0% found this document useful (0 votes)
295 views8 pages

FP 24-36

Uploaded by

Samorai Kaza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
295 views8 pages

FP 24-36

Uploaded by

Samorai Kaza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 8
FP O3 CIS 255 Grids FP gas type circuit breakers Rated voltage:7.2- 36 KV Rated current 630-2000 A Breaking capacity : 16 - 31.5 KA A ee Ee a ae a eae ee PARS SWITCH & Manufacturer of Medium & Hig! Voltage Circuit Breakers and Deaeees PARS switcH FP gas type circuit breaker which uses puffer system for oxtinguishing the arc, 4s a dual axial blast circuit breaker so it cools the arc more quickly and effectvely. This feature in addition to remarkable thermal properties of SFe gas causes an instant reduction in the arc Volume increases theif time of the are contacis and also the circu breakey's life time, FP circuit breakers are manufactured under French ALSTOM company's license wth the highest quality accordng to IEC 622 71-100,BS 5311, VDE 670, UTEC 64100 standards and can be delivered : » With rated voltage from 7.2 KV 10:36 KV,rated current from 630 to 2000 Aand breaking capacity from 16 to 31.5 KA. (Accordig to the table in the last pages) With front or side command arrangement © With primary over current relay. 2 With pressure switch for supervision of gas pressure of the poles 2 With withdrawable connections. SF6 gas as an excellent dielectric substance : ‘The remarkable dielectric properties of tho sulphur hexafluoride in comparison with other dielectric substances such as air and oil, its ability in absorbing and transfering thermal energy of the arc together wit its high performance makes SFe gas an ideal dielectric substance for circuit breakers and causes a substantial reduction in the dimensions of these circuit breakers. Electro negativity of SFs gas is an important factor in reducing the are intensity caused by switching that increases the circuit breaker's life time. SFo gas has a high chemical stability and in this way it has a life time as long as the circuit breaker's life time ‘Thermal Conductivity wim.k Temp.0 ” Breakdown Voltage (30 Hz) 120 100 : 80 s =F 6 1 : o AR 1 20 | 0 02 «03 Ot Gas Pressure Mpa (abs) ee NSFP GG gi Oy Glas Wayne go UaS pl Seek (dal axial Blast) oy2 239 poe LI pa ndelage 9 ge Ball ee ok ee by See spl) SB US ba Ole | sls te a SF6 38 JG Jil > leo nat Job HIB Us ee eS oe Jae Jyh and 239 sh classe 133 Ss i Las pled cng FP yt ANS Glad aI ilar Cok oy SUL, ALY TEC62271-100.B85311.VDE670. UTEC 61100, 86 HU LS Glas) 29 pot Ly LeU STP J V/Y AS) @ salves SITs AG Sly PAMSTYID DP ah yb (Es Finis Jot Gh) be NOU SL gle Le pay te BEI pl, dol ass) GHD Weel» Bop ADS slg TS S89 Me, i y'SSi Lal 1 dle dale oe GB SK6 iF yo SF6 Fang AG Kp gs ole cule bay glen he Soa Ale alot cali pi GAe Sie lily ole tly s\n SE cule STeabll dp 2 Slee ol am Si euyleole day yu islet ool! abel gale al She 9 tle ce feel GES a5 AIS GS cab le SFO 8 gut, She pth pots Ga cas Raped Sui pot Gab see SEL Glas Blal SKO 5S Assembly ine o! medium votage circu beakers [dn cineca delet mtu ‘2 Short installation time because of its efficient design. ® Having a simple mechanism and litle wear, it has a simple maintenance limited to lubricating of the operating mechanism, and that's why it is called maintenance tree circuit breaker. FP type circuit breaker is equipped with floor rollers and can easily be installed in withdrawable cubicles 2 Gas valve is easily accessible and the gas pressure can be inspected by a conventional manometer ® Because of the low normal filing pressure of the poles (3.5 bars at 20'c) the operation of the circuit breaker is in perfect safety. Since the poles are apart from each other, itis possible to replace every defective pole with a new one in the shortest possible time 2 To have more security in the event of any abnormal overpressure, each pole is Coat ee neem se, provided with a special safety bursting membrane . ® Toassure the quality of SFs gas each pole is provided with absorbant substance which absorbs any other gases caused by switching operation . ® : : - ey PPO AUS fp solace INTERNAL PARIS OF FP POLE ©@ = ® @ \ 1 - UPPER LINE CONNECTION © ' 2. EPOXY RESIN ENVELOPE ® © t 3+ LOWER LINE CONNECTION = @ r 4- MOVING CONTACT ROD - s ‘ 5 - MOVING MAIN CONTACT @ 2) 3 6- MOVING ARCINGCONTACT be 7- FIXED MAIN CONTACT = ® x 8- FIXED ARCING CONTACT ‘ 9. NOZZLE & PISTON ASSEMBLY 4 10- LINKAGE SYSTEM hdres. 11. MOLECULAR STEVE BUSI SUSE Sagby Gils =1) 12- OPERATING SHAFT pote Wy 13- SAFETY MEMBRANE dbeabligy 9 “V0 ) ag pole sysiem of FP C.BSis their main yay cape Ly} ctal FP cy sass lola be lh ee advantage, because in the case of any probable defecton gu Qn 3 b bibs Jy Ss bil lies Si 53 Kida se ‘one pole it can be replaced only by unscrewing 5 nus Gari Uys Nak aod ly Slee For pole replacement please refer to its instruction The injection of SFs gas in FP circuit breakers with the nominal pressure of 3.5 bars at 20'C is done with the quality according to IEC standards. In order to regulate the gas pressure in a temperature more or less than 20°C the injection of the gas should be performed according to the front graph. Pressure switch for FP poles: There is a place for mounting of pressure switch on the bottom of the FP poles to operate for the lower pressure than normal which is mounted acc. to the request of customer . This switch could be double step. In this case the first switch operates in 2.9 bars for issuing alarm signal and for more reduction of gas pressure the second switch trips the C.B. it should be mentioned that the pressure switch terminals are available for customer and could be used acc. to the protection system design. et ads Gk © SFE GLE LE 4 TEC slate! oat ps CAS L FP doe Shp ep Ca JLT /0 Ole ln ate (ladda SSL ays Yo BN pals PW hosel > a 1S Slr aah SL Lol Sal Relative pressure in bar 4 apts i pln! ‘Temperature inC eof cal lz ce FP Spa Gl lb > Siglo s Je I Sl gi al > baie ds P/O dep ae J iS Ls Selig 53 Ap ag Coal ue aes os Fete Spa hes eee ch Ese ey cul Bir aeecioas XS Sey Sie gene Mali Wiring workshop for C.B. control cireuit & Pressure switch FP circuit breakers are equipped with BLRM operating mechanism which utilizes energy stored in the springs is of a high reliability and its maintenance is limited to lubricