Problem Solving 8D Report
8D Report No. : 20180609001                       Report Type:       Customer     √       Supplier               Internal                Other
                                                            Problem Solving Summary
Nature of Complaint :                                                           Complaint/ Reference No.                    Complaint Due Date :
                           Component labeling mismatch                                                      By Mail                      04-09-2018
 Customer / Supplier Name
                        M/s FIBCOM INDIA LIMITED                                Product Name : Battery Charger
Location (Where Occurred)                                                       Part Name : DCPS Power Plant 48vdc/45Amp
          Plot No. B 215, Phase II, Noida, Gautambudh Nagar, UP
                                                                                Part No. : FGS75NA3002
1. Problem Solving Team Leader & Team Members
                        Name                                Deptt.                       Phone No.                            Email ID
Suresh Muthu                                                 QA                         9655179485                    suresh.muthu@eltek.com
Santosh Kumar                                                QA                         9911668586                    santosh.kumar@eltek.com
Chanchal Kumar                                               QA                         9582080062                    chanchal.kumar@eltek.com
Narender Kumar                                           Production                     9717530315                    narender.kumar@eltek.com
2. Problem Description
In Battery charger, Battery and Load MCB Isolation MCB labeling sticker interchange, not as per BOM                         Qty.
                                                                                                                               18nos
nomiclature
3. Interim Containment Actions
1. Arrange a meeting to all the concern to describe the customer issue.                                            Implementation Date
2. Next day of meeting one quality person visit to FIBCOM, to verify physically and rectify accordingly but due Immediate
to most of system deliver to site thats why they refuse to open packing and do the rework thats why
replacement sticker handover to Fibcom team so that they can pest as per convenient on site
4. Root Cause Analysis
                WrongWrong Sticker                                                                          OK Sticker
1. Sticker printing person not verify the matter after sticker printing as per BOM nomiclature.
                           2. During finishing of system, finishing person also not verify all as per BOM nomiclature.
3. Final Quality person also laps the process before packing not inspects the material throughly.
Conclusion: The process is not well self-checked casual approach taken by both Quality & Production team.
  Root Cause: Eltek has confirmed that the cause for the problem is a process issue and its a silly mistake Load and battery matter
interchange and Actions
5. Corrective    no one can observed during entire process.
1. Adequate training is to be provided to all the concerned testing, labeling and quality operators to minimize /   Implementation Date
eliminate this problem.                                                                                           Immediate
2. 100% visual inspection started by OQC person before handover to packing
6. Verification of Corrective Actions
                                                                                                                              Implementation Date
The failure caused was due to human error we have Increased our monitoring process                                          Continious
7. Preventive Actions
                                                                                                                              Implementation Date
As per check point monitoring process increased                                                                             Continious
8. Closure Statement
                           Written By : Santosh Kumar                                                  Approved By : Suresh Muthu
                                Date : 14.09.2018                                                           Date : 14.09.2018