RESEARCH: SUMMARY SERIES
The Project Benefits of Building
Information Modelling (BIM)
D. Bryde, M. Broquetas, J. Marc Volm, International Journal of Project Management, 31.7 (2013), p.971-980
KEYWORDS Article Highlight:
Business
Information This article provides an outlook on the potential use and advantages of BIM in the
Modelling (BIM) construction sector for project managers. It has been taken from the International
Journal of Project Management.
3D BIM
5D BIM
What does the paper cover?
All UK Government contracts will require the use of 3D BIM. Project professionals will not
be able to avoid BIM when working public sector projects.
BIM is software for modelling and information input but also incorporates project
management tools and processes. BIM can therefore be used in construction projects by
project professionals, for example to improve stakeholder collaboration.
BIM potentially enables:
1. Better communication and collaboration: In complex inter-organisational, BIM
could lead to an integrated database opposed to the sharing of documents.
2. Organise the project schedule and budget: BIM allows the updating of schedule
and budget when any project design change occurs.
3. Budget control: 5D offers the project manager more tools to monitor and keep tight
reins on costs.
4. Rapid analysis of different scenarios and feedback to owner: BIM allows the
project manager to show how design decisions impact cost and schedule.
5. Lean management: BIM has been linked to the development of lean approaches, as
the enhanced collaboration and information sharing can contribute to reducing non-
value-adding waste.
BIM’s uncertain effects:
BIM may change the roles of key parties including the project manager in ways which
are uncertain.
The fragmented nature of the construction industry means that knowledge gained by a
team in one venture may not be retained for the next project.
Methodology:
This paper reports analysis of secondary data from 35 case studies relating to the use of BIM that
have been documented in academic literature or otherwise placed in the public domain.
The study aimed to explore whether the use of BIM has resulted in benefits to construction
projects by assigning quantitative values to a number of key success criterion over a 2 year period.
Research findings:
Cost: BIM had a positive effect on reducing costs in 60% of the studies and the minority
of negative effects were of a smaller magnitude than the large positive gains that could be
made.
Time: BIM had a positive effect in 34% of cases on time.
Communication: While not all projects reported a change in communication success,
those that did found that it had a positive effect.
Quality: The effect on quality was positive thanks to more accurate designs and the
incorporation of sustainability features which may become a key driver of demand.
However, this is slightly muted owing to the capacity of the software.
Negative effects: These were observed particularly with regard to software and the
difficulty of interoperability. The software was unable to deal with large amounts of data in
large projects. This may be rectified as the BIM market matures.
Additional costs: There was often an initial one-off additional cost in converting systems to
the BIM platform.
Conclusions:
Research suggests that BIM provides an effective tool in improving certain aspects
of the delivery of projects particularly cost, time and communications.
Many of the negatives, particularly relating to software, can be corrected given time,
expertise and investment.
People may not agree common platforms and collaboration to share BIM models.
This may cause difficulty because interdependency is needed.
BIM allows a wider definition of success than the Iron Triangle permits alone.
There is a need for a rigorous cost/benefit analysis of BIM in order to convince
practitioners.
Significance of the research:
BIM has been heralded as being able to reduce both transaction costs and error. In this study
most of these benefits have been realised. In time, however, yet more may be seen with
negative technical issues being ironed out.
This article promotes confidence in BIM before the technology has been fully integrated,
highlighting an opportunity for enterprising project professionals in construction.
Comments from author:
As project management practitioner’s awareness and knowledge of the concepts of BIM
increases over time, attention is now also focusing on how BIM can be effectively utilised
on “real” projects.
This requires an appreciation that BIM has a key role to play in both
the promotion and advancement of collaborative and integrated team working, through
such approaches as Integrated Project Delivery. It is by looking at the wider picture, and
understanding what BIM means for project design and delivery, that the project benefits of
BIM will be realised.
Professor David Bryde
Complete article
The original version of this article was published in the International Journal of Project
Management, Vol number 31.7.D. Bryde, M. Broquetas, J. Marc Volm, (2013), p.
971-980. It can can be accessed via: sciencedirect.com/science/article/pii/
S0263786312001779.
For further information please visit apm.org.uk/research. Please contact us with your
views and suggestions at research@apm.org.uk.
RESEARCH
Association for Project Management
Ibis House, Regent Park Tel (UK) 0845 458 1944
Summerleys Road, Tel (Int) +44 1844 271 640
Princes Risborough Email research@apm.org.uk
Buckinghamshire, Web apm.org.uk
HP27 9LE
Glossary:
Business Information Modelling (BIM): a set of policies, processes and technologies generating
a methodology to manage the essential building design and
project data in digital format throughout a building’s life-cycle.
3D BIM: all project and asset information, data and documentation must be in
electronic form.
5D BIM: Includes all of the above plus scheduling information and information
for estimating the project from the model.
Copyright Elsevier Ltd, APM and IPMA
and is reproduced with permission.
Association for Project Management is incorporated
by Royal Charter RC000890 and a registered charity
No: 1171112. Principal office as shown above.