BIM Presentation 1
BIM Presentation 1
11 January 2013
1 | WWW.BENTLEY.COM
Introduction
• Introduction
• HMG BIM Strategy
• Progress Update
• Early Adopters
• Lean & Build Off Site
2 | WWW.BENTLEY.COM
What is BIM & why is the Government
seeking its adoption?
3 | WWW.BENTLEY.COM
Hypothesis
4 | WWW.BENTLEY.COM
Hypothesis
1. Valuable
Government as a client can 2. Understandable
derive significant 3. General
4. Non Proprietary
improvements in cost, 5. Competitive
value and carbon 6. Open
performance through the 7. Verifiable
8. Compliant
use of open sharable asset 9. Funded
information” 10. Five Year Programme
5 | WWW.BENTLEY.COM
What is the Strategy?
• Pull (Government)
– Be good a buying data (as
well as assets and services)
– Do it consistently
– Leave the “How” to the PROJECT
Supply Chain
PUSH PULL
• Push (Supply Chain)
How do we ensure we get the
6 | WWW.BENTLEY.COM
· Vision & Value
· SME/Localism
· Media & Communications
· Project Management
· Stakeholder Management
· Plan of Works
· Level of Definition (Detail)
· COBie-UK-2012
· PAS 1192:2/3
· Data Management
Training Delivery
& &
Academia Productivity
· Academic Forum
· Construction Skills
· Technical Training
· APM
· Accreditation Commercial
· Supply Strategies &
Legal · Contracts
· Copyright
· IP
· PI
· Departmental Strategies
Departmental Engagement · Early Adopters
· Sustained Embedded
Change
7 | WWW.BENTLEY.COM
Delivery Standards & Documentation
B/555 Roadmap Level 0 Level1 Level 2 Level 3
Lifecycle Management
iBIM
BIMs
BSI M
SI M
BRI M
AI M
FI M
2D 3D IDM IFD
IFC
CPIC
AVANTI
CAD BS 1192:2007
ISO BIM
© 2008/10 Bew - Richards
User Guides CPIC , Avanti, BSI
Drawings , lines arcs text
. etc Models, objects, collaboration Integrated, Interoperable Data
BS 1192:2007 IFC
Standards BS1192:2 BS1192:3
CAPEX OPEX
BS 7000 : 4 IDM
8 | WWW.BENTLEY.COM
Generic & Specific Building and Civils Delivery Stages
The Project
Plan of Works
Management
Framework
Stage 1 Stage 3 Stage 4 Stage 6 Stage 7
(PFM) Stage 0 Stage 2 Stage 5
Outcome Concept Detailed Project Benefits
Strategy Feasibility Delivery
Lifecycle Definition Design Design Close Realisation
C
TfL Pre-tender
(CGAP) A B Option D E
Commence Select Award Close
CIOB RICS RIBA ICE ACE CIBSE BSRIA HVCA BRE BIFM
Develop Develop Undertake Design
Establish Manage
Business Delivery Competitive Build
Service Asset
OGC Case Strategy Procurement Test
Gateways
Gate 1 Gate 2 Gate 3 Gate 4 Gate 5
TfL
Startup Initiation Delivery Close
Spearmint
Documentation
Tender Action
Development
Construction
to Practical
Mobilisation
Completion
Des ign Br ief
Information
Production
Technical
Appraisal
Concept
Des ign
Design
RIBA
Tender
Post Practical Completion
Work stage
A B C D E F G H J K L
P re perat i on Design Pre-Construction Construction Operational Use
Gather
1 2 3 4
20
40
Maintain N N N N
% Benefit
Data and information to manage the asset base 60
Check against O&M Data
Check against Package in a safe, clean and cost effective manner.
project brief Handover
clients brief Scope check Actual Costs
Cost planning
Use Cost planning Cost Checks Data drops (N) will be provided as often as is
Tender Actual
Risk Carbon necessary, reflecting notifiable changes to the
transparency Programme
Management Checks asset either through maintenance or re- 80
Environmental Actual Carbon
Checks Performance purposing
Does the brief Has anything Has anything Did I get what I Transparency and clear availability of
meet my changed? changed? asked for? information to proactively managed cost and
Key requirements in What is being Has the design Data to carbon performance of the asset.
Client terms of priced by the been over value effectively
Benefits function, cost Easy presentation of HMG reporting systems for
main contractor? engineered? manage my asset
and carbon? future planning and performance management
Key
Operatons
10 | WWW.BENTLEY.COM
Capital Delivery Operational Processing
CoST
Dependency Analyitics
Summary Strategic HMT Summary Strategic HMT
E-PIMS
E-PIMS Planning
Portfolio Lease Mgt GPU Portfolio Budgets Depts
Oasis
Asset SmartMeters Depts
Asset / Depts
Asset Portfolio
COBie
Data KNX
IFC Full Asset & Sensors
Atomic Operations Transactions Operations
Systems and
Detail Capture
Data
Level of Detail Description Consumer Level of Detail Description Consumer
Types
1 2 IP Occ
3 4 5 N N N
Data Data
Portfolio
Mgt
PPM
11 | WWW.BENTLEY.COM
Supply Chain Management
PUSH SIDE – SUPPLY CHAIN PULL SIDE - CLIENT
E
1
LD 2
ME
E MC 3
ME
4
5
E MAC1
Portfolio
N Mgt
P
PPM
OPS
N
MAC2
12 | WWW.BENTLEY.COM
Process Example
13 | WWW.BENTLEY.COM
HA Detail
14 | WWW.BENTLEY.COM
What is COBie?
15 | WWW.BENTLEY.COM
16 | WWW.BENTLEY.COM
17 | WWW.BENTLEY.COM
18 | WWW.BENTLEY.COM
19 | WWW.BENTLEY.COM
PAS 1192/2
DOCUMENT & DATA MANAGEMENT REPOSITORY
Capex Start
AUTHORIZED
Information Exchange
1, 2, 3 & 6 Tier 1 Appointments
ACCEPTED 5 Employer‟s Information
Requirements
BS 1192:2007
Client Shared Area 6
APPROVED
Verified design data shared Non-verified design
IN data
APPROVED
Specialist design teams, WORK PROGRESS
WORK IN PROGRESS
Fabricators Manufacture and with the project team: used by in-house design
Installation Ongoing design team only:
Drafts development
Development concepts
PAS 1192-2
Minor versions
SUITABILITY S0 VERSION Pnn.n
Client Shared Area SUITABILITY S0 VERSION Pnn.n
SUITABILITY S1 REVISION Pnn 1 Professional Design Task
Specialist Suppliers Task 4
Team
Team Professional Design Task
Specialist Suppliers Task Client Shared Area
Team Team Design Task
Professional
Specialist Suppliers Task Team
Team 2 AUTHORIZED
PUBLISHED
ARCHIVE
DOCUMENTATION
Specialist Appointment
CAPEX
20 | WWW.BENTLEY.COM
PAS 1192/2 – Data Checking
DOCUMENT & DATA MANAGEMENT REPOSITORY
Capex Start
AUTHORIZED
Information Exchange
1, 2, 3 & 6 Tier 1 Appointments
ACCEPTED 5 Employer‟s Information
Requirements
BS 1192:2007
Client Shared Area 6
APPROVED
Verified design data shared Non-verified design
IN data
APPROVED
Specialist design teams, WORK PROGRESS
WORK IN PROGRESS
Fabricators Manufacture and with the project team: used by in-house design
Installation Ongoing design team only:
Drafts development
Development concepts
PAS 1192-2
Minor versions
SUITABILITY S0 VERSION Pnn.n
Client Shared Area SUITABILITY S0 VERSION Pnn.n
SUITABILITY S1 REVISION Pnn 1 Professional Design Task
Specialist Suppliers Task 4
Team
Team Professional Design Task
Specialist Suppliers Task Client Shared Area
Team Team Design Task
Professional
Specialist Suppliers Task Team
Team 2 AUTHORIZED
PUBLISHED
ARCHIVE
DOCUMENTATION
Specialist Appointment
CAPEX
VERIFIED
design output for use by the for knowledge and
total project team. regulatory and legal
Production information requirements.
suitable for Tender or Repository of the project
Construction : information for non asset
SUITABILITY A REVISION Cnn 3 portfolio employers.
Supply Chain
X
Client/Employer
COBie
Native
2D PDF
Files PoW - LoD
Store in Collaboration Check
System or EDMS
Uniclass2
Report Use Data
Answer “English”
Questions
21 | WWW.BENTLEY.COM
PAS 1192/2 – Data Checking
Data issued from
supply chain
Check process
compares issued file Check PoW – LoD (x)
with LoD Overlay
No Compliance shown
as a Red/amber/Green RAG Result
Report for rework or
approval
22 | WWW.BENTLEY.COM
Progress update
23 | WWW.BENTLEY.COM
Documents & guidance
24 | WWW.BENTLEY.COM
Government Soft Landings (GSL)
28 | WWW.BENTLEY.COM
Stakeholder engagement
29 | WWW.BENTLEY.COM
Departmental engagement
• Ministry of Justice
• Highways Agency
• NHS (ProCure21+)
31 | WWW.BENTLEY.COM
Departmental engagement
32 | WWW.BENTLEY.COM
Early Adopter Programme
• Large
• Small
• New Build
• Refurbishment / Maintenance
• Handover
33 | WWW.BENTLEY.COM
· Implementation Plan
· EIR
· Tender Documents
· Scoring Process
· Framework Training
· Framework Support · Departmental Strategies
Departmental Engagement · Early Adopters
· Sustained Embedded
Change
34 | WWW.BENTLEY.COM
Process mapping
35 | WWW.BENTLEY.COM
New ways of working
• Implementation plan
• Employer‟s Information
Requirements
• Tender documents
• Scoring process
• Framework training
• Framework support
• Lessons learnt
36 | WWW.BENTLEY.COM
Projects
37 | WWW.BENTLEY.COM
HMP Cookham Wood
• New 180 room, accommodation unit for the Youth Justice Board with
associated education / regime building.
• Five available constructors expressed a desire to tender; all five have returned
tenders.
• Tender package included the native model developed by the design team, 2D
cuts and COBie drop 2a.
• Tenderers had to return the developed model, 2D cuts and COBie drop 2b.
38 | WWW.BENTLEY.COM
HMP Cookham Wood
39 | WWW.BENTLEY.COM
HMP Cookham Wood
40 | WWW.BENTLEY.COM
HMP Chelmsford
41 | WWW.BENTLEY.COM
HMP Chelmsford
42 | WWW.BENTLEY.COM
HMP Chelmsford
44 | WWW.BENTLEY.COM
Lesson Learnt
45 | WWW.BENTLEY.COM
Questions
www.bimtaskgroup.org
@BIMgcs