2F,3E RANGE SITE RCC
57 5/20/2019 SAKTHI RAMESH ETU COLUMN 4E,4F,8E RANGE SITE RCC
58 5/21/2019 ANANDHAN DECK-1 FOOTING R17 VANAZ SITE RCC
59 5/21/2019 JOTHISH DECK-1 FOOTING P16' VANAZ SITE RCC
60 5/21/2019 RAJA ETU PLINTH BEAM C-E-1-3 VANAZ SITE RCC
61 5/22/2019 VINITH SITE OFFICE FLOORING VANAZ URC PCC
62 5/22/2019 JOTHISH DECK-1 DECK-1 S18 VANAZ SITE PCC
63 5/22/2019 RAJA ETU COLUMN A11,A10,A6 VANAZ SITE RCC
64 5/22/2019 JOTHISH DECK-1 COLUMN R16' VANAZ SITE RCC
65 5/22/2019 SAKTHI RAMESH ETU FOOTING 2F,7F RANGE SITE RCC
66 5/22/2019 SAKTHI RAMESH ETU COLUMN 4E,4F,8E RANGE SITE RCC
67 5/22/2019 MATHAN BATCHING PLANT SILO-1 FOOTING RANGE URC RCC
68 5/23/2019 JOTHISH DECK-1 FOOTING Q16' VANAZ SITE RCC
69 5/23/2019 JOTHISH DECK-1 FOOTING R18 VANAZ SITE PCC
70 5/23/2019 RAJA ETU FOOTING A1,B1 VANAZ SITE RCC
71 5/23/2019 RAJA ETU COLUMN VANAZ SITE RCC
72 5/23/2019 SAKTHI RAMESH ETU FOOTING 9' 6' RANGE SITE RCC
73 5/23/2019 SAKTHI RAMESH ETU COLUMN 7E,2F RANGE SITE RCC
74 5/23/2019 VINITH SITE OFFICE FLOORING VANAZ URC PCC
75 5/24/2019 RAJA ETU PLINTH BEAM C-E 7-E VANAZ SITE PCC
76 5/24/2019 JOTHISH DECK-1 Q18, P18 FOOTING VANAZ SITE PCC
77 5/24/2019 RAJA ETU COLUMN A11,C10 VANAZ SITE RCC
78 5/24/2019 VINITH SITE OFFICE FLOORING VANAZ URC PCC
79 5/24/2019 SAKTHI RAMESH ETU FOOTING 9F,9E RANGE SITE RCC
80 5/24/2019 SAKTHI RAMESH ETU COLUMN 6E RANGE SITE RCC
81 5/24/2019 SELVA KUMAR STEEL YARD ESTHABLISHMENT RANGE URC PCC
82 5/25/2019 VINITH SITE OFFICE FLOORING VANAZ URC PCC
83 5/25/2019 RAJA ETU COLUMN C1,D1 VANAZ SITE RCC
84 5/25/2019 VINITH LABOUR SHED FLOORING VANAZ URC PCC
85 5/25/2019 JOTHISH DECK-1 FOOTING S18' VANAZ SITE RCC
86 5/25/2019 ASHIK ALI LABOUR COOKING FLOORING ESTHABLISHMENT RANGE URC PCC
87 5/26/2019 JOTHISH DECK-1 FOOTING U17,P18,N18 VANAZ SITE PCC
88 5/26/2019 VINITH SITE OFFICE FLOORING VANAZ URC PCC
89 5/26/2019 RAJA ETU PLINTH BEAM VANAZ SITE PCC
90 5/27/2019 VINITH LABOUR SHED FLOORING ESTHABLISHMENT VANAZ URC PCC
91 5/27/2019 JOTHISH DECK-1 FOOTING R18 VANAZ SITE RCC
92 5/27/2019 RAJA ETU PLINTH BEAM C-E 3-5 VANAZ SITE RCC
93 5/27/2019 RAJA ETU PLINTH BEAM B2-B8 VANAZ SITE PCC
94 5/28/2019 SELVA KUMAR ETU FOOTING 1E,1H,1F,1G, RANGE SITE RCC
95 5/28/2019 SELVA KUMAR ETU COLUMN 6E RANGE SITE RCC
96 5/28/2019 RAja ETU PLINTH BEAM C-E 8-12 VANAZ SITE PCC
97 5/28/2019 RAJA ETU COLUMN A1,A5 VANAZ SITE RCC
98 5/29/2019 SELVA KUMAR ETU FOOTING 12E,12F,12G,12H RANGE SITE PCC
99 5/29/2019 ASHIK ALI STEEL YARD FLOORING ESTHABLISHMENT RANGE URC PCC
100 5/29/2019 RAJA ETU CPLINTH BEAM C-E 8-12 VANAZ SITE PCC
101 5/29/2019 JOTHISH DECK-1 COLUMN R17 VANAZ SITE RCC
102 5/29/2019 SANKAR LABOUR SHED FLOORING VANAZ URC PCC
103 5/29/2019 ASHIK ALI STAFF ROOM FLOORING RANGE URC PCC
104 5/29/2019 RAJA ETU COLUMN B1 A2 VANAZ SITE RCC
105 5/29/2019 VINITH LABOUR SHED FLOORING VANAZ URC PCC
106 5/29/2019 SELVA KUMAR ETU COLUMN RANGE SITE RCC
107 5/30/2019 RAJA ETU COLUMN A3 VANAZ SITE RCC
U 5/30/2019 RAJA ETU PLINTHBEAM VANAZ SITE PCC
109 5/30/2019 VINITH LABOUR SHED FLOORING VANAZ URC PCC
110 5/30/2019 JOTHISH DECK-1 FOOTING U17,U18 VANAZ SITE RCC
111 5/31/2019 MATHAN STAFF ROOM FLOORING RANGE URC PCC
112 5/31/2019 SANKAR LABOUR SHED FLOORING VANAZ URC PCC
113 5/31/2019 RAJA ETU COLUMN C2,D2,E1,E2 VANAZ SITE RCC
114 5/31/2019 JOTHISH DECK-1 COLUMN P16' VANAZ SITE RCC
115 5/31/2019 RAJA ETU PLINTH BEAM A9-A6 VANAZ SITE PCC
116 5/31/2019 VINITH LABOUR SHED FLOORING VANAZ URC PCC
117 5/31/2019 SELVA KUMAR ETU FOOTING 8E,12F,12G,12H RANGE SITE RCC
118 5/31/2019 SELVA KUMAR ETU COLUMN 3H,4H RANGE SITE RCC
119 5/31/2019 SELVA KUMAR ETU FOOTING 10E,11E,8H RANGE SITE PCC
RANGE HILL
GRADE LAST MONTH THIS MONTH CUMMULATIVE VANAZ SITE
M10 URCC 0 11 11 GRADE LAST MONTH THIS MONTH CUMMULATIVE
M15 URCC 6 19.25 25.25 M10 URCC 1.5 14.5 16
M30 URCC 0 5.25 5.25 M15 URCC 13.5 47.75 61.25
M35 URCC 0 0 0 M30 URCC 0 0 0
M40 URCC 0 5.75 5.75 M35 URCC 3.75 3.75 7.5
M15 SITE 20 12.75 32.75 M40 URCC 0 0 0
M35 SITE 0 0 0 M15 SITE 41 38.75 79.75
M40 SITE 0 88.25 88.25 M30SITE 0 0.5 0.5
TOTAL 26 142.25 168.25 M35 SITE 0 174 174
M40 SITE 143.25 187 330.25
TOTAL 203 466.25 669.25
608.50
192
URC CONSTRUCTION PVT LTD
Jun-19
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRCTURE ID SITE SITE/URC MIX GRADE ACTUAL QTY no of cube
8 6/2/2019 ANKIT ETU PLINTH BEAM PCC VANAZ SITE PCC M15 0.75 0
10 6/3/2019 ANKIT ETU PLINTH BEAM PCC VANAZ SITE PCC M15 1.50 0
19 6/4/2019 ANKIT ETU PLINTH BEAM PCC VANAZ SITE PCC M15 0.5 0
21 6/5/2019 ANKIT ETU PLINTH BEAM PCC VANAZ SITE PCC M15 1 0
27 6/7/2019 ANKIT ETU PLINTH BEAM C5-C7 E5-E7 VANAZ SITE RCC M40 16 12
40 6/8/2019 ANKIT ETU PLINTH BEAM C7-C9 VANAZ SITE RCC M40 9 12
49 6/11/2019 ANKIT ETU PLINTH BEAM B4-B6 VANAZ SITE RCC M35 10 9
51 6/12/2019 ANKIT ETU PLINTH BEAM 9-12 A-E VANAZ SITE RCC M35 15.5 12
62 6/13/2019 ANKIT ETU PLINTH BEAM B7-B9 VANAZ SITE RCC M35 10.5 9
70 6/15/2019 ANKIT ETU PLINTH BEAM B9-B12 VANAZ SITE RCC M35 10.5 9
81 6/17/2019 ANKIT ETU PLINTH BEAM A9-A12 VANAZ SITE RCC M35 10.25 9
85 6/18/2019 RAJA ETU PLINTH BEAM A9-A7 VANAZ SITE RCC M35 8 9
96 6/20/2019 RAJA ETU PLINTH BEAM 3A-5A VANAZ SITE RCC M35 10.25 9
109 6/25/2019 RAJA ETU PLINTH BEAM 1A-3A VANAZ SITE RCC M35 10 9
182.5
9/21/2019 MATHAN IWB FOOTING RANGE SITE RCC M35 94.5 1023
13.5
63
9/27/2019 10/4/2019
9/30/2019 10/7/2019
URC CONSTRUCTION PVT LTD
Oct-19
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRCTURE ID SITE LOCATION MIX GRADE ACTUAL QTY
6 10/1/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.75
14 10/3/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.5
25 10/7/2019 MAHENDRAN TOILET FOOTING VANAZ SITE RCC M30 1
34 10/9/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.75
39 10/10/2019 MAHENDRAN ETU SILL VANAZ SITE PCC M15 0.5
42 10/11/2019 MAHENDRAN HIC DRAIN pcc VANAZ SITE PCC M15 2
43 10/11/2019 MAHENDRAN HIC DRAIN RAFT VANAZ SITE RCC M35 4.5
52 10/12/2019 MAHENDRAN HIC DRAIN RAFT VANAZ SITE RCC M35 3.5
53 10/12/2019 MAHENDRAN HIC DRAIN WALL VANAZ SITE RCC M35 3
59 10/14/2019 MAHENDRAN TOILET FOOTING VANAZ SITE RCC M30 0.5
60 10/14/2019 MAHENDRAN TOILET BLOCK VANAZ SITE RCC M30 0.5
61 10/14/2019 MAHENDRAN ETU PCC VANAZ SITE PCC M15 1
63 10/14/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.75
66 10/14/2019 MAHENDRAN HIC DRAIN WALL VANAZ SITE RCC M35 3.25
77 10/16/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.5
78 10/16/2019 MAHENDRAN HIC DRAIN WALL VANAZ SITE RCC M35 1.5
95 10/21/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.75
96 10/22/2019 MAHENDRAN HIC DRAIN RAFT VANAZ SITE RCC M35 2
97 10/22/2019 MAHENDRAN ETU LINTEL& BEAM VANAZ SITE RCC M35 1
98 10/22/2019 MAHENDRAN HIC DRAIN WALL VANAZ SITE RCC M35 2.5
102 10/24/2019 MAHENDRAN ETU LINTEL& BEAM VANAZ SITE RCC M35 1
103 10/24/2019 MAHENDRAN ETU COLUMN VANAZ SITE RCC M35 1.5
108 10/25/2019 MAHENDRAN HIC DRAIN WALL VANAZ SITE RCC M35 4.5
119 10/28/2019 MAHENDRAN ETU LINTEL& BEAM VANAZ SITE RCC M35 1.5
124 10/29/2019 MAHENDRAN HIC SUPPORTING COLUMN VANAZ SITE RCC M35 1.75
DECK-2 189.5 0
DECK-3 402.25 24.75
ETU/HIC 26.25 23.75
RW WALL 252 16.5
TOILET 1.5 0
BPLANT 22 7.25
L SHED 0 11.5
1551.25 121.5
TOTAL
1672.75
102.75
7.25
11.5
3
4.5
4.5
4.5
4.5
1
URC CONSTRUCTION PVT LTD
Dec-19
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION MIX GRADE QTY CUMMULATIVE
INCHARGE
2 12/2/2019 ARUN TOILET FOOTING RCC SITE RCC M30 0.5 1
6 12/3/2019 MAURIYA EAST SIDE RETAIINING WALL IIND LIFT SITE RCC M30 21 57.25
13 12/4/2019 KARTHIK BATCHING PLANT-2 PLANT FOUNDATION URCC RCC M30 3.5 75
19 12/5/2019 ARUN TOILET PLINTH BEAM SITE RCC M30 6.75 96.75
24 12/6/2019 MAURIYA EAST SIDE RETAINING WALL SITE RCC M30 52.5 161
35 12/9/2019 KARTHIK STORE WEIGHNING BRIDGE URCC RCC M30 8 348
39 12/10/2019 ARUN TOILET PLINTH BEAM SITE RCC M30 3.75 369.5
40 12/10/2019 ANKIT DECK-3 RETAINING WALL L/9 -L/7 SITE RCC M30 21 390.5
42 12/10/2019 ANKIT DECK-3 FOOTING F/6,F/7 SITE RCC M30 15 425
44 12/11/2019 ANKIT DECK-3 FOOTING G9,G8, E2 SITE RCC M30 30.5 459
48 12/12/2019 MAURIYA EAST SIDE RW WALL SITE RCC M30 10.5 480
50 12/13/2019 MAURIYA EAST SIDE RW WALL RAG 18-21 SITE RCC M30 42 528.75
51 12/13/2019 ARUN TOILET COLUMN SITE RCC M30 0.5 529.25
54 12/13/2019 ANKIT DECK-3 FOOTING G6,G7,G'7, L3 SITE RCC M30 54 622.25
58 12/14/2019 RS MAURIYA RETAINING WALL & HAUNCH SITE RCC M30 1 1070
60 12/16/2019 ARUN TOILET PLINTH BEAM SITE RCC M30 2.5 1077
64 12/17/2019 RS MAURIYA EAST SIDE RETAINING WALL SITE RCC M30 9.75 1103.75
73 12/18/2019 ANKIT DECK-3 FOOTING F2,F3,G3 SITE RCC M30 21 1233.25
76 12/19/2019 ARUN TOILET COLUMN SITE RCC M30 1.5 1237.75
81 12/21/2019 ANKIT DECK-3 FOOTING H3,E5,L5,G7 SITE RCC M30 193 1771.75
83 12/21/2019 ARUN TOILET COLUMNN SITE RCC M30 1.5 1774.75
85 12/21/2019 MAURIYA RETAINING WALL SITE RCC M30 8.5 1787.25
92 12/23/2019 ANKIT DECK-3 FOOTING H7 SITE RCC M30 11 1858.25
93 12/23/2019 ARUN TOILET COLUMN SITE RCC M30 0.5 1858.75
96 12/23/2019 ANKIT DECK-03 FOOTING G2 SITE RCC M30 8 1884.75
106 12/25/2019 ARUN TOILET COLUMN SITE RCC M30 0.75 1898
108 12/25/2019 RS MAURIYA EAST SIDE RETAINING WAL 3RD LIFT SITE RCC M30 8.25 1907.25
113 12/26/2019 RS MAURIYA EAST SIDE RETAINING RAFT SITE RCC M30 118.5 2062
114 12/26/2019 SOUNDAR DECK-3 FOOTING SITE RCC M30 12.75 2074.75
120 12/30/2019 MAURIYA EAST SIDE RETAINIG WALL SITE RCC M30 6.75 3322
128 12/31/2019 MAURIYA EAST SIDE RETAINING WALL STARTER SITE RCC M30 1 3544.25
521
10/31/2019 12/26/2019
11/1/2019 12/27/2019
11/2/2019 12/28/2019
11/3/2019 12/29/2019
11/4/2019 12/30/2019
11/5/2019 12/31/2019
11/6/2019 1/1/2020
11/7/2019 1/2/2020
11/8/2019 1/3/2020
3
1 3 4.5
2 4.5 4.5
3 4.5 4.5
4 1.5 4.5
5 4.5
6 4.5
7 4.5
8 4.5
9 4.5
10 3
11 4.5
12 4.5
13 3
14 4.5
15 4.5
16 3
17 3
18 1.5
19 4.5
20 4.5
21 0.75
22 4.5
23 3
24 2.25
25 1.5
STTETER (CUM)
205
66.00
2/3/2020
TOTAL 118.75
0
0
0
0
0
0
9
130.25
678
0
817.25
URC CONSTRUCTION PVT LTD
FEBRAURY -2020
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
INCHARGE
1 2/1/2020 RS MAURIYA EAST SIDE RW WALL WALL RAG 18-16 -IIND LIFT SITE RCC OPC M30 0 18 12 30
7 2/3/2020 MAURIYA EAST SIDE RW WALL STARTER SITE RCC OPC M30 0 2.25 0 2.25
8 2/3/2020 ANKIT DECK-3 COLUMN SITE RCC OPC M30 0 1.5 0 1.5
15 2/6/2020 ARUN TOILET PLINTH BEAM SITE RCC OPC M30 0 1 0 1
18 2/6/2020 MAURIYA EAST SIDE RETAINING WALL RAG 21-18 SITE RCC OPC M30 40 0 0 40
19 2/6/2020 ANKIT DECK-3 FOOTING H1 SITE RCC OPC M30 3 24.75 0 27.75
26 2/8/2020 MAURIYA EAST SIDE RETAINING WALL IIIRD LIFT ( RAG 18-16) SITE RCC OPC M30 21.5 0 0 21.5
27 2/8/2020 MAHENDRAN ETU FRONT WALL RAFT SITE RCC OPC M30 6 0 0 6
52 2/14/2020 MAHENDRAN ETU FRONT WALL IIND LIFT SITE RCC OPC M30 2 0 0 2
57 2/15/2020 RS MAURIYA EAST SIDE RETAINING WALL RAG 26-29 IST LIFT SITE RCC OPC M30 37.5 0 0 37.5
73 2/18/2020 RS MAURIYA EAST SIDE RETAINING WALL RAFT RAG 27-30 SITE RCC OPC M30 78.5 0 0 78.5
76 2/19/2020 RS MAURIYA EAST SIDE RW WALL 24-27 IST LIFT SITE RCC OPC M30 0 30.5 0 30.5
79 2/19/2020 RS MAURIYA EAST SIDE RETAINING WALL STARTER SITE RCC OPC M30 0 2.25 0 2.25
82 2/19/2020 ANKIT DECK-3 FOOTING D2 SITE RCC OPC M30 12.5 0 0 12.5
84 2/19/2020 SOUNDAR DECK-3 FOOTING E-F-10-L10 SITE RCC OPC M30 132 0 0 132
93 2/21/2020 ANKIT DECK-3 FOOTING D/1 SITE RCC OPC M30 31.5 0 0 31.5
94 2/22/2020 RS MAURIYA EAST SIDE RW WALL IST LIFT 30-33 SITE RCC OPC M30 0 36 0 36
108 2/25/2020 ANKIT DECK-3 FOOTING J1,K1 SITE RCC OPC M30 60.75 0 0 60.75
121 2/27/2020 ANKIT DECK-3 FOOTING C4 SITE RCC OPC M30 14 0 0 14
3140.25
276
3416.25
2810.25
279.25
19.5
530.5
556
NO OF CUBES 7
CUMMULATIVE NO OF 28 DAYS
DAYS
30
66.25
67.75
123.25
190
217.75
305
311
1297.25
1380.5
1571.5
1616.75
1649.5
1672.5
1822.5
1936
1972
2143.75
2783.75
0 0
0 0
0 0
0 0
0 0
0 0
0 9
12 142.25
264 942
0 0
276 1093.25
URC CONSTRUCTION PVT LTD
FEBRAURY -2020
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL CUMMULATIVE
INCHARGE
GRADE OF
CONCRETE UPTO
TO UPTO TO LAST
M10 URCC 74.75 0 74.75 THIS MON TOTAL THIS MONTH
LAST MONTH
MONTH
TOTAL
0
0
0
0
0
0
9
142.25
942
0
1093.25
URC CONSTRUCTION PVT LTD
FEBRAURY -2020
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
INCHARGE
1 4/29/2020 mahendran etu front end wall site vanaz rcc opc M35 1.5 0.5 0 2
2 4/30/2020 ANKIT DECK-3 RETAINING WALL starter site vanaz rcc opc M35 2 0 0 2
3 4/30/2020 SOUNDAR DECK-3/4 COMBINED FOOTING A-E `SITE VANAZ RCC OPC M30 63 90 0 153
66.5 90.50 0.00 157.00
157.00
GRADE OF
CONCRETE UPTO
