HVWS SYSTEM COMMISSIONING REPORT
REPORT NO:- 01
DATE: - 03 September, 2021
REF. BARC P.O:- DPS/NRBPSU/03/N1/3027/TPT/PO/10354 Dt 22/04/2019
CLIENT : BHARAT BIJLEE LTD
SYSTEM : HIGH VELOCITY WATER SPRAY SYSTEM
SYSTEM INSTALLED BY : DOUSE FIRE SYSTEMS (P) LTD.
SITE : BARC-Tarapur , Elecrical Block-132, INRP
LOCATION : TRANSFORMER GROUP “B”
Sr.No. Activity Description Status (Yes/No) Remarks
1. HVWS system is pressurized from Main line. Yes Inlet pressure at HVWS system is
And is in active position.
between 6 to 8 kg/cm2
2. Yes Control panel power supply
HVWS control panel is in ON postion. And in normal
position. given by UPS DB.
3. Quartz bulb Detection line is pressurized from main line. Yes No leakages found in QBD line.
HVWS system is in Normal
position.
4. Deluge valve is in working postion. Yes No leakages found in Deluge
valve assembly.
5. Inlet Gate valve and Butterfliy valve is in open state. Yes
6. Outlet Gate valve of HVWS system is in open position. Yes
7. Emergency By-pass line is in close postion. Yes
8. Pressure switch and solenoid valve are in working condition. Yes
9. Control panel activation checked for working operations. Yes
Company Name Douse Fire System (P) Ltd Bharat Bijlee Ltd BARC- Tarapur
Seal & Signature
Date 13/10/2021