Commissioning Review Comments
Commissioning Review Comments
Discipline: Setup 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer:
Issue Date: 10/28/2004
Hide/Unhide Resolved Comments Global command to hide/unhide all resolved comments on all sheets
Show/Hide Sheet Notes Global command to show/hide sheet notes on all sheets
Resolve/Unresolve Current Comment Resolves/unresolves the comment in which the cursor currently resides
Print Report Displays dialog box where the desired sheets to be printed may be selected
Goto Team Captains Sheet Setup: the project, Current Review Phase, Buildings, Reviewers, Disciplines, etc.
Begin DRC Input Opens the Project Information dialog box…start of comment entry requirements
Hide/Unhide Resolved Comments Local command to hide/unhide all resolved comments on current sheet only
Show/Hide Sheet Notes Local command to show/hide sheet notes on current sheet only
Resolve/Unresolve Current Comment Resolves/unresolves the comment in which the cursor currently resides
Goto Team Captains Sheet Setup: the project, Current Review Phase, Buildings, Reviewers, Disciplines, etc.
Setup Current Job Enter job information: Job name, number, bid package, phase, and issue date
Return to Setup Only Sheet Closes Team Captain ONLY sheet and returns to Setup Only sheet
Page 1
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Architectural 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004
Page 2
542511417.xls
Printed 09/16/2021
Design Review Comments Sample
Project No:
Project: Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electrical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date:
A/E Response:
There is no mention of security device plates. Please include them and
indicate where they are required.
95% CD Specifications EE 002 N 16140 2.3 II
A/E Response:
Testing, calibration and setting of protective devices is required but there
is no corresponding requirement to document and submit this
95% CD Specifications EE 003 N 16163 3.1C 2 II information. Suggest adding this requirement.
A/E Response:
Testing, calibration and setting of protective devices is required but there
is no corresponding requirement to document and submit this
95% CD Specifications EE 004 N 16420 3.4C II information. Suggest adding this requirement.
A/E Response:
Page 3
542511417.xls
Printed 09/16/2021
Design Review Comments Sample
Project No:
Project: Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electrical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date:
A/E Response:
A/E Response:
[Dennis Gallagher - Kitchell] No testing or documentation is required for
the equipment in this section.
95% CD Specifications EE 009 N 16510 Part 3 II
A/E Response:
[Dennis Gallagher - Kitchell] Factory testing is required but there is no
requirement to document or submit test results.
95% CD Specifications EE 010 N 16612 2.1AA 8 II
A/E Response:
[Dennis Gallagher - Kitchell] There are no specific post installation tests
required. Suggest adding. This should include opening the main breaker
and making sure all loads pick up in the required time. Another important
95% CD Specifications EE 011 N 16612 2.1AA II
criteria is that the time to pick up the loads is met.
A/E Response:
[Dennis Gallagher - Kitchell] No power is shown for Fire Smoke
Dampers. Verify that there are no FSDs requiring power.
95% CD All EE 012 N E1.10A II
A/E Response:
Page 4
542511417.xls
Printed 09/16/2021
Design Review Comments Sample
Project No:
Project: Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electrical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date:
[Dennis Gallagher - Kitchell] The power for the VAV boxes is shown as
coming from a normal power panel. It would appear that it should be fed
from an emergency panel so there could be smoke control during a
95% CD All EE 013 N E1.11A II
power outage.
A/E Response:
[Dennis Gallagher - Kitchell] No numbers are shown for the pumps.
Please include so all the documentation can be coordinated.
95% CD Central Plant EE 014 N E1.50 II
A/E Response:
[Dennis Gallagher - Kitchell] There are no requirements for O&M
documents for any of the electrical sections except 16612 (Emergency
Generator) and 16721 (Fire Alarm). There should be some requirement
95% CD Central Plant EE 015 N 16010 II
for almost all sections.
A/E Response:
A/E Response:
A/E Response:
Page 5
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electronic Security 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gallagher, Dennis
Issue Date: 10/28/2004
[Dennis Gallagher - Kitchell] Note this is the second "A" in the article. It
is titled "System Performance Guidelines" and the first three paragraphs
give performance requirements. However, the next paragraph gives
specific product requirements. Suggest putting this in its own article. It
also should be noted that the equipment listed are minimum requirements
and that the performance requirements have to be met.
Page 6
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electronic Security 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gallagher, Dennis
Issue Date: 10/28/2004
[Dennis Gallagher - Kitchell] This is the intercom system section but this
paragraph provides performance requirements for performance of the
intercom and CCTV systems together. It would be better to have this in
an overall performance paragraph in a general section such as 13700.
Page 7
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Civil 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004
Page 8
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004
A/E Response:
A/E Response:
Page 9
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004
A/E Response:
A/E Response:
A/E Response:
Page 10
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004
A/E Response:
A/E Response:
[Valentin Gheorghita - Kitchell] FC 2-1 & FC 2-2: These fan coils are
located above the corridor. No return and outside air ductwork is shown.
95% CD Building 2 SuppME 011 N M1.21 II Please clarify.
A/E Response:
Page 11
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004
A/E Response:
A/E Response:
A/E Response:
A/E Response:
Page 12
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004
A/E Response:
A/E Response:
A/E Response:
[Valentin Gheorghita - Kitchell] Indicate location of balancing valve on all
HWR branches. Comment applies to all buildings.
95% CD All ME 019 N P1.11A II
A/E Response:
[Valentin Gheorghita - Kitchell] Recommend providing injection ports and
valves in the CW, HW and HWR lines at each building to facilitate
95% CD All ME 020 N P1.11A II chlorination of the system on a building by building basis.
A/E Response:
Page 13
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004
A/E Response:
A/E Response:
A/E Response:
A/E Response:
Page 14
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Specifications 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004
Page 15
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Structural 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004
Page 16
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center
Bid Pkg: Commissioning
Current Phase: 95% CD
Page 17
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center
Bid Pkg: Commissioning
Current Phase: 95% CD
Page 18
542511417.xls
Printed 09/16/2021