Labour Rates For Common SR 2018-19 For 33 KV System: 1 Detailed Surveying On Turn-Key
Labour Rates For Common SR 2018-19 For 33 KV System: 1 Detailed Surveying On Turn-Key
Labour
                                                                                                                                       Proposed
                                                                                                                           charges
Sl   Item                                                                                                                           Labour charges
                                                      Description                                               Unit     Common SR
No    No                                                                                                                             Common SR
                                                                                                                         2016-17 in
                                                                                                                                    2018-19 in Rs.
                                                                                                                             Rs.
             Fixing marking stones of size 200X200 x 1000 mm with approved marks including painting
             above the ground level and Yellow Lettering and marking the direction of incoming line and
             out going lines are to be clearly marked on the top with red colour. If the distance between       Per
5     iii)                                                                                                                  442           486
             two anchor points is more than I km, one more directional stone is to be fixed. So also for       Stone
             the road crossing, railway crossing ,River crossing , HT crossing and nala crossing for all on
             both the sides.
                                                                                                                Per
             Burgie details for identification for all Anchor towers with existing permanent marks like
6     iv)                                                                                                      Anchor       400           440
             poles, telephone lines, buildings, etc.,
                                                                                                               Tower
                                                                                                                Per
7     v)     v) Conducting soil resistivity tests                                                                           766           843
                                                                                                                Test
             Clearing of bushes, tree branches of trees crops and shrubs wherever encountered for
      vi)    detailed survey to enroute the corridor width of 3 mtrs (including viewing for fixing anchor
             towers etc.,)
8     a)     Hilly terrain                                                                                      KM          1326         1459
9     b)     Plain terrain                                                                                      KM           886          975
             a) Submission of reports in the form of good binding including the preparation of sketches
10   vii)    for burgie details for each anchor points, scheduling of line details, S.R. values, soil          Per set      270           297
             classification reports, tower schedule, abstract of towers etc., complete.
             b) Drawing the route profile on graph sheet, including geographic feature like Nalas, rivers,
11           gardens, P&T lines railway crossing etc, inclusive of all stationaries. (Normal requirement is                 270           297
             5 Sets)
             Preparing the Schedules: PTCC Proposal : Containing PTCC questionaire, topo sheet
     Viii)
12           extracts with marking of the proposed line, SR Report, tower sketch, station single line           Set         1069         1176
      a)
             diagram etc., (30 Copies/Sets)
                                                                                                                 Per
             Railway Crossing proposal with drawing are inclusive of graph sheets and other stationery
13    b)                                                                                                       crossin      1069         1176
             materials, labour etc., (10 Sets)
                                                                                                                  g
                                                                                                                Per
             Tree Schedule Containing the details like name of tree, girth size of tree, distance from
14    c)                                                                                                       Hectar       766           843
             central line of the alignment, approximate height of the tree etc., complete
                                                                                                                 e
             Forest proposals: Inclusive of all works like fixing of stones at every 20 mtrs in the centre
             line and both ends of the corridor, painting of each tree after chipping, writing the numbers
15    d)     on the tree, taking girth size of all the trees coming in the corridor at 1 mtr height from GL,    Km          4985         5484
             approximate height of the tree and forest clearance proposals etc., complete (10 Sets).
             Note: This applies to forest area only.
                                                                         1 of 16
                                                                                                                           Labour
                                                                                                                                       Proposed
                                                                                                                           charges
Sl   Item                                                                                                                           Labour charges
                                                       Description                                              Unit     Common SR
No    No                                                                                                                             Common SR
                                                                                                                         2016-17 in
                                                                                                                                    2018-19 in Rs.
                                                                                                                             Rs.
             Running Peripheral Theodolite traverse along periphery and coordinating and heightening of
             all corners/turning points, establishing permanent co-ordinate axis formation of grids at
18           50m intervals for northing and easting with reference to already established permanent co-         Acre        1479         1627
      a)
             ordinate axis levels at 50m grid intersection for preparing plot plan of the entire area with
             contours. Including existing structure location.
             Establishing datum level and bench marks at every 100m/50m intervals both longitudinal
             and laterally and all corners/turning points with stone pillars of size not less than
19    b)                                                                                                         No         1479         1627
             0.2mx2mx1.0m buried on the ground and exposed top engraved for painting RL, and
             coordinates of that point.
             Taking level at 5M suitable grid interval in the sub-station area for plotting block levels,
20    c)                                                                                                         No          32           35
             contour map.
             Preparation of CAD drawings, generating the contours using appropriate software and
                                                                                                                 Per
21    d)     submission of 6 sets of blue prints and one tracing sheet (original) and one soft copy etc.                   14780         16258
                                                                                                               Project
             Complete.
             Furnishing cutting and filling quantities using appropriate software for earth work                 Per
22    e)                                                                                                                    4434         4877
             calculation.                                                                                      Project
             Making 150mm nominal diameter bore holes at various locations in soil using suitable
             approved method of boring including, cleaning providing Bore holes at interval and at
             change of strata, collections of water samples, observation such as ground water etc.,
24    a)     Collection of undisturbed soild samples at ever 2.0m/3.0m interval and at change of strata,        Mtrs        2212         2433
             transportation of all the collected samples to the laboratory and back filling of bore holes on
             completion of the work, complete as per sepcification and instruction of the engineers, for
             depths up to 6.0 m below natural ground level or refusal strata.
             Note: The above rates are inclusive of mobilization of Plant Equipment & Materials for,
             Topographical survey, block leveling and Geotechnical investigation works, and
             Demobilization. No extra rate is admisible for mobilization & Demobilization
                                                                         2 of 16
                                                                                                                      Labour
                                                                                                                                  Proposed
                                                                                                                      charges
Sl   Item                                                                                                                      Labour charges
                                                      Description                                            Unit   Common SR
No    No                                                                                                                        Common SR
                                                                                                                    2016-17 in
                                                                                                                               2018-19 in Rs.
                                                                                                                        Rs.
                                                                                                                    1)                1) Corresponding
                                                                                                                    Correspondin      rates in KPWD
                                                                                                                    g rates in        SR as mentioned
                                                                                                                    KPWD SR as        against each
                                                                                                                    mentioned         classification
                                                                                                                    against each      below shall be
                                                                                                                    classification    adopted.
                                                                                                                    below shall be    2) Area
                                                                                                                    adopted.          weightages
                                                                                                                    2) Area           applicable for
                                                                                                                    weightages        the respective
                                                                                                                    applicable for    areas as per
                                                                                                                    the respective    latest KPWD SR
             Excavation of pits as per specifications for lattice type of station structures, Tr. Plinth,           areas as per      shall be allowed
             control panels, mounting structures for breakers, CT's, PT's Isolators, LA's etc., Excavation          latest KPWD       to arrive at Final
             of trenches for control cables, U.G. Cables, Groundmat etc.,                                           SR shall be       Rate.
                                                                                                                    allowed to        3) Extra for
                                                                                                                    arrive at Final   excavation
                                                                                                                    Rate.             under water
                                                                                                                    3) Extra for      conditions
                                                                                                                    excavation        and/or foul
                                                                                                                    under water       conditions
                                                                                                                    conditions        including
                                                                                                                    and/or foul       bailing/pumping
                                                                                                                    conditions        out, rempving
                                                                                                                    including         slush add 20%
                                                                                                                    bailing/pumpi     of the rate of the
                                                                                                                    ng out,           respective rate
                                                                                                                    rempving          on account of
                                                                                                                       Rate for
                                                                                                                    ordinary rock Rate for ordinary
                                                                                                                      (Without      rock (Without
43    v)     Wet black cotton soil                                                                           Cmt
                                                                                                                     blasting) of blasting) of latest
                                                                                                                    latest KPWD       KPWD SR
                                                                                                                         SR
                                                                                                                       Rate for
                                                                                                                    ordinary rock Rate for ordinary
                                                                                                                      (Without      rock (Without
45   vii)    Latterite soil                                                                                  Cmt
                                                                                                                     blasting) of blasting) of latest
                                                                                                                    latest KPWD       KPWD SR
                                                                                                                         SR
                                                                        3 of 16
                                                                                                                       Labour
                                                                                                                                   Proposed
                                                                                                                       charges
Sl   Item                                                                                                                       Labour charges
                                                      Description                                             Unit   Common SR
No    No                                                                                                                         Common SR
                                                                                                                     2016-17 in
                                                                                                                                2018-19 in Rs.
                                                                                                                         Rs.
                                                                                                                        Rate for
                                                                                                                     ordinary rock   Rate for Hard
                                                                                                                         (With        rock (With
46   viii)   Hard rock with blasting/Hard latterite                                                           Cmt
                                                                                                                      blasting) of blasting) of latest
                                                                                                                     latest KPWD       KPWD SR
                                                                                                                          SR
             Note 1: For Excavation purposes measurement shall be as per actuals.
                  2: For foundation purposes predominant soil shall be considered.
      6      Excavation (For Tr. Line Tower)
47     i)    Normal Soil                                                                                      Cmt
48    ii)    B.C. Soil                                                                                        Cmt
49    iii)   Partially Submerged soil                                                                         Cmt     Rates as per Rates as above
50    iv)    Fully submerged soil                                                                             Cmt    item 5 + 50% per item 5 + 50%
51     v)    Wet black cotton soil                                                                            Cmt        extra           extra
52    vi)    Dry fissured/Ordinary rock                                                                       Cmt
53   vii)    Latterite soil                                                                                   Cmt
54   viii)   Hard rock with blasting/Hard latterite                                                           Cmt
      7      Back Filling :
                                                                                                                     Rates as per
                                                                                                                                        Rates as per
                                                                                                                      KPWD SR
                                                                                                                                          KPWD SR
             Back filling with excavated earth available near the tower and consolidation layer by layer of          applicable to
55    i)                                                                                                      Cmt                       applicable to
             150 mm depth with adequate quantity of water.                                                            respective
                                                                                                                                       respective area
                                                                                                                      area +10%
                                                                                                                                         +10% extra
                                                                                                                         extra
             Note: This item is applicable only when Black cotton, soil, wet black cotton soil, dry
             fissured rock, ordinary rock, Hard rock are encountered.
8 Concreting and curing (For Both Transmission lines and station structures)
                                                                                                                           1)
                                                                                                                     Correspondin
                                                                                                                       g rates in
                                                                                                                     latest KPWD      1) Corresponding
                                                                                                                         SR as          rates in latest
                                                                                                                      mentioned          KPWD SR as
                                                                                                                     against each         mentioned
                                                                                                                     classification      against each
             Concreting & curing as per specifications including the cost of materials,T&P materials and
                                                                                                                        shall be        classification
      a)     labour charges with all lead and lift, for lattice type station structures,Tr. Plinth, control
                                                                                                                        adopted.      shall be adopted.
             panels, mounting structures for Breakers, CT's PT's Isolators, LA's, etc.,
                                                                                                                       2) For the     2) For the above
                                                                                                                      above basic       basic rate add
                                                                                                                        rate add       applicable area
                                                                                                                       applicable     weightage as per
                                                                                                                          area        latest KPWD SR.
                                                                                                                     weightage as
                                                                                                                       per latest
                                                                                                                      KPWD SR.
                                                                                                                      Rates under
                                                                                                                                    Rates under
                                                                                                                          plain
                                                                                                                                   plain concrete
                                                                                                                      concrete for
57    i)     1:4:8 concrete (M 7.5)                                                                           Cmt                  for foundation
                                                                                                                     foundation of
                                                                                                                                   of latest KPWD
                                                                                                                      latest KPWD
                                                                                                                                          SR
                                                                                                                           SR
                                                                        4 of 16
                                                                                                                      Labour
                                                                                                                                  Proposed
                                                                                                                      charges
Sl   Item                                                                                                                      Labour charges
                                                     Description                                           Unit     Common SR
No    No                                                                                                                        Common SR
                                                                                                                    2016-17 in
                                                                                                                               2018-19 in Rs.