TO UPTO TO LAST
M10 URCC 74.75 0 74.75 THIS MON TOTAL
LAST MONTH
MONTH
2
4
157
0 0
0 0
0 0
0 0
0 0
0 0
0 9
0 142.25
0 942
0 0
0 1093.25
URC CONSTRUCTION PVT LTD
FEBRAURY -2020
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
INCHARGE
1 5/1/2020 MAHENDRAN HIC PLATFORM PCC SITE VANAZ PCC OPC M15 7.5 0 0 7.5
2 5/1/2020 RAJKUMAR TOILET FOOTING PCC SITE VANAZ PCC OPC M15 1.5 0 0 1.5
3 5/14/2020 RAJKUMAR DECK-2 APPROACH SLAB SITE VANAZ RCC OPC M35 32.25 0 0 32.25
4 5/16/2020 SOUNDAR DECK-3 SLAB FF A-E SITE VANAZ RCC OPC M35 175.75 171 0 346.75
5 0
6 0
7 0
8 0
9 0
10 0
11 0
12 0
13 0
14 0
15 0
16 0
17 -2011 0
18 0
19 0
20 0
21 0
22 0
23 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31 0
32 0
33 0
34 0
35 0
36 0
37 0
37 0
38 0
39 0
40 0
41 0
42 0
43 0
44 0
45 0
46 0
47 0
48 0
49 0
50 0
51 0
52 0
53 0
54 0
55 0
56 0
57 0
58 0
59 0
60 0
61 0
62 0
63 0
64 0
65 0
66 0
67 0
68 0
69 0
70 0
71 0
72 0
73 0
74 0
75 0
76 0
77 0
78 0
79 0
80 0
81 0
82 0
83 0
217 171.00 0.00 388.00
388.00
GRADE OF
CONCRETE
GRADE OF
CONCRETE UPTO
TO UPTO TO LAST
M10 URCC 74.75 0 74.75 THIS MON TOTAL
LAST MONTH
MONTH
7.5
9
41.25
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388 621.756
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388
388 3.552
388 5.4
388
388
388
388
388
388
388
388
388
388
388
388
388
388
0 0
0 0
0 0
0 0
0 0
0 0
0 9
0 142.25
0 942
0 0
0 1093.25
1
URC CONSTRUCTION PVT LTD
Jul-20
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
INCHARGE
1 7/4/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 4.25 0 4.25
2 7/7/2020 ETU FOOTING PCC SITE VANAZ PCC OPC M15 1.5 0 1.5
3 7/8/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 8.5 0 8.5
4 7/8/2020 DECK-3 COLUMN D10 SITE VANAZ RCC OPC M35 3 0 3
5 7/9/2020 ETU TOILET WALL SITE VANAZ RCC OPC M35 3 0 3
6 7/11/2020 EAST SIDE RETAINING WALL BOUNDARY WALL SITE VANAZ RCC OPC M30 24 0 24
7 7/11/2020 HIC GRADE SLAB B5-7 SITE VANAZ RCC OPC M35 8 0 8
8 7/11/2020 DECK-3 RETAINING WALL SITE VANAZ RCC OPC M35 18 0 18
9 7/14/2020 DECK-3 SLAB SITE VANAZ RCC OPC M35 75 99 174
10 7/15/2020 HIC GRADE SLAB 07-09 F=GRID SITE VANAZ RCC OPC M35 8 0 8
11 7/15/2020 DECK-3 COLUMN SITE VANAZ RCC OPC M35 2.25 0 2.25
12 7/17/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 8.75 0 8.75
13 7/17/2020 DECK-1 `OHE PEDASTAL SITE VANAZ RCC OPC M35 3.25 0 3.25
14 7/17/2020 DECK-1 MULLILION COLUMN SITE VANAZ RCC OPC M35 0.75 0 0.75
15 7/17/2020 DECK-3 COLUMN STARTER SITE VANAZ RCC OPC M35 0.5 0 0.5
16 7/17/2020 DECK-3 PLINTH BEAM PCC SITE VANAZ RCC OPC M15 1 0 1
17 7/18/2020 DECK-3 RETAINING WALL SITE VANAZ RCC OPC M30 40.5 0 40.5
18 7/18/2020 EXTERNAL WORK MH-18/MH 19 SITE VANAZ RCC OPC M15 1.5 0 1.5
19 7/19/2020 DECK-3 PLINTH BEAM PCC SITE VANAZ RCC OPC M15 0.75 0 0.75
20 7/20/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 4.5 0 4.5
21 7/20/2020 DECK-3 COLUMN A5,A6 SITE VANAZ RCC OPC M35 6.75 0 6.75
22 7/20/2020 EXTERNAL WORK EFFLUENT CHAMBER PCC SITE VANAZ RCC OPC M15 4.5 0 4.5
23 7/21/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 8 0 8
24 7/21/2020 DECK-3 COLUMN SITE VANAZ RCC OPC M35 7.5 0 7.5
25 7/22/2020 DECK-3 COLUMN STARTER SITE VANAZ RCC OPC M35 2.25 0 2.25
26 7/22/2020 MULLILION COLUMN SITE VANAZ RCC OPC M35 0.5 0 0.5
27 7/22/2020 EXTERNAL WORK EFFLUENT CHAMBER SITE VANAZ RCC OPC M15 2 0 2
28 7/23/2020 DECK-3 COLUMN SITE VANAZ RCC OPC M35 9 0 9
29 7/24/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 9 0 9
30 7/24/2020 EAST SIDE RETAINING WALL BOUNDARY WALL SITE VANAZ RCC OPC M30 18.25 0 18.25
31 7/24/2020 EXTERNAL WORK EFFLUENT CHAMBER PCC SITE VANAZ PCC OPC M15 3 0 3
32 7/25/2020 EXTERNAL WORK EFFLUENT CHAMBER SITE VANAZ PCC OPC M15 1.5 0 1.5
33 7/25/2020 DECK-3 PLINTH BEAM PCC SITE VANAZ PCC OPC M15 1 0 1
34 7/25/2020 TOILET FLOORING PCC SITE VANAZ PCC OPC M15 3.25 0 3.25
35 7/25/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 8 0 8
36 7/25/2020 DECK-3 COLUMN B5,C5 SITE VANAZ RCC OPC M35 7.5 0 7.5
37 7/27/2020 DECK-3 PLINTH BEAM SITE VANAZ RCC OPC M35 39.75 0 39.75
37 7/27/2020 DECK-3 RETAINING WALL STARTER SITE VANAZ RCC OPC M35 1 0 1
38 7/27/2020 HIC COLUMN SITE VANAZ RCC OPC M35 1 0 1
39 7/28/2020 DECK-3 COLUMN STARTER SITE VANAZ RCC OPC M35 1 0 1
40 7/28/2020 DECK-3 PLINTH BEAM PCC SITE VANAZ PCC OPC M15 1.75 0 1.75
41 7/29/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 0 8.5 8.5
42 7/29/2020 DECK-3 PLINTH BEAM SITE VANAZ RCC OPC M35 0 57 57
43 7/29/2020 DECK-3 TIE BEAM SITE VANAZ RCC OPC M35 0 18.75 18.75
44 7/30/2020 HIC GRADE SLAB SITE VANAZ RCC OPC M35 0 9 9
45 7/30/2020 DECK-3 COLUMN A8, C7 SITE VANAZ RCC OPC M35 0 6.5 6.5
46 7/30/2020 EXTERNAL WORK EFFLUENT CHAMBER SITE VANAZ PCC OPC 1.3.6 0 2 2
47 7/31/2020 MESS PCC ESTH VANAZ RCC OPC 1.3.6 0 0.5 0.5
48 7/31/2020 EXTERNAL WORK WATER CHAMBER SITE VANAZ RCC OPC 1.3.6 0 1 1
49 0
50 0
51 0
52 0
53 0
54 0
55 0
56 0
57 0
58 0
59 0
60 0
61 0
62 0
63 0
64 0
65 0
66 0
67 0
68 0
69 0
70 0
71 0
72 0
73 0
74 0
75 0
76 0
77 0
78 0
79 0
80 0
81 0
82 0
83 0
353.5 202.25 0.00 555.75
555.75
353.503
GRADE OF
CONCRETE
GRADE OF
CONCRETE UPTO
TO UPTO TO LAST
M10 URCC 74.75 0 74.75 THIS MON TOTAL
LAST MONTH
MONTH
17446.75
23.25
23.25 42.25
45.25 486.75
486.75 2
2
NO OF CUBES 7
CUMMULATIVE NO OF 28 DAYS
DAYS
4.25
5.75
14.25
17.25
20.25
44.25
52.25
70.25
244.25
252.25
254.5
263.25
266.5
267.25
267.75
268.75
309.25
310.75
311.5
316
322.75
327.25
335.25
342.75
345
345.5
347.5
356.5
365.5
383.75
386.75
388.25
389.25
392.5
400.5
408 621.756
447.75
448.75
449.75
450.75
452.5
461
518
536.75
545.75
552.25
554.25
554.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75 3.552
555.75 5.4
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
555.75
0 0
0 0
0 0
0 0
0 0
0 0
0 9
0 142.25
0 942
0 0
0 1093.25
1
URC CONSTRUCTION PVT LTD
Jul-20
SITE
S.NO DATE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
INCHARGE
1 8/1/2020 DECK-1 CONNECTING SLAB SITE VANAZ RCC OPC M35 48.25 48.25
8/1/2020 DECK-3 COLUMN STARTER SITE VANAZ RCC OPC M35 0.5 0.5
8/2/2020 DECK-3 PLINTH BEAM SITE VANAZ RCC OPC M35 0 36.75 36.75
8/2/2020 HIC COPPING BEAM SITE VANAZ RCC OPC M35 0 0.5 0.5
2 8/3/2020 DECK-3 WALL STARTER SITE VANAZ RCC OPC M35 1 1
3 8/3/2020 MULLILION COLUMMN SITE VANAZ RCC OPC M35 0.75 0.75
4 8/3/2020 DECK-4 RETAINING WALL SITE VANAZ RCC OPC M35 20 20
5 8/3/2020 EXTERNAL STORM WATER CHAMBER SITE VANAZ PCC OPC 1.3.6 1.5 1.5
6 8/6/2020 DECK-3 PLINTH BEAM SITE VANAZ RCC OPC M35 20.75 20.75
7 8/7/2020 ` DECK-3 PLINTH BEAM SITE VANAZ RCC OPC M35 16.25 16.25
8 8/7/2020 EXTERNAL STORM WATER CHAMBER SITE VANAZ RCC OPC 1.3.6 5.5 5.5
9 8/7/2020 EXTERNAL WHEEL WASHING PLANT ESTH VANAZ PCC OPC M15 7.5 7.5
10 8/7/2020 PUBLIC TOILET FLOORING PCC SITE VANAZ PCC OPC M15 2.25 2.25
11 8/7/2020 EXTERRNAL EAST SIDE EFFLUENT LINE SITE VANAZ PCC OPC 1.5.10 4 4
12 8/8/2020 EAST SIDE PCC SITE VANAZ PCC OPC M15 1 1
13 8/8/2020 DECK-3 COLUMN STARTER SITE VANAZ RCC OPC M35 0.5 0.5
14 8/8/2020 EXTERNAL PULL PIT CHAMBER SITE VANAZ RCC OPC M30 1 1
15 8/9/2020 DECK-3 COLUMN STARTER SITE VANAZ RCC OPC M35 0.5 0.5
16 8/11/2020 DECK-3 COLUMN D5,D6,G10,H10 SITE VANAZ RCC OPC M35 19 19
17 8/11/2020 DECK-2 MULLILION COLUMN SITE VANAZ RCC OPC M35 1 1
18 8/11/2020 DECK-2 MULLILION COLUMN SITE VANAZ RCC OPC M30 4.5 4.5
19 8/11/2020 ETU TRACK PIT SHED SITE VANAZ RCC OPC M35 16.5 16.5
20 8/11/2020 DECK-4 RETAINING WALL SITE VANAZ RCC OPC M35 17.25 17.25
21 8/11/2020 EXTERNAL WHEEL WASHING PLANT ESTH VANAZ PCC OPC M15 0.5 0.5
22 8/11/2020 EXTERNAL EFFLUENT LINE SITE VANAZ PCC OPC 1.3.6 4.5 4.5
23 8/13/2020 EXTERNAL EFFLUENT LINE SITE VANAZ RCC OPC 1.5.10 0 9 9
24 8/14/2020 EXTERNAL SEWARAGE LINE SITE VANAZ PCC OPC 1.5.10 0 1 1
25 8/14/2020 DECK-3 PLINTH BEAM SITE VANAZ RCC OPC M35 0 67.5 67.5
26 8/14/2020 DECK-3 COLUMN SITE VANAZ RCC OPC M35 0 17.25 17.25
27 8/15/2020 JOTHISH DECK-1 COLUMN S19,U19,U20,V19,V20 SITE VANAZ RCC OPC M35 0 10.5 10.5
28 8/15/2020 JOTHISH DECK-2 MULLILON COLUMN S13,S14,S15 SITE VANAZ RCC OPC M30 0 2 2
29 8/15/2020 MAHENDRAN EAST SIDE BOUNDARY WALL SITE VANAZ PCC OPC M15 0 9 9
30 8/15/2020 INIYAVAN EAST SIDE STROM WATER DRAIN SITE VANAZ RCC OPC 1:05:10 0 9 9
31 8/15/2020 SOUNDAR DECK-3 COLUMN A9,B8,C8,C9,D9 SITE VANAZ RCC OPC M35 0 19 19
32 8/17/2020 ANKIT DECK-3 PLINTH BEAM PCC SITE VANAZ PCC OPC M15 0 1.75 1.75
33 8/17/2020 MAHENDRAN ETU MULLILION COLUMN SITE VANAZ RCC OPC M35 0 2 2
34 8/17/2020 ANKIT DECK-3 COLUMN E9,F9,E8,F8 SITE VANAZ RCC OPC M35 0 10.75 10.75
8/18/2020 INIYAVAN EXTERNAL SEWAGE PIPE LINE PCC PCC SITE VANAZ PCC OPC 1:05:10 0 15 15
36 8/18/2020 EXTERNAL STORM WATER DRAIN SITE VANAZ PCC OPC 1:05:10 0 4.5 4.5
37 8/19/2020 MAHENDRAN ETU MULLILON COLUMN SITE VANAZ RCC OPC M35 0 0 1.5 1.5
37 8/19/2020 INIYAVAN EXTERNAL PIPE ENCHASING SITE VANZ RCC OPC 1:05:10 0 0 4.5 4.5
38 8/20/2020 ANKIT DECK-3 PLINTH BEAM D1-E1 SITE VANAZ RCC OPC M35 0 27 0 27
39 8/20/2020 INIYAVAN EXTERNAL BACKSIDE STROM WATER PCC SITE VANAZ PCC OPC 1:05:10 0 1 0 1
40 8/20/2020 ANKIT DECK-3 COLUMN D2,D3,E2 SITE VANAZ RCC OPC M35 0 11.25 0 11.25
41 8/20/2020 ANKIT DECK-3 RETAINING WALL 2-5 L SITE VANAZ RCC OPC M35 0 30.75 0 30.75
42 8/20/2020 INIYAVAN EXTERNAL EFFLUENT LINE ENCHASING SITE VANAZ PCC OPC 1:05:10 0 4.5 0 4.5
43 8/20/2020 MAHENDRAN ETU SHED DRAIN WALL (7-10) SITE VANAZ RCC OPC M35 0 18 0 18
44 8/20/2020 INIYAVAN EXTERNAL EFFLUENT LINE PIPE LINE SITE VANAZ RCC OPC 1:05:10 0 1.5 0 1.5
45 8/20/2020 MAHENDRAN HIC PLATFORM GRADE SLAB SITE VANAZ RCC OPC M35 0 6 0 6
46 8/20/2020 JOTHISH DECK-4 RETAINING WALL D-C 11 SITE VANAZ RCC OPC M35 0 18.5 0 18.5
47 8/21/2020 INIYAVAN EXTERNAL SEWAGE PIPE LINE PCC SITE VANAZ RCC OPC 1:05:10 0 9 9
48 8/21/2020 ARUN EXTERNAL EFFLUENT PIPE LINE SITE VANAZ PCC OPC 1:05:10 0 4.5 4.5
49 8/21/2020 RAJKUMAR NEAR DECK-2 STEEL YARD SITE VANAZ RCC OPC M15 0 5.75 5.75
50 8/21/2020 MAHENDRAN ETU MULLILION COLUMN SITE VANAZ RCC OPC M35 0 1.5 1.5
51 8/22/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAFT SITE VANAZ RCC OPC M30 0 108 108
52 8/22/2020 INIYAVAN EXTERNAL PIPE ENCHASING PCC SITE VANAZ RCC OPC 1:05:10 0 3 3
53 8/22/2020 ARUN EXTERNAL STORM WATER PIPE LINE SITE VANAZ RCC OPC 1:05:10 0 0.5 0.5
54 8/22/2020 ANKIT DECK-3 COLUMN F2,F3,F4,D3,B8 SITE VANAZ RCC OPC M35 0 13.5 13.5
55 8/23/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ RCC OPC 1:05:10 0 9 9
56 8/24/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ RCC OPC 1:05:10 0 3 3
57 8/24/2020 ARUN EXTERNAL PIPE ENCHASING PCC SITE VANAZ RCC OPC 1:05:10 0 2.5 2.5
58 8/25/2020 ANKIT DECK-3 COLUMN E3,E4,E5,E6,E7,F4 SITE VANAZ RCC OPC M35 0 22 22
59 8/25/2020 ARUN EXTERNAL EFFLUENT LINE ENCASING SITE VANAZ RCC OPC 1:05:10 0 4.5 4.5
60 8/25/2020 ANKIT DECK-3 COLUMN (L-K)2 L (1-2) I(K-J ) SITE VANAZ RCC OPC M35 0 27 27
61 8/25/2020 MAHENDRAN HIC MULLILON COLUMN SITE VANAZ RCC OPC M35 0 1.5 1.5
62 8/25/2020 JOTHISH DECK-4 RWALL D-C 11 SITE VANAZ RCC OPC M35 0 18 18
63 8/25/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 35-37 SITE VANAZ RCC OPC M35 0 13 13
64 8/26/2020 SOUNDAR DECK-3 SLAB J-L 1/3 SITE VANAZ RCC OPC M35 132 162 294
65 8/26/2020 ANKIT DECK-3 COLUMN F5,F7,F3 SITE VANAZ RCC OPC M35 0 7.5 7.5
66 8/26/2020 ARUN EXTERNAL PIPE ENCHASING SITE VANAZ RCC OPC 1:05:10 0 3 3
67 8/26/2020 INIYAVAN EXTERNAL STORM WATER SITE VANAZ RCC OPC 1:05:10 0 6 6
68 8/27/2020 MAHENDRAN ETU MULLILION COLUMN SITE VANAZ RCC OPC M35 0 2 2
69 8/29/2020 INIYAVAN EXTERNAL SEWAGE PIPE LINE PCC ENCASING SITE VANAZ RCC OPC 1:05:10 0 0 12 12
70 8/30/2020 SOUNDAR DECK-3 COLUMN J4,K4,J3,K3,J2 SITE VANAZ RCC OPC M35 0 19.75 0 19.75
71 8/30/2020 SOUNDAR DECK-3 RETAINING WALL J-F SITE VANAZ RCC OPC M35 0 30 0 30
72 8/30/2020 JOTHISH DECK-4 RETAINING WALL site VANAZ RCC OPC M35 0 21.75 0 21.75
73 8/31/2020 ARUN EXTERNAL EFFLUENT LINE SITE VANAZ PCC OPC 1:05:10 0 3 3
74 8/31/2020 ANKIT DECK-3 COLUMN C5,C6,C2 SITE VANAZ RCC OPC M35 0 7.5 7.5
75 8/31/2020 MAHENDRAN EAST SIDE BOUNDARY WALL PCC SITE VANAZ RCC OPC M15 4.5 0 4.5
76 8/31/2020 MAHENDRAN EAST SIDE BOUNDARY WALL 37-39 SITE VANAZ RCC OPC M30 12 27 39
77 8/31/2020 MAHENDRAN ETU FLOORING PCC SITE VANAZ RCC OPC M15 19.75 0 19.75
78 8/31/2020 0 0
79 8/31/2020 0
80 0
81 0
82 0
83 0
362.25 870.25 18.00 1250.50
1232.50
17446.75
23.25
23.25 42.25
45.25 486.75
486.75 2
2
NO OF CUBES 7
CUMMULATIVE NO OF 28 DAYS
DAYS
48.25
48.75
85.5
86
87
87.75
107.75
109.25
130
146.25
151.75
159.25
161.5
165.5
166.5
167
