Thyssenkrupp Industrial Solutions (India) Job Safety Analysis 1 4

The document provides a job safety analysis for excavation and soil loading/backfilling work. It identifies potential hazards such as damage to underground utilities, electric shock from overhead cables, injury from moving machinery, dust inhalation, and falls. Control measures are outlined to address each hazard, including checking for utilities, using signal men during excavation, water sprinkling to control dust, barricading excavation areas, and providing certified ladders for access. The analysis was carried out with input from the job implementing group to identify hazards and establish safety controls for the work.

Uploaded by

Nitesh Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
379 views6 pages

Thyssenkrupp Industrial Solutions (India) Job Safety Analysis 1 4

The document provides a job safety analysis for excavation and soil loading/backfilling work. It identifies potential hazards such as damage to underground utilities, electric shock from overhead cables, injury from moving machinery, dust inhalation, and falls. Control measures are outlined to address each hazard, including checking for utilities, using signal men during excavation, water sprinkling to control dust, barricading excavation areas, and providing certified ladders for access. The analysis was carried out with input from the job implementing group to identify hazards and establish safety controls for the work.

Uploaded by

Nitesh Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

09-2021

Process
Construction HSE Management
QM code
thyssenkrupp JOB SAFETY ANALYSIS PIN LP-CHM-022 F01
Industrial Solutions (India)
Page 1 of 4

Job area is considered: Unit area:- Ammonia Storage tank Establishment/Project: JSA No.:
Project No:

Contractor: Hill India tkIS India: Client:


1. 1. 1.
Person participating in 2. 2. 2.
Job Safety Analysis. 3. 3. 3.
4. 4. 4.
5. 5. 5.

JOB DESCRIPTION: Excavation & soil loading/backfilling

Requirement of adding Personal Protection Requirement of adding special equipment or tool


Requirement of Working Permit Equipment.
(Check the relevant box) (Additional list)
Restricted space 1. Helmet 6. Red & Green Flag 1. Excavator 5.
Heating job 2. Shoes 7. Signal light 2. Roller 6.
Digging 3. Safety Goggles 8. Megaphone 3. Earth compacter 7.
Isolation / Energization 4. Hand Gloves 4. Dozer 8.
Other job  5. Whistle

JSA considering procedure Yes No Comment



Is JSA establishment participated by job implementing group?

tkIS India Form: Job Safety Analysis


09-2021
Process
Construction HSE Management
QM code
thyssenkrupp JOB SAFETY ANALYSIS PIN LP-CHM-022 F01
Industrial Solutions (India)
Page 2 of 4


Is JSA considered by Job implementing group before carrying out the job?

Is JSA sheet used/ consulted in work implementation?

Is the job carried out step by step?

Do you propose to improve JSA sheet (give in detail)

Is detail of any trouble showing

ACTIVITIES HAZARD/ DANGER CONTROL MEASURE ACTION

Separate the job into the Describe all hazards identified for each task based Describe fully all equipment, facility, and/or procedure controls
main tasks and record them on observations and experience. applicable for each hazard.
in sequence.

 Pre-work safety training


 Conduct TBT before start the work

tkIS India Form: Job Safety Analysis


09-2021
Process
Construction HSE Management
QM code
thyssenkrupp JOB SAFETY ANALYSIS PIN LP-CHM-022 F01
Industrial Solutions (India)
Page 3 of 4

 PTW will be taken prior to job.


 Damage underground utilities Checking for underground utilities before starting the work,
Taking proper precautions before starting of work, the work must be carried out in
presence of supervisor.
Undergound utilities

 If the height or voltage of the overhead electric lines cannot


 Electric shock by overhead cable be accurately estimated ask your Electricity Supply
Authority for advice.

 Injury to personal working near by excavator.


 Moving machinery near the edge of the excavation  No person will allowed to enter on excavation area while excavation is in
may cause a collapse. progress, signal man must be aware.

 Inhalation of dust  Water sprinkling at regular intervals to avoid dust accumulation


and use Nose mask.

Dust pollution while soil


backfilling

tkIS India Form: Job Safety Analysis


09-2021
Process
Construction HSE Management
QM code
thyssenkrupp JOB SAFETY ANALYSIS PIN LP-CHM-022 F01
Industrial Solutions (India)
Page 4 of 4

 Fall of person inside the pit Put the barricade around the pit
Person working too close to  .
the edge of excavation  Make proper arrangements to barricade the area being
excavated.

 All open excavation are to be provided with hard barricade


 Excavated soil to be kept away at least 4mtr away from
excavation
Access of workers into  Fall of worker into excavation
 Provide warning signage near excavation.
excavation area  Fall of material into excavation
 Use certified and inspected ladder as access into
excavations.
Ladder should be extend at least 1.5mtr at landing platform.

 Shoring / slope should maintain as per soil condition placing the


 Collapse of soil equipment away (min1.5m) from the edge of excavation, excavated
soil should kept 1.5mtr distance from the edge of excavated pit.

 Avoid roller rolling to the edges.


 Maintain at least 1.5m away from the edges.
 Toppling of roller.
 Experienced person should drive.
 Accident due to failure moving parts
Moving parts must have proper cover/Guard

Compaction with roller


 Injury due to slip/trip and fall  Proper housekeeping will be maintained

Housekeeping

tkIS India Form: Job Safety Analysis


09-2021
Process
Construction HSE Management
QM code
thyssenkrupp JOB SAFETY ANALYSIS PIN LP-CHM-022 F01
Industrial Solutions (India)
Page 5 of 4

 Asphyxiation due to lack of oxygen


 Inhalation of toxic materials
 Fire
 Excavated Soil or Equipment falling workers.
 Moving machinery near the edge of the
excavation can cause a collapse.

 Falling, Slips, Trips
 The accidental severing of underground
utility lines/power lines.
 Material handling Hazards.

Prepared by Reviewed by Approved by


(Team -Area supervisor/Engineer/Safety (Area Manager) (Area owner/Area authority)
officer)
Name: Name: Name:

Designation: Designation: Designation:


Signature: Signature: Signature:
Date: Date: Date:

tkIS India Form: Job Safety Analysis


09-2021
Process
Construction HSE Management
QM code
thyssenkrupp JOB SAFETY ANALYSIS PIN LP-CHM-022 F01
Industrial Solutions (India)
Page 6 of 4

tkIS India Form: Job Safety Analysis