                                                                                                                        Rs.
                                                                                                                    Rates under
                                                                                                                                  Rates under
                                                                                                                    basement of
58    ii)    1:3:6 concrete (M-10)                                                                         Cmt                    basement of
                                                                                                                    latest KPWD
                                                                                                                                latest KPWD SR
                                                                                                                         SR
                                                                                                                     Rates under
                                                                                                                          raft    Rates under raft
59    iii)   1:2:4 concrete (M-15)                                                                         Cmt      foundation of  foundation of
                                                                                                                     latest KPWD latest KPWD SR
                                                                                                                          SR
                                                                                                                     Rates under
                                                                                                                          raft    Rates under raft
60    iv)    1:1.5: 3 concrete (M-20)                                                                      Cmt      foundation of  foundation of
                                                                                                                     latest KPWD latest KPWD SR
                                                                                                                          SR
                                                                                                                    For arriving at
                                                                                                                      the rates for
                                                                                                                                     For arriving at
                                                                                                                    concrete items
                                                                                                                                       the rates for
                                                                                                                            for
                                                                                                                                     concrete items
                                                                                                                     transmission
                                                                                                                                    for transmission
                                                                                                                    lines add 25%
                                                                                                                                     lines add 50%
             Concreting and curing as per specifications including the cost of materials, T&P materials              weightage to
61    b)                                                                                                   Cmt                      weightage to the
             and labour charges with all lead and lift, for Tr. line towers.                                            the basic
                                                                                                                                      basic rates of
                                                                                                                         rates of
                                                                                                                                         different
                                                                                                                        different
                                                                                                                                      proportion of
                                                                                                                     proportion of
                                                                                                                                         concrete
                                                                                                                        concrete
                                                                                                                                    proposed above.
                                                                                                                        proposed
                                                                                                                          above.
             Note :
             a) Extra as indicated in the relevant KPWD SR may be allowed for providing concrete in
             watery situation including cost of bailing out water and removing slush.
             b) Only machine mixing is to be used for concreting.
             c) Jelly to be used is 20mm and down size for 1:1.5:3, 1:2:4 and 1:3:6 concrete and 40mm
             and down size for CC 1:4:8.
              d) 50% above KPWD SR is proposed only for Tr line works from 2016.
      9      Towers
62    a)     Sorting of tower parts made of fabricated angle iron                                           MT           346             381
                                                                                                            Per
63    b)     Setting up of stubs templates and from one location to another location                      Locatio        450             495
                                                                                                             n
             Assembling and errection of towers including tightening of bolts and nuts including
64    c)                                                                                                   MT           2513             2764
             loading,unloading at store and site (Including the Wt. of stubs)
             Rivetting of tower bolt ends by heating using dry- Acetylene gas and hammering to destroy
             threads so as to make the tower members theft - prrof (Bolts at nodal points only to be       Per
65    d)                                                                                                                 12               13
             selected and rivetted up to hieght of bottom cross arm, as per the directions of the field    Bolt
             engineer)
                                                                                                           Per
66    e)     Welding of bolts and nuts                                                                                   12               13
                                                                                                           Bolt
             Note: For tower errections requiring shutdown 25% above S.R. for item 5c to 5e only are to
             be adopted.
     10      Supplying and fixing AC devices:
             Supplying and fixing G.I. Angle iron 45x45x5 mm (1mtr length) with cleats, bolt & nuts as
67    a)     per specification and fixing above 0.5 mtrs length each at inner and outer surface of the    Per Set       2459             2705
             tower to facilitate running of barbed wire.
68    b)     Supplying and fixing barbed wire as per specification                                         Rmtr          47               52
                                                                      5 of 16
                                                                                                                       Labour
                                                                                                                                   Proposed
                                                                                                                       charges
Sl   Item                                                                                                                       Labour charges
                                                     Description                                            Unit     Common SR
No    No                                                                                                                         Common SR
                                                                                                                     2016-17 in
                                                                                                                                2018-19 in Rs.
                                                                                                                         Rs.
     11     Fixing of Boards
69    a)    Fixing Danger Board                                                                              Nos           48                 53
70    b)    Fixing Number Plate                                                                              Nos           48                 53
                                                                                                            Set (3
71    c)    Fixing Phase plate                                                                                            141                155
                                                                                                             Nos)
72    d)    Fixing Circuit Plates                                                                            Nos           48                 53
            Stringing conductor with out allowing the conductor to touch the ground and
     12
            with out damaging the conductor
            Paving out the conductor from anchor to anchor normally spaced at 5 spans with 4 tangent
            towers in between, including providing stays at each anchor points and jointing of
            conductors, hositing anf fixing of insulator string, armour rods,vibration dampers, including
      A
            the cost of T & P materials like comealong, wire ropes, pulley, rollers, suspesnion, clamps,
            compression jointing machines with bits , drum stands, manila ropes, truckker and jeep etc
            (Rate of 1 route KM of single conductor)
                                                                                                                     10269 With
73    i     For hilly tarrian                                                                                KM                             11296
                                                                                                                     Coyote ACSR
                                                                                                                      10269 with
                                                                                                                                         proposed for
74    ii                                                                                                               Rabbit on
                                                                                                                                           deletion
                                                                                                                        towers
                                                                                                                      7528 With
75    i     For plain Tarrian                                                                                KM                             8281
                                                                                                                     Coyote ACSR
                                                                                                                       3763 with
                                                                                                                                         proposed for
76    ii                                                                                                               Rabitt on
                                                                                                                                           deletion
                                                                                                                        towers
            Stringing of Ground Conductor as above
77          For hilly tarrian                                                                                KM          5025               5528
78          For plain Tarrian                                                                                KM          3764               4140
            Note:
                                                                                                                       50% more
                                                                                                                        above the      50% more above
                                                                                                                     rates specified       the rates
                                                                                                                       for normal        specified for
                                                                                                                         works is      normal works is
                                                                                                                     admissible for     admissible for
                                                                                                                       shutdown        shutdown works
            II) For shut down works 50% more than the above rates of the Work (This is applicable to                  works of 33        of 33 kV and
79
            shutdown of 33 kV and above lines only. 11 kV and LT lines shutdown not included).                       kV and above      above lines, CTs,
                                                                                                                       lines, CTs,      PTs, Las only.