168
168.5
187.5
188.5
193
209.5
226.75
227.25
231.75
240.75
241.75
309.25 19
326.5
337
339
348
357
376
377.75
379.75
390.5
405.5
410 621.756
411.5
416
443
444
455.25
486
490.5
508.5
510
516
534.5
543.5
548
553.75
555.25
663.25
666.25
666.75
680.25
689.25
692.25
694.75
716.75
721.25
748.25
749.75
767.75
780.75
1074.75
1082.25
1085.25
1091.25
1093.25 3.552
1105.25 5.4
1125
1155
1176.75
1179.75
1187.25
1191.75
1230.75
1250.5
1250.5
1250.5
1250.5
1250.5
1250.5
1250.5
1
URC CONSTRUCTION PVT LTD
Sep-20
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX GRADE PLANT-1 PLANT-2 rh TOTAL CUMMULATIVE
1 9/1/2020 RAJA ETU FLOORING PCC A1-A12 SITE VANAZ PCC M15 11.5 0 0 11.5 11.5
2 9/2/2020 ARUN EXTERNAL SEWAGE LINE ENCASING SITE VANAZ PCC 1:05:10 3.5 3.5 15
3 9/2/2020 ARUN EXTERNAL EFFLUENT LINE ENCASING SITE VANAZ PCC 1:05:10 2.5 2.5 17.5
4 9/2/2020 JOTHISH BOUNDARY WALL WALL RAG40-43 SITE VANAZ RCC M30 24 24 41.5
5 9/3/2020 RAJKUMAR EXTERNAL S&T TRENCH PCC SITE VANAZ PCC 1:05:10 2.25 2.25 43.75
5 9/3/2020 JOTHISH ETU TRACK AREA PCC SITE VANAZ PCC 1:05:10 2.5 2.5 46.25
6 9/3/2020 JOTHISH HIC STAIRCASE A12 SITE VANAZ RCC M35 6 6 52.25
7 9/3/2020 MANIVASAGAM ADMIN BUILDING RW WALL SITE VANAZ RCC M40 37 37 89.25
8 9/3/2020 SOUNDAR DECK-3 COLUMN B2 SITE VANAZ RCC M35 1 1 90.25
9 9/4/2020 ARUN EXTERNAL PIPE ENCHASING SITE VANAZ PCC 1:05:10 7.25 0 7.25 97.5
10 9/4/2020 SOUNDAR DECK-3 PLINTH BEAM PCC SITE VANAZ PCC 1:05:10 0.5 0 0.5 98
11 9/5/2020 ARUN EXTERNAL LT TRENCH RAFT SITE VANAZ RCC M30 2 0 2 100
12 9/5/2020 SOUNDAR DECK-3 RETAINING WALL L5-L6 SITE VANAZ RCC M35 19 0 19 119
13 9/5/2020 SOUNDAR DECK-3 RETAINING WALL B1/3-C2/3 SITE VANAZ RCC M35 15.75 0 15.75 134.75
14 9/5/2020 SOUNDAR DECK-3 LIFT WALL SITE VANAZ RCC M35 12.5 0 12.5 147.25
15 9/5/2020 RAJKUMAR EXTERNAL CABLE TRENCH PCC 126-129 SITE VANAZ PCC M15 5.5 0 5.5 152.75
16 9/5/2020 SOUNDAR DECK-3 STAIRCASE COLUMN SITE VANAZ RCC M35 4.5 0 4.5 157.25
17 9/5/2020 SOUNDAR UNLOADING PLATFORFM GRADE SLAB SITE VANAZ RCC M35 6 0 6 163.25
18 9/5/2020 SOUNDAR DECK-4 RETAINING WALL A11-C11 SITE VANAZ RCC M35 0 20.25 20.25 183.5
19 9/6/2020 RAJKUMAR DECK OHT PEDASTAL SITE VANAZ RCC M35 0 2.5 2.5 186
20 9/6/2020 SOUNDAR DECK-3 TANK PCC SITE VANAZ RPCC M15 0 9.75 9.75 195.75
21 9/6/2020 RAJA UNLOADING PLATFORFM GRADE SLAB SITE VANAZ RCC M35 0 6 6 201.75
22 9/7/2020 SOUNDAR DECK-3 COLUMN C8,C7 SITE VANAZ RCC M35 0.75 1 1.75 203.5
23 9/7/2020 JOTHISH DECK-1 COLUMN S20, T"20 SITE VANAZ RCC M35 0 4.5 4.5 208
24 9/7/2020 RAJA EAST SIDE BOUNDARY WALL RAG37-39 SITE VANAZ RCC M30 15 0 15 223
25 9/7/2020 SOUNDAR DECK-3 COLUMN STARTER SITE VANAZ RCC M35 0.75 0 0.75 223.75
26 9/7/2020 JOTHISH DECK-1 MULLILON COLUMN SITE VANAZ RCC M35 2 0 2 225.75
27 9/7/2020 RAJKUMAR EXTERNAL STORM WATER PCC SITE VANAZ PCC 1:05:10 1.5 0 1.5 227.25
28 9/8/2020 JOTHISH DECK-1 MULLILON COLUMN SITE VANAZ RCC M35 2.5 0 2.5 229.75
29 9/8/2020 ARUN LABOUR TOILET PCC ESTHA VANAZ PCC 1:05:10 0 2 2 231.75
30 9/8/2020 JOTHISH UNLOADING PLATFORFM GRADE SLAB SITE VANAZ RCC M35 0 7 7 238.75
31 9/8/2020 SOUNDAR DECK-3 JACKPIT PCC SITE VANAZ PCC 1:05:10 0 1.5 1.5 240.25
32 9/9/2020 ARUN EXTERNAL LT PULL PIT RAFT SITE VANAZ RCC M30 0 3.75 3.75 244
33 9/9/2020 SOUNDAR DECK-3 TANK FLOOR SLAB SITE VANAZ RCC M35 0 60 60 304
34 9/9/2020 SOUNDAR DECK-3 COLUMN A10-E10 SITE VANAZ RCC M35 0 17.25 17.25 321.25
35 9/10/2020 SOUNDAR DECK-3 COLUMN SITE VANAZ RCC M35 0 16 16 337.25
36 9/10/2020 SOUNDAR DECK-3 RETAINING WALL SITE VANAZ RCC M35 0 36 36 373.25
37 9/10/2020 RAJKUMAR EXTERNAL S&T TRENCH RAFT PCC SITE VANAZ RCC M15 0 1 1 374.25
38 9/10/2020 JOTHISH ETU COPING BEAM SITE VANAZ RCC M35 0 2 2 376.25
39 9/10/2020 JOTHISH EAST SIDE BOUNDARY WALL PCC SITE VANAZ PCC M15 0 3 3 379.25
40 9/10/2020 ARUN EXTERNAL LT TRENCH RAFT SITE VANAZ RCC M35 0 0.75 0.75 380
41 9/10/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 0 2 2 382
42 9/10/2020 JOTHISH DECK-1 MULLILON COLUMN SITE VANAZ RCC M35 0 1.25 1.25 383.25
43 9/11/2020 RAJKUMAR EXTERNAL S&T TRENCH RAFT SITE VANAZ RCC M30 0 6.5 6.5 389.75
44 9/11/2020 JOTHISH ETU COPING BEAM site vanaz RCC M35 0 1 1 390.75
45 9/11/2020 JOTHISH ETU GRADE SLAB A (7-9) B (7-9) SITE VANAZ RCC M35 0 7 7 397.75
46 9/11/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 0 0.5 0.5 398.25
47 9/11/2020 JOTHISH EAST SIDE BOUNDARY WALL RAG 32-35 SITE VANAZ RCC m35 0 13.5 13.5 411.75
48 9/11/2020 SOUNDAR DECK-3 RETAINING WALL D-E SITE VANAZ RCC M35 0 9 9 420.75
49 9/12/2020 JOTHISH DECK-1 MULLILON COLUMN SITE VANAZ RCC M35 0 1.5 1.5 422.25
50 9/12/2020 ARUN LABOUR FLOORING PCC ESTHA VANAZ PCC 1:05:10 0 5 5 427.25
51 9/12/2020 ARUN EXTERNAL SEWAGE LINE ENCASING SITE VANAZ PCC 1:05:10 0 6 6 433.25
52 9/12/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1:05:10 0 3 3 436.25
53 9/12/2020 SOUNDAR DECK-3 PLINTH BEAM PCC SITE VANAZ PCC M15 0 2 2 438.25
54 9/12/2020 JOTHISH ETU GRADE SLAB SITE VANAZ RCC M35 0 5 5 443.25
55 9/13/2020 RAJKUMAR EXTERNAL L&T TRENCH RAFT SITE VANAZ RCC M30 0 6.75 6.75 450
56 9/13/2020 SOUNDAR DECK-3 COLUMN SITE VANAZ RCC M35 0 12.75 12.75 462.75
57 9/13/2020 SOUNDAR DECK-3 PLINTH BEAM PCC SITE VANAZ PCC M15 0 0.5 0.5 463.25
58 9/14/2020 SOUNDAR DECK-3 RETAINING WALL L8-L9 SITE VANAZ RCC M35 0 21 21 484.25
59 9/14/2020 MAHENDRAN ETU GRADE SLAB GRID 4-5 SITE VANAZ RCC M35 0 6 6 490.25
60 9/14/2020 ANKIT DECK-3 TANK STARTER SITE VANAZ RCC M35 0 1 1 491.25
61 9/14/2020 MAHENDRAN EAST SIDE BOUNDARY WALL STARTER SITE VANAZ RCC M30 0 1 1 492.25
62 9/14/2020 RAJKUMAR EXTERNAL EFFLUENT LINE EMT 18-19 SITE VANAZ RCC 1:05:10 0 3 3 495.25
63 9/14/2020 ARUN EXTERNAL ENCASING PCC SITE VANAZ PCC 1:05:10 0 3 3 498.25
64 9/14/2020 SOUNDAR DECK-3 PLINTH BEAM PCC SITE VANAZ PCC 1:05:10 0 1 1 499.25
65 9/15/2020 SOUNDAR DECK-3 PLINTH BEAM PCC SITE VANAZ PCC 1:05:10 0 3 3 502.25
66 9/15/2020 ARUN EXTERNAL EFFLUENT LINE ENCASING SITE VANAZ PCC 1:05:10 0 5 5 507.25
67 9/15/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1:05:10 0 1 1 508.25
68 9/15/2020 RAJKUMAR EXTERNAL LT TRENCH RAFT SITE VANAZ PCC 1:05:10 0 0.5 0.5 508.75
69 9/15/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 40-43 SITE VANAZ RCC M30 0 14 14 522.75
70 9/15/2020 ARUN EXTERNNAL S&T TRENCH RAFT SITE VANAZ RCC M30 0 4.5 4.5 527.25
71 9/16/2020 JOTHISH ETU GRADE SLAB SITE VANAZ RCC M35 0 8.25 8.25 535.5
72 9/16/2020 RAJKUMAR EXTERNAL EFFLUENT LINE ENCASING SITE VANAZ RCC 1:05:10 0 0.5 0.5 536
73 9/16/2020 JOTHISH EAST SIDE BOUNDARY WALL WALL SITE VANAZ RCC M30 12 0 12 548
74 9/16/2020 SOUNDAR DECK-3 PLINTH BEAM EFG 9-10 SITE VANAZ RCC M35 9 0 9 557
75 9/16/2020 RAJKUMAR EXTERNAL PIPE ENCHASING SITE VANAZ PCC 1:05:10 2 0 2 559
76 9/16/2020 ARUN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 3.75 0 3.75 562.75
77 9/16/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 3.5 0 3.5 566.25
78 9/16/2020 ANKIT DECK-3 STAIRCASE B9 SITE VANAZ RCC M35 18 0 18 584.25
79 9/16/2020 ANKIT DECK-3 LIFT WALL B4 SITE VANAZ RCC M35 6 0 6 590.25
80 9/18/2020 ANKIT DECK-3 WALL STARTER SITE VANAZ RCC M35 1.75 0 1.75 592
81 9/18/2020 MAHENDRAN ETU GRADE SLAB SITE VANAZ RCC M35 6 0 6 598
82 9/18/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 0.5 0 0.5 598.5
83 9/19/2020 MAHENDRAN EAST SIDE BOUNDARY WALL STARTER SITE VANAZ RCC M30 0 0.75 0.75 599.25
84 9/19/2020 ARUN EXTERNAL STORM WATER PCC SITE VANAZ RCC 1:05:10 0 5 5 604.25
85 9/19/2020 ANKIT DECK-3 TANK STARTER SITE VANAZ RCC M35 0 0.5 0.5 604.75
86 9/19/2020 JOTHISH DECK-1 LIFT WALL U19/20 SITE VANAZ RCC M35 9 0 9 613.75
87 9/19/2020 SOUNDAR DECK-3 PLINTH BEAM A-E 9-10 SITE VANAZ RCC M35 29.75 0 29.75 643.5
88 9/19/2020 ARUN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 0.75 0 0.75 644.25
89 9/19/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 2 0 2 646.25
90 9/20/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 37-40 SITE VANAZ RCC M30 9 9.5 18.5 664.75
91 9/20/2020 RAJKUMAR EXTERNAL LT TRENCH WALL SITE VANAZ RCC M30 0 1 1 665.75
92 9/20/2020 SOUNDAR DECK-3 PLINTH BEAM STARTER SITE VANAZ RCC M35 0.5 0 0.5 666.25
93 9/21/2020 SOUNDAR DECK-3 JACKPIT SLAB G-H 5-7 SITE VANAZ RCC M35 64.5 81 145.5 811.75
94 9/21/2020 SOUNDAR DECK-3 PLINTH BEAM G-H1-5 SITE VANAZ RCC M35 48 76.5 124.5 936.25
95 9/21/2020 ARUN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1:05:10 0 10.25 10.25 946.5
96 9/21/2020 ARUN EXTERNAL LT PULL PIT WALL AND RAFT SITE VANAZ RCC M30 0 4.5 4.5 951
97 9/21/2020 SOUNDAR DECK-3 COLUMN A10-G10 SITE VANAZ RCC M35 0 14.75 14.75 965.75
98 9/22/2020 JOTHISH DECK-1 MULLILION COLUMN SITE VANAZ RCC M35 0.5 0 0.5 966.25
99 9/22/2020 MAHENDRAN ETU GRADE SLAB SITE VANAZ RCC M35 3.75 0 3.75 970
100 9/22/2020 RAJKUMAR EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 1.5 8.25 9.75 979.75
101 9/22/2020 ANKIT DECK-3 STAIRCASE SITE VANAZ RCC M35 0 11.25 11.25 991
102 9/22/2020 ANKIT DECK-3 COLUMN A10-G10 SITE VANAZ RCC M35 0 15 15 1006
103 9/23/2020 ARUN LT PULL PIT WALL SITE VANAZ RCC M30 0 2 2 1008
104 9/23/2020 JOTHISH DECK-1 MULLILON COLUMN SITE VANAZ RCC M35 0 1.75 1.75 1009.75
105 9/23/2020 ARUN EXTERNAL PIPE ENCHASING SITE VANAZ RCC 1:05:10 2.25 7.75 10 1019.75
106 9/23/2020 ARUN WHEEL WASH PLANT NEAR GATE ESTHA VANAZ PCC 1:05:10 0 12 12 1031.75
107 9/24/2020 MAHENDRAN EAST SIDE BOUNDARY WALL PCC SITE VANAZ PCC M15 0 3 3 1034.75
108 9/25/2020 RAJKUMAR EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 0 8.25 8.25 1043
109 9/25/2020 ARUN EXTERNAL LT PULL PIT PCC SITE VANAZ PCC 1:05:10 0 1 1 1044
110 9/25/2020 MAHENDRAN ETU GRADE SLAB PCC SITE VANAZ PCC M15 0 2 2 1046
111 9/25/2020 MAHENDRAN ETU GRADE SLAB C3-5 SITE VANAZ RCC M35 0 8 8 1054
112 9/26/2020 ANKIT DECK-3 RETAINING WALL A1-B1 SITE VANAZ RCC M35 0 22.5 22.5 1076.5
113 9/26/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 37-40 SITE VANAZ RCC M30 0 18 18 1094.5
114 9/26/2020 RAJKUMAR EXTERNAL LT PULL PIT PCC SITE VANAZ RCC 1:05:10 0 1 1 1095.5
115 9/26/2020 MAHENDRAN EAST SIDE BOUNDARY WALL PCC SITE VANAZ PCC M15 0 4.5 4.5 1100
116 9/26/2020 INIYAVAN EXTERNAL SEWAGE LINE PCC SITE VANAZ PCC 1:05:10 0 2.75 2.75 1102.75
117 9/26/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ PCC 1:05:10 0 3 3 1105.75
118 9/26/2020 ARUN EXTERNAL LT PULL PIT RAFT SITE VANAZ RCC M30 0 2 2 1107.75
119 9/26/2020 MAHENDRAN ETU GRADE SLAB C(5-7) SITE VANAZ RCC M35 0 8 8 1115.75
120 9/26/2020 ANKIT DECK-3 COLUMN A/2,B/2,A/3 SITE VANAZ RCC M35 0 11.5 11.5 1127.25
121 9/26/2020 ANKIT DECK-3 JACKPIT STARTER SITE VANAZ RCC M35 0 2 2 1129.25
122 9/27/2020 RAJKUMAR EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 0 4 4 1133.25
123 9/27/2020 SOUNDAR DECK-3 COLUMN STARTER SITE VANAZ RCC M35 0 0.5 0.5 1133.75
124 9/28/2020 ANKIT DECK-3 WALL STARTER SITE VANAZ RCC M35 0 0.5 0.5 1134.25
125 9/28/2020 MAHENDRAN ETU GRADE SLAB B(1-2) SITE VANAZ RCC M35 0 5 5 1139.25
126 9/28/2020 ARUN EXTERNAL HIGH MAST PCC SITE VANAZ RCC 1.3.6 0 1.5 1.5 1140.75
127 9/28/2020 RAJKUMAR EXTERNAL ST 124-125 SITE VANAZ RCC M15 0 3 3 1143.75
128 9/28/2020 INIYAVAN EXTERNAL SEWAGE LINE ENCASING SITE VANAZ PCC 1:05:10 0 3.75 3.75 1147.5
129 9/28/2020 RAJKUMAR EXTERNAL S&T TRENCH STARTER 131-133 SITE VANAZ RCC M30 0 2.5 2.5 1150
130 9/28/2020 ELERTICAL WALL SITE VANAZ RCC M30 0 0.5 0.5 1150.5
131 9/28/2020 RAJKUMAR LT PULL PIT WALL SITE VANAZ RCC M30 0 1.5 1.5 1152
132 9/28/2020 RAJKUMAR LT PIPE ENCHASING SITE VANAZ PCC 1:05:10 0 1 1 1153
133 9/29/2020 RAJKUMAR S&T TRENCH RAFT 133-137 SITE VANAZ RCC M30 0 5 5 1158
134 9/29/2020 ARUN HIGHMAST FOUNDATION SITE VANAZ RCC M30 0 3.5 3.5 1161.5
135 9/29/2020 RAJKUMAR LT PULL PIT WALL SITE VANAZ RCC M30 0.5 1 1.5 1163
136 9/29/2020 SOUNDAR DECK-3 SLAB A-H 9-10 SITE VANAZ RCC M35 164.75 132 296.75 1459.75
137 9/29/2020 ANKIT DECK-3 COLUMN G4,G5,A4,H5,C2,C3 SITE VANAZ RCC M35 12.5 0 12.5 1472.25
138 9/29/2020 RAJKUMAR EXTERNAL S&T TRENCH PCCC 128-127 SITE VANAZ PCC M15 1.5 0 1.5 1473.75
139 9/29/2020 RAJKUMAR EXTERNAL PIPE ENCHASING SITE VANAZ PCC 1:05:10 1 0 1 1474.75
140 9/30/2020 ARUN EXTERNAL LT PIPE ENCASING PCC SITE VANAZ PCC 1:05:10 3.75 0 3.75 1478.5
141 9/30/2020 INIYAVAN EXTERNAL STORM LINE ENCASING PCC SITE VANAZ PCC 1:05:10 10.5 0 10.5 1489
142 9/30/2020 MAHENDRAN ETU TERRACE SCRRED SITE VANAZ PCC M15 23.5 0 23.5 1512.5
143 9/30/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAFT ( RAG46-48) SITE VANAZ RCC M30 19.5 0 19.5 1532
144 9/30/2020 JOTHISH DECK-1 MUMTY LEVEL SLAB SITE VANAZ RCC M35 54 0 54 1586
145 9/30/2020 ARUN EXTERNAL HIGH MAST RAFT SITE VANAZ RCC M30 3.75 0 3.75 1589.75
146 9/30/2020 MAHENDRAN EAST SIDE BOUNDARY WALL WALL SITE VANAZ RCC M30 13.5 0 13.5 1603.25
148 9/30/2020 EXTERNAL S&T TRENCH RAFT SITE VANAZ RCC M30 16.5 2 18.5 1621.75
149 9/30/2020 EXTERNAL S&T TRENCH RAFT WALL 121-126 SITE VANAZ RCC M30 3 3 1624.75
150 9/30/2020 ANKIT DECK-3 COLUMN G7,G8 H7,H6 SITE VANAZ RCC M35 0 6 6 1630.75
148 0 1630.75
0 1630.75
123 9/30/2020 0
701.75 929.00 0.00 1630.75 1630.75
1630.75 1630.75
353.5
156
8.75
23.25
23.25 42.25
45.25 486.75
486.75 2
2
123
0.40650407
0.59349593
NO OF CUBES 7
NO OF 28 DAYS
DAYS
SIKA
621.756
3.552
5.4
7.5
8
4
4
3
5
6
9
6.5
6
7.5
6.5
6.5
6
4
3580
;'
19.5
13.5
19.5
3.75
1
Oct-20
NO OF CUBES 7
S.NO DATE SITE INCHARGE LOCATION STRUCTURE GRADE PLANT-1 PLANT-2 rh TOTAL CUMMULATIVE
DAYS
NO OF 28 DAYS
156
8.75
23.25
23.25 42.25
45.25 486.75
486.75 2
2
1 11/2/2020 SOUDAR DECK-3 SLAB GRID 1-5 SITE VANAZ RCC M35 135.5 54.75 0 190.25 190.25
2 11/2/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 37-40 SITE VANAZ RCC M30 6.5 0 6.5 196.75
3 11/2/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 2 0 2 198.75
4 11/3/2020 MAHENDRAN DECK-1 RETAINING WALL SITE VANAZ RCC M35 4.5 0 4.5 203.25
5 11/3/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 37-40 SITE VANAZ RCC M30 3 0 3 206.25
6 11/3/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 2 0 2 208.25
7 11/3/2020 MAHENDRAN DECK-1 ELEVATION WALL SITE VANAZ RCC M35 2.75 0 2.75 211
8 11/4/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 4 0 4 215
9 11/4/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1 0 1 216
10 11/4/2020 MAHENDRAN DECK-3 RETAINING WALL L2-L5 SITE VANAZ RCC M35 18 0 18 234
11 11/4/2020 INIYAVAN EXTERNAL LT PULL PIT RAFT LT 96-97 SITE VANAZ RCC M30 5 0 5 239
12 11/5/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ RCC 1:05:10 7.25 0 7.25 246.25
13 11/5/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1.5 0 1.5 247.75
14 11/6/2020 MAHENDRAN EAST SIDE BOUNDARY WALL RAG 43-45 SITE VANAZ RCC M30 16.5 0 16.5 264.25
15 11/6/2020 MAHENDRAN DECK-1 ELEVATION WALL SITE VANAZ RCC M35 4.5 0 4.5 268.75
16 11/6/2020 SOUDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 12.75 0 12.75 281.5
17 11/6/2020 INIYAVAN EXTERNAL PIPE LINE ENCASING PCC SITE VANAZ RCC 1:05:10 2.25 0 2.25 283.75
18 11/6/2020 INIYAVAN EXTERNAL LT PULL PIT WALL 95-96-97 SITE VANAZ RCC M30 8 0 8 291.75
19 11/7/2020 SOUNDAR DECK-3 SLAB B-D 5-10 SITE VANAZ RCC M35 147 151.5 298.5 590.25
20 11/7/2020 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 21 0 21 611.25
21 11/7/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 0.5 0 0.5 611.75
22 11/8/2020 INIYAVAN EXTERNAL PIPE LINE ENCASING PCC SITE VANAZ PCC 1:05:10 8 0 8 619.75
23 11/9/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 0 2 2 621.75
24 11/9/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 0 2 2 623.75
25 11/9/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 0 4.5 4.5 628.25
26 11/10/2020 JEGAN DECK-1 ELEVATION WALL SITE VANAZ RCC M35 0 9.25 9.25 637.5
27 11/10/2020 JEGAN EAST SIDE BOUNDARY WALL SITE VANAZ RCC M30 0 6 6 643.5
28 11/10/2020 SOUNDAR DECK-3 COLUMN H6,H7,B6,B7,C6,C7 SITE VANAZ RCC M35 0 13 13 656.5
29 11/10/2020 SOUNDAR DECK-3 JACKPIT SLAB SITE VANAZ RCC M35 0 22.5 22.5 679
30 11/10/2020 INIYAVAN EXTERNAL LT PULL PIT WALL 97 SITE VANAZ RCC M30 0 2 2 681
31 11/10/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 0 2 2 683
32 11/10/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 0 2 2 685
33 11/11/2020 SOUNDAR DECK-3 JACKPIT SLAB PCC SITE VANAZ PCC M15 0 3.25 3.25 688.25
34 11/11/2020 INIYAVAN EXTERNAL LT PULL PIT WALL 95-96-97 SITE VANAZ RCC M30 0 6.5 6.5 694.75
35 11/12/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1 0 1 695.75
36 11/12/2020 INIYAVAN DECK-1 TERRACE PCC SITE VANAZ RCC M15 31.5 0 31.5 727.25
37 11/12/2020 JEGAN DECK-1 ELEVATION WALL SITE VANAZ RCC M35 7.5 7.5 734.75
38 11/12/2020 JEGAN EXTERNAL LT PULL PIT WALL 95-96-97 SITE VANAZ RCC M30 5.75 4.75 739.5
39 11/12/2020 SOUNDAR DECK-3 COLUMN D5,C4,C3 SITE VANAZ RCC M35 7.5 0 7.5 747
40 11/12/2020 SOUNDAR DECK-3 BEAM 2B 19,45,51,34,18 SITE VANAZ RCC M35 122.25 0 122.25 869.25
11/13/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 0 2 871.25
42 11/13/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 3 0 3 874.25
43 11/13/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ PCC 1:05:10 1 0 1 875.25
44 11/14/2020 INIYAVAN DECK-3 JACKPIT STARTER SITE VANAZ RCC M35 0.75 0 0.75 876
45 11/14/2020 INIYAVAN EXTERNAL PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1.5 0 1.5 877.5
46 11/15/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 4.5 0 4.5 882
47 11/16/2020 INIYAVAN EXTERNAL LT PULL PIT WALL 96 SITE VANAZ RCC M30 2.5 0 2.5 884.5
48 11/16/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ RCC 1:05:10 13.5 0 13.5 898
49 11/16/2020 SOUNDAR DECK-3 COLUMN B2,C2,D2,D3,D4,C3,C9 SITE VANAZ RCC M35 18 0 18 916
50 11/16/2020 INIYAVAN EXTERNAL ST TRENCH WALL SITE VANAZ RCC M30 2 0 2 918
51 11/16/2020 SOUNDAR DECK-3 PARAPET WALL A10-A8 SITE VANAZ RCC M35 9 0 9 927
52 11/16/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 3 0 3 930
53 11/17/2020 INIYAVAN DECK-1 WATERPROOFING PCC SITE VANAZ PCC M15 92.5 0 92.5 1022.5
54 11/17/2020 SOUNDAR DECK-3 COLUMN B1,C1,D1 SITE VANAZ RCC M35 8.25 0 8.25 1030.75
55 11/17/2020 INIYAVAN EXTERNAL LT PULL PIT WALL 98,99 SITE VANAZ RCC M30 4 0 4 1034.75
56 11/17/2020 INIYAVAN EXTERNAL STORM WATER PCC SITE VANAZ RCC 1:05:10 1.5 1.5 1036.25
57 11/18/2020 INIYAVAN DECK-2 TOE WALL SITE VANAZ RCC M35 2 2 1038.25
58 11/18/2020 INIYAVAN EXTERNAL LT PULL PIT WALL 98,99 SITE VANAZ RCC M30 6 6 1044.25
59 11/18/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1 1 1045.25
60 11/19/2020 SOUNDAR DECK-3 SLAB B-D 5-9 SITE VANAZ RCC M35 63 42 105 1150.25
61 11/19/2020 SOUNDAR DECK-3 PARAPET WALL A6-A8 SITE VANAZ RCC M35 0 12 12 1162.25
62 11/19/2020 JEGAN DECK-2 TOE WALL SITE VANAZ RCC M35 0 2.5 2.5 1164.75
63 11/19/2020 JEGAN DECK-2 ELEVATION WALL SITE VANAZ RCC M35 0 5 5 1169.75
64 11/19/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 0 2 2 1171.75
65 11/20/2020 INIYAVAN EXTERNAL STORM WATER / SEWAGE ENCASING SITE VANAZ RCC 1:05:10 16.75 0 16.75 1188.5
66 11/20/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1.5 0 1.5 1190
67 11/21/2020 SOUNDAR DECK-3 PARAPET WALL A1-A3 SITE VANAZ RCC M35 9 0 9 1199
68 11/21/2020 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 12 0 12 1211
69 11/21/2020 JEGAN DECK-2 ELEVATION WALL SITE VANAZ RCC M35 3 0 3 1214
70 11/21/2020 JEGAN DECK-2 TOE WALL SITE VANAZ RCC M35 0.75 0 0.75 1214.75
71 11/21/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 0 2 1216.75
72 11/21/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 1.5 0 1.5 1218.25
73 11/22/2020 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 6 0 6 1224.25
74 11/23/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 3 0 3 1227.25
75 11/23/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1.5 1.5 1228.75
76 11/23/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 1.5 1.5 1230.25
77 11/23/2020 INIYAVAN EXTERNAL UG SUMP PCC SITE VANAZ RCC M15 3 3 1233.25
78 11/23/2020 SOUNDAR DECK-3 JACKPIT WALL STARTER SITE VANAZ RCC M35 1.75 1.75 1235
79 11/24/2020 SOUNDAR DECK-3 PARAPET WALL A6-A4 SITE VANAZ RCC M35 12 12 1247
80 11/24/2020 SOUNDAR DECK-3 STAIRCASE COLUMN SITE VANAZ RCC M35 2.5 2.5 1249.5
81 11/24/2020 SOUNDAR DECK-3 COLUMN SITE VANAZ RCC M35 5.25 5.25 1254.75
82 11/24/2020 JEGAN DECK-2 ELEVATION WALL SITE VANAZ RCC M35 3.75 3.75 1258.5
83 11/24/2020 JEGAN DECK-1 TOE WALL SITE VANAZ RCC M35 0.75 0.75 1259.25
84 11/24/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 2 2 1261.25
85 11/24/2020 INIYAVAN EXTERNAL PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1.5 1.5 1262.75
86 11/24/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 10.5 10.5 1273.25
87 11/25/2020 SOUNDAR DECK-3 TOE WALL SITE VANAZ RCC M35 1 1 1274.25
88 11/25/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2.5 2.5 1276.75
89 11/25/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 4 4 1280.75
90 11/25/2020 INIYAVAN EAST SIDE BOUNDARY WALL WALL FINAL LIFT SITE VANAZ RCC M30 2.25 2.25 1283
91 11/25/2020 SOUNDAR DECK-3 COLUMN B2 SITE VANAZ RCC M35 1 1 1284
92 11/26/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 4.5 4.5 1288.5
93 11/26/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1 1 1289.5
94 11/26/2020 SOUNDAR DECK3 COLUMN SITE VANAZ RCC M35 3 2 5 1294.5
95 11/26/2020 INIYAVAN EXTERNAL UG SUMP RAFT SITE VANAZ RCC M35 8 8 1302.5
96 11/27/2020 SOUNDAR DECK-3 TOE WALL SITE VANAZ RCC M35 1 1 1303.5
97 11/27/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1 1 1304.5
98 11/27/2020 SOUNDAR DECK-3 PARAPET WALL A4-A6 SITE VANAZ RCC M35 12 12 1316.5
99 11/27/2020 SOINDAR DECK-3 COLUMN SITE VANAZ RCC M35 6 6 1322.5
100 11/27/2020 SOUNDAR DECK-3 JACKPIT STARTER SITE VANAZ RCC M35 2.5 2.5 1325
101 11/28/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2.75 2.75 1327.75
102 11/28/2020 MANI MECHANIC ROOM SITE VANAZ RCC 1:05:10 0.75 0.75 1328.5
103 11/29/2020 SOUNDAR DECK-3 JACKPIT STARTER SITE VANAZ RCC M35 2.5 2.5 1331
104 11/29/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 4.5 4.5 1335.5
105 11/30/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1:05:10 2.5 2.5 1338
11/30/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 2 1340
11/30/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 2 2 1342
11/30/2020 INIYAVAN EAST SIDE BOUNDARY WALL WALL FINAL LIFT SITE VANAZ RCC M30 9 9 1351
106 11/30/2020 SOUNDAR DECK-3 COLUMN D6,C7.B7 SITE VANAZ RCC M35 5.25 5.25 1356.25
107 0
108 0
1010.5 346.75 0.00 1356.25
1357.25
156
8.75
23.25
23.25 42.25
45.25 486.75
486.75 2
2
123 301.25
0.40650407
0.59349593
NO OF CUBES 7
NO OF 28 DAYS
DAYS
621.756
3.552
5.4
1262
1902.5
1
URC CONSTRUCTION PVT LTD
Dec-20
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX GRADE PLANT-1 PLANT-2 rh TOTAL CUMMULATIVE
1 12/1/2020 SOUNDAR DECK-3 SLAB B-D 9-10 D-F 5-10 SITE VANAZ RCC M35 210 186 0 396 396
2 12/2/2020 INIYAVAN DECK-1 TOE WALL SITE VANAZ RCC M35 0.75 0 0.75 396.75
3 12/2/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 0 2 398.75
4 12/2/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1.5.10 1 0 1 399.75
5 12/3/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1.5.10 4.5 0 4.5 404.25
6 12/3/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 0 2 406.25
7 12/3/2020 SOUNDAR DECK-3 TOE WALL SITE VANAZ RCC M35 3.5 0 3.5 409.75
8 12/3/2020 JEGAN DECK-1 TERRACE RECTIFING SITE VANAZ RCC M35 1 0 1 410.75
9 12/4/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 2 0 2 412.75
10 12/4/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 0 2 414.75
11 12/4/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1.5.10 15.5 0 15.5 430.25
12 12/4/2020 SOUNDAR DECK-3 TOE WALL SITE VANAZ RCC M35 0.75 0 0.75 431
12/5/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 4 2 6 437
14 12/5/2020 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC M30 1.5 0 1.5 438.5
15 12/5/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1.5.10 2.5 0 2.5 441
16 12/5/2020 INIYAVAN EXTERNAL ST WALL SITE VANAZ RCC M30 2.5 0 2.5 443.5
17 12/5/2020 SOUNDAR DECK-3 STAIRCASE B-C 3-4 SITE VANAZ RCC M35 12 0 12 455.5
18 12/5/2020 SOUNDAR DECK-3 COLUMN B8,B9,B10,C10 SITE VANAZ RCC M35 13 0 13 468.5
19 12/5/2020 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 40.5 0 40.5 509
20 12/5/2020 JEGAN DECK-1 FLOORING SITE VANAZ RCC M35 0.75 0 0.75 509.75
21 12/6/2020 SOUNDAR DECK-3 RETAINING WALL L5-L9 SITE VANAZ RCC M35 30 0 30 539.75
22 12/6/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 1 0 1 540.75
23 12/7/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 3 0 3 543.75
24 12/7/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 1 0 1 544.75
25 12/7/2020 SOUNDAR DECK-3 COLUMN D10,C10,9D SITE VANAZ RCC M35 7.5 0 7.5 552.25
26 12/8/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 2 2 554.25
27 12/8/2020 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC M30 2 2 556.25
28 12/8/2020 INIYAVAN ST WALL SITE VANAZ RCC M30 1 1 557.25
29 12/8/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 2 2 559.25
30 12/9/2020 INIYAVAN S&T DUCT BANK PCC SITE VANAZ PCC M15 4 4 563.25
31 12/9/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 2 2 565.25
32 12/9/2020 SOUNDAR DECK-3 RW WALL L2-H1 SITE VANAZ RCC M35 11.5 11.5 576.75
33 12/10/2020 iniyavan EXTERNAL ST WALL SITE VANAZ RCC M30 0.5 0.5 577.25
34 12/10/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 2 2 579.25
35 12/10/2020 SOUNDAR DECK-3 STAIRCASE COLUMN SITE VANAZ RCC M35 2.25 2.25 581.5
36 12/10/2020 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC M30 2 2 583.5
37 12/11/2020 INIYAVAN NEAR OFFICE BOUNDARY WALL COLUMN SITE VANAZ RCC M30 0.75 0.75 584.25
38 12/11/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 4.5 4.5 588.75
39 12/11/2020 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC M30 2.25 2.25 591
40 12/11/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1.5.10 2.5 2.5 593.5
41 12/12/2020 SOUNDAR DECK-3 JACKPIT WALL 4&5 G-H 5-7 SITE VANAZ RCC M35 40.5 40.5 634
42 12/12/2020 SOUNDAR DECK-3 LIFT WALL B-C 4-5 SITE VANAZ RCC M35 13.5 13.5 647.5
43 12/12/2020 SOUNDAR DECK-3 RETAINING WALL J1-F1 SITE VANAZ RCC M35 6.75 6.75 654.25
44 12/12/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 2 2 656.25
45 12/12/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 1 1 657.25
46 12/12/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1.5.10 2 2 659.25
47 12/13/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 1.5 1.5 660.75
48 12/13/2020 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC M30 1.5 1.5 662.25
49 12/13/2020 INIYAVAN EXTERNAL SEWAGE LINE PCC SITE VANAZ RCC 1.5.10 4.5 4.5 666.75
50 12/14/2020 INIYAVAN DECK-1 WATER PROOFING SCREED SITE VANAZ PCC M15 30 30 696.75
51 12/14/2020 INIYAVAN EXTERNAL INFRONT OF ETU DUCT BANK PCC SITE VANAZ PCC M15 3.5 3.5 700.25
52 12/14/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2.5 2.5 702.75
53 12/14/2020 INIYAVAN EXTERNAL ST WALL SITE VANAZ RCC M30 0.75 0.75 703.5
54 12/14/2020 SOUNDAR DECK-3 JACKPIT WALL PCC SITE VANAZ RCC M15 0.5 0.5 704
55 12/14/2020 SOUNDAR DECK-3 JACKPIT WALL STARTER SITE VANAZ RCC M35 0.5 0.5 704.5
56 12/15/2020 INIYAVAN DECK-1 WATER PROOFING SITE VANAZ PCC M15 33.75 33.75 738.25
57 12/15/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 0.75 0.75 739
58 12/15/2020 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC M30 3 3 742
59 12/15/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 3.5 3.5 745.5
60 12/15/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1.5.10 2 2 747.5
61 12/16/2020 INIYAVAN EXTERNAL LT PULL PIT WALL ` SITE VANAZ RCC M30 3.75 3.75 751.25
62 12/16/2020 SOUNDAR DECK-3 BEAM H-K 5-10 SITE VANAZ RCC M35 135.75 60 195.75 947
63 12/16/2020 INIYAVAN EXTERNAL SEWAGE LINE PCC SITE VANAZ PCC 1.5.10 0 4.5 4.5 951.5
64 12/16/2020 INIYAVAN EXTERNAL SEWAGE LINE PCC SITE VANAZ PCC M15 4.5 4.5 956
65 12/17/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 0 4.5 4.5 960.5
66 12/17/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 6.25 6.25 966.75
67 12/17/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1.5.10 0 10 10 976.75
68 12/18/2020 INIYAVAN EXTERNAL ST PIPE SITE VANAZ PCC 1.5.10 0 8.5 8.5 985.25
69 12/18/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 0 2.25 2.25 987.5
70 12/18/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 0 4.5 4.5 992
71 18-12-2020 INIYAVAN ATWSP RAFT SITE VANAZ RCC M35 0 14.5 14.5 1006.5
72 19-12-20 SOUNDAR DECK-3 RETAINING WALL L5-L2 SITE VANAZ RCC M35 20.25 0 20.25 1026.75
73 19-12-20 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 1.5 0 1.5 1028.25
74 12/19/2020 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 21.75 0 21.75 1050
75 12/19/2020 SANTOSH DECK-1 TRENCH WALL SITE VANAZ RCC M35 1 0 1 1051
76 12/19/2020 INIYAVAN EXTERNAL ST LINE PCC SITE VANAZ RCC 1.5.10 2.5 0 2.5 1053.5
77 12/20/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 7.5 0 7.5 1061
78 12/20/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 3 3 1064
79 12/20/2020 INIYAVAN EXTERNAL ST PIPE PCC SITE VANAZ RCC 1.5.10 8.5 8.5 1072.5
80 12/20/2020 SOUNDAR DECK-3 DRAIN PCC SITE VANAZ RCC M15 2.5 2.5 1075
81 12/21/2020 SANTOSH DECK-1 EXPANSION JOINT SITE VANAZ RCC M35 1.5 1.5 1076.5
82 12/21/2020 INIYAVAN EAST SIDE BOUNDARY WALL COLUMN SITE VANAZ RCC M35 0.75 0.75 1077.25
83 12/21/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 2.5 2.5 1079.75
84 12/21/2020 INIYAVAN EXTERNAL ST PIPE PCC SITE VANAZ RCC 1.5.10 4.5 4.5 1084.25
85 12/22/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 3 3 1087.25
86 12/22/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 3.75 3.75 1091
87 12/22/2020 SOUNDAR DECK-3 PIT CHAMBER SITE VANAZ RCC M30 2 2 1093
88 12/22/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1.5.10 1 1 1094
89 12/23/2020 santosh DECK-1 WATER PROOFING SITE VANAZ RCC M15 44.25 44.25 1138.25
90 12/23/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2.5 2.5 1140.75
91 12/23/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 3.75 3.75 1144.5
92 12/23/2020 SANTOSH DECK-1 TRENCH WALL SITE VANAZ RCC M35 3.25 3.25 1147.75
93 12/24/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 4 4 1151.75
94 12/24/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 4 4 1155.75
95 12/24/2020 SOUNDAR DECK-3 SLAB SITE VANAZ RCC M35 97.75 30 127.75 1283.5
96 12/25/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 2 0 2 1285.5
97 12/25/2020 RAJA DECK-3 RETAINING WALL SITE VANAZ RCC M35 0.75 0.75 1286.25
98 12/25/2020 JEGAN DECK-3 MULLILLIN COLUMN SITE VANAZ RCC M35 1.5 0.75 2.25 1288.5
99 12/25/2020 INIYAVN EXTERNAL ST WALL SITE VANAZ RCC M30 2 0 2 1290.5
100 12/25/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2.5 2.5 1293
101 12/26/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 4 4 1297
102 12/26/2020 INIYAVN DECK-1 ST WALL SITE VANAZ RCC M35 5.25 5.25 1302.25
103 12/26/2020 SANTOSH EXTERNAL STORM WATER ENCASING SITE VANAZ PCC 1.5.10 3 3 1305.25
104 12/26/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M30 1 1 1306.25
105 12/27/2020 SOUNDAR DECK-3 SLAB SITE VANAZ RCC M35 151.5 138 289.5 1595.75
106 12/28/2020 DECK-3 DECK-3 MULLILLIN COLUMN SITE VANAZ RCC M35 0.75 1 1.75 1597.5
107 12/28/2020 INIYAVAN EXTERNAL STORM WATER ENCXASING SITE VANAZ RCC 1.5.10 5.75 0 5.75 1603.25
108 12/28/2020 RAJA PIT WHEEL LATHE FOOTING PCC SITE VANAZ PCC M15 2 0 2 1605.25
109 12/28/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 2 0 2 1607.25
110 12/28/2020 INIYAVAN PRECAST YARD S&T TRENCH RAFT SITE VANAZ RCC M30 0 3 3 1610.25
111 12/28/2020 INIYAVAN PRECAST YARD ESTHABLSHMENT SITE VANAZ RCC 1.5.10 0 2 2 1612.25
112 12/28/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 0 3 3 1615.25
113 12/28/2020 JEGAN DECK-3 FLOORING 2-5 C-D SITE VANAZ RCC M15 0 15.5 15.5 1630.75
114 12/29/2020 INIYAVAN EXTERNAL DUCT BANK PCC SITE VANAZ PCC M15 0 4.5 4.5 1635.25
115 12/29/2020 INIYAVAN EXTERNAL ST PIPE PCC SITE VANAZ PCC 1.5.10 0 4.5 4.5 1639.75
116 12/29/2020 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC M30 0 2.25 2.25 1642
117 12/29/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 0 2.25 2.25 1644.25
118 12/29/2020 SANTOSH DECK-1 TRENCH WALL SITE VANAZ RCC M35 0 4 4 1648.25
119 12/29/2020 RAJA DECK-3 MULLILLIN LINTEL SITE VANAZ RCC M35 0 2.5 2.5 1650.75
120 12/29/2020 INIYAVAN EXTERNAL S&T TRENCH WALL SITE VANAZ RCC M35 0 4.5 4.5 1655.25
121 12/30/2020 SANTOSH DECK-1 WATER PROOFING SITE VANAZ RCC M15 72 0 72 1727.25
122 12/30/2020 JEGAN DECK-3 FLOORING PCC SITE VANAZ RCC M15 27 0 27
123 12/30/2020 JEGAN DECK-3 MULLILLIN COLUMN SITE VANAZ RCC M35 0.5 0 0.5
124 12/30/2020 SOUNDAR DECK-3 RETAINING WALL SITE VANAZ RCC M35 9.75 0 9.75
125 12/30/2020 INIYAVAN EXTERNAL PRECAST YARD COVER SLAB SITE VANAZ RCC M30 1.5 0 1.5
126 12/30/2020 INIYAVAN EXTERNAL ST LINE SITE VANAZ RCC M30 5.25 0 5.25
127 12/31/2020 SOUNDAR DECK-3 CHAMBER RAFT SITE VANAZ RCC M30 0.75 0.75
128 12/31/2020 SOUNDAR DECK-3 CHAMBER RAFT SITE VANAZ RCC M35 0.75 0.75
129 12/31/2020 JEGAN DECK-3 MULLILLIN LINTEL SITE VANAZ RCC M35 2.5 2.5
130 12/31/2020 INIYAVAN EXTERNAL LT PULL PIT WALL SITE VANAZ RCC M30 1.75 1.75
131 12/31/2020 INIYAVAN PRECAST YARD PRECAST COVER SLAB SITE VANAZ RCC M30 2.5 2.5
132 12/31/2020 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ RCC 1.5.10 3 3
133 12/31/2020 SOUNDAR DECK-3 RETAINING WALL SITE VANAZ RCC M35 5.25 5.25
134 12/31/2020 SOUNDAR DECK-3 SLAB SITE VANAZ RCC M35 48.5 48.5
0
VANAZ 1315.5 520.75 0.00 1836.25
VANAZ 1836.25
353.503
117
129.75
141
417.25
156
8.75
23.25
23.25 42.25
45.25 486.75
486.75 2
1063.5 2
20.5
14.25 123 301.25
84.25 0.40650407
103.75 0.59349593
13.5
4.25
45
NO OF CUBES 7
NO OF 28 DAYS
DAYS
621.756
3.552
5.4
1262
1902.5
1
URC CONSTRUCTION PVT LTD
Jan-21
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX GRADE PLANT-1 PLANT-2 rh TOTAL CUMMULATIVE
4 1/1/2021 SOUNDAR DECK-3 SLAB K-L 2-5 SITE VANAZ RCC M35 27 36.25 63.25 170.75
8 1/2/2021 JEGAN DECK-3 MULLILON COLUMN SITE VANAZ RCC M35 0 0.75 0.75 182.5
9 1/2/2021 SOUNDAR DECK-3 CHAMBER RCC SITE VANAZ RCC M35 0 2.25 2.25 184.75
15 1/3/2021 INIYAVAN DECK-3 MULLILON COLUMN SITE VANAZ RCC M35 1 0 1 203.75
16 1/4/2021 soundar DECK-3 JACKPIT WALL 1 SITE VANAZ RCC M35 21 0 21 224.75
17 1/4/2021 SOUNDAR DECK-3 SLAB J2-J5 SITE VANAZ RCC M35 29.25 30 59.25 284
27 1/5/2021 JEGAN DECK-3 MULLILON COLUMN SITE VANAZ RCC M35 0 0.5 0.5 304
39 1/8/2021 SOUNDAR DECK-3 JACKPIT WALL site VANAZ RCC M35 15.5 15.5 450
41 1/8/2021 SOUNDAR DECK-3 BRACKET WALL SITE VANAZ RCC M35 9 9 462
48 1/9/2021 SOUNDAR DECK-3 TOE WALL SITE VANAZ RCC M35 3 3 504.75
50 1/10/2021 SOUNDAR DECK-3 LIFT WALL SITE VANAZ RCC M35 14.25 14.25 520.5
62 1/12/2021 JEGAN DECK-3 MULLILON COLUMN SITE VANAZ RCC M30 0.5 0.5 613.25
63 1/12/2021 JEGAN DECK-3 LINTEL BEAM SITE VANAZ RCC M35 1 1 614.25
67 1/12/2021 SOUNDAR DECK-3 BEAM F1-F5 SITE VANAZ RCC M35 68.25 68.25 688.5
68 1/12/2021 SOUNDAR DECK-3 SLAB SITE VANAZ RCC M35 34.5 9 43.5 732
70 1/13/2021 JEGAN DECK-3 LINTEL SITE VANAZ RCC M35 0.5 0.5 762.5
74 1/13/2021 JEGAN DECK-3 MULLILION COLUMN SITE VANAZ RCC M35 0.5 0.5 772
81 1/15/2021 RAJA EAST SIDE BOUNDARY WALL RAFT RAG 42 SITE VANAZ RCC M30 9.75 0 9.75 847.75
82 1/15/2021 SOUNDAR DECK-3 SLAB SITE VANAZ RCC M35 38.25 0 38.25 886
83 1/15/2021 SOUNDAR DECK-3 RW F1-G1 SITE VANAZ RCC M35 4.5 0 4.5 890.5
84 1/16/2021 RAJA EAST SIDE BOUNDARY WALL RAG 42 SITE VANAZ RCC M30 6 0 6 896.5
86 1/16/2021 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 15.25 0 15.25 912.75
88 1/17/2021 JEGAN DECK-3 MULLILON AND LINTEL SITE VANAZ RCC M35 2 0 2 921.5
93 1/18/2021 SOUNDAR DECK-3 SLAB E-H 7-10 SITE VANAZ RCC M35 171 112.5 283.5 1256.75
94 1/19/2021 RAJA EAST SIDE BOUNDARY WALL RAG 42 SITE VANAZ RCC M30 3 3 1259.75
103 1/21/2021 SOUNDAR DECK-3 DRAIN WALL SITE VANAZ RCC M35 5 5 1321.25
107 1/21/2021 JEGAN DECK-3 MULLILON COLUMN SITE VANAZ RCC M35 0.5 0.5 1327.25
110 1/22/2021 JEGAN DECK-3 MULLILION COLUMN SITE VANAZ RCC M35 1 1 1332.25
111 1/22/2021 SOUNDAR DECK-3 JACKPIT WALL SITE VANAZ RCC M35 7.5 7.5 1339.75
112 1/22/2021 SOUNDAR DECK-3 SLAB J-H 5-7 SITE VANAZ RCC M35 31.5 31.5 1371.25
115 1/22/2021 SOUNDAR DECK-3 TOE WALL SITE VANAZ RCC M35 0.75 0.75 1378
122 1/23/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC M30 2 2 1405.5
128 1/24/2021 JEGAN DECK-3 MULLILON COLUMN SITE VANAZ RCC M35 1.5 1.5 1447.5
136 1/25/2021 RAJA DECK-3 SLAB J-E 5-7 SITE VANAZ RCC M35 113 51 164 1655.75
140 1/26/2021 RAJA RETAINING WALL PCC SITE VANAZ RCC M15 21 21 1687
146 1/27/2021 JEGAN DECK-3 LINTEL BEAM SITE VANAZ RCC M35 1 1 1743.25
151 1/28/2021 JEGAN DECK-3 DRAIN WALL PCC SITE VANAZ PCC M15 3 3 1750.5
154 1/28/2021 RAJA WEST SIDE RETAINING PCC 19-21 SITE VANAZ RCC M15 15.75 15.75 1771.25
158 1/29/2021 RAJA SOUTH SIDE RETAINING WALL PCC SITE VANAZ RCC M35 9 9 1797
159 1/29/2021 RAJA SOUTH SIDE RETAINING WALL PCC SITE VANAZ RCC M15 17 17 1814
160 1/29/2021 ANKIT DECK-3 SLAB H-K 5-2 SITE VANAZ RCC M35 26 26 1840
164 1/30/2021 RAJA SOUTH SIDE RW WALL PCC RAG 39-38 SITE VANAZ PCC M15 12 0 12 1897.75
173 1/31/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC M35 92.25 69 161.25 2094.5
8.75
0.00
NO OF CUBES 7
NO OF 28 DAYS
DAYS
URC CONSTRUCTION PVT LTD
Feb-21
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
1 2/1/2021 INIYAVAN EXTERNAL STORM WATER ENCASING SITE VANAZ PCC OPC 1.5.10 4 0 0 4
2 2/1/2021 INIYAVAN ETU ROAD SEPTIC TANK PCC SITE VANAZ PCC OPC 1.5.10 1 0 0 1
3 2/1/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5 0.5
4 2/1/2021 SANTOSH EXTERNAL LT PULL PIT WALL SITE VANAZ RCC OPC M30 2.25 2.25
5 2/1/2021 SANTOSH EXTERNAL ETU FRONT CHAMBER SITE VANAZ RCC OPC M30 0.75 0.75
6 2/1/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 3 3
7 2/1/2021 ANKIT STP WALL STARTER SITE VANAZ RCC OPC M35 0.75 0.75
8 2/1/2021 INIYAVAN EXTERNAL RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 2 2
9 2/1/2021 INIYAVAN ETU ROAD SEPTIC TANK RAFT SITE VANAZ PCC OPC M15 1.5 1.5
10 2/1/2021 SANTOSH ST PIPE LINE PCC SITE VANAZ PCC OPC M15 1 1
11 2/1/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 9.75 9.75
12 2/2/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5 0.5
13 2/2/2021 INIYAVAN EXTERNAL RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 1.5 1.5
14 2/2/2021 SANTOSH ST PIPE LINE PCC SITE VANAZ RCC OPC M15 3 3
15 2/2/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 0.5 0.5
16 2/2/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 3 3
17 2/2/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 14.25 14.25
18 2/3/2021 RAJA EAST SIDE RETAINING WALL RAFT RAG21-24 SITE VANAZ RCC PSC M35 181.5 181.5
19 2/3/2021 RAJA WEST SIDE RETAINING WALL PCC SITE VANAZ PCC PSC M15 26 26
20 2/3/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 1.5 1.5
21 2/3/2021 SANTOSH ST TRENCH RAFT SITE VANAZ RCC OPC M30 4.5 4.5
22 2/3/2021 INIYAVAN EXTERNAL RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 2 2
24 2/3/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 9 9
25 2/3/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 1.5 1.5
26 2/4/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 3.5 3.5
27 2/4/2021 SANTOSH EXTERNAL ST TRENCH WALL SITE VANAZ RCC OPC M30 13.75 13.75
28 2/4/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5 0.5
29 2/4/2021 ANKIT INSPECTION PIT PCC SITE VANAZ PCC PSC M15 2.5 2.5
30 2/4/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M35 4.5 4.5
31 2/4/2021 ANKIT INSPECTION PIT RCC SITE VANAZ RCC OPC M35 8.25 8.25
32 2/4/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 3.75 3.75
34 2/4/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 3 3
35 2/5/2021 RAJA INSPECTION PIT PCC SITE VANAZ PCC OPC M15 2.25 2.25
36 2/5/2021 SANTOSH EXTERNAL LT PULL PIT WALL SITE VANAZ RCC OPC M30 0.5 0.5
37 2/5/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 3 3
38 2/5/2021 RAJA DECK-3 SLAB SITE VANAZ RCC OPC M35 84 64.5 148.5
39 2/5/2021 INIYAVAN EXTERNAL RETAINING WALL COLUMN SITE VANAZ RCC OPC M35 1.5 1.5
40 2/5/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 5.5 4.5 10
41 2/5/2021 RAJA SOUTH SIDE RETAINING WALL RAFT RAG 42-40 SITE VANAZ RCC PSC M35 138 138
42 2/6/2021 RAJA EAST SIDE RETAINING WALL RAG24-26 SITE VANAZ PCC PSC M15 10.5 10.5
43 2/6/2021 RAJA EAST SIDE RETAINING WALL STARTER SITE VANAZ RCC OPC M35 2.5 2.5
44 2/6/2021 INIYAVAN EXTERNAL ST TRENCH WALL SITE VANAZ RCC OPC M30 4 4
45 2/6/2021 RAJA STP WALL SITE VANAZ RCC OPC M35 25.5 25.5
46 2/6/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 2 2
47 2/6/2021 SANTOSH ST PIPE LINE SITE VANAZ RCC OPC M30 2 2
48 2/6/2021 SANTOSH CABLE TRENCH WALL SITE VANAZ RCC OPC M30 3 3
49 2/6/2021 RAJA EAST SIDE RETAINING WALL SITE VANAZ RCC PSC M15 3.5 3.5
50 2/7/2021 INIYAVAN EXTERNAL ST TRENCH RAFT SITE VANAZ RCC OPC M30 3.5 3.5
51 2/7/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 16.5 16.5
52 2/7/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 0.5 0.5
53 2/7/2021 SANTOSH LT PULL PIT PCC SITE VANAZ RCC PSC M15 1.5 1.5
54 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 3 3
55 2/8/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5 0.5
56 2/8/2021 SANTOSH CABLE TRENCH WALL SITE VANAZ RCC OPC M30 1 1
57 2/8/2021 SANTOSH LT PULL PIT RAFT SITE VANAZ RCC OPC M30 1.5 1.5
58 2/8/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 12 12
59 2/8/2021 SANTOSH S&T TRENCH RAFT SITE VANAZ RCC OPC M30 2 2
60 2/8/2021 SANTOSH STORM WATER ENCASING SITE VANAZ PCC PSC 1.5.10 6.25 6.25
61 2/8/2021 JEGAN DECK-3 LINTEL BEAM SITE VANAZ RCC OPC M35 0.5 0.5
62 2/8/2021 INIYAVAN DECK-1 NEAR UG SUMP SLAB SITE VANAZ RCC OPC M35 4.5 4.5
63 2/9/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 5.5 5.5
64 2/9/2021 SANTOSH S&T TRENCH WALL SITE VANAZ RCC OPC M30 1.5 1.5
65 2/9/2021 SRIDHAR RETAINING WALL STARTER SITE VANAZ RCC OPC M35 1.5 1.5
66 2/9/2021 SANTOSH S&T TRENCH PCC SITE VANAZ PCC PSC M15 1.5 1.5
67 2/9/2021 RAJA RETAINING WALL SOUTHSIDE RAG 37-40 SITE VANAZ RCC PSC M35 210 210
68 2/9/2021 ANKIT RETAINING WALL WALL D-E/1 SITE VANAZ RCC OPC M35 7 7
69 2/9/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 13.5 13.5
70 Z INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 1.5 1.5
71 2/10/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 3.75 3.75
72 2/10/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 3.75 3.75
73 2/10/2021 SANTOSH CABLE TRENCH RAFT SITE VANAZ RCC OPC M30 2.5 2.5
74 2/10/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 3 3
75 2/10/2021 SANTOSH LT PULL PIT PCC SITE VANAZ PCC PSC M15 1.75 1.75
76 2/10/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ PCC PSC 1.5.10 2 2
77 2/10/2021 JEGAN DECK-3 LINTEL BEAM SITE VANAZ RCC OPC M35 0.75 0.75
73 2/11/2021 RAJA SOUTH SIDE RETAINING WALL RAG 19-21 SITE VANAZ RCC PSC M35 166.5 166.5
74 2/11/2021 SRIDHAR SOUTH SIDE RETAINING WALL STARTER SITE VANAZ RCC OPC M35 3.5 3.5
75 2/11/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 2.25 2.25
76 2/11/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 1.5 1.5
77 2/11/2021 SOUNDAR LT PULL PIT WALL PCC SITE VANAZ PCC PSC 1.5.10 1.5 1.5
78 2/11/2021 SOUNDAR LT PULL PIT WALL SITE VANAZ PCC PSC M15 0.5 0.5
79 2/11/2021 INIYAVAN ETU BEWHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 0 20.5 20.5
80 2/11/2021 ANKIT DECK-3 RETAINING WALL D-F/1 SITE VANAZ RCC OPC M35 0 9.75 9.75
81 2/11/2021 INIYAVAN INFRONT OF ETU FLOORING PCC SITE VANAZ PCC PSC M15 0 4.5 4.5
82 2/12/2021 INIYAVAN STREET LIGHT POLE PEDASTAL SITE VANAZ RCC OPC M30 0 2 2
83 2/12/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 1.75 1.75
84 2/12/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 13.5 3.75 17.25
85 2/12/2021 INIYAVAN SEWAGE LINE PCC SITE VANAZ PCC OPC 1.5.10 0 2.25 2.25
86 2/12/2021 INIYAVAN ST PULL PIT SITE VANAZ RCC OPC M30 0 1.5 1.5
87 2/12/2021 INIYAVAN ST TRENCH WALL SITE VANAZ RCC OPC M30 2 0 2
88 2/13/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 0 1 1
89 2/13/2021 SANTOSH LT PULL PIT WALL PCC SITE VANAZ RCC OPC M15 0 1 1
90 2/13/2021 SOUNDAR PWL FOUNDATION SITE VANAZ RCC OPC M35 0 45 45
91 2/13/2021 SRIDHAR SOUTH SIDE RETAINING WALL WALL SITE VANAZ RCC OPC M35 0 30.5 30.5
92 2/13/2021 SOUNDAR PWL STARTER SITE VANAZ RCC OPC M35 0 1 1
93 2/13/2021 SANTOSH ST PULL PIT WALL SITE VANAZ RCC OPC M30 3 3
94 2/13/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 0 14.5 14.5
95 2/13/2021 SANTOSH ST PIPE LINE PCC SITE VANAZ RCC OPC 1.5.10 0 3 3
96 2/14/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 0 3 3
97 2/14/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 0 4.5 4.5
98 2/14/2021 JEGAN DECK-3 MULLILON COLUMN SITE VANAZ RCC OPC M35 0 1 1
99 2/14/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 0 3.5 3.5
100 2/14/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 0 1.5 1.5
101 2/14/2021 HEMANDH HIGH MAST PEDASTAL SITE VANAZ RCC OPC M30 0 1 1
102 2/14/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ PCC OPC 1.5.10 0 2 2
103 2/15/2021 SANTOSH CABLE TRENCH PCC SITE VANAZ PCC OPC M15 0 1 1
104 2/15/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 0 1.75 1.75
105 2/15/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 0 9.75 9.75
106 2/15/2021 INIYAVAN STREET LIGHT PEDASTAL SITE VANAZ RCC OPC M30 0 0.75 0.75
107 2/15/2021 RAJA STP WALL SITE VANAZ RCC OPC M35 0 1.75 1.75
108 2/15/2021 SANTOSH EXTERNAL STORM WATER ENCASING SITE VANAZ PCC OPC 1.5.10 0 1.5 1.5
109 2/15/2021 SANTOSH S&T TRENCH WALL SITE VANAZ RCC OPC M30 0 1.25 1.25
110 2/16/2021 SANTOSH LT PULL PIT WALL SITE VANAZ rcc OPC M30 0 0.5 0.5
111 2/16/2021 INIYAVAN ST TRENCH RAFT SITE VANAZ RCC OPC M30 0 6.25 6.25
112 2/16/2021 INIYAVAN ETU BEHIND PAVEMENT ROAD SITE VANAZ RCC OPC M30 0 9 9
113 2/16/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 0 5.5 5.5
114 2/16/2021 SOUNDAR PWL FOOTING PCC SITE VANAZ RCC OPC M15 0 1.5 1.5
115 2/16/2021 SRIDHAR SOUTHSIDE RETAINING WALL SITE VANAZ RCC OPC M35 0 51.25 51.25
116 2/16/2021 SOUNDAR PWL PEDASTAL SITE VANAZ RCC OPC M35 0 6.5 6.5
117 2/17/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 0 3.75 3.75
118 2/17/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 0 1.5 1.5
119 2/17/2021 INIYAVAN HDPE PIPE RCC SITE VANAZ RCC OPC M30 0 2 2
120 2/17/2021 INIYAVAN STREET LIGHT PEDASTAL SITE VANAZ RCC OPC M30 0 1 1
121 2/17/2021 INIYAVAN BOUNDARY WALL COLUMN SITE VANAZ RCC OPC M30 0 0.5 0.5
122 2/17/2021 SANTOSH S&T TRENCH WALL SITE VANAZ RCC OPC M30 0 4.5 4.5
123 2/17/2021 SOUNDAR LT PULL PIT WALL SITE VANAZ RCC OPC M30 0 3 3
124 2/17/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 0 3 3
125 2/17/2021 JEGAN DECK-3 PIT CHAMBER SITE VANAZ RCC OPC M35 0 0.75 0.75
126 2/17/2021 ANKIT DECK-3 JACKPIT WALL SITE VANAZ RCC OPC M35 0 8.75 8.75
127 2/17/2021 SANTOSH STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 0 2 2
128 2/18/2021 INIYAVAN KERB STONE PCC SITE VANAZ RCC OPC M30 0 1 1
129 2/18/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 0 0.75 0.75
130 2/18/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 0 2.75 2.75
131 2/18/2021 SANTOSH PIPE LINE ENCASING SITE VANAZ RCC OPC 1.5.10 0 0.75 0.75
132 2/18/2021 JEGAN DECK-3 LINTEL BEAM SITE VANAZ RCC OPC M35 0 1 1
133 2/19/2021 SRIDHAR RETAINING WALL SOUTHSIDE SITE VANAZ RCC OPC M35 35 0 35
134 2/19/2021 SOUNDAR PWL FOOTING SITE VANAZ RCC OPC M35 16.5 0 16.5
135 2/19/2021 SOUNDAR PWL WALL SITE VANAZ RCC OPC M35 10.5 0 10.5
136 2/19/2021 INIYAVAN PIPE LINE ENCASING SITE VANAZ PCC OPC 1.5.10 4 0 4
137 2/19/2021 SRIDHAR RETAINING WALL PCC SITE VANAZ PCC OPC M15 9 0 9
138 2/19/2021 ANKIT DECK-3 BRACKET BEAM SITE VANAZ RCC OPC M35 27.25 0 27.25
139 2/19/2021 SOUNDAR ST TRENCH WALL SITE VANAZ RCC OPC M35 0.75 0 0.75
140 2/20/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 3 0 3
141 2/20/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 9.5 0 9.5
142 2/20/2021 INIYAVAN ST PIPE LINE PCC SITE VANAZ RCC OPC M15 1.5 0 1.5
143 2/20/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 4.5 0 4.5
144 2/20/2021 JEGAN DECK-3 LINTEL BEAM SITE VANAZ RCC OPC M35 0.5 0.5
145 2/21/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 1.5 1.5
146 2/21/2021 INIYAVAN S&T TRENCH PCC SITE VANAZ RCC OPC M15 2.5 0 2.25
147 2/22/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5 0.5
148 2/22/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC OPC M35 95.25 22.5 117.75
149 2/22/2021 SANTOSH CABLE TRENCH RAFT SITE VANAZ RCC OPC M30 3 1.5 4.5
150 2/22/2021 SANTOSH ST TRENCH RAFT SITE VANAZ RCC OPC M30 5.25 5.25
151 2/22/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 0 1.5 1.5
152 2/22/2021 SRIDHAR EAST SIDE RETAINING WALL SITE VANAZ RCC OPC M35 0 56.25 56.25
153 2/23/2021 SRIDHAR RETAINING WALL raft 25-27 SITE VANAZ RCC PSC M35 198.75 0 198.75
154 2/23/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC OPC M35 0 18 18
156 2/23/2021 SOUNDAR PIT WHEEL LATHE WALL SITE VANAZ RCC OPC M35 0 21 21
157 2/24/2021 INIYAVAN BOUNDARY COLUMN SITE VANAZ RCC OPC M30 0 1.5 1.5
158 2/24/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 0 5.25 5.25
159 2/24/2021 SANTOSH CABLE TRENCH WALL SITE VANAZ RCC OPC M30 0 8 8
160 2/25/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 5.5 0 5.5
161 2/25/2021 SOUNDAR PWL FOOTING SITE VANAZ RCC OPC M35 5.25 0 5.25
162 2/25/2021 SANTOSH S&T TRENCH WALL SITE VANAZ RCC OPC M30 0.5 0 0.5
163 2/25/2021 INIYAVAN DECK-1 TRACK BED SITE VANAZ RCC OPC M35 6.5 0 6.5
164 2/25/2021 SOUNDAR PWL COLUMN SITE VANAZ RCC OPC M35 2.5 0 2.5
165 2/25/2021 SOUNDAR ASS FOOTING PCC SITE VANAZ RCC OPC M15 1.75 0 1.75
166 2/25/2021 SOUNDAR LT PULL PIT RAFT SITE VANAZ RCC OPC M30 1.25 0 1.25
167 2/25/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ PCC PSC 1.5.10 1 0 1
168 2/25/2021 SRIDHAR EAST SIDE RW WALL RAG 41-38 SITE VANAZ RCC OPC M35 33.5 0 33.5
169 2/26/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC OPC M35 79.5 48 24 151.5
170 2/26/2021 SRIDHAR RETAINING WALL WALL RAG 22-23 SITE VANAZ RCC OPC M35 19.25 19.25
171 2/26/2021 SRIDHAR RETAINING WALL RAFT SITE VANAZ RCC PSC M35 146.5 146.5
172 2/26/2021 SANTOSH APPROACH SLAB PCC SITE VANAZ RCC OPC M15 3.75 3 6.75
173 2/26/2021 INIYAVAN ST TRENCH WALL SITE VANAZ RCC OPC M30 0 4.5 4.5
174 2/27/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.75 0 0.75
175 2/27/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 2.5 2.5
176 2/27/2021 INIYAVAN LT TRENCH WALL SITE VANAZ RCC OPC M30 1.5 1.5
177 2/27/2021 INIYAVAN EXTERNAL S&T PCC SITE VANAZ PCC OPC M15 2 2
178 2/27/2021 SANTOSH DECK-1 APPROACH SLAB SITE VANAZ RCC OPC M35 13.5 13.5
179 2/27/2021 SOUNDAR PWL FOOTING AND COLUMN SITE VANAZ RCC OPC M35 4.5 4.5
180 2/27/2021 SANTOSH DECK-1 TRACK BED SITE VANAZ RCC OPC M35 27.75 0 27.75
189 2/28/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 3.75 0 3.75
VANAZ 1895 560.25 24.00 2479.00
VANAZ 2479.25
353.503
NO OF CUBES 7
CUMMULATIVE NO OF 28 DAYS
DAYS
4
5
5.5
7.75
8.5
11.5
12.25
14.25
15.75
16.75
26.5
27
28.5
31.5
32
35
49.25
230.75
256.75
258.25
262.75
264.75
273.75
275.25
278.75
292.5
293
295.5
300
308.25
312
315
317.25
317.75
320.75
469.25
470.75
480.75
618.75
629.25
631.75 621.756
635.75
661.25
663.25
665.25
668.25
671.75
675.25
691.75
692.25
693.75
696.75
697.25
698.25
699.75
711.75
713.75
720
720.5
725
730.5
732
733.5
735
945
952
965.5
967
970.75
974.5
977
980
981.75
983.75
984.5 0
1151 3.552
1154.5 5.4
1156.75
1158.25
1159.75
1160.25
1180.75
1190.5
1195
1197
1198.75
1216
1218.25
1219.75
1221.75
1222.75
1223.75
1268.75
1299.25
1300.25
1303.25
1317.75
1320.75
1323.75
1328.25
1329.25
1332.75
1334.25
1335.25
1337.25
1338.25
1340
1349.75
1350.5
1352.25
1353.75
1355
1355.5
1361.75
1370.75
1376.25
1377.75
1429
1435.5
1439.25
1440.75
1442.75
1443.75
1444.25
1448.75
1451.75
1454.75
1455.5
1464.25
1466.25
1467.25
1468
1470.75
1471.5
1472.5
1507.5
1524
1534.5
1538.5
1547.5
1574.75
1575.5
1578.5
1588
1589.5
1594
1594.5
1596
1598.25
1598.75
1716.5
1721
1726.25
1727.75
1784
1982.75
2000.75
2021.75
2023.25
2028.5
2036.5
2042
2047.25
2047.75
2054.25
2056.75
2058.5
2059.75
2060.75
2094.25
2245.75
2265
2411.5
2418.25
2422.75
2423.5
2426
2427.5
2429.5
2443
2447.5
2475.25
8.75
1
VANAZ BATCHING PLANT PRODUCTION DETAILS
329.28
1394.25
1635.4
155.4175
3514.3475
RECEIVED FROM RH
6133.25
1
URC CONSTRUCTION PVT LTD
Mar-21
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site MIX CEMENT GRADE PLANT-1 PLANT-2 rh
3/1/2021 SRIDHAR SOUTHSIDE RW WALL RAG 39-37 SITE VANAZ RCC OPC M35 18 16.5
2 3/1/2021 SRIDHAR SOUTHSIDE RW WALL STARTER SITE VANAZ RCC OPC M35 2
3 3/1/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 2.5
4 3/1/2021 ANKIT DECK-3 RAMP SITE VANAZ RCC OPC M35 1.5
5 3/1/2021 SANTOSH DECK-1 CONNECTING SLAB SITE VANAZ RCC OPC M35 6
6 3/1/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 3
7 3/1/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 1
8 3/1/2021 INIYAVAN S&T TRENCH PCC SITE VANAZ PCC OPC M15 4
9 3/2/2021 SRIDHAR RETAINING WALL RAFT PCC SITE VANAZ PCC OPC M15 1.25
10 3/2/2021 SOUNDAR PWL FOOTING PCC SITE VANAZ PCC OPC M15 2
11 3/2/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 1
12 3/2/2021 SRIDHAR RETAINING WALL STARTER SITE VANAZ RCC OPC M35 2
13 3/2/2021 SOUNDAR PWL COLUMN SITE VANAZ RCC OPC M35 2
14 3/2/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M35 1.5
15 3/3/2021 SOUNDAR PWL FOOTING SITE VANAZ RCC OPC M35 7.5
16 3/3/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 2
17 3/3/2021 INIYAVAN ST TRENCH PCC SITE VANAZ RCC OPC M15 3.5
18 3/3/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 1.5
19 3/3/2021 INIYAVAN S&T TRENCH RAFT SITE VANAZ RCC OPC M30 2.5
20 3/3/2021 SANTOSH DECK-1 TRACK BED SITE VANAZ RCC OPC M35 14.25
21 3/3/2021 ANKIT ETU EMBEDDED TRACK SITE VANAZ RCC OPC M35 12.25
22 3/4/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.75
24 3/4/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 2.25
25 3/4/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 1.5
26 3/4/2021 SRIDHAR RETAINING WALL WALL RAG 38-36 SITE VANAZ RCC OPC M35 20.75
27 3/4/2021 SRIDHAR RETAINING WALL WALL RAG19-18 SITE VANAZ RCC OPC M35 18
28 3/4/2021 SRIDHAR RETAINING WALL RAFT 21-23 SITE VANAZ RCC OPC M35 22
29 3/4/2021 RAJA BOUNDARY WALL WALL SITE VANAZ RCC OPC M35 10.5
30 3/4/2021 INIYAVAN NEAR UP PAVEMENT ROAD PCC SITE VANAZ PCC OPC M15 9
31 3/4/2021 SOUNDAR LT PULL PIT WALL SITE VANAZ RCC OPC M15 3
32 3/5/2021 INIYAVAN BOUNDARY WALL COLUMN SITE VANAZ RCC OPC M30 1.5
34 3/5/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.75
35 3/5/2021 SOUNDAR ASS FOOTING PCC SITE VANAZ RCC OPC M15 3.75
36 3/5/2021 SOUNDAR PWL PEDASTAL SITE VANAZ RCC OPC M35 3.5
37 3/5/2021 INIYAVAN PAVEMENT ROAD PCC SITE VANAZ RCC OPC M15 31
38 3/5/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 3
39 3/5/2021 ANKIT STP WALL SITE VANAZ RCC OPC M35 10.75
40 3/5/2021 SANTOSH DECK-1 TRACK BED SITE VANAZ RCC OPC M35 10.5
41 3/6/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 4.25
42 3/6/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 1.5
43 3/6/2021 RAJA ETU EMBEDDED TRACK SITE VANAZ RCC OPC M35 9.5
44 3/6/2021 INIYAVAN RETAINING WALL COLUMN SITE VANAZ RCC OPC M30 1
45 3/6/2021 SOUNDAR LT PULL PIT PCC SITE VANAZ PCC OPC M15 2.25
46 3/6/2021 INIYAVAN PAVEMENT ROAD PCC SITE VANAZ PCC OPC M15 1.5
47 3/6/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 6
48 3/6/2021 SANTOSH DECK-1 TRACK BED SITE VANAZ RCC OPC M35 31
49 3/7/2021 SOUNDAR ASS FOOTING SITE VANAZ RCC OPC M35 6
50 3/7/2021 SRIDHAR RETAINING WALL WALL SITE VANAZ RCC OPC M35 48 4.5
51 3/7/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 16.5 12
52 3/8/2021 RAJA EAST SIDE BOUNDARY WALL SITE VANAZ RCC OPC M30 1
53 3/8/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 1
54 3/8/2021 SOUNDAR PWL BEAM PCC SITE VANAZ RCC OPC M15 1
55 3/8/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 26
56 3/8/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC OPC M35 157.5 120
57 3/8/2021 SANTOSH DECK-1 TRACK BED SITE VANAZ RCC OPC M35 12 12
58 3/8/2021 SOUNDAR ASS FOOTING SITE VANAZ RCC OPC M35 2.25 0
59 3/9/2021 SRIDHAR EAST SIDE RETAINING WALL PCC SITE VANAZ RCC OPC M15 7.5
60 3/9/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 2.5
61 3/9/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 26.25
62 3/9/2021 SOUNDAR ASS FOOTING SITE VANAZ RCC OPC M35 2.25
63 3/10/2021 RAJA BOUNDARY WALL SITE VANAZ RCC OPC M30 1
64 3/10/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 2
65 3/10/2021 SOUNDAR LT PULL PIT PCC SITE VANAZ RCC OPC M15 2.25
66 3/10/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 4.5
67 3/10/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 4
68 3/10/2021 INIYAVAN ST PIPE PCC SITE VANAZ RCC OPC M15 2.5
69 3/10/2021 SRIDHAR RETAINING WALL SITE VANAZ RCC OPC M35 3.75
70 3/10/2021 SOUNDAR ASS FOOTING SITE VANAZ RCC OPC M35 2
71 3/10/2021 SOUNDAR ASS COLUMN SITE VANAZ RCC OPC M35 2
72 3/11/2021 SRIDHAR SOUTHSIDE RETAINING WALL SITE VANAZ RCC OPC M35 3
73 3/11/2021 SOUNDAR HUME PIPE ENCASING SITE VANAZ PCC OPC 1.5.10 1.25
74 3/11/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 3.25
75 3/11/2021 SANTOSH ST TRENCH WALL SITE VANAZ RCC OPC M30 2.25
76 3/11/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 2.5
77 3/11/2021 SRIDHAR RETAINING WALL WALL RAG 23-24 SITE VANAZ RCC OPC M35 36
73 3/11/2021 SRIDHAR RETAINING WALL RAFT RAG 27-29 SITE VANAZ RCC OPC M35 0 72
74 3/11/2021 INIYAVAN STP LINE PCC SITE VANAZ PCC OPC M15 2
75 3/12/2021 INIYAVAN PAVEMENT road SITE VANAZ PCC OPC M15 6 18
76 3/12/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M35 0.5
77 3/12/2021 SANTOSH HUME PIPE ENCASING SITE VANAZ PCC OPC 1.5.10 10.75
78 3/12/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 1
79 3/12/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC OPC M35 1 1.25
80 3/12/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 1
81 3/13/2021 INIYAVAN PIPE LINE ENCASING SITE VANAZ RCC OPC 1.5.10 4.5
82 3/13/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 0 3
83 3/13/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 0 24.5
84 3/13/2021 SOUNDAR ASS COLUMN SITE VANAZ RCC OPC M35 0 2.5
85 3/13/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 0 2.5
86 3/14/2021 SANTOSH HUME PIPE ENCASING SITE VANAZ RCC OPC 1.5.10 1.25 0
87 3/14/2021 SANTOSH LT PULL PIT WALL SITE VANAZ RCC OPC M30 1 0
88 3/14/2021 SRIDHAR RETAINING WALL IST LIFT SITE VANAZ RCC OPC M35 34.5 0
89 3/14/2021 ANKIT STP WALL SITE VANAZ RCC OPC M35 15 0
90 3/15/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 30
91 3/15/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5
92 3/15/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 2.5
93 3/15/2021 SANTOSH STORM WATER ENCASING SITE VANAZ PCC OPC 1.5.10 5.5
94 3/15/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 3
95 3/15/2021 SOUNDAR PWL PEDASTAL SITE VANAZ RCC OPC M35 1.5
96 3/15/2021 INIYAVAN PAVEMENT ROAD PCC SITE VANAZ RCC OPC M15 36
97 3/15/2021 RAJA SOUTHSIDE RETAINING WALL SITE VANAZ RCC OPC M15 5.5
98 3/16/2021 SANTOSH STORM WATER ENCASING SITE VANAZ PCC OPC 1.5.10 3.75
99 3/16/2021 JEGAN DECK-3 GRADE SLAB SITE VANAZ PCC OPC M15 15
100 3/16/2021 INIYAVAN PRECAST YARD COVER SLAB SITE VANAZ RCC OPC M30 1
101 3/16/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 10.25
102 3/16/2021 SOUNDAR PWL PLINTH BEAM SITE VANAZ RCC OPC M35 9.25
103 3/16/2021 SOUNDAR DUCT CONCRETE SITE VANAZ RCC OPC M30 6.25
104 3/16/2021 SOUNDAR LT PULL PIT RAFT SITE VANAZ RCC OPC M30 1
0 3/17/2021 SOUNDAR DUCT BANK SITE VANAZ RCC OPC M30 0.5
106 3/17/2021 SOUNDAR PWL PLINTH BEAM SITE VANAZ RCC OPC M35 0 1.25
107 3/17/2021 KARTHIK SOUTHSIDE RETAINING WALL SITE VANAZ RCC OPC M35 30 6
108 3/17/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 12
109 3/17/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 2.25
110 3/17/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 4
111 3/17/2021 NAGARAJ BOUNDARY WALL PCC RAG 10-13 SITE VANAZ RCC OPC M15 7.5
112 3/17/2021 JEGAN DECK-3 GRADE SLAB SITE VANAZ RCC OPC M15 18.5
113 3/18/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 12 10.5
114 3/18/2021 SOUNDAR LT PULL PIT WALL SITE VANAZ RCC OPC M30 1.5 5
115 3/18/2021 INIYAVAN PAVEMENT ROAD PCC SITE VANAZ RCC OPC M15 1 9.75
116 3/18/2021 INIYAVAN DECK-1 TRACK BED SITE VANAZ RCC OPC M35 0 15
117 3/18/2021 SOUNDAR EXTERNAL CASH BASIN PCC SITE VANAZ RCC OPC M15 0.5 0
118 3/18/2021 NAGARAJ BOUNDARY WALL RAG 8-10 SITE VANAZ RCC OPC M30 26.25 0
119 3/18/2021 NAGARAJ BOUNDARY WALL PCC RAG 10-13 SITE VANAZ RCC OPC M15 2.25 0
120 3/19/2021 SOUNDAR STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 9.25 0
121 3/19/2021 ANKIT STP WALL SITE VANAZ RCC OPC M35 1.5 0
122 3/19/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5
123 3/19/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 18
124 3/19/2021 SOUNDAR PWL PLINTH BEAM SITE VANAZ RCC OPC M35 9 1
125 3/19/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 1.5 0.75
126 3/19/2021 INIYAVAN PAVEMENT ROAD PCC SITE VANAZ RCC OPC M15 0 6
127 3/19/2021 INIYAVAN DECK-1 TRACK BED SITE VANAZ RCC OPC M35 0 6
128 3/20/2021 SOUNDAR STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 0 4
129 3/20/2021 KARTHIK BOUNDARY WALL RAFT RAG 10-13 SITE VANAZ RCC OPC M30 0 84
130 3/20/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 61 0
131 3/20/2021 JEGAN DECK-3 GRADE SLAB SITE VANAZ RCC OPC M15 15
132 3/20/2021 ANKIT STP WALL SITE VANAZ RCC OPC M35 5.25
133 3/22/2021 KARTHIK RETAINING WALL WALL SITE VANAZ RCC OPC M35 39.75
134 3/22/2021 SOUNDAR LT PULL PIT SITE VANAZ RCC OPC M30 2.25
135 3/22/2021 KARTHIK BOUNDARY WALL STARTER SITE VANAZ RCC OPC M30 0.75
136 3/22/2021 KARTHIK BOUNDARY WALL PCC RAG 13-16 SITE VANAZ RCC OPC M15 9
137 3/22/2021 SOUNDAR ASS COLUMN SITE VANAZ RCC OPC M35 3.5
138 3/22/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 3
139 3/22/2021 INIYAVAN HIGH MAST RAFT SITE VANAZ RCC OPC M30 3.75
140 3/22/2021 INIYAVAN DUMMY COLUMN SITE VANAZ RCC OPC 0 6.25
141 3/22/2021 INIYAVAN DECK-1 TRACK BED SITE VANAZ RCC OPC M35 0 6.5
142 3/23/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ PCC OPC 1.5.10 4.5
143 3/23/2021 INIYAVAN HIGH MAST PCC SITE VANAZ RCC OPC M15 1
144 3/23/2021 INIYAVAN S&T TRENCH PCC SITE VANAZ RCC OPC M15 1
145 3/23/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5
146 3/23/2021 INIYAVAN HIGH MAST SITE VANAZ RCC OPC M30 1.25
147 3/23/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 16
148 3/23/2021 STR JEGAN ASS COLUMN SITE VANAZ RCC OPC M35 2.25
149 3/24/2021 FIN JEGAN DECK-3 GRADE SLAB SITE VANAZ RCC OPC M15 30
150 3/24/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 2.5
151 3/24/2021 INIYAVAN S&T TRENCH RAFT SITE VANAZ RCC OPC M30 4
152 3/24/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5
153 3/24/2021 INIYAVAN HIGH MAST RAFT SITE VANAZ RCC OPC M30 4
154 3/24/2021 INIYAVAN LT PULL PIT SITE VANAZ RCC OPC M30 1
156 3/24/2021 INIYAVAN PRECAST YARD SITE VANAZ RCC OPC M35 2.75
157 3/24/2021 KARTHIK SOUTHSIDE RETAINING WALL SITE VANAZ RCC OPC M35 33
158 3/25/2021 NAGARAJ BOUNDARY WALL WALL RAG 8-10 SITE VANAZ RCC OPC M35 12.75
159 3/25/2021 NAGARAJ BOUNDARY WALL RAFT RAG 13-16 SITE VANAZ RCC OPC M35 54.75
160 3/25/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 1
161 3/25/2021 INIYAVAN STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 2.5 1
162 3/25/2021 FIN JEGAN DECK-3 GRADE SLAB PCC SITE VANAZ RCC OPC M15 15.5
163 3/25/2021 INIYAVAN S&T TRENCH RAFT SITE VANAZ RCC OPC M30 3
164 3/26/2021 INIYAVAN DUMMY COLUMN SITE VANAZ PCC OPC 1.5.10 2.5
165 3/26/2021 INIYAVAN PIPE LINE ENCASING SITE VANAZ PCC OPC 1.5.10 4.5
166 3/26/2021 INIYAVAN DUCT BANK PCC SITE VANAZ RCC OPC M15 3
167 3/26/2021 INIYAVAN ASS TRENCH PCC SITE VANAZ RCC OPC M15 17.5
168 3/26/2021 INIYAVAN KERB STONE SITE VANAZ RCC OPC M30 0.5
169 3/26/2021 INIYAVAN S&T TRENCH WALL SITE VANAZ RCC OPC M30 2
170 3/26/2021 JEGAN RETAINING WALL SITE VANAZ RCC OPC M35 31.5
171 3/26/2021 ANKIT DECK-3 SLAB SITE VANAZ RCC OPC M35 165 144.75
172 3/27/2021 INIYAVAN PRECAST YARD PRECAST PANEL site VANAZ RCC OPC M35 3.5
173 3/27/2021 INIYAVAN DUCT BANK SITE VANAZ RCC OPC M30 4.5
177 3/27/2021 INIYAVAN HIGH MAST PCC SITE VANAZ RCC OPC M15 3
174 3/28/2021 INIYAVAN PAVEMENT ROAD SITE VANAZ RCC OPC M30 18
175 3/28/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ RCC OPC M30 2
176 3/28/2021 INIYAVAN BOUNDARY WALL COLUMN SITE VANAZ RCC OPC M30 1.25
178 3/28/2021 JEGAN DECK-3 GRADE SLAB PCC SITE VANAZ RCC OPC M15 4.5
179 3/30/2021 INIYAVAN KERB STONE PCC SITE VANAZ RCC OPC M15 1
180 3/30/2021 JEGAN DECK-3 GRADE SLAB SITE VANAZ RCC OPC M30 77.25 12.5
181 3/30/2021 INIYAVAN PIPE LINE ENCASING SITE VANAZ RCC OPC 1.5.10 2 2
182 3/30/2021 JOTHISH BOUNDARY WALL PCC SITE VANAZ RCC OPC M15 0 9.75
183 3/30/2021 INIYAVAN PRECAST YARD PRECAST PANEL SITE VANAZ RCC OPC M35 0 3
184 3/31/2021 JOTHISH RETAINING WALL SITE VANAZ RCC OPC M35 24 0
185 3/31/2021 JOTHISH BOUNDARY WALL SITE VANAZ RCC OPC M30 11.25
186 3/31/2021 JOTHISH ASS TRENCH SITE VANAZ RCC OPC M35 27.25
187 3/31/2021 INIYAVAN DECK-1 TRACK BED SITE VANAZ RCC OPC M35 21
188 3/31/2021 KRISHNA STORM WATER ENCASING SITE VANAZ RCC OPC 1.5.10 4
189 3/31/2021 ANKIT STP FOOTING PCC SITE VANAZ RCC OPC M15 0.75
190 3/31/2021 JOTHISH ASS TRENCH PCC SITE VANAZ RCC OPC M15 1.5
191 3/31/2021 JEGAN DECK-3 GRADE SLAB SITE VANAZ RCC OPC M30 1
192 3/31/2021 INIYAVAN BOUNDARY WALL COLUMN SITE VANAZ RCC OPC M30 2
184
185 VANAZ 1818 629.25 0.00
VANAZ 2447.25
353.503
18 44
26.25
88
24
8
22
7.33333333333333
35
11.66667 3/30/2021 6/20/2021 82.00
NO OF CUBES 7
TOTAL CUMMULATIVE
DAYS
NO OF 28 DAYS
34.5 34.5
2 36.5
2.5 39
1.5 40.5
6 46.5
3 49.5
1 50.5
4 54.5
1.25 55.75
2 57.75
1 58.75
2 60.75
2 62.75
1.5 64.25
7.5 71.75
2 73.75
3.5 77.25
1.5 78.75
2.5 81.25
14.25 95.5
12.25 107.75
0.75 108.5
2.25 110.75
1.5 112.25
20.75 133
18 151
22 173
10.5 183.5
9 192.5
3 195.5
1.5 197
0.75 197.75
3.75 201.5
3.5 205
31 236
3 239
10.75 249.75
10.5 260.25
4.25 264.5
1.5 266
9.5 275.5 621.756
1 276.5
2.25 278.75
1.5 280.25
6 286.25
31 317.25
6 323.25
52.5 375.75
28.5 404.25
1 405.25
1 406.25
1 407.25
26 433.25
277.5 710.75
24 734.75
2.25 737
7.5 744.5
2.5 747
26.25 773.25
2.25 775.5
1 776.5
2 778.5
2.25 780.75
4.5 785.25
4 789.25
2.5 791.75
3.75 795.5
2 797.5
2 799.5
3 802.5
1.25 803.75
3.25 807
2.25 809.25
2.5 811.75
36 847.75 0
72 919.75 3.552
2 921.75 5.4
24 945.75
0.5 946.25
10.75 957
1 958
2.25 960.25
1 961.25
4.5 965.75
3 968.75
24.5 993.25
2.5 995.75
2.5 998.25
1.25 999.5
1 1000.5
34.5 1035
15 1050
30 1080
0.5 1080.5
2.5 1083
5.5 1088.5
3 1091.5
1.5 1093
36 1129
5.5 1134.5
3.75 1138.25
15 1153.25
1 1154.25
10.25 1164.5
9.25 1173.75
6.25 1180
1 1181
0.5 1181.5
1.25 1182.75
36 1218.75
12 1230.75
2.25 1233
4 1237
7.5 1244.5
18.5 1263
22.5 1285.5
6.5 1292
10.75 1302.75
15 1317.75
0.5 1318.25
26.25 1344.5
2.25 1346.75
9.25 1356
1.5 1357.5
0.5 1358
18 1376
10 1386
2.25 1388.25
6 1394.25
6 1400.25
4 1404.25
84 1488.25
61 1549.25
15 1564.25
5.25 1569.5
39.75 1609.25
2.25 1611.5
0.75 1612.25
9 1621.25
3.5 1624.75
3 1627.75
3.75 1631.5
6.25 1637.75
6.5 1644.25
4.5 1648.75
1 1649.75
1 1650.75
0.5 1651.25
1.25 1652.5
16 1668.5
2.25 1670.75
30 1700.75
2.5 1703.25
4 1707.25
0.5 1707.75
4 1711.75
1 1712.75
2.75 1715.5
33 1748.5
12.75 1761.25
54.75 1816
1 1817
3.5 1820.5
15.5 1836
3 1839
2.5 1841.5
4.5 1846
3 1849
17.5 1866.5
0.5 1867
2 1869
31.5 1900.5
309.75 2210.25
3.5 2213.75
4.5 2218.25
3 2221.25
18 2239.25
2 2241.25
1.25 2242.5
4.5 2247
1 2248
89.75 2337.75
4 2341.75
9.75 2351.5
3 2354.5
24 2378.5
11.25 2389.75
27.25 2417
21 2438
4 2442
0.75 2442.75
1.5 2444.25
1 2445.25
2 2447.25
0
2447.25
1
ETU/HIC
STRUCTURE APR MAY JUNE JULY AUG SEP OCT NOV DEC
FOOTING 133.5 142.25 0 0 0 0 0
P BEAM 0 22.5 120.25 0 0 0
COLUMN 9.75 37.5 25 28.5 0 0
SLAB 0 0 0 180.75 182.25 0 0
STAIRCASE 0 0 13.25 0 0 0 0
PIT WALL 0 0 0 51.5 45.5 0 0
CHAJJA 0 0 0 0 0.75 0 0 19.5
SUPPORTING COLUMN 0 0 0 0 15.5 21.5 11.75
HIC RAFT WALL 0 0 0 0 64.75 0 0
WATER TANK 0 0 0 0 0 30.75 0
DRAIN 0 0 0 0 0 0 24.75
LINTEL 0 0 0 0 0 0 5
OTHERS 0 18.5
PLATFORM 0 54
FLOORING 0 0 0 0 0 0 0 0 0
143.25 202.25 158.5 260.75 308.75 52.25 41.5 19.5 72.5
RW WALL APR MAY JUNE JULY AUG SEP OCT NOV DEC
RAFT AND WALL 0 0 0 0 0 524.5 291.25 252 279.75
DECK1/2/ APR MAY JUNE JULY AUG SEP OCT NOV DEC
FOOTING/RAFT 0 143.5 335 396.5 962 115.5 242.25 156.5 81.25
COLUMN 0 14.75 13.5 104 71 125.5 223.25 204 0
PLINTHBEAM 0 41.5 109.75 63.5 189.5 79.5
SLAB 0 347 202.5 1381.75
LIFTEWALL 0 6.25 17 10.5 19.25
RAMP/SLAB 0 0 105.25 39
TIEBEAM 0 92 46.25 17.75 6.75
RW WALL /HAUNCH 0 18 36.5 218.25 163.75 57.5
STAIRCASE 12 6.75
DECK4/5 RW WALL
APPROACH SLAB
TOTAL 0 158.25 348.5 500.5 1092.5 832.5 1025 847.25 1671.75
DECK3 APR MAY JUNE JULY AUG SEP OCT NOV DEC
FOOTING/RAFT 230 567.75 283.25 366.25
COLUMN 10.75 29.25 56.25 34
PLINTHBEAM 61.5 50.75
SLAB
LIFTEWALL
RAMP/SLAB
TIEBEAM
RW WALL /HAUNCH 12 90
STAIRCASE
DECK4/5 RW WALL
APPROACH SLAB
TOTAL 0 0 0 0 0 240.75 658.5 402.25 490.25
UNLOADING PLATFORM APR MAY JUNE JULY AUG SEP OCT NOV DEC
GRADE SALB 0 0 0 0 0 0 0 0 0
TOILET APR MAY JUNE JULY AUG SEP OCT NOV DEC
ALL MEMBER
25.61 29.51
25.28 29.33
28.46 29.47
24.55 29.48
27.47 25.22
25.47 29.12
25.21 25.46
28.34 197.59
29.3
28.58
268.28
JAN FEB MAR APR MAY TOTAL
275.75
142.75
7.25 108
363
13.25
97
20.25
48.75
64.75
30.75
24.75
5
0 9 6.5 2 0 36
54 52.25 0 160.25 6
0 0 13.5 13.5 6
61.25 61.25 20 2 0 1403.75 5.25
6
JAN FEB MAR APR MAY 6
282.5 278.5 518 0 0 2426.5 6
6
JAN FEB MAR APR MAY TOTAL 6
0 0 0 2432.5 6
185.5 10.25 0 951.75 6
0 483.75 6
117.75 0 2049 6
879 1193.5 567 0 2692.5 6
16.5 0 160.75 0
0 162.75 6
24.25 129 0 647.25 6
9.5 8.25 0 36.5 3
94.25 0 94.25 6
32.25 32.25 6
1208.3 1330.5 696 0 32.25 9743.25 6
6
6
6
JAN FEB MAR APR MAY TOTAL 6
521.75 295.5 83.75 153 2501.25 4.5
158.5 118.5 47.75 455 1
155.25 126.5 394 0.75
346.25 346.25 140.5
19.5 9.5 29 5
61.5 61.5
21 21
196.25 65.5 363.75
18.25 18.25
0
0
1031.8 578.75 288.5 153 346.25 4190
6 4/1/2021 INIYAVAN S&T TRENCH SITE VANAZ OPC M30 0 0.5 0.5
12 4/2/2021 INIYAVAN S&T TRENCH RAFT SITE VANAZ OPC M30 0 2 2
13 4/2/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ OPC M30 0 3 3
20 4/3/2021 INIYAVAN LT PULL PIT WALL SITE VANAZ OPC M30 0 3 3
30 4/4/2021 JOTHISH LT PULL WALL SITE VANAZ OPC M30 1 1
31 4/4/2021 JOTHISH ST PULL PIT SITE VANAZ OPC M30 1 1
34 4/5/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 1 1
44 4/6/2021 JOTHISH LT PULL WALL SITE VANAZ OPC M30 4.75 4.75
48 4/7/2021 KRISHNA S&T TRENCH WALL SITE VANAZ OPC M30 2.25 2.25
52 4/8/2021 JOTHISH WEST SIDE BOUNDARY WALL WALL SITE VANAZ OPC M30 11 11
58 4/8/2021 KRISHNA S&T TRENCH WALL SITE VANAZ OPC M30 3 3
59 4/8/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 1.5 1.5
60 4/8/2021 VIJI EAST SIDE BOUNDARY WALL TIE BEAM SITE VANAZ OPC M30 2.5 2.5
69 4/9/2021 KRISHNA S&T TRENCH WALL SITE VANAZ OPC M30 4.5 4.5
75 4/10/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 0 6 6
78 4/11/2021 KRISHNA DUCT BANK SITE VANAZ OPC M30 0 2.5 2.5
80 4/12/2021 KRISHNA LT PULL PIT WALL SITE VANAZ OPC M30 0 4 4
82 4/13/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 0 5.5 5.5
89 4/14/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 0 1 1
90 4/14/2021 VIJI S&T TRENCH RAFT SITE VANAZ OPC M30 0 5.25 5.25
92 4/14/2021 NAGARAJ SOUTHSIDE BOUNDARY WALL SITE VANAZ OPC M30 16 0 16
102 4/16/2021 KRISHNA LT PULL PIT WALL SITE VANAZ OPC M30 0 2 2
111 4/19/2021 JOTHISH LT PULL WALL SITE VANAZ OPC M30 0.75 0 0.75
115 4/19/2021 VIJI S&T TRENCH RAFT SITE VANAZ OPC M30 6.5 0 6.5
125 4/21/2021 KRISHNA LT PULL PIT WALL SITE VANAZ OPC M30 1.25 0 1.25
131 4/22/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 1 1
137 4/23/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 1.5 1.5
144 4/23/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 1 1
147 4/24/2021 JOTHISH LT PULL PIT WALL SITE VANAZ OPC M30 1 1.5 2.5
158 4/26/2021 NAGARAJ WEST SIDE BOUNDARY WALL SITE VANAZ OPC M30 4.25 4.25
170 4/28/2021 GAUTAM S&T TRENCH WALL SITE VANAZ OPC M30 3 3
4/30/2021 NAGARAJ SOUTHSIDE BOUNDARY WALL SITE VANAZ OPC M30 7.5 7.5
44
88
13.8 15 13.8
14.6 14 14.6
24
8
22
7.33333333333333
16.5
121.5
124.5
177.75
199
200
202.5
305.75
311.75
360
388.75
390.25
392.75
462
494.25
554.5
560.5
566.5
607.25
612.5
634.25
772.25
845.5
869.5
890
929.75
976.5
987.25
992.75
1044.5
1149.25
1172.75
URC CONSTRUCTION PVT LTD
May-21
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
19.25
57.75
81.5
130.75
132.25
160.25
199.25
223.75
226.75
234.25
256
258.5
297.25
297.75
303.5
308
346.25
353 3.552
362
374.5
613.75
618.25
683.25
684.5
693.5
756.25
757.75
763
776
792
URC CONSTRUCTION PVT LTD
Jun-21
S.NO DATE SITE INCHARGE LOCATION STRUCTURE STRUCTURE ID LOCATION site CEMENT GRADE PLANT-1 PLANT-2 rh TOTAL
1 6/1/2021 GAUTAM DECK-3 MULLILON COLUMN VANAZ DEPOT OPC M35 1.5 1.5
2 6/1/2021 JOTHISH EXTERNAL LT PULL PIT WALL VANAZ DEPOT OPC M30 3.75 3.75
3 6/1/2021 VIJI PRECAST PANEL VANAZ DEPOT OPC M35 1.5 1.5
4 6/1/2021 GAUTAM ASS TOE WALL VANAZ DEPOT OPC M35 4.25 4.25
5 6/1/2021 MANI BOUNDARY WALL COLUMN VANAZ DEPOT OPC M30 1 1
6 6/1/2021 VIJI DECK-5 TRENCH WALL VANAZ DEPOT OPC M30 2 2
5 6/2/2021 GAUTAM ASS TOE WALL VANAZ DEPOT OPC M35 4.5 4.5
6 6/2/2021 JOTHISH S&T TRENCH PCC VANAZ DEPOT OPC M15 4 4
7 6/2/2021 VIJI S&T TRENCH WALL VANAZ DEPOT OPC M30 2 2
8 6/3/2021 GAUTAM S&T TRENCH WALL VANAZ DEPOT OPC M30 4 4
9 6/3/2021 ANKIT STP SLAB VANAZ DEPOT OPC M35 14.25 14.25
10 6/3/2021 VIJI TSO COLUMN VANAZ DEPOT OPC M35 3 3
11 6/3/2021 MANI BOUNDARY WALL COLUMN VANAZ DEPOT OPC M35 1.5 1.5
12 6/4/2021 GAUTAM ASS PLUM PCC VANAZ DEPOT OPC M15 6.75 6.75
13 6/4/2021 VIJI S&T TRENCH WALL VANAZ DEPOT OPC M30 2.5 2.5
14 6/4/2021 GAUTAM ASS PLINTH BEAM VANAZ DEPOT OPC M35 13.25 13.25
15 0
16 0
17 0
18 0
19 0
20 0
21 0
22 0
24 0
25 0
26 0
27 0
28 0
29 0
30 0
31 0
32 0
34 0
35 0
36 0
37 0
38 0
39 0
40 0
41 0
42 0
43 0
44 0
45 0
46 0
47 0
48 0
49 0
50 0
51 0
52 0
53 0
54 0
55 0
56 0
57 0
58 0
59 0
60 0
61 0
62 0
63 0
64 0
65 0
66 0
67 0
68 0
69 0
70 0
71 0
72 0
73 0
74 0
75 0
76 0
77 0
73 0
74 0
75 0
76 0
77 0
78 0
79 0
80 0
81 0
82 0
83 0
84 0
85 0
86 0
87 0
88 0
89 0
90 0
91 0
92 0
93 0
94 0
95 0
96 0
97 0
98 0
99 0
100 0
101 0
102 0
103 0
104 0
105 0
106 0
107 0
108 0
109 0
110 0
111 0
112 0
113 0
114 0
115 0
116 0
117 0
118 0
119 0
120 0
121 0
122 0
123 0
124 0
125 0
126 0
127 0
128 0
129 0
130 0
131 0
132 0
133 0
134 0
135 0
69.75 0
69.75
24
8
22
7.33333333333333
1.5
5.25
6.75
11 DIVERT TO VIJI
12
14
18.5
22.5
24.5
28.5
42.75
45.75
47.25
54
56.5
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75 621.756
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75 0
69.75 3.552
69.75 5.4
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
69.75
1