0% found this document useful (0 votes)
289 views1 page

HVWS System Commissioning Report

The HVWS system commissioning report summarizes the testing and status of the high velocity water spray system installed at the BARC-Tarapur electrical block. The report finds that the HVWS control panel, detection lines, valves, pressure switches, and activation are all functioning properly. All status checks during the commissioning were marked as "yes" or in working condition. The site visit was conducted on September 3rd, 2021 to verify the HVWS system was properly installed and pressurized to protect the transformer group.

Uploaded by

Vishal Sanas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
289 views1 page

HVWS System Commissioning Report

The HVWS system commissioning report summarizes the testing and status of the high velocity water spray system installed at the BARC-Tarapur electrical block. The report finds that the HVWS control panel, detection lines, valves, pressure switches, and activation are all functioning properly. All status checks during the commissioning were marked as "yes" or in working condition. The site visit was conducted on September 3rd, 2021 to verify the HVWS system was properly installed and pressurized to protect the transformer group.

Uploaded by

Vishal Sanas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

HVWS SYSTEM COMMISSIONING REPORT

REPORT NO:- 01

DATE: - 03 September, 2021

REF. BARC P.O:- DPS/NRBPSU/03/N1/3027/TPT/PO/10354 Dt 22/04/2019

CLIENT : BHARAT BIJLEE LTD

SYSTEM : HIGH VELOCITY WATER SPRAY SYSTEM

SYSTEM INSTALLED BY : DOUSE FIRE SYSTEMS (P) LTD.

SITE : BARC-Tarapur , Elecrical Block-132, INRP

LOCATION : TRANSFORMER GROUP “B”


Sr.No. Activity Description Status (Yes/No) Remarks
1. HVWS system is pressurized from Main line. Yes Inlet pressure at HVWS system is
And is in active position.
between 6 to 8 kg/cm2

2. Yes Control panel power supply


HVWS control panel is in ON postion. And in normal
position. given by UPS DB.

3. Quartz bulb Detection line is pressurized from main line. Yes No leakages found in QBD line.
HVWS system is in Normal
position.
4. Deluge valve is in working postion. Yes No leakages found in Deluge
valve assembly.
5. Inlet Gate valve and Butterfliy valve is in open state. Yes
6. Outlet Gate valve of HVWS system is in open position. Yes
7. Emergency By-pass line is in close postion. Yes
8. Pressure switch and solenoid valve are in working condition. Yes
9. Control panel activation checked for working operations. Yes