                                                                                                                     PTs, Las only.       This is not
                                                                                                                       This is not     applicable for 11
                                                                                                                     applicable for     kV and LT Line
                                                                                                                     11 kV and LT         shut down
                                                                                                                        Line shut           works.
                                                                                                                      down works.
            Stringing Conductors for short lengths: These Rates are applicable only when
     13     total Length of the entire Line is less than 3 spans (River crossing, railway
            crossing Etc.,).
                                                                       6 of 16
                                                                                                                     Labour
                                                                                                                                 Proposed
                                                                                                                     charges
Sl    Item                                                                                                                    Labour charges
                                                       Description                                         Unit    Common SR
No     No                                                                                                                      Common SR
                                                                                                                   2016-17 in
                                                                                                                              2018-19 in Rs.
                                                                                                                       Rs.
a) Anchoring Single span upto 320 mtrs 1 span New Item 2822
                                                                                                            2
             b) Anchoring 2 span interval upto 640 mtrs with one tangent tower only                                 New Item       3364
                                                                                                          Spans
                                                                                                            3
             c) Anchoring 3 span interval up to 960 mtrs with two tangent towers only                               New Item       3999
                                                                                                          Spans
             ii) For plain terrian
a) Anchoring Single span upto 320 mtrs 1 span New Item 2124
                                                                                                            2
             b) Anchoring 2 span interval upto 640 mtrs with one tangent tower only                                 New Item       2583
                                                                                                          Spans
                                                                                                            3
             c) Anchoring 3 span interval up to 960 mtrs with two tangent towers only                               New Item       3041
                                                                                                          Spans
             NOTE:
             For shut down works 50% more than the above rates of the Work (This is applicable to
             shutdown of 33 kV and above lines only. 11kV & LT line shutdown works not included).
             Rates for Short span stringing in Normal length of the line of more than 3
      14
             spans comprising of short spans
                                                                     7 of 16
                                                                                                                             Labour
                                                                                                                                         Proposed
                                                                                                                             charges
Sl    Item                                                                                                                            Labour charges
                                                         Description                                              Unit     Common SR
No     No                                                                                                                              Common SR
                                                                                                                           2016-17 in
                                                                                                                                      2018-19 in Rs.
                                                                                                                               Rs.
                                                                                                                             647 With
101          a) Anchoring single span upto 320 Mtrs                                                              1 Span                      712
                                                                                                                              Coyote
                                                                                                                             314 With    Proposed for
102
                                                                                                                              Rabbit       deletion
                                                                                                                   2        1057 With
103          b) Anchoring 2 span interval upto 640 Mtrs with 1 tangent tower only                                                           1163
                                                                                                                 Spans        Coyote
                                                                                                                             518 With    Proposed for
104
                                                                                                                              Rabbit       deletion
                                                                                                                   3        1563 With
105          c) Anchoring 3 Span interval upto 960 Mtrs with two tangent towers only                                                        1719
                                                                                                                 Spans        Coyote
                                                                                                                             788 With    Proposed for
106
                                                                                                                              Rabbit       deletion
             Stringing Ground Conductor
             i) For Hilly terrian
a) Anchoring Single span upto 320 mtrs 1 span New Item 427
                                                                                                                   2
             b) Anchoring 2 span interval upto 640 mtrs with one tangent tower only                                         New Item         677
                                                                                                                 Spans
                                                                                                                   3
             c) Anchoring 3 span interval up to 960 mtrs with two tangent towers only                                       New Item        1000
                                                                                                                 Spans
             ii) For plain terrian
a) Anchoring Single span upto 320 mtrs 1 span New Item 323
                                                                                                                   2
             b) Anchoring 2 span interval upto 640 mtrs with one tangent tower only                                         New Item         521
                                                                                                                 Spans
                                                                                                                   3
             c) Anchoring 3 span interval up to 960 mtrs with two tangent towers only                                       New Item         760
                                                                                                                 Spans
                                                                                                                            Material +
      15     Grounding of Towers/Equipments
                                                                                                                             Labour
             a) Grounding of towers including cost of 40mm dia 2.5 mm thick, class 'C' G.I. Pipe of 3 Mtrs
107          length as per specifications, with 50X6 mm GI Flats 3 Mtr long, salt charcoal, including             Set       3010+832      3010+832
             excavation charges.
             c) Grounding of equipments by providing cast iron pipe of 100mm ID 13mm thickness, 2.75
             Mtrs long with 2 part clamp out of G.I.Flat 50X6mm continuously welded alround the pipe
109                                                                                                               Set      1582+1055     7370+2011
             using cast iron welding electrodes as per drawing including the cost of excavation (All
             materials to be supplied by the contractor)
             Note : All the leads from earthmat & equipment should be connected to earth
             electrode through the GI Flat 50 x 6 mm of suitable length and welded as per
             specifications.
             Supplying and fixing of counter poise earthing with GI Stranded wire where hard rock is
110   16                                                                                                         Per Loc   2143+1916     2143+1916
             encountered as per specifications. (including excavation charges).
      17     Station Structures
             Errection, assembly and alignment of Station structure as per the directions of site
111    a)                                                                                                          MT         2372          2609
             Engineer.
             Erection, alignment & assembly of fabricated steel lattice structure, pedestal structures &
112    b)                                                                                                          MT         2210          2431
             Mounting structures, for G.O.S., CT's, PT's LA's etc.,
      18     Erection of Transformers
                                                                                                                  Per
             Moving the Transformer on to the plinth (Maximum allowable distance is 50 mtrs.) more
113    a)                                                                                                         MT/          47            51
             than 50 mtrs. approval of the CEE, O&M Zone has to be obtained)
                                                                                                                  Mtr
             Assembly of Transformer parts like bushings, radiators, filling oil into Tr. etc., (for the total
114    b)                                                                                                          MT         1059          1165
             wt. of the Tr.)
c) Filling oil to the power Tr., Conservator and radiator (for maintenance purpose only).
                                                                            8 of 16
                                                                                                                             Labour
                                                                                                                                         Proposed
                                                                                                                             charges
Sl    Item                                                                                                                            Labour charges
                                                        Description                                               Unit     Common SR
No     No                                                                                                                              Common SR
                                                                                                                           2016-17 in
                                                                                                                                      2018-19 in Rs.
                                                                                                                               Rs.
                                                                                                                 Per Set
120   21     Fixing of H.T. fuse units & wiring                                                                               1138         1252
                                                                                                                 (3 Nos)
             b) Testing:                                                                                    1.
             Ratio Test                                                                           2. SC test
             3. Excitation test                                                                        4.
             Magnetic Balance test                                                               5. Vector
122                                                                                                              Each        23668         26035
             group test.                                                                   6. induced high
             voltage test.                                                         7. OLTC operation.
             8. Protective devices operation checks.                                                     9.
             stability checks:- for differential and REFR protection
             Erection, assembly, alignment & interpole wiring of breakers with its connected equipments
123    i)                                                                                                        Per Set      6654         7319
             including movement from the point of unloading to the point of erection.
      25     Erection of NCTs
             Erection of NCTs with ground including movement from the point of unloading to the point
131    a)                                                                                                         Set         500           550
             of erection
132    b)    Assisting in Testing and Commissioning                                                               Set          64           70
      26     Erection of Isolators
             Assembly, Errection alignment and wiring including movement from the point of unloading
133    a)                                                                                                         Set         1040         1144
             to the point of erection. (Upright)
134    b)    Assisting in Testing and Commissioning (Upright)                                                     Set         106           117
                                                                         9 of 16
                                                                                                                           Labour
                                                                                                                                       Proposed
                                                                                                                           charges
Sl    Item                                                                                                                          Labour charges
                                                       Description                                               Unit    Common SR
No     No                                                                                                                            Common SR
                                                                                                                         2016-17 in
                                                                                                                                    2018-19 in Rs.
                                                                                                                             Rs.
             Note :
             1) Assisting in testing and commissioning for item No. 13 to 18 means contractors should
             provide labourers for testing and commissioning by RT/MT/Firm engineers.
             2) Testing & Commissioning in item 13 & 18 means the testing will be carried out bythe
             firms themselves using their own testing equipments and staff in presence of the MRT staff
             who will witness the tests.
                                                                                                                         As per Latest
                                                                                                                            KPWD         As per Latest
             (i) Burnt brick/size stone/RCC Cable duct including form box, back filling the sides,                       electrical SR KPWD electrical
138    a)                                                                                                        Cmt
             removing the excess escavated soil, duct covering with RCC slabs.                                           applicable to SR applicable to
                                                                                                                          respective   respective areas.
                                                                                                                            areas.
                                                                                                                         As per Latest
                                                                                                                            KPWD         As per Latest
             (ii) Supplying 300 mm dia 1.5" to 2" thick RCC Hume pipes including loading unloading, and
                                                                                                                         electrical SR KPWD electrical
139          transportation charges and laying at required level and gradient as per the direction of field      Rmtr
                                                                                                                         applicable to SR applicable to
             engineer
                                                                                                                          respective   respective areas.
                                                                                                                            areas.
                                                                                                                         As per Latest
             Providing, laying and jointing PVC pipes conforming to IS 4085-1960, & 7634-1975, and                          KPWD         As per Latest
             approved makes with necessary specials such as collars, bends, Elbows, Tee, nipples, plugs                  electrical SR KPWD electrical
140    b)
             with cuts and threads using jointing ring with solutions, wherever necessary as per the                     applicable to SR applicable to
             directions of the field Engineer including all lead and lift.                                                respective   respective areas.
                                                                                                                            areas.
32 11 kV Switchgear
                                                                         10 of 16
                                                                                                                         Labour
                                                                                                                                     Proposed
                                                                                                                         charges
Sl    Item                                                                                                                        Labour charges
                                                      Description                                             Unit     Common SR
No     No                                                                                                                          Common SR
                                                                                                                       2016-17 in
                                                                                                                                  2018-19 in Rs.
                                                                                                                           Rs.
                                                                                                              Per
155           i) 11kV Indoor/out door switchgear                                                                          2078         2286
                                                                                                             Panel
                                                                                                              Per
156           ii) 11kV Kiosk                                                                                              1729         1902
                                                                                                             Panel
       b      Wiring & assisting in testing & Commissioning
                                                                                                              Per
157           i) 11 kV indoor/ outdoor switchgear                                                                         689           758
                                                                                                             Panel
                                                                                                              Per
158           ii) 11kV Kiosk                                                                                              689           758
                                                                                                             Panel
              Testing & Commissioning:                                                            Wiring:
        c     Identification of wires, Ferruling Crimping & Termination of wires for annunciation, etc.,
              Testing of Relays, CTs, PTs, & Breaker for operation
159 i) For indoor/outdoor panel comprising of 2I+8F+1BC+1AP3 Per Set 65503 72053
160    ii)    For single 11kV panel indoor/outdoor type /Kiosk                                                Nos        13098         14408
161    iii)   For additional 11kV panel indoor                                                                Nos        6549          7204
162    iv)    For each additional 11kV panel out door type/Kiosk                                              Nos        10009         11010
              Note:Assisting in testing & Commissioning for item 19,20 & 21 mean contractors should
              provide labourers for wiring & Commissioning by RT/MT/Firm Engineers.
      33      Busbar Formation
              Main bus/cross bus (all the three phases in a segment) of using Coyote-single/double
              conductors with fixing of insulator spacers, levelling of string conductors to the required
              height above the equipment, including providing jumps to interconnect different segments of
              the main bus.
163    a)     Main Bus/Cross Bus as above using Single Lynx Conductor                                                     6152         6767
       b)     Main Bus/Cross Bus as above using Single Coyote Conductor                                                   6152         6767
              Formation of cross bus in each individual bay using Lynx/Coyote - Single/Double conductor
              with fixing of insulators, spacers, levelling the strung conductors to the required height      Per
164    b)                                                                                                                Deleted      Deleted
              above the equipment including providing jumps to inter-connect different segments of the        Bay
              main bus.
                                                                                                              Per
165   34      Faradays Cage Formation as per specification:                                                               254           279
                                                                                                              Bay
      35      Groundmat
              Laying of M.S. Flats, welding, applying ACB paint to welded portion and covering with
166    a)                                                                                                    Rmtr          33           36
              sodium bentonite clay
                                                                                                                       50x6mm -
                                                                                                                           273
                                                                                                                       50x8mm -
                                                                                                                                   50x6mm - 314
                                                                                                                           291
              Supplying and laying of MS flats, of various sizes, welding and applying ACB paint to welded                         50x8mm - 335
       b)                                                                                                              75x6mm -
167           portion and covering with sodium bentonite clay, as per the drawing/standard specifications    Rmtr                  75x6mm - 651
                                                                                                                           566
              and consolidation.                                                                                                   75x8mm - 581
                                                                                                                        75x8mm -
                                                                                                                                   75x12mm - 615
                                                                                                                           505
                                                                                                                       75x12mm -
                                                                                                                           535
                                                                                                                        50x6mm -
                                                                                                                           135
                                                                                                                        50x8mm -
                                                                                                                                    50x6mm - 155
                                                                                                                           152
                                                                                                                                    50x8mm - 175
                                                                                                                        75x6mm -
168    c)     Same as above but without sodium bentonite clay                                                Rmtr                   75x6mm - 422
                                                                                                                           367
                                                                                                                                    75x8mm - 454
                                                                                                                        75x8mm -
                                                                                                                                   75x12mm - 493
                                                                                                                           395
                                                                                                                       75x12mm -
                                                                                                                           429
                                                                       11 of 16
                                                                                                                         Labour
                                                                                                                                     Proposed
                                                                                                                         charges
Sl    Item                                                                                                                        Labour charges
                                                      Description                                              Unit    Common SR
No     No                                                                                                                          Common SR
                                                                                                                       2016-17 in
                                                                                                                                  2018-19 in Rs.
                                                                                                                           Rs.
                                                                                                                        50x6mm -
                                                                                                                           226
                                                                                                                        50x8mm -
             Grounding of equipment with various sizes, G.I. Flat and connecting Equipment to the                                      50x6mm - 260
                                                                                                                           253
             earthmat/ground pit. Each point of earthing with all formation works like bending,                                       50x8mm - 296
                                                                                                               Per      75x6mm -
169    d)    twisting, drilling of holes and connecting by welding (inclusive of all T&P and consumables)                              75x6mm - 633
                                                                                                              point        541
             to the earthmat/ ground pit/ point of earth connection,all the materials supplied by the                                  75x8mm - 656
                                                                                                                        75x8mm -
             contractor.                                                                                                              75x12mm - 710
                                                                                                                           571
                                                                                                                       75x12mm -
                                                                                                                           618
             Providing 25mm dia M.S.rod 1.05 Mtr. Long earthmat spikes including heating, bending
170    e)    top 50mm over lap flattening and making spike edge at one end driving into the earth below       Each         260              299
             the ground level and welding the rod with ground mat flat.
             Supplying & Providing 450 mm dia 450 mm height 1.5" to 2" thick hume pipe collar (non
171    f)                                                                                                     Each         864              994
             pressure type) for earth pits including all lead and lifts etc.,
      36     Providing Deep Bore earthing
             "Sinking bore of 150mm clear dia using fast rig including fixing of 40mm dia MS rod,
             including jointing the pipes as per KPTCL standard and providing sodium bentonite
             treatment in the annular space, including transportation of rig and other supporting
             vehicles etc., complete, as per the directions of engineer in charge, including cost of MS rod
             & sodium bentonite".
172          a) Drilling 150mm dia bore                                                                       Rmtr         687              687
173          b) 40 mm dia MS rod                                                                              Rmtr         541              638
174          c) Bentonite Clay                                                                                 Kgs         15               15
                                                                                                               Per
175          d) Cost of GI flat for joining two rods by welding to obtain continuous length                                572              682
                                                                                                              joint
      37     Spreading of Jelly
             Supplying and spreading 100mm thick with 20/25mm jelly with all lead and lifts.
                                                                                                                      As per Latest
                                                                                                                         KPWD         As per Latest
                                                                                                                      electrical SR KPWD electrical
177          a) Supplying and erection of fabricated supporting structures including foundation.              Per Set
                                                                                                                      applicable to SR applicable to
                                                                                                                       respective   respective areas.
                                                                                                                         areas.
                                                                                                                      As per Latest
                                                                                                                         KPWD         As per Latest
                                                                                                                Per   electrical SR KPWD electrical
178          b) Supplying and fixing of Sodium Vapour lamp fittings of 250 watts.
                                                                                                              Fitting applicable to SR applicable to
                                                                                                                       respective   respective areas.
                                                                                                                         areas.
                                                                                                                       As per Latest
                                                                                                                          KPWD         As per Latest
             c) Supplying and laying of 1.1KV, 6 Sqmm PVC cable or any other specified size, testing and               electrical SR KPWD electrical
179                                                                                                           Rmtr
             commissioning of yard lights.                                                                             applicable to SR applicable to
                                                                                                                        respective   respective areas.
                                                                                                                          areas.
                                                                                                                       Furnished in    Furnished in
180          d) Erection of RCC poles with stringing of O.H. conductor/Laying of cable for yard lights.
                                                                                                                       11kV Works      11kV Works
                                                                                                                       Material+Lab
      39     Painting of structures
                                                                                                                           our
             a) Supplying and painting of two coats of good quality Red Oxide primer after cleaning and
181                                                                                                           Sq Mtr      23+46           23+51
             scrapping the surface.
             b) As above with 2 coats of good quality Aluminium paint after2 coats of good quality Red
182                                                                                                           Sq Mtr      50+70           50+77
             Oxide primer.
                                                                        12 of 16
                                                                                                                             Labour
                                                                                                                                         Proposed
                                                                                                                             charges
Sl    Item                                                                                                                            Labour charges
                                                       Description                                                Unit     Common SR
No     No                                                                                                                              Common SR
                                                                                                                           2016-17 in
                                                                                                                                      2018-19 in Rs.
                                                                                                                               Rs.
             c) Supplying and painting two coats of aluminium paint after cleaning and scraping the
183                                                                                                              Sq Mtr       24+39           24+44
             surface wilthout applying Red Oxide primer
184 d) As per (b) but with synthetic enamel paint Sq Mtr 60+77 60+85
             e) Supplying and painting two coats of Synthetic enamel paint after cleaning and scraping
185                                                                                                              Sq Mtr       32+37           35+41
             the surface without aplying red oxide primer.
      40     Battery Set and charger
             Installing, assembling, filling of acid, wiring, assisting, test-charging and discharging Battery
       a)
             set.
186     i)   110 Volts                                                                                            Set          8632            8632
187    ii)   48/24 Volts                                                                                          Set          3456            3456
       b)    Erection of Battery Charger and wiring
188     i)   110 Volts                                                                                            Set          1379            1379
189    ii)   48/24 Volts                                                                                          Set          1379            1379
             Testing & Commissioning of Battery Charger:
             Wiring: Identification, Ferruling, Crimping & connecting
190    c)
              i)AC Supply cable upto 2 sources                                                        ii) Load
             cables, connection at charger end upto 10 load points
             Testing:                                                                                 i) AC
             supply Voltage Phase Sequence.                                                             ii)
             Testing of Output DC Voltages in Boost/Float/Trickle/Variations as per the
             order/requirement .                                                                     iii)
             Testing for Ripple Factor.
191          Commissioning:                                                                      i) Fixing
             of Boost Voltage level                                                         ii) Fixing of
             Float Voltage level
             iii) Fixing of Trickle Volage level
             iv) Testing of alarm, indication and load ckts, Auto /Manual change overs etc.
             v) Full load test in Boost & Trickle modes.
192 i) 110V DC: (1 set for 33kV Stations) Per Set 17042 17042
      41     Fencing :
             Colony and Station yard Boundary fencing including erection of supports
                                                                                                                           As per KPWD
                                                                                                                                         As per KPWD SR
                                                                                                                           SR applicable
193          a) Security fencing using 8SWG chainlink/50mm Mesh                                                                            applicable to
                                                                                                                           to respective
                                                                                                                                          respective area
                                                                                                                                area
                                                                                                                           As per KPWD
                                                                                                                                         As per KPWD SR
                                                                                                                           SR applicable
194          b) Barbed wire fencing                                                                                                        applicable to
                                                                                                                           to respective
                                                                                                                                          respective area
                                                                                                                                area
      42     PLCC Equipments
195    a)    Erection of mounting structures for coupling capacitors                                              Set          4912            5403
196    b)    Erection of Coupling capacitors/wave traps/LMU.                                                      Set          1846            1846
197    c)    Wiring , testing and commissioning                                                                   Set           486             486
      43     Yard Levelling
                                                                                                                           As per KPWD
                                                                                                                                         As per KPWD SR
                                                                                                                           SR applicable
198          Yard Levelling and filling up of soil and consolidation.                                             Cmt                      applicable to
                                                                                                                           to respective
                                                                                                                                          respective area
                                                                                                                                area
                                                                        13 of 16
                                                                              Labour
                                                                                          Proposed
                                                                              charges
Sl    Item                                                                             Labour charges
                                            Description              Unit   Common SR
No     No                                                                               Common SR
                                                                            2016-17 in
                                                                                       2018-19 in Rs.
                                                                                Rs.
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs.45/-
200          ii) 51 to 100 KMs                                                                KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs.34/-
201          iii) 101 to 150 KMs                                                              KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs.21/-
202          iv) Beyond 150 KMs                                                               KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
       b)    Using 10 MT Truck & Trailor                                                      KPTCL SR
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                             Rs. 60/- per
                                                                                              deletion as
                                                                            KM, subject to
203          i) 1 to 50 KMs                                                                   KPTCL SR
                                                                             a Min. of Rs.
                                                                                               format is
                                                                                2000/-
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs.45/-
204          ii) 51 to 100 KMs                                                                KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs.34/-
205          iii) 101 to 150 KMs                                                              KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs.21/-
206          iv) Beyond 150 KMs                                                               KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
       c)    Using 20 MT Truck & Trailor.                                                     KPTCL SR
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                            Rs. 475/- per
                                                                                              deletion as
                                                                            KM, subject to
207          i) 1 to 50 KMs                                                                   KPTCL SR
                                                                             a Min. of Rs.
                                                                                               format is
                                                                               25000/-
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs 396
208          ii) 51 to 100 KMs                                                                KPTCL SR
                                                                             /- per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs 215/-
209          iii) 101 to 150 KMs                                                              KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                                                             Proposed for
                                                                                              deletion as
                                                                            Min + Rs 192/-
210          iv) Beyond 150 KMs                                                               KPTCL SR
                                                                               per KM
                                                                                               format is
                                                                                                adopted
                                                          14 of 16
                                                                                                                       Labour
                                                                                                                                   Proposed
                                                                                                                       charges
Sl    Item                                                                                                                      Labour charges
                                                     Description                                            Unit     Common SR
No     No                                                                                                                        Common SR
                                                                                                                     2016-17 in
                                                                                                                                2018-19 in Rs.
                                                                                                                         Rs.
                                                                                                                                     Proposed for
             Mobilisation charges of IDLE Transportation applicable for places where heavy duty trucks                                deletion as
211          are not available, is admissible in addition to: (a) as far as possible full load shall be                   30          KPTCL SR
             transported.                                                                                                              format is
                                                                                                                                        adopted
                                                                                                                                     Proposed for
                                                                                                                                      deletion as
                                                                                                                      27% of the
212          b) Transportation of other materials                                                                                     KPTCL SR
                                                                                                                        above
                                                                                                                                       format is
                                                                                                                                        adopted
                                                                                                                                     Proposed for
                                                                                                                      Prevailing
                                                                                                                                      deletion as
             c) Using light vehicle including fuel, oil, lubricants and crew subject to a minimum of 100                Board
213                                                                                                        Per Set                    KPTCL SR
             Kms per day in case of break down/ subject to prior approval of CEE.                                     approved
                                                                                                                                       format is
                                                                                                                        Rates
                                                                                                                                        adopted
             Transportation:
             a) Transportation of Transformer, CTs PTs, Breakers, C & R Panels, 11kV Switchgears
             and EHT LA's only
             1. Using 10 MT Lorry
             Upto 250kms                                                                                    km         New Item          40
             greater than 250kms                                                                            km         New Item          35
             2. Using 10 MT Truck & Trailor
             Upto 250kms                                                                                    km         New Item          70
             greater than 250kms                                                                            km         New Item          55
             3. Using 11MT to 20MT Truck & Trailor
             Upto 250kms                                                                                    km         New Item          90
             greater than 250kms                                                                            km         New Item          70
             4. Using 21 MT to 40 MT Truck & Trailor
             Upto 250kms                                                                                    km         New Item          135
             greater than 250kms                                                                            km         New Item          110
             5. Using 41 MT to 80 MT Truck & Trailor
             Upto 250kms                                                                                    km         New Item          575
             greater than 250kms                                                                            km         New Item          500
             6. Using 81 MT to 120 MT Truck & Trailor
             Upto 250kms                                                                                    km         New Item         1400
             greater than 250kms                                                                            km         New Item         1100
             b) Crane hiring charges for substation works
             1. Up to 5 hours                                                                               hour       New Item         1500
             2. Greater than 5 hours                                                                        hour       New Item         1200
             NOTE :
             1. The rates are for up and down journey and for a minimum distance of 300kms.
             2. Detention charges are Rs. 5000.00 per day for vechicles upto 40MT trailor and Rs.
             15000.00 for vehicles greater than 40Mt trailor.
                                                                       15 of 16
                                                                                                                      Labour
                                                                                                                                  Proposed
                                                                                                                      charges
Sl    Item                                                                                                                     Labour charges
                                                      Description                                            Unit   Common SR
No     No                                                                                                                       Common SR
                                                                                                                    2016-17 in
                                                                                                                               2018-19 in Rs.
                                                                                                                        Rs.
             a) Erection of 9/9.5 Mtrs RCC Poles 300 Kg working load, in the excavated pit as per the
219          approved drawing specification including the cost of excavation, backfilling(Concreting         Nos        1374              1511
             charges extra)
             b) Erection of DP structure including fixing of braces insulators etc., as per the approved
             drawings and specifications including the cost of excavation, backfilling (Concreting charges
220                                                                                                          Set        3250              3575
             extra).
221          c) Fixing of V-Shape cross arms, single top supports and insulators.                            Set         96                106
222          d) Fixing of spiral earth electrodes                                                            Nos         35                39
223          e) Road/P&T Guarding                                                                            Set         949              1044
224          f) Stringing Rabbit conductor, fixing disc insulator to cross arms etc.,                        KM         2608              2869
225          g) Stringing Coyote conductor, fixing disc insulator to cross arms etc.,                        KM         4031              4434
                                                                                                                          As
                                                                                                                                     As provisioned
226          h) Supplying and fixing of AC devices as per specification                                      Rmtr   provisioned in
                                                                                                                                     in 11 kV works
                                                                                                                     11 kV works
      49     Dismantling
                                                                                                                    Same rate as
                                                                                                                                      Same rate as
                                                                                                                       that of
                                                                                                                                     that of erection
227          i) Dismantling of Power Transformer                                                                     erection of
                                                                                                                                        of Power
                                                                                                                       Power
                                                                                                                                      Transformer
                                                                                                                    Transformer
228          ii) Dismantling charges for conctrete with steel reinforcement                                  Cmt        799                879
229          iii) Dismantling of concrete only                                                               Cmt        390                429
                                                                                                                      75% of
                                                                                                                                     75% of erection
                                                                                                                      erection
230          iv) Dismantling charges in all other cases                                                                                charges in
                                                                                                                     charges in
                                                                                                                                        general
                                                                                                                      general
                                                                          16 of 16
Annexure -1
     Transportation by Head Load wherever there is no accessability for transportation by vehicle for
                                    transmission line works only
                                                                                Rough, size,
                                                                 Earth, Gravel,
                                                                                cut latterite
                                                                 Sand, Lime &
                                                     Steel,                        stones,
                                                                     other
  Sl. No.                 Total distance           Cement,per                     Concrete
                                                                 Str.Mat.Rate
                                                   Ton in Rs.                   Blocks Rate
                                                                  per Cmt. In
                                                                                 per Cmt in
                                                                      Rs.
                                                                                     Rs.
                                                        19             24              31
     2        Beyond 50Mtrs and upto 100Mtrs
                                                        31             39              48
     3        Beyond 100 Mtrs and upto 150Mtrs
                                                        42             53              66
     4        Beyond 150 Mtrs and upto 200Mtrs
                                                        52             66              82
     5        Beyond 200 Mtrs and upto 250 Mtrs
            RCC Pole
           300Kg WL
            Rate per
           pole in Rs.
379
545
605
696
696