0% found this document useful (0 votes)
332 views7 pages

Fire Protection

1. All fire protection system installation must follow NFPA standards 10, 13, 14, and 20. 2. Pipes shall be schedule 40 black iron pipes with a safety red paint coating and fittings must conform to ASTM standards. 3. Mechanical couplings or flanges must connect pipes every 12 meters. 4. Pipes must pass a hydrostatic test of 200PSI for two hours with no visible leaks for internal sprinkler piping.

Uploaded by

Ronald
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
332 views7 pages

Fire Protection

1. All fire protection system installation must follow NFPA standards 10, 13, 14, and 20. 2. Pipes shall be schedule 40 black iron pipes with a safety red paint coating and fittings must conform to ASTM standards. 3. Mechanical couplings or flanges must connect pipes every 12 meters. 4. Pipes must pass a hydrostatic test of 200PSI for two hours with no visible leaks for internal sprinkler piping.

Uploaded by

Ronald
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

GENERAL NOTES:

1. ALL FIRE PROTECTION SYSTEM INSTALLATION SHALL FOLLOW THE NFPA


10, 13, 14 & 2O STANDARDS.
2. PIPES SHALL BE BLACK IRON (B.I.) PIPES, SCHEDULE 40 WITH FIRST AND
FINAL COATING OF SAFETY RED PAINT. FITTINGS SHALL CONFORM
WITH ASTM, A53/A153.
3. PROVIDE FLANGE OR MECHANICAL COUPLING CONNECTION FOR
EVERY 12 MTRS. OF PIPE LENGTHS.
4. ALL PIPE LINE SHALL B.I. PIPE SCHED. 40 AND TO BE SUBJECTED TO
HYDROSTATIC TEST OF NOT LESS THAN 200PSI FOR TWO HOURS. NO
VISIBLE LEAKAGE FOR INSIDE SPRINKLER PIPING SHALL BE ALLOWED.
5. PIPE SLEEVE SHALL BE PROVIDED ON EVERY PIPES THROUGH WALL
AND BEAM, AND FIRE SEALANT SHALL BE THE SAME FIRE RATING OF
WALLS/PARTITION.
6. DISTANCE OF SPRINKLER HEAD (PENDENT OR UPRIGHT) TO A WALL OR
HIGH PARTITION MUST NOT EXCEED 2.25m. SYSTEM PRESSURE
GAUGE AT HIGHEST
7. MAXIMUM DISTANCE OF A SPRINKLER UNIT FROM THE SLAB SHOULD FLOOR LEVEL (FOR
UPFEED SYSTEM)
BE 300mm.
BLIND FLANGE
8. ALL SPRINKLER HEADS, PENDENT (CONCEALED, UPRIGHT AND CONNECTION

SIDEWALL) SHALL BE RATED 57°C (135°F) TO 74°C (165°F) MACHINE FLOOR CONTROL
50Ø FCV DRAIN LINE VALVE WITH SUPER-
ROOM, KITCHEN AREA SHALL BE RATED 212°F. K-FACTOR = 5.6 (12" NPT) STACKED TAPPED TO
THE NEAREST DRAIN
VISORY SWITCH ELECTRICAL JUNCTION
BOX (BY OTHERS)
SYSTEM PRESSURE
100Ø AFSS RISER GAUGE

LEGENDS: PIPE SLEEVE


PROVIDED WITH NON-
WATER FLOW
SWITCH
ELECTRICAL CONDUIT
TO FIRE ALARM CONTROL
PANEL (BY OTHERS)
COMBUSTIBLE MAT'L
MINERAL WOOL OR
UPRIGHT SPRINKLER HEAD APPROVED EQUAL

(VARIES)
300 MIN.
PENDENT SPRINKLER HEAD
100x75Ø TEE REDUCER
(WELDED TYPE)

SIDEWALL SPRINKLER HEAD

300(MIN.)
FEEDMAIN
CONNECTION LINE
CROSSMAIN/FEEDMAIN/BRANCHLINE
25mmØ INSPECTOR
TEST VALVE

PIPE HANGER 25mmØ 25mmØ BALL VALVE


SLIP-ON FLANGE SIGHT GLASS (DRAIN VALVE)
EVERY 6m LENGTH

CHECK VALVE

GATE VALVE / OS & Y GATE VALVE

STANDPIPE RISER
100
RISER NIPPLE 65Ømm FIRE HOSE VALVE
WITH CAP AND CHAIN

PIPE BRACKET/SUPPORT
100x65Ø TEE REDUCER
(WELDED TYPE)

FIRE HOSE VALVE

900 FROM FIN. FLR. LVL.


FIRE HOSE CABINET

ALARM CHECK VALVE 100Ø AFSS RISER

PIPE SLEEVES PIPE SLEEVE

PORTABLE FIRE EXTINGUISHER

INSPECTOR TEST CONNECTION FIRE RATED SEALANT FILLED WITH NON-


COMBUSTIBLE MATERIAL

PRESSURE RELIEVE VALVE

FIRE DEPARTMENT INLET CONNECTION

PROJECT TITLE: SHEET CONTENTS: REVISIONS DATE DESIGNED: SHEET NUMBER:

BODEGA DIPNAY AGA MOS ECO DEVELOPMENT


CHECKED: FP-1
OWNER
AS SHOWN
PROJ. CODE
CADD:
LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN
ALARM MOTOR
1 2 3 4 5
BACK TO TANK GONG

100Ø (BURIED)

100Ø

65Ø

A
25Ø 25Ø 25Ø 25Ø

25Ø

25Ø

25Ø

25Ø
2-10LBS 2-10LBS
PFE PFE

B 40Ømmx100mm LONG
50Ø
32Ø RN
25Ø

32Ø RN 32Ø RN
50Ø
32Ø RN 32Ø RN
40Ømmx100mm LONG
NIPPLE & CAPPED END
32Ø RN
NIPPLE & CAPPED END TO ABOVE
MEZZANINE

32Ø
100Ø STANDPIPE RISER
50Ø DRAIN LINE RISER
75Ø MV (SUPERVISORY SWITCH)
75Ø FLOW SWITCH
25Ø INSPECTOR TEST ASSEMBLY

75Ø
65Ø FIRE HOSE VALVE

FHC-S

25Ø
C

40Ø
65Ø
40Ø RN

25Ø
25Ø

PROJECT TITLE: SHEET CONTENTS: REVISIONS DATE DESIGNED: SHEET NUMBER:

BODEGA DIPNAY AGA MOS ECO DEVELOPMENT


CHECKED: FP-2
OWNER
AS SHOWN
PROJ. CODE
CADD:
LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN
1 2 3 4 5

A 100Ø STANDPIPE RISER


50Ø DRAIN LINE RISER
75Ø MV (SUPERVISORY SWITCH)
75Ø FLOW SWITCH 25Ø
25Ø INSPECTOR TEST ASSEMBLY
65Ø FIRE HOSE VALVE
25Ø 25Ø

25Ø

25Ø
2-20LBS 2-20LBS
CO2 PFE CO2 PFE

25Ø
25Ø
FHC-S
25Ø
TO ABOVE

32Ø
GRND FLR.

25Ø

25Ø

25Ø

40Ø
32Ø

32Ø
40Ø
75Ø
C 40Ømmx100mm LONG
50Ø 65Ø 65Ø 50Ø
25Ø

40Ømmx100mm LONG
NIPPLE & CAPPED END 40Ø RN NIPPLE & CAPPED END
32Ø RN 32Ø RN 40Ø RN 32Ø RN 40Ø RN 32Ø RN 40Ø RN

25Ø

25Ø
25Ø

25Ø

25Ø
25Ø
100ØFL
25Ø
FROM GRND FLR.
100ØFL H/L 100ØFL
HIGH LEVEL

PROJECT TITLE: SHEET CONTENTS: REVISIONS DATE DESIGNED: SHEET NUMBER:

BODEGA DIPNAY AGA MOS ECO DEVELOPMENT


CHECKED: FP-3
OWNER
AS SHOWN
PROJ. CODE
CADD:
LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN
1 2 3 4 5

100Ø STANDPIPE RISER


50Ø DRAIN LINE RISER
75Ø MV (SUPERVISORY SWITCH)
75Ø FLOW SWITCH
25Ø INSPECTOR TEST ASSEMBLY
65Ø FIRE HOSE VALVE

25Ø 25Ø

B 25Ø

25Ø

25Ø

32Ø

25Ø

25Ø
32Ø

75Ø
40Ø
32Ø

32Ø

32Ø

32Ø
40Ø
FHC-S
C

40Ø
50Ø 65Ø 65Ø 50Ø
40Ømmx100mm LONG 40Ømmx100mm LONG
NIPPLE & CAPPED END 40Ø RN NIPPLE & CAPPED END
40Ø RN 40Ø RN 40Ø RN 32Ø RN 40Ø RN 40Ø RN 40Ø RN

25Ø

25Ø

25Ø

25Ø

25Ø

25Ø

25Ø
100ØFL
T/B

D
100ØFL (BURIED)

65Øx65Øx150Ø AFSS
100ØFL-T/B FIRE DEPARTMENT
INLET CONNECTION

PROJECT TITLE: SHEET CONTENTS: REVISIONS DATE DESIGNED: SHEET NUMBER:

BODEGA DIPNAY AGA MOS ECO DEVELOPMENT


CHECKED: FP-4
OWNER
AS SHOWN
PROJ. CODE
CADD:
LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN
1 2 3 4 5

100Ø STANDPIPE RISER


50Ø DRAIN LINE RISER
75Ø MV (SUPERVISORY SWITCH)
75Ø FLOW SWITCH
25Ø INSPECTOR TEST ASSEMBLY
65Ø FIRE HOSE VALVE

A 40Ømmx100mm LONG
NIPPLE & CAPPED END
40Ømmx100mm LONG
NIPPLE & CAPPED END

25Ø

25Ø

25Ø

25Ø

25Ø
25Ø
25Ø 25Ø

50Ø
50Ø
32Ø RN
25Ø

25Ø
25Ø 25Ø 25Ø

B 25Ø RN
25Ø

32Ø RN
32Ø RN
25Ø

FHC-S
25Ø

50Ø
50Ø

75Ø
C 32Ø RN

40Ø
25Ø 65Ø 65Ø
40Ømmx100mm LONG
32Ø RN 25Ø RN 32Ø RN NIPPLE & CAPPED END
40Ømmx100mm LONG 40Ø RN
NIPPLE & CAPPED END

25Ø
25Ø
25Ø

25Ø

PROJECT TITLE: SHEET CONTENTS: REVISIONS DATE DESIGNED: SHEET NUMBER:

BODEGA DIPNAY AGA MOS ECO DEVELOPMENT


CHECKED: FP-5
OWNER
AS SHOWN
PROJ. CODE
CADD:
LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN
1 2 3 4 5

100Ø STANDPIPE RISER


50Ø DRAIN LINE RISER
75Ø MV (SUPERVISORY SWITCH)
75Ø FLOW SWITCH
25Ø INSPECTOR TEST ASSEMBLY
65Ø FIRE HOSE VALVE

A 40Ømmx100mm LONG
NIPPLE & CAPPED END
40Ømmx100mm LONG
NIPPLE & CAPPED END

25Ø

25Ø
25Ø 25Ø
32Ø RN 32Ø RN

50Ø
50Ø
25Ø RN 25Ø RN

B 25Ø RN
25Ø

25Ø 25Ø
32Ø RN

FHC-S
32Ø RN

50Ø
50Ø

75Ø
C 40Ømmx100mm LONG
50Ø 65Ø 65Ø
40Ø RN

50Ø
40Ømmx100mm LONG
NIPPLE & CAPPED END 32Ø RN 32Ø RN 32Ø RN 32Ø RN NIPPLE & CAPPED END

25Ø 25Ø 25Ø


32Ø
25Ø

25Ø

25Ø
25Ø
25Ø

25Ø
D

PROJECT TITLE: SHEET CONTENTS: REVISIONS DATE DESIGNED: SHEET NUMBER:

BODEGA DIPNAY AGA MOS ECO DEVELOPMENT


CHECKED: FP-6
OWNER
AS SHOWN
PROJ. CODE
CADD:
LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN
A B C D

75Ø FCV, 75Ø WFS


25Ø ITCS, 25Ø DV

PROJECT TITLE:
65Ø FHV FHC

100ØAFSS RISER
50Ø DRAIN LINE

75Ø FCV, 75Ø WFS 65Ø FHV


25Ø ITCS, 25Ø DV

FHC

100ØAFSS RISER
50Ø DRAIN LINE

LOCATION: BRGY SAN FERNANDO, EL NIDO, PALAWAN


75Ø FCV, 75Ø WFS
25Ø ITCS, 25Ø DV
65Ø FHV
65Øx65Øx150Ø AFSS
FIRE DEPARTMENT
INLET CONNECTION

FHC

100Ø FL (BURIED)

BODEGA DIPNAY
75Ø FCV, 75Ø WFS
25Ø ITCS, 25Ø DV

FHC
65Ø FHV
100ØAFSS RISER
50Ø DRAIN LINE

75Ø FCV, 75Ø WFS


25Ø ITCS, 25Ø DV

65Ø FHV FHC

100ØAFSS RISER
50Ø DRAIN LINE

100Ø FL (BURIED)

OWNER

ADRESS: BRGY. CORONG CORONG, EL NIDO, PALAWAN


AGA MOS ECO DEVELOPMENT

FIRE PUMP SCHEDULE


PUMP EQUIPMENT EECTRICAL DATA
LOCATION QUANTITY CAPACITY GPM MOTOR HP CONTROLLER REMARKS
DESIGNATION NAME (VOLT / PHASE / HERTZ)
SHEET CONTENTS:

AS SHOWN

PUMP ROOM
FP-1 FIRE PUMP BASEMENT 1-SET 400 ( 1,514 LPM) 25 400 V / 3PH / 60 Hz

JOCKEY PUMP ROOM


1-SET 20 ( 75 LPM) 3 230 V / 3PH / 60 Hz
REVISIONS

JP-1 PUMP BASEMENT


DATE

CADD:
CHECKED:
DESIGNED:

FP-7
PROJ. CODE
SHEET NUMBER: