Job Safety Analysis
JSA No: EF-1931-HSE-
Activity: FIRE PROOFING WORKS
016 Rev. 00
GC 32 – NEW GATHERING CENTRE FOR SEK EF 1931 / JI
Project Title: Project No: JI - 2035
2035
Site/Facility: Work Area: AREA-2, ISBL Permit No:
KOC Emergency Contact Number: 160
Date:
972 99 100 (Mobile)
Hard Hat, Safety Shoes, Safety Goggles, Hand Gloves, Covera
Personal Protective Equipment’s: disposable coverall, ear plugs, respiratory protections, full body harnes
etc.
RESIDUA
RISK RISK
JOB STEPS POTENTIAL HAZARDS MITIGATION MEASURES
RATING RATING
Pre - work Permit to Work procedure
(KOC.SA.004) shall be complied.
Mobile Equipment procedure
Non-compliance of KOC Mediu (KOC.SA.013) shall be complied.
Low
HSEMS Procedure m Working at Height Procedure
(koc.sa.031) shall be complied.
Waste Handling Procedure
(KOC.EV.008) shall be complied.
Poor Task Planning Medium Physically check all equipment tools Low
Defective tools by an authorized person and ensure
Unauthorized personnel color coding.
Ensure pre-task briefing before fire
proofing activity about the safe
procedure and prior inspection of
equipment to be carried out.
All equipment to have KOC CC and
the same shall be displayed with
equipment.
Conduct TBT and ensure that PPE
appropriate to the work to be
undertaken is correctly identified and
used.
Ensure the equipment and tool to be
used are free from defect.
Ensures all hoses and connections
are properly crimped and jubilee clip
shall not be used.
Ensure all emergency exits at work
location are not blocked.
Personnel trained as per training
matrix.
Ensure the area is fully barricaded
and adequate signage’s posted around
Page 1 of 5 JSA No. EF 1931-HSE-016; Rev-00
the working area.
First Aid kit and trained first aider shall
always be available at the work
location.
Ensure gas testing is carried out to
confirm free from flammable / toxic
vapor.
Only authorized personnel shall be
allowed near the work area.
Ensure all personnel have completed
safety awareness trainings as per
Untrained Personnel and training matrix.
Medium Low
Poor supervision Ensure supervisor on site and workers
involved in fire proofing are trained &
competent to carry out the work safely.
Adequate number of lighting plants
shall be placed.
Reflector coveralls / jackets shall be
Working at night Medium Low
provided to the crew members.
White glass shall be provided to all
crew members.
Ensure that the Emergency Numbers
are posted at site, and personnel are
informed in during the TBT.
Lack of ERP All incidents and emergencies to be
Lack of adequate Medium communicated to KOC Emergency Low
communication number – 160.
All incidents and emergencies to be
communicated to PIL Emergency
number – 900 30 980.
Ensure barricading of area with
authorized personnel entry.
Tool box talk to discuss pinch points
and drop objects.
Only competent and authorized
Trip hazard personnel to set up the equipment.
Setting of
Pinch point Medium Equipment KOC CC to be displayed Low
Equipment’s
Drop objects on air compressors, Generator sets,
hopper, etc.
Ensure earthing connections are
properly fixed.
Ensure proper hoisting of equipment
at height.
Proper planning of work and provision Low
Medium of fall protection materials including
Working at Fall of person working at lanyards, snap hooks, full body safety
Height height harness has been provided to all
Fall of object from person workers involved.
working Ensure that a personal fall arrest
system is in place and available to all
Trip/Slip hazards workers involved, including but not
limited to anchorage connector, full
Page 2 of 5 JSA No. EF 1931-HSE-016; Rev-00
body safety harness, lanyard etc.
Supervisor to ensure that workers
assigned for the work are well trained
and highly competent in this type of
work, 100 % tie-off to maintained.
Conduct a toolbox talk briefing
workers on potential hazards and
precautionary measures required for
working at height has been made clear
to all workers to be involved in the
work.
All tools and materials shall be placed
in a safe container and properly
secured throughout the duration of
work at height.
Hand tools used during the work must
have a lanyard attached.
Ensure the work area to be free from
all slip/trip hazard. and proper access is
made available for all workers at
height.
Ensure that all precautionary
measures required for the safe
execution of work at height has been
taken prior to start of work.
Fixing of Ensure sharp edges of the object are
Sharp edge
Wire Mesh protected by means of softener.
and Fire Pinch Point Ensure proper whiplash arrestor
Proofing provided to pressurized hose.
Caught by, striking,
crushing Ensure wire mesh properly fixed
before starting the fire proofing.
Stored Energy Ensure chemical mixing are perform
Irritation as per manufacturer recommendation.
Ensure all involve personnel adhere to
Fire approved and mandatory PPE’s
requirements while performing fire
proofing works.
Ensure equipment and vessel is
temporarily grounded to prevent static
electricity hazards.
Ensure first aid box and trained first
aider shall be available.
Ensure enough number fire
extinguisher available to the work
location.
Eye wash station shall be positioned
at work location.
Respiratory protection shall be readily
available for issuance to workers as
needed as per the SDS.
Ensure access/egress are always free
of obstruction.
Page 3 of 5 JSA No. EF 1931-HSE-016; Rev-00
Ensure job perform under the present
of competent supervisor or WSS.
Obtain SDS for the paint as well as
thinner.
Wear the required PPE (Long Sleeve
Coverall, Apron, Face Shield & suitable
respiratory protection etc.).
Ensure there is no naked flame or
spark generating equipment in the area
where spray painting is to be done.
Keep the suitable fire extinguishers in
Exposure to Harmful ready condition.
Vapor Do not eat or smoke wearing a paint-
Fire & Explosion Medium soaked coverall / gloves Low
Contaminated Clothing Clean / dispose safely the paint-
Un-attended Equipment / soaked coverall / gloves.
Painting Tool Wash properly before consuming any
Unsafe Storage of Paint food.
& Thinner Do not leave unattended the Spray
Paint Gun & Hose with on condition.
Isolate the equipment from all source of
energy when not in use.
Store the paint & thinners in safe &
designated location away from source
of ignition.
Slip/Trip/Fall Ensure the workplace is maintained
House
Personnel injury due to Low clear of debris, waste at all stages of Low
Keeping
poor house keeping job.
Ensure workers are training for heat
stroke and heat extortion
Ensure workers are medically fit for
the job
Additional Ensure adequate resting and welfare
facility provided at the site
Hazards Extreme weather
Ensure trained first aider with
(Other than condition Medium Low
adequate filled content of first aid kit is
indicated Heat Stroke/Extortion
available at site.
above)
Ensure sufficient/ enough cool
drinking water available at site.
Ensure toilet facility available at site in
compliance with KOC.HE.025
procedure.
Permit No: Work Area:
Name: Controlling Team:
JSA Done by
Permit Applicant
KOC. No. Signature:
Name: Controlling Team:
JSA Reviewed
Page 4 of 5 JSA No. EF 1931-HSE-016; Rev-00
by Permit Issuer
KOC. No. Signature:
Page 5 of 5 JSA No. EF 1931-HSE-016; Rev-00