Saudi Arabian Oil Company: SECTION 02513 Sub-Base/Base Course and Asphalt Concrete Paving

This document provides specifications for sub-base/base course and asphalt concrete paving for Saudi Aramco. It includes three parts that cover general requirements, products, and execution of the work. The general section describes the scope of work, which involves site grading, granular sub-base, aggregate base course, and asphalt paving. The products section specifies requirements for materials like sub-base course, base course, prime coat, tack coat, and asphalt mixtures. The execution section outlines steps for subgrade preparation, placement and compaction of base courses, and application of prime/tack coats and asphalt concrete.

Uploaded by

طه حلمى
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
575 views11 pages

Saudi Arabian Oil Company: SECTION 02513 Sub-Base/Base Course and Asphalt Concrete Paving

This document provides specifications for sub-base/base course and asphalt concrete paving for Saudi Aramco. It includes three parts that cover general requirements, products, and execution of the work. The general section describes the scope of work, which involves site grading, granular sub-base, aggregate base course, and asphalt paving. The products section specifies requirements for materials like sub-base course, base course, prime coat, tack coat, and asphalt mixtures. The execution section outlines steps for subgrade preparation, placement and compaction of base courses, and application of prime/tack coats and asphalt concrete.

Uploaded by

طه حلمى
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 11

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
SAUDI ARABIAN OIL COMPANY
SECTION 02513

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
SUB-BASE/BASE COURSE AND ASPHALT CONCRETE PAVING
ENGG CERT

SUBSECTION INDEX

Part 1 - General

1.01 Description
1.02 Related Work
DESCRIPTION

1.03 Reference Standards

Part 2 - Products

2.01 Sub-Base Course


2.02 Base Course
2.03 Bituminous Prime Coat
2.04 Tack Coat
2.05 Bituminous Paving Mixture
2.06 Job Mix
JO/EWO

Part 3 - Execution
DATE

3.01 Subgrade Preparation and Maintenance


3.02 Sub-Base Course Placement, Compaction and Maintenance
NO.
REV

3.03 Base Course Placement, Compaction and Maintenance


DISCIPLINE
ENGINEER 3.04 Prime Coat Application
3.05 Tack Coat Application
DATE:
3.06 Placement of Asphaltic Concrete
PROJECT
ENGINEER 3.07 Compaction Sampling and Testing
3.08 Tolerance
DATE:
CERTIFIED

PART 1 - GENERAL
DATE:
CONSTRUCTION
AGENCY 1.01 Description
DATE:
A. Work in this Section includes, but is not limited to; site grading, granular sub-base,
OPERATIONS
aggregate base course, prime coat, tack coat, asphalt concrete paving, sampling and
testing for the new construction (asphalt road travel lines and asphalted parkings
DATE: inclusive) as indicated on the Drawings.
CONTROL NUMBER
VERIFICATION

1.02 Related Work


EDSD

DATE:

A. Section 02200 - Earthwork


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 1
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
1.03 Reference Standards

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. Ministry of Transport, The Technical Administration for Roads and Ports - General
ENGG CERT

Specifications for Road and Bridge Construction (MOT).

B. General Specifications for Road and Bridge Construction, Ministry of Transport


(MOT).

C. Asphalt Institute Manual Series No. 1 (MS-1).

D. American Association of State Highway and Transportation Officials (AASHTO):


DESCRIPTION

1. T 11 (latest edition) – Standard Method of Test for Amount of Material Finer


than 0.075 mm Sieve in Aggregate.

2. T 27 (latest edition) - Sieve Analysis of Fine and Coarse Aggregates.

3. T 48 (latest edition) - Flash and Fire Points by Cleveland Open Cup.

4. T 49 (latest edition) - Penetration of Bituminous Materials.


JO/EWO

5. T 51 (latest edition) - Ductility of Bituminous Materials.

6. T 90 (latest edition) - Determining the Plastic Limit and Plasticity Index of


DATE

Soils.
NO.
REV

7. T 176 (latest edition) - Plastic Fines in Graded Aggregate and Soils by Use of
DISCIPLINE
ENGINEER the Sand Equivalent Test.

DATE:
8. T 179 (latest edition) - Effect of Heat and Air on Asphalt Materials (Thin-film
PROJECT
ENGINEER oven test).

DATE: 9. T 201 (latest edition) - Kinematic Viscosity of Asphalt.


CERTIFIED

E. American Society for Testing and Materials (ASTM):


DATE:
CONSTRUCTION
AGENCY 1. ASTM D 1883 - Test Method for CBR (California Bearing Ratio) of Laboratory
- Compacted Soils.
DATE:
OPERATIONS
2. ASTM D 4253 - Test Method for Maximum Index Density and Unit Weight of
Soils Using a Vibratory Table.
DATE:
CONTROL NUMBER

3. ASTM D 4254 - Test Method for Minimum Index Density and Unit Weight of
VERIFICATION

Soils and Calculation of Relative Density.


EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 2
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
PART 2 - PRODUCTS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
2.01 Sub-Base Course
ENGG CERT

A. General: Sub-base course material shall consist of mixture of gravel and stone
fragments with sand, silt and clay.

B. Production: Sub-base course material shall be blended to meet the requirements


specified in Part C of this Section. Individual sizes of material shall be blended by a
mixing plant as necessary to meet grading requirements.
DESCRIPTION

C. Gradation Requirements: Sub-base course material shall be gravel, mixed with fine
material consisting of natural material, of suitable binding quality.

The combined materials shall consist of a mixture of well graded gravel or uniformly
graded from coarse to fine to conform to the following gradation requirements:

AASHTO-Sieve % Passing % Passing


Class A Class B

2-1/2 in. 100 -


JO/EWO

2- in. 90-100 100


1-1/2 in. - 70-100
1 in. - 55-85
DATE

3/4 in. * - 50-80


3/8 in. - 40-70
NO.
REV

No. 4 35-70 30-60


DISCIPLINE
ENGINEER No. 10 - 20-50
No. 40 - 10-30
DATE:
No. 200 0-15 5-15
PROJECT
ENGINEER

* If less than 30% of the sample is retained on a ¾ in. sieve use (ASTM
DATE: D1557). If 30% or more of the sample is retained on a ¾ in. sieve use
CERTIFIED
(AASHTO T180).
DATE:
CONSTRUCTION
D. Physical Requirements: Sub-base course aggregate shall conform to the following
AGENCY physical requirements:
DATE:
1. Loss of Magnesium Sulfate Soundness Test (ASTM C88):
OPERATIONS

For Coarse Aggregate - 25% maximum for Classes A&B.


DATE:
CONTROL NUMBER

For Fine Aggregate - 25% maximum for Classes A&B.


VERIFICATION
EDSD

2. Loss by Abrasion Test (ASTM C131 or ASTM C535)- 50% maximum for
DATE:

Classes A&B.
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

3. Plasticity Index - 6 maximum for Class B.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

4. Liquid Limit - 25 maximum for Class B.


Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 3
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
E. CBR Ratio: When tested in accordance with ASTM D-1883, California Bearing Ratio,
after four days soaking, shall not be less than 25 for Class `A' and Class 'B' of the
ENGG CERT

sub-base course material.

2.02 Base Course

A. General: All aggregates for base course shall consist of clean, tough, durable, sharp
angle fragments free of any excess of thin or elongated pieces, and reasonably free
of soft, disintegrated or decomposed stone, dirt, organic matter, shale, clay, clay lump
or other deleterious matter.
DESCRIPTION

B. Production: Crushed gravel or stone fragments for base shall consist of the product
obtained by crushing gravel that has first been screened in such a manner that not
less than 90% of the material to be crushed is retained on a one-quarter (1/4) in
sieve. The amount of crushing shall be regulated so that at least 80%, by weight, of
the pieces retained on the No. 4 sieve have at least one (1) mechanically fractured
face.

C. Aggregate Mix and Gradation Requirements: Base Course material shall be crushed
rock or crushed gravel, mixed with fine material consisting of quarry screening, or
JO/EWO

natural material, of suitable binding quality.

The combined materials shall consist of a mixture of all aggregate uniformly graded
DATE

from coarse to fine to conform to the following gradation requirements:


NO.
REV

AASHTO-Sieve % Passing % Passing


DISCIPLINE
ENGINEER Class A Class B

DATE:
2-1/2 in. 100 -
PROJECT
ENGINEER 2- in. 90-100 -
1-1/2 in. 60-90 100
DATE: 1 in. 42-77 60-100
CERTIFIED
3/4 in. 35-70 55-85
1/2 in. 25-60 -
DATE:
CONSTRUCTION
No. 4 15-40 35-60
AGENCY No. 10 10-26 25-50
No. 40 5-15 15-30
DATE:
No. 200 2-9 8-15
OPERATIONS

D. Physical Requirements: Base course aggregate shall conform to the following


DATE: physical requirements:
CONTROL NUMBER
VERIFICATION

1. Loss of Magnesium Sulfate Soundness Test (ASTM C88):


EDSD

DATE:

For Coarse Aggregate - 25% maximum for Classes A&B.


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

For Fine Aggregate - 25% maximum for Classes A&B.


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 4
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
2. Loss by Abrasion Test (ASTM C131 or ASTM C535)- 40% maximum for

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Classes A&B.
ENGG CERT

3. Thin and Elongated Pieces, by Weight (larger than 1 in., thickness less than
1/5 length) - Maximum 5% for Classes A&B.

4. Friable Particles (ASTM C142) - Maximum 0.25% for Classes A&B.

5. Plasticity Index - 6 maximum for Classes A and B.

6. Liquid Limit - 25 maximum for Class B.


DESCRIPTION

E. CBR Ratio: When tested in accordance with ASTM D-1883, California Bearing Ratio,
after four days soaking, shall not be less than 50 for Class `B' and 100 for Class 'A'.

2.03 Bituminous Prime Coat

A. Prime coat shall be MC-70 conforming to Ministry of Transport.

2.04 Tack Coat


JO/EWO

A. Liquid asphalt for tack coat shall be rapid curing type cutback grades RC-250
conforming to Ministry of Transport.
DATE

2.05 Bituminous Paving Mixture


NO.
REV

A. Asphalt mixture: Asphalt shall be petroleum asphalt cement, grade 60-70


DISCIPLINE
ENGINEER penetration, conforming to the requirements in the following table:

DATE:
General Requirements AASHTO Test Method
PROJECT
ENGINEER Grade 60-70 and Acceptable Limits

DATE: Penetration, 25 degrees C,


CERTIFIED
100 grams, 5 seconds T 49 60-70
DATE:
CONSTRUCTION
Flash point (Cleveland)
AGENCY open cup, degrees C T 48 232.2
DATE:
Thin film oven test T 179 -
OPERATIONS

Penetration after test


DATE: 25 degrees C, 100 grams,
CONTROL NUMBER

5 seconds percent of
VERIFICATION

original T 49 52 min.
EDSD

DATE:

Ductility: At 25 degrees C T 51 100 min


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Solubility in organic
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

solvents, percent T 44 99 min


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 5
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
The asphalt shall be prepared by the refining of petroleum. It shall be uniform in

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
character and shall not foam when heated to 176.7 degrees C.
ENGG CERT

B. Mineral Aggregate:

1. Gradation: When tested according to ASTM C-117 and ASTM C-136, the
combined mineral aggregate shall conform to the following grading:

a. Class A:

Hot Asphalt Hot Asphalt


DESCRIPTION

Base Course Surface Course

Sieve Size % Passing % Passing

1-1/2 in. 100 -


1 in. 75-90 -
3/4 in. 65-80 100
1/2 in. 55-70 76-92
3/8 in. 45-60 64-79
No. 4 31-46 41-56
JO/EWO

No. 10 18-33 23-37


No. 40 5-18 7-20
No. 80 3-13 5-13
DATE

No. 200 2-9 3-8


NO.
REV

b. Class B:
DISCIPLINE
ENGINEER

Hot Asphalt Hot Asphalt


DATE:
Base Course Surface Course
PROJECT
ENGINEER

Sieve Size % Passing % Passing


DATE:
CERTIFIED
1 -1/2 in. 100 -
1 in. 100 -
DATE:
CONSTRUCTION
3/4 in. 80-100 100
AGENCY 1/2 in. 68-88 80-100
3/8 in. 60-80 -
DATE:
No. 4 45-65 50-70
OPERATIONS
No. 10 30-50 32-47
No. 40 15-32 16-26
DATE: No. 80 - 10-18
CONTROL NUMBER

No. 200 3-10 4-10


VERIFICATION
EDSD

2. Physical requirements: The combined mineral aggregate shall meet the


DATE:

quality requirements specified in "Aggregate Base Course" and, in addition,


BY:

shall conform to the following physical requirements:


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 6
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Sand Equivalent

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
(ASTM D-2419) 50 minimum
Plasticity Index
ENGG CERT

(ASTM D-4318) 6 max.(Asphaltic Base


Course)
3 max.(Surface
Course)

Loss of magnesium sulphate


Soundness Test:
Coarse Aggregate 25% maximum
DESCRIPTION

Fine Aggregate 25% maximum

Loss by Abrasion %
(ASTM C-131) 40% maximum

Thin and elongated pieces


by weight (larger than
25 mm, thickness less
than 1/5 length) per
CRD-C119 5% maximum
JO/EWO

2.06 Job Mix


DATE

A. The job-mix formula shall combine the mineral aggregates and asphalt in such
proportion as to produce a mixture conforming to the following composition limits by
NO.
REV

weight in accordance with ASTM D2172 or ASTM D6307:


DISCIPLINE
ENGINEER

Mix Item %
DATE:
PROJECT
ENGINEER Total Mineral Aggregates 93-96
Asphaltic Binder 4-7
DATE:
CERTIFIED
When tested according to the Marshall Method, the bituminous mixture shall conform
to the following requirements:
DATE:
CONSTRUCTION
AGENCY Characteristics Asphalt Base Surface
DATE:
Stability (kg) 700 min. 800 min.
OPERATIONS
Flow (mm) 2.4-5.0 2.4-4.0

DATE: Loss of Marshall


CONTROL NUMBER

stability by sub-merging
VERIFICATION

specimens in water at
EDSD

60 deg C for 24 hrs as


DATE:

compared to stability
BY:

measured after submersion


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

in water at 60 deg C for


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

(20) minutes 25% max 25% max


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 7
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
Voids in total

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
mix % 3.0-7.0 3.0-5.0
ENGG CERT

Voids filled with


Bitumen % 60-75 70-80

Voids in mineral Class A Class A


aggregate (VMA) % 13 min. 14 min.
per ASTM D-2041
Class B Class B
12 min. 15 min.
DESCRIPTION

B. Maximum Variation: Upon receiving the job-mix formula, approved by Saudi Aramco
Representative, Contractor shall adjust his plant to proportion the individual
aggregates, mineral filler and asphalt to produce a final mix that, when compared to
the job-mix formula, shall be within the following limits:

Tolerance
Material Sieve Size Asphalt Base Wearing

Larger than ½” + 6.0% + 6.0%


JO/EWO

½” + 5.0% + 6.0%
DATE

No. 4 and 3/8 in. + 5.0% + 5.0%


No. 10 and retained on No.80 + 4.0% + 4.0%
NO.
REV

DISCIPLINE
ENGINEER No. 80 + 3% + 3%

DATE:
No. 200 + 1.5% + 1.5%
PROJECT
ENGINEER Asphalt Content + 0.4% + 0.4%

DATE:
CERTIFIED Submit asphalt mix design to Saudi Aramco Representative for review and approval
at least 30 days prior to use. The asphalt concrete shall be graded from a
DATE: Government approved batch plant.
CONSTRUCTION
AGENCY
C. The mixture temperature shall have a temperature between 139 degrees C and 163
DATE:
degrees C when it leaves the plant and shall be transported from the mixing plant to
OPERATIONS the point of use in pneumatic-tired vehicles having tight bodies, previously cleaned of
all foreign materials. The mixture shall be delivered on the road or surface to be
DATE:
paved, between the temperature of 139 degrees C and 163 degrees C.
CONTROL NUMBER
VERIFICATION
EDSD

PART 3 - EXECUTION
DATE:

3.01 Subgrade Preparation and Maintenance


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

A. Demolition and Existing Material Cuts: Existing asphalt, or other materials identified
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

to be demolished as shown on the Drawings, shall be removed prior to the


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 8
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
commencement of subgrade cut/fill and asphalt overlay operation. Asphalt is to be

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
saw cut, providing clean, neat vertical edges that will provide a suitable surface for
matching of new asphalt.
ENGG CERT

B. Subgrade preparation: Contractor shall, as a part of the Work and prior to delivery of
materials for the sub-base course, prepare the roadbed surface including parking
areas by sprinkling, blading, rolling and lightly scarifying where necessary, until the
proper crown is obtained. When compacted and ready for sub-base course
construction, the roadbed shall be well compacted, smooth hard and uniform, all
irregularities having been bladed out and rolled smooth.
DESCRIPTION

C. Sub-grade Compaction: Subgrade shall be compacted to not less than 95% of ASTM
D 1557 or AASHTO T 180, method D, or to 85% of relative density determined by
ASTM D 4253 and D 4254.

D. Maintenance of Subgrade: After the roadbed has been prepared, it shall be


maintained true to cross section and grade until the sub-base course is completed.
The roadbed of the entire project shall be maintained by Contractor from the time the
Work is started until covered with the sub-base course.

3.02 Sub-base Course Placement, Compaction and Maintenance


JO/EWO

A. Sub-Base Course Placement: Do not place any sub-base course material until the
subgrade upon which it is to be placed has been approved by Saudi Aramco
DATE

Representative.
NO.
REV

B. The sub-base course shall be compacted to not less than 95% of the maximum
DISCIPLINE
ENGINEER laboratory density as determined by ASTM D-1557, Method D, or AASHTO- T180.

DATE:
C. Sub-Base Course Maintenance: Following the construction of the granular sub-base,
PROJECT
ENGINEER the compacted sub-base course shall be maintained by Contractor. Contractor shall
blade, broom and otherwise maintain the sub-base, keeping it free from raveling, and
DATE: other defects until such time as the other surface is applied. Water shall be applied at
CERTIFIED
such time and in such quantities as directed by Saudi Aramco Representative.
DATE:
CONSTRUCTION
3.03 Base Course Placement, Compaction and Maintenance
AGENCY

A. Base Course Placement: Do not place any base course material until the sub-base
DATE:
upon which it is to be placed has been approved by Saudi Aramco Representative.
OPERATIONS

B. The base course shall be compacted to not less than 100% of the maximum
DATE: laboratory density as determined by ASTM D-1557, Method D, or AASHTO- T180.
CONTROL NUMBER
VERIFICATION

C. Base Course Maintenance: Following the construction of the aggregate base, the
EDSD

compacted base course shall be maintained by Contractor. Contractor shall blade,


DATE:

broom and otherwise maintain the base, keeping it free from raveling, and other
BY:

defects until such time as the bituminous prime or other surface is applied. Water
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

shall be applied at such time and in such quantities as directed by Saudi Aramco
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Representative.
(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 9
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
3.04 Prime Coat Application

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
A. A prime coat consists of the initial application of liquid asphalt onto the surface of a
ENGG CERT

non-asphalt base course.

B. Cleaning Surface: Immediately before applying the bituminous primer material, the
surface shall be cleaned of all loose dirt and other objectionable materials with a
power broom, hand broom, or blower. If so ordered by Saudi Aramco Representative,
the surface shall be lightly bladed and rolled immediately prior to the application of the
bituminous material, in which case brooming or blowing will not be required. Saudi
Aramco Representative may order a light application of water, just before application
DESCRIPTION

of bituminous material, if required.

C. Application: Prime coat shall be applied only when the surface to be treated is dry
and when the temperature in the shade is 8 degrees C and rising. Bituminous
material shall be applied by means of a distributor at a rate of 1.75 liters per sq.m and
at a temperature between 50 degrees to 80 degrees C. If the material is applied in
two lanes, there shall be an overlap of at least 200 mm. Any prescribed application
may be divided into two applications to prevent flowing of the surface and additional
bituminous material shall be applied where surface conditions indicate it is required.
JO/EWO

D. Drying Time: The primed surface shall be kept free from all traffic and in a clean
condition pending placement of the covering asphaltic concrete pavement. A
minimum period of 24 hours shall be allowed for the absorption and curing of the
DATE

prime coat prior to placement of covering pavement.


NO.
REV

3.05 Tack Coat Application


DISCIPLINE
ENGINEER

A. 1. Concrete Surfaces: Tack coat shall be applied to all concrete surfaces that
DATE:
will be in contact with the asphalt pavement. Tack coat applications shall take
PROJECT
ENGINEER place prior to the paving operations and shall include contact surfaces of
concrete gutters and other drainage structures.
DATE:
CERTIFIED
2. Asphalt Surfaces: Tack coat shall be applied between the binder course and
the surface course; new and old asphalt surface, and vertical cut of adjacent
DATE:
CONSTRUCTION
to a new asphalt. If application of the surface is delayed by more than 3 days,
AGENCY or if dirt, sand or other impurities have contaminated the tack coat, then a new
tack coat shall be applied after the original one has been swept clean.
DATE:
OPERATIONS
B. Method of Application: The bituminous material shall be applied on the binder course
by means of a bituminous distributor at a maximum rate of 0.25 liters per sq.m or as
DATE: directed by Saudi Aramco Representative. A hand broom shall be used for
CONTROL NUMBER

application of the tack coat to concrete surfaces not covered by the bituminous
VERIFICATION

distributor.
EDSD

DATE:

3.06 Placement of Asphaltic Concrete


BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

A. Receipt of Materials: Do not accept asphaltic concrete material unless it is covered


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

with tarpaulins until unloaded, and unless it has a temperature of at least 139 degrees
(DCC) NO. _____________________

C.
Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 10
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
B. Placement and Compaction: Placement and compaction of the bituminous mixture
shall progress in sections not more than 90 m in length. The bituminous mixture shall
ENGG CERT

be spread, shaped and finished with the power machine with automatic adjustable
grade controlled by a ski or a straight line. The mixture shall be placed one-half width
or one traffic lane at a time. After the first width has been compacted, the second
width shall be placed, finished and compacted as specified for the first width. Do not
place asphaltic concrete when the atmosphere temperature is below 4 degrees C, nor
during fog, rain, wind or other unsuitable conditions.

C. Spreading: Spread material in a placement thickness so that after rolling the nominal
DESCRIPTION

thickness of the compacted bituminous material shall not be more than 80 mm per
layer and not less than 50 mm per layer.

D. Rolling: After a layer has been placed the full width, the surface shall be rolled.
Rolling shall be longitudinal, and shall commence at the outer edge of the road
overlapping it and progress towards the center. Rolling shall continue until the
surface is of uniform texture and degree of compaction is achieved, and is true to
grade and cross section. Under no circumstances shall the center of the surface
course be rolled first.
JO/EWO

E. Asphalt Compaction Density: The requirement shall be equal to or greater than 96%
of the Marshall density of each day production.
DATE

F. Protection of Work: Protect those portions of curbs, manholes, valve boxes and other
structures, that will be visible upon completion of the project, from bituminous
NO.
REV

material. Remove any bituminous material from asphalt fouled surfaces and clean
DISCIPLINE
ENGINEER these surfaces to the satisfaction of Saudi Aramco Representative.

DATE:
3.07 Compaction Sampling and Testing
PROJECT
ENGINEER

A. The compacted asphalt samples shall be taken for testing.


DATE:
CERTIFIED
3.08 Tolerance
DATE:
CONSTRUCTION
A. Surface Tolerance: The surface will be tested with a 4 m straightedge at selected
AGENCY locations. The variation of the surface from the testing edge of the straightedge
between any two contacts with the surface shall at no point exceed 4 mm when
DATE:
placed on or parallel to the centerline or 3 mm when placed perpendicular to the
OPERATIONS
centerline of the roadway. All humps and depressions exceeding the specified
tolerance shall be corrected by removing the defective work and replacing it with new
DATE: material as directed by Saudi Aramco Representative.
CONTROL NUMBER
VERIFICATION

B. Tolerance in Thickness: Measurement of core shall be no less than design thickness


EDSD

minus 10 mm or 15% of the design thickness whichever is less.


DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

- END OF SECTION -
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


(DCC) NO. _____________________

Section 02513
Construction Specifications & Scope of Work DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

30% Detailed Design for 2 Typical Design of DOC


SK-KHBE01-101 11
A
Saudi Aramco Built Government Schools of 0
Safwa and Khobar SAUDI ARABIA BI / JO: BI-23-10029 11
EDSD/2616-0399.doc
703B: KH1815 Specs – Safwa & Khobar