0% found this document useful (0 votes)
43 views1 page

Power Dissipation Factor (Tan-Delta) Measurement of Bushing & Transformer

The document outlines details of various on-job training courses conducted for staff at different sub-stations, including course content, duration, participants and venue. A total of 10 different courses were conducted, ranging from insulation resistance and oil quality testing to DFDR operation to battery maintenance. Over 55 participants received training over a total of 2200 hours, with an average of 40 hours per participant. The training was conducted at various sub-stations including Haripur, Siddhirganj, Sonargaon, Maghnaghat and Madanganj.

Uploaded by

Allama Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

Power Dissipation Factor (Tan-Delta) Measurement of Bushing & Transformer

The document outlines details of various on-job training courses conducted for staff at different sub-stations, including course content, duration, participants and venue. A total of 10 different courses were conducted, ranging from insulation resistance and oil quality testing to DFDR operation to battery maintenance. Over 55 participants received training over a total of 2200 hours, with an average of 40 hours per participant. The training was conducted at various sub-stations including Haripur, Siddhirganj, Sonargaon, Maghnaghat and Madanganj.

Uploaded by

Allama Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Sl.

On job training Duration Sub-Station Particip Venue/ Organizer Man


No. course content (Hourse) ants Hours
1 Insulation 8 Haripur 230/132 KV 6 Haripur 230/132 KV 48
Resistance and Oil 8 Siddhirganj 230/132 KV 3 24
Quality & Oil Test 8 Siddhirganj 132 KV 9 Siddhirganj 230/132 KV 72
of Transformer 8 Sonargaon 132 kV 3 Sonargaon 132 kV 24
8 Madanganj 132 KV 3 Madanganj 132 KV 24
2 Sub-Station earth 8 Haripur 230/132 KV 10 Haripur 230/132 KV 80
resistance 8 Siddhirganj 230/132 KV 7 56
measurement 8 Siddhirganj 132 KV 13 Siddhirganj 230/132 KV 104
procedure & Test 8 Sonargaon 132 kV 7 Sonargaon 132 kV 56
8 Maghnaghat 132 KV 8 Maghnaghat 132 KV 64
8 Madanganj 132 KV 5 Madanganj 132 KV 40
3 Power Dissipation 8 Haripur 230/132 KV 5 Haripur 230/132 KV 40
Factor (Tan-Delta) 8 Siddhirganj 230/132 KV 5 40
Measurement of Siddhirganj 132 KV Siddhirganj 230/132 KV
8 2 16
Bushing &
Transformer 8 Sonargaon 132 kV 4 Sonargaon 132 kV 32
8 Madanganj 132 KV 3 Madanganj 132 KV 24
4 Maintenance of CT, 8 Haripur 230/132 KV 6 Haripur 230/132 KV 48
PT & LA 8 Siddhirganj 230/132 KV 3 24
8 Siddhirganj 132 KV 9 Siddhirganj 230/132 KV 72
8 Sonargaon 132 kV 3 Sonargaon 132 kV 24
8 Maghnaghat 132 KV 4 Maghnaghat 132 KV 32
8 Madanganj 132 KV 3 Madanganj 132 KV 24
5 Maintenance of CB, 8 Haripur 230/132 KV 6 Haripur 230/132 KV 48
DS & Contact 8 Siddhirganj 230/132 KV 3 24
Resistance 8 Siddhirganj 132 KV 9 Siddhirganj 230/132 KV 72
Measurement 8 Sonargaon 132 kV 3 Sonargaon 132 kV 24
8 Maghnaghat 132 KV 4 Maghnaghat 132 KV 32
8 Madanganj 132 KV 3 Madanganj 132 KV 24
6 Climbing procedure in 8 Haripur 230/132 KV 3 Haripur 230/132 KV 24
tower & tightness 8 Siddhirganj 132 KV 6 48
check of transmission
8 Sonargaon 132 kV 1 Sonargaon 132 kV 8
line
8 Maghnaghat 132 KV 2 Maghnaghat 132 KV 16
7 DFDR Operation 8 Haripur 230/132 KV 7 Haripur 230/132 KV 56
8 Siddhirganj 230/132 KV 7 Siddhirganj 230/132 KV 56
8 Maghnaghat 132 KV 7 Maghnaghat 132 KV 56
8 Third Harmonics 8 Haripur 230/132 KV 6 Haripur 230/132 KV 48
current 8 Siddhirganj 230/132 KV 6 48
Measurement of LA 8 Siddhirganj 132 KV 6 Siddhirganj 230/132 KV 48
8 Sonargaon 132 kV 6 Sonargaon 132 kV 48
8 Maghnaghat 132 KV 6 Maghnaghat 132 KV 48
8 Madanganj 132 KV 4 Madanganj 132 KV 32
9 Battery & Charger 8 Haripur 230/132 KV 10 Haripur 230/132 KV 80
Maintenance 8 Siddhirganj 230/132 KV 7 56
8 Siddhirganj 132 KV 13 Siddhirganj 230/132 KV 104
8 Sonargaon 132 kV 7 Sonargaon 132 kV 56
8 Maghnaghat 132 KV 8 Maghnaghat 132 KV 64
8 Madanganj 132 KV 5 Madanganj 132 KV 40
10 SHAS Operation 8 Siddhirganj 230/132 KV 9 Siddhirganj 230/132 KV 72

Total Participants (SDE/AE,SAE & Technical Staff) = 55 Total Training Hours= 2200
Total Training Hours Per Participant =(2200/55) = 40

You might also like