Ilaya Flood Control - PERT

This document provides a schedule for the construction of the Ilaya Flood Control Structure project in Romblon, Philippines. It includes a timeline of key activities with their estimated start and end dates shown on a PERT/CPM chart. Some of the main activities include excavation works, installation of steel sheet piles, construction of the rubble concrete structure, and placement of embankment and riprap materials. The schedule shows the critical path and estimated durations for each activity ranging from 30 to 405 days.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
1K views1 page

Ilaya Flood Control - PERT

This document provides a schedule for the construction of the Ilaya Flood Control Structure project in Romblon, Philippines. It includes a timeline of key activities with their estimated start and end dates shown on a PERT/CPM chart. Some of the main activities include excavation works, installation of steel sheet piles, construction of the rubble concrete structure, and placement of embankment and riprap materials. The schedule shows the critical path and estimated durations for each activity ranging from 30 to 405 days.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LEGACY CONSTRUCTION CORPORATION /

EMQ DESIGN & CONSTRUCTION JOINT VENTURE


A
LEGEND 5 5

NAME OF PROJECT : CONSTRUCTION OF ILAYA FLOOD CONTROL STRUCTURE, STA. MARIA, ROMBLON EVENT A EVENT
EARLY START OF E-H 5 EARLY FINISH OF B-E

LOCATION : Tablas Island, Romblon LATE START OF E-H 5 LATE FINISH OF B-E

ACTIVITY 1717(2)a1 ACTIVITY

DURATION 120 DURATION

DUMMY DUMMY

CRITICAL ACTIVITY CRITICAL ACTIVITY

PERT / CPM
100
A.1.1(6)-Provision of Combined Field Office, Laboratory and Living Quartes building for the engineers (Rental Basis), A.1.1(11) - Provision of Furnitures/Fixtures, Equipment and Appliances
for the Field Office for the Engineer, B.7(1) - Occupational Safety Health Program, B.5 - Project Billboard/Signboard
90
% 1704(1)b - Haul,
Spread & Compact
F M Embankment
80 30 119 16 200 276 40
A 1701(1) - Unsuitable

C E Excavation
1714(2) - Install

C
70 22 37 135
N Matresses
1702(1)a - Structure 180 221 95
O Excavation Cont. 405(1)a2 -
Install forms &
60
M Pour Conc. on
Pile Cap & SP
Cont. 1713(1) - Install Forms, Cont. 1710(2)a - Excav. for
Foundation & Handlay 4
Q
Pour Concrete & Place Stones for
C L P
1717(2)a1 - Hauling, Falsework and
P A B D Driving of Steel Sheet Piles K Rubble Concrete Struc. O Stones for Grouted Riprap

50 0 0 5 5 5 4 9 9 6 15 15 120 135 135 143 143 95 78 316 316 320 320


404(1)a - Cut, bend,

238 238
8
L
fab. & Install RSB

B.9 - Demobilization
I 405(1)a2 - Install
forms & Pour
40
S Conc. on Pile
Cap & SP
H G H 25 1713(1) - Install Forms, 1710(2)a - Excav. for
85 107 88 110 Pour Concrete & Place
M 30 3 Stones for Rubble
Foundation & Handlay
Stones for Grouted
Concrete Struc. Riprap
E I 20
24
N 20 120 123

T J
10 200 214

0
64 128 192 256 320
NUMBER OF DAYS

PROJECT TITLE/LOCATION: PREPARED BY: CHECKED BY: RECOMMENDING APPROVAL: APPROVED:


CONSTRUCTION OF ILAYA FLOOD CONTROL
STRUCTURE, STA. MARIA, ROMBLON ALEX H. ABELIDO ALAN T. SALVADOR ROGER F. DAVID NAPOLEON S. FAMADICO
Tablas Island, Romblon Authorized Managing Officer Chief, Construction Section Assistant District Engineer District Engineer