Commissioning Review Comments

The document provides instructions for using a design review comment workbook, including how to begin inputting comments, add reviewers and disciplines, and set up the current job. It outlines the menu options for inputting and resolving comments on individual discipline sheets as well as general setup options on the team captain sheet. Technical details are provided on sorting comments and printing report functions to prepare comment sheets.

Uploaded by

vin ss
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views18 pages

Commissioning Review Comments

The document provides instructions for using a design review comment workbook, including how to begin inputting comments, add reviewers and disciplines, and set up the current job. It outlines the menu options for inputting and resolving comments on individual discipline sheets as well as general setup options on the team captain sheet. Technical details are provided on sorting comments and printing report functions to prepare comment sheets.

Uploaded by

vin ss
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 18

Project No: 3143A3

Project: SRP-MIC Detention Center Sheet Notes:


Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:

Discipline: Setup 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained

Reviewer:
Issue Date: 10/28/2004

Design Review Comment Input Form


Getting Started
Typical User - General Information:
1 Before starting, check with the project Team Captain to ensure the workbook is ready for input
2 Locate the "DrcInput" menu group in the menu bar above (it should be the last group on the right)
3 This menu group is available on all spreadsheets in this workbook; different items are available, depending on which sheet you are using
4 Using the sheet tabs at the bottom of this workbook, select the desired discipline sheet (this is where your comments will be placed)
5 Select "Begin DRC Input" from the "DrcInput" menu group DefaultAction for Show/Hide Resolved Comments
6 Select your name from the "Reviewer" drop down list box (Required) Hide The current status is indicated by "Show" if the items
are "showing" and "Hide" if the objects are currently
7 Select your discipline from the "Discipline" drop down list box (Required)
"hidden". These are changed in Module1, subs
8 Select your Company Name from the "Company" drop down list box (Required - default = Kitchell) DefaultAction for Show/Hide Sheet Notes glbShowNotes() and glbUnHideResolvedComments()
9 Click the "Start" green button Hide
10 Input your comments using the dialog box. This method will ensure all required information is input
11 To add new comments, click the "New/Post Comment" button and add your comment.
12 Once all comment information is entered, click the "New/Post Comment" button to post your comment and prepare for the next comment entry
13 To review/modify or resolve previous comments, click "First", "Previous", "Next","Last" or "Go To"
14 To Resolve a comment, move to that comment and check the "Resolve Comment" checkbox.
15 When finished with comment entry, click "Exit"; to check spelling select "Yes" from the "Spell Check" dialog box (only checks comments for spelling)

Team Captain - General Job Setup Information


1 Select "Show Team Captains Sheet" from the "DrcInput" menu group
2 On the "Team Captain ONLY" sheet, do the following:
3 Add names to the "Reviewers" list as needed, using LastName, FirstName format (do not leave blank rows between entries)
4 Change the building names to match the project requirements (do not leave blank rows between entries)
5 Ensure all disciplines are entered in the "Disciplines" list. To add new disciplines, select "Add Discipline" from the "DrcInput" menu group
6 Ensure all Company Names for the Reviewers are listed in the "Company" list…typically, this will be Kitchell, but may vary if user comments are included
7 Enter current job information: Job name, number, bid package, phase, and issue date by selecting "Setup Current Job" from the "DrcInput" menu group
8 When all job information is complete, select "Return to Setup Only Sheet" from the "DrcInput" menu group
9 Note: Do NOT move ANY of the lists; the programs look for information in these specific loctions, so DO NOT MOVE!

Menu Items Available for "Setup Only" Sheet


Item Description

Hide/Unhide Resolved Comments Global command to hide/unhide all resolved comments on all sheets

Show/Hide Sheet Notes Global command to show/hide sheet notes on all sheets

Resolve/Unresolve Current Comment Resolves/unresolves the comment in which the cursor currently resides

A/E Utilities Create A/E response sheets, extract/embed A/E responses.

Print Report Displays dialog box where the desired sheets to be printed may be selected

Hides sheet notes, hides resolved comments


Prepare to Print Runs comment count, runs summary
Sorts all sheets by sheet no, detail, specification section

Restores sort order based on DRC Numbers


Restore Sort Order Note: This is automatically accomplished from the Team Captain's Worksheet
Each time the "Setup Current Job" menu item is selected

Goto Team Captains Sheet Setup: the project, Current Review Phase, Buildings, Reviewers, Disciplines, etc.

Menu Items Available for each Discipline Sheets


Item Description

Begin DRC Input Opens the Project Information dialog box…start of comment entry requirements

Hide/Unhide Resolved Comments Local command to hide/unhide all resolved comments on current sheet only

Show/Hide Sheet Notes Local command to show/hide sheet notes on current sheet only

Resolve/Unresolve Current Comment Resolves/unresolves the comment in which the cursor currently resides

Goto Team Captains Sheet Setup: the project, Current Review Phase, Buildings, Reviewers, Disciplines, etc.

Menu Items Available for "Team Captain ONLY" Sheet


Item Description

Add Discipline Add new discipline(s) sheet(s) to workbook

Setup Current Job Enter job information: Job name, number, bid package, phase, and issue date

Return to Setup Only Sheet Closes Team Captain ONLY sheet and returns to Setup Only sheet

Page 1
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Architectural 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page

Page 2
542511417.xls
Printed 09/16/2021
Design Review Comments Sample
Project No:
Project: Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electrical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date:

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Dennis Gallagher

This requires insulation testing. However, this is not covered in the


individual sections where it applies. Suggest adding to sections 16120,
95% CD Specifications EE 001 N 16010 3.25F II 16163 and 16420.

A/E Response:
There is no mention of security device plates. Please include them and
indicate where they are required.
95% CD Specifications EE 002 N 16140 2.3 II
A/E Response:
Testing, calibration and setting of protective devices is required but there
is no corresponding requirement to document and submit this
95% CD Specifications EE 003 N 16163 3.1C 2 II information. Suggest adding this requirement.

A/E Response:
Testing, calibration and setting of protective devices is required but there
is no corresponding requirement to document and submit this
95% CD Specifications EE 004 N 16420 3.4C II information. Suggest adding this requirement.

A/E Response:

Testing is required but there is no corresponding requirement to


document and submit this information. Suggest adding this requirement.
95% CD Specifications EE 005 N 16165 3.1D II
A/E Response:

Reference to non-existent section 17000. Probably meant to be 13700.


Please correct.
95% CD Specifications EE 006 N 16165 3.1E II
A/E Response:

Page 3
542511417.xls
Printed 09/16/2021
Design Review Comments Sample
Project No:
Project: Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electrical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date:

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Dennis Gallagher

[Dennis Gallagher - Kitchell] There is no performance criteria for the


grounding system. Also, there is no testing required for the system and
there is no direction of what corrective action is to be taken if the testing
indicates that the criteria are not being met. This should include all
95% CD Specifications EE 007 N 16450 II
separately derived grounds as well as the service entrance switchboard.
Please address.

A/E Response:

[Dennis Gallagher - Kitchell] This requires the submittal of photometric


calculations but it does not provide the criteria or require testing to verify
that the criteria has been met. This is particularly important for the cells.
95% CD Specifications EE 008 N 16500 2.6C 4 II
Please address.

A/E Response:
[Dennis Gallagher - Kitchell] No testing or documentation is required for
the equipment in this section.
95% CD Specifications EE 009 N 16510 Part 3 II
A/E Response:
[Dennis Gallagher - Kitchell] Factory testing is required but there is no
requirement to document or submit test results.
95% CD Specifications EE 010 N 16612 2.1AA 8 II
A/E Response:
[Dennis Gallagher - Kitchell] There are no specific post installation tests
required. Suggest adding. This should include opening the main breaker
and making sure all loads pick up in the required time. Another important
95% CD Specifications EE 011 N 16612 2.1AA II
criteria is that the time to pick up the loads is met.

A/E Response:
[Dennis Gallagher - Kitchell] No power is shown for Fire Smoke
Dampers. Verify that there are no FSDs requiring power.
95% CD All EE 012 N E1.10A II
A/E Response:

Page 4
542511417.xls
Printed 09/16/2021
Design Review Comments Sample
Project No:
Project: Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electrical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date:

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Dennis Gallagher

[Dennis Gallagher - Kitchell] The power for the VAV boxes is shown as
coming from a normal power panel. It would appear that it should be fed
from an emergency panel so there could be smoke control during a
95% CD All EE 013 N E1.11A II
power outage.

A/E Response:
[Dennis Gallagher - Kitchell] No numbers are shown for the pumps.
Please include so all the documentation can be coordinated.
95% CD Central Plant EE 014 N E1.50 II
A/E Response:
[Dennis Gallagher - Kitchell] There are no requirements for O&M
documents for any of the electrical sections except 16612 (Emergency
Generator) and 16721 (Fire Alarm). There should be some requirement
95% CD Central Plant EE 015 N 16010 II
for almost all sections.

A/E Response:

[Dennis Gallagher - Kitchell] This is a general requirement to provide


submittals but most of the individual sections do not have specific
requirements. Specific requirements should be provided for the specific
95% CD Central Plant EE 016 N 16010 2.3C 3 II
data that is needed.

A/E Response:

[Dennis Gallagher - Kitchell] Only a few sections have specific


requirements for training. For the most part not much training is required
for the standard electrical systems, but there should be some training on
95% CD Central Plant EE 017 N 16010 II the switchboards, panel boards, fire alarm and other systems. Suggest
reviewing and adding the appropriate requirements.

A/E Response:

Page 5
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electronic Security 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gallagher, Dennis
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Dennis Gallagher

[Dennis Gallagher - Kitchell] This paragraph is titled "Commissioning".


Since there is a specific Commissioning agent, suggest changing this
title. Possibly "Architect/Engineer Observations".

95% CD Specifications ES 001 N 13700 3.11 16 II A/E Response:

[Dennis Gallagher - Kitchell] The services of manufacturer's


representatives is required. This should be made specific as to which
particular systems this is required for. Note some of the sections require
the manufacturer's representative so a reference to the specific sections
would be one approach that would address this issue.

95% CD Specifications ES 002 N 13700 3.10B 16 II A/E Response:


[Dennis Gallagher - Kitchell] Reference is made to "section 13700 testing
procedures" but this paragraph doesn't exist. Please correct.

95% CD Specifications ES 003 N 13700 3.15 18 II A/E Response:

[Dennis Gallagher - Kitchell] Note this is the second "A" in the article. It
is titled "System Performance Guidelines" and the first three paragraphs
give performance requirements. However, the next paragraph gives
specific product requirements. Suggest putting this in its own article. It
also should be noted that the equipment listed are minimum requirements
and that the performance requirements have to be met.

95% CD Specifications ES 004 N 13700 2.4A 6 II A/E Response:

Page 6
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Electronic Security 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gallagher, Dennis
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Dennis Gallagher

[Dennis Gallagher - Kitchell] This article covers "wire and cable" .


However, there is an entire section (13710) that covers wire and cable.
This occurs in several sections and for the grounding system also. It
should be made clear what applies in the event of a conflict.

95% CD Specifications ES 005 N 13735 2.11 8 II A/E Response:

[Dennis Gallagher - Kitchell] This is the intercom system section but this
paragraph provides performance requirements for performance of the
intercom and CCTV systems together. It would be better to have this in
an overall performance paragraph in a general section such as 13700.

95% CD Specifications ES 006 N 13735 3.2B II A/E Response:

Page 7
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Civil 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page

Page 8
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Valentin Gheorghita

[Valentin Gheorghita - Kitchell] In order to facilitate commissioning


activities, review all technical sections where equipment is specified and
clearly indicate the followings requirements:
1. Equipment start-up and testing by a factory authorized technician;
95% CD Specifications ME 001 N Div 15 II
2. Specific number of hours for operator training;
3. O&M Manuals to be submitted.

A/E Response:

[Valentin Gheorghita - Kitchell] Provide installation details for HVAC


equipment and piping. Include:
1. Method of supporting the equipment;
2. Flexible connections;
3. Isolation valves, by-pass valves, pressure reducing valves, etc;
95% CD All ME 002 N II
4. Temperature and pressure gauges and sensors;
5. Test ports;
6. Balancing devices.

A/E Response:

[Valentin Gheorghita - Kitchell] All Floor Plans: Indicate location of all


balancing dampers.
95% CD All ME 003 N M1 SERIES II
A/E Response:
[Valentin Gheorghita - Kitchell] All Floor Plans: Indicate location of all
Fire and Smoke Dampers.
95% CD All ME 004 N M1 SERIES II
A/E Response:
[Valentin Gheorghita - Kitchell] All Floor Plans: Indicate location of all
thermostats and duct stats.
95% CD All ME 005 N M1 SERIES II
A/E Response:

Page 9
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Valentin Gheorghita

[Valentin Gheorghita - Kitchell] AHU 1-1: Review sizing of supply air


riser. Note #4 indicates an 18"x16" duct riser is used to transport 6,500
CFM of air. The resulting air velocity (3,600 FPM) and pressure drop
(0.85"/100') are outside the usually accepted ranges for comfort
95% CD All ME 006 N M1.11A II cooling/heating application. Objectionable noise and vibration, and high
pressure drop will result. Comment applies to most roof mounted air
handlers in all buildings.

A/E Response:

[Valentin Gheorghita - Kitchell] Review sizing of medium pressure


ductwork upstream of Terminal Units. Recommend selecting a pressure
drop range and using it consistently on every duct run. For example TU
1-9 is scheduled for 900 CFM and has a 10" dia. inlet duct (0.4"/100')
while TU 1-8 is scheduled for 1,200 CFM and also has a 10" dia. inlet
95% CD All ME 007 N M1.11A II
duct (0.75"/100'). This will result is a more uniform pressure variation
throughout the ductwork and a system that is easier to balance and
control. Comment applies to all buildings.

A/E Response:

[Valentin Gheorghita - Kitchell] Review sizing of low pressure ductwork


downstream of Terminal Units. For example, the pressure drop varies
between 0.08"/100' and 0.045"/100' in the duct trunk downstream of TU
95% CD All ME 008 N M1.11A II 1-9. Recommend selecting a pressure drop range (0.08 - 0.1"/100') and
using it consistently on every duct run.

A/E Response:

Page 10
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Valentin Gheorghita

[Valentin Gheorghita - Kitchell] General duct sizing:


1. If space above the ceiling permits, recommend using round ductwork
instead of rectangular and using standard stock sizes for cost savings.
2. Recommend that size changes be done in only one duct dimension
where possible (i.e. ductwork downstream of TU 1-9) and not both
dimension (i.e. ductwork downstream of TU 1-8). Fittings are usually
95% CD All ME 009 N M1.11A II easier to fabricate and therefore less expensive. Use the same method
consistently on every duct run.
3. Recommend minimizing number of fittings by changing duct sizes only
when duct changes by 4" or more in any dimension. Fewer fittings result
in cost savings.

A/E Response:

[Valentin Gheorghita - Kitchell] Clarify if flexible ducts will be allowed at


the Terminal Units inlet and at the final connection to ceiling registers.
The drawing symbology appears to indicate that rigid duct is used
95% CD All ME 010 N M1.11A II
everywhere.

A/E Response:
[Valentin Gheorghita - Kitchell] FC 2-1 & FC 2-2: These fan coils are
located above the corridor. No return and outside air ductwork is shown.
95% CD Building 2 SuppME 011 N M1.21 II Please clarify.

A/E Response:

Page 11
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Valentin Gheorghita

[Valentin Gheorghita - Kitchell] Drawing M1.21 indicates that TU 2-8


serves rooms with constant exhaust. The schedule on M6.04 indicates a
design flow of 1,100 cfm with a cooling minimum of 200 cfm and a
heating minimum of 250 cfm. Since the exhaust flow is constant, the
supply flow should also be constant and the box should be set a constant
95% CD All ME 012 N M6.04 II volume box.
Drawing M1.31 - same comment for TU 3-13 (serves cells)
Review VAV Terminal Unit Schedule and clearly indicate which boxes will
be set with variable flow and which will be set with constant flow.

A/E Response:

[Valentin Gheorghita - Kitchell] Note #21 indicates a SG-1 9x9 ceiling


register will be used. The schedule on M6.02 indicates that SG-1 is a
Titus model SG-SD register. That catalog shows only even inch sizes are
95% CD All ME 013 N M1.31 II
available for this register type. Please verify and revise as necessary.

A/E Response:

[Valentin Gheorghita - Kitchell] Note #24 indicates a EG-1 9x9 ceiling


register will be used. The schedule on M6.02 indicates that SG-1 is a
Titus model SG-PRA aluminum register. Please verify if an aluminum
95% CD All ME 014 N M1.31 II register is required for this application and consider using a steel
equivalent for cost savings (approximately 10%).

A/E Response:

[Valentin Gheorghita - Kitchell] Pump Schedule: CHWP 1 & 2 are


identified as secondary pumps. Piping schematic on M1.52 identifies the
95% CD Central Plant ME 015 N M6.02 II same pumps as primary pumps. Please coordinate.

A/E Response:

Page 12
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Valentin Gheorghita

[Valentin Gheorghita - Kitchell] None of the pumps are specified with


Variable Frequency Drives (VFDs). The sequence of Operations in
section 15900 calls for VFDs on secondary pumps. Electrical drawings
95% CD Central Plant ME 016 N M6.02 II show VFDs for all pumps (primary, secondary, condenser) and the
Cooling Tower fan. Please coordinate and clarify VFD requirements.

A/E Response:

[Valentin Gheorghita - Kitchell] Domestic HW is distributed at 140 deg. F.


The Plumbing Narrative in the Preliminary Project Description indicates
that all public and inmate areas will be provided with maximum 109 deg.
95% CD All ME 017 N P1.11A II F HW. Please clarify if the requirements have changed, or indicate
location of tempering valves.

A/E Response:

[Valentin Gheorghita - Kitchell] Staff Toilet 1B02 has an instantaneous


water heater. Please clarify need, given the fact that a HW main is
95% CD All ME 018 N P1.11A II located directly above the room.

A/E Response:
[Valentin Gheorghita - Kitchell] Indicate location of balancing valve on all
HWR branches. Comment applies to all buildings.
95% CD All ME 019 N P1.11A II
A/E Response:
[Valentin Gheorghita - Kitchell] Recommend providing injection ports and
valves in the CW, HW and HWR lines at each building to facilitate
95% CD All ME 020 N P1.11A II chlorination of the system on a building by building basis.

A/E Response:

Page 13
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Mechanical 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s): Gheorghita, Valentin
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page
Kitchell Valentin Gheorghita

[Valentin Gheorghita - Kitchell] The Air Handlers are on emergency


power. According to the Preliminary Project Description only the fans are
required to be on emergency power. Clarify if the electrical heaters
95% CD All ME 021 N M1 SERIES II inside the Air Handlers will be disabled during emergency power
operation. This relates to the sizing of the emergency generator.

A/E Response:

[Valentin Gheorghita - Kitchell] The Air Handlers are on emergency but


the Terminal Units are not. Clarify the failure mode of the boxes (NO or
NC) and ensure the system will function during emergency power
95% CD All ME 022 N M1 SERIES II
operation.

A/E Response:

[Valentin Gheorghita - Kitchell] Recommend providing a couple of


sections through the Central Plant to clarify arrangement of equipment
and piping. Also recommend indicating key clear space requirements
95% CD Central Plant ME 023 N M1.51 II that have to be maintained in order to allow future equipment to be
transported inside the building and installed in the allocated spaces.

A/E Response:

[Valentin Gheorghita - Kitchell] The Fire Alarm Narrative in the


Preliminary Project Description indicates the FACP monitors FSDs,
selected supply and exhaust fans, and tamper / flow switches in the
95% CD All ME 024 N M1 SERIES II automatic sprinkler system. The Mechanical drawings do not show any
communication with the FACP. Please coordinate and clarify.

A/E Response:

Page 14
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Specifications 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page

Page 15
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center Sheet Notes:
Bid Pkg: Commissioning 1. Priority: I = Major Concern; II = Coordination; III = Recommendation
Current Phase: 95% CD 2. A/E Response Codes:
Discipline: Structural 1 = Changed as directed 2 = Changed, but modified as noted 3 = Not changed-explained
Reviewer(s):
Issue Date: 10/28/2004

DRC Drawings Specifications


Phase Reference Resolved Priority Value, $ Comment
No. Sheet Detail Section Parag. Page

Page 16
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center
Bid Pkg: Commissioning
Current Phase: 95% CD

Issue Date: 10/28/2004

Unresolved Issues Resolved Issues


Phase DRC # Value, $ Phase DRC # Value, $
Total: - Total: -

Page 17
542511417.xls
Printed 09/16/2021
Design Review Comments
Project No: 3143A3
Project: SRP-MIC Detention Center
Bid Pkg: Commissioning
Current Phase: 95% CD

Issue Date: 10/28/2004

Comment Count Summary

Unresolved Comments by Discipline


Priority
Discipline Major
Coordination Recommendation Total
Concerns
Architectural 0 0 0 0
Civil 0 0 0 0
Electrical 0 17 0 17
Mechanical 0 24 0 24
Specifications 0 0 0 0
Structural 0 0 0 0
Electronic Security 0 6 0 6
Totals: 0 47 0 47

Total Comments by Phase (Resolved & Unresolved)


Resolved Total
Totals Major Concerns Coordination Recommendation
Comments Comments
95% CD 47 47
Totals 0 47 0 47

Page 18
542511417.xls
Printed 09/16/2021