0% found this document useful (0 votes)
75 views7 pages

Well Intervention PEA

The document advertises a 21-day virtual training/internship on well intervention operations offered by Petroleum Engineers Association. The training will be taught by an instructor with over 13 years of experience in well intervention and completion workover operations. It will cover topics such as slickline operations, electric line operations, coiled tubing operations, completion operations, and workover operations. The training costs $150 USD plus taxes and has limited available seats.

Uploaded by

ghassen laouini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
75 views7 pages

Well Intervention PEA

The document advertises a 21-day virtual training/internship on well intervention operations offered by Petroleum Engineers Association. The training will be taught by an instructor with over 13 years of experience in well intervention and completion workover operations. It will cover topics such as slickline operations, electric line operations, coiled tubing operations, completion operations, and workover operations. The training costs $150 USD plus taxes and has limited available seats.

Uploaded by

ghassen laouini
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

PETROLEUM ENGINEERS ASSOCIATION

AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

150 USD

+18% VAT

HE IS A FREELANCER INSTRUCTOR FOR WELL INTERVENTION


OPERATIONS. HE IS CURRENTLY WORKING AS TEAM LEAD OF
COMPLETION WELL INTERVENTION & WORKOVER OPERATIONS
AND HAS OVER +13 YEARS OF EXPERIENCE IN WELL
INTERVENTION & COMPLETION WORKOVER OPERATIONS WITH
HPHT EXPERIENCE AND DOMAIN SPECIALIZATION OF WELL
COMPLETION AND INTERVENTIONS WITH "HANDS
ON"EXPERIENCE

LIMITED SEATS AVAILABLE ONLY


COMMENCING SOON! REGISTRATION OPEN!
Reach out to us at
CONTACT FOR
+91-93415 13462 SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM
PETROLEUM ENGINEERS ASSOCIATION
AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

Many of today’s most vital


oilfield operations depend
directly on the use of
different Tec of well
intervention activates such
as S/L and E/L, CTU,
workover etc. . Well
intervention operations is
particularly important to
increase production or
keep well in production
phase for long time or
fixed problem while
production phase
This training course covers
and describes the various
well intervention
operations (diagnostic,
troubleshooting, and
completion and
production maintenance)
performed while well
intervention operations

LIMITED SEATS AVAILABLE ONLY


COMMENCING SOON! REGISTRATION OPEN!
Reach out to us at
CONTACT FOR
+91-93415 13462 SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM
PETROLEUM ENGINEERS ASSOCIATION
AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

Slick line introduction.


Slick line applications.
Preparation and planning
HADZ (Hazard and Drops Zone)
Slickline surface equipment’s
Pressure control equipment
Stander tool string.
Barrier & safety aspects.
Pre-job Check List.
Rig Up/Down operations.
Slickline calculation.
Pressure Testing (using Pump Unit).
Slick line operations program.
Drift Runs.
Plug setting/ Retrieval.
Gas Lift valves change out.
Retrieving and running SCSSSV
Open/Close SSD
Running Pressure Gauges.
Precaution during fishing
Operations.
Slick line Operation problems.

LIMITED SEATS AVAILABLE ONLY


COMMENCING SOON! REGISTRATION OPEN!
Reach out to us at
CONTACT FOR
SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM
PETROLEUM ENGINEERS ASSOCIATION
AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

Electric line introduction.


Electric line applications
Preparation and planning
HADZ (Hazard and Drops Zone)
Electric line surface
equipment’s
Pressure control equipment
Barrier & safety aspects.
Pre-job Check List.
Rig Up/Down operations
Operation procedure
Common problems while E/L
operations

LIMITED SEATS AVAILABLE ONLY


COMMENCING SOON! REGISTRATION OPEN!
Reach out to us at
CONTACT FOR
+91-93415 13462 SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM
PETROLEUM ENGINEERS ASSOCIATION
AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

Introduction
Completion operations
definition
Completion operations reasons
Completion operations steps
Completion and Workover Rigs
components and selection
Scrapper run
Perforation operations
Sand control operations
Completion types ( uses and
advantages , dis advantage for
each type )
Completion and workover fluids
Completion design
Completion Equipment
Flow Control Devices
Packers
Tubing
Circulation Devices
Expansion joints
Sub-Surface Safety Valves
Christmas Trees and it’s Types
Surface Equipment
LIMITED SEATS AVAILABLE ONLY
COMMENCING SOON! REGISTRATION OPEN!
Reach out to us at
CONTACT FOR
+91-93415 13462 SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM
PETROLEUM ENGINEERS ASSOCIATION
AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

Workover operations definition


Workover reasons and
applications
Workover risks
Workover operations planning
Workover processes
Killing operations ( types and
procedure )
Killing calculations
Example for completions and
workover operations

Introduction
Coiled tubing definition
Coiled tubing application
Coiled tubing equipment’s
Coiled tubing tools
Coiled tubing well control
equipment’s
Operations procedure of CTU
Safety issues with CTU
operations
Well control and emergency
procedure of CTU
LIMITED SEATS AVAILABLE ONLY

COMMENCING SOON! REGISTRATION OPEN!


Reach out to us at
CONTACT FOR
+91-93415 13462 SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM
PETROLEUM ENGINEERS ASSOCIATION
AN ISO 9001:2015 CERTIFIED COMPANY

MSME CERTIFIED

21 DAY'S LONG VIRTUAL TRAINING/INTERNSHIP ON

Recognize and explain function of, wireline equipment


Recognize and explain function of the Pressure Control Equipment
and Bottom-hole assemblies for slick line and wireline interventions.
Identify common applications for slick line, wireline interventions
Assess the pros and cons of each intervention and evaluate which
intervention type to utilizes for various job problems
Identify and describe critical job design considerations for each job
type of intervention that should be present in a contractor proposal
Discuss risks associated with each type of intervention and the
corresponding mitigation controls recommended for each job type
and well control
Apply an up-to-date knowledge on wireline equipment, techniques
and operations during well completion, servicing, work over and
production
Plan, design, manage and execute completion operation
Improve the overall operational performance during work-over
operations
Select or recommend completion equipment for given field
conditions and applications
Select the most commonly used downhole tools and explain their
function
Manage and execute Coiled Tubing interventions
Know CTU operationprocedure
Increase overall operational performance during Coiled Tubing
interventions
Select the most commonly used downhole tools and explain their
function
Mange different well control issues during CTU operations
Work safely with liquid nitrogen
LIMITED SEATS AVAILABLE ONLY
COMMENCING SOON! REGISTRATION OPEN!
Reach out to us at
CONTACT FOR
+91-93415 13462 SCAN TO JOIN
INFORMATION
TELEGRAM GROUP
WWW.PEASSOCIATIONS.COM

You might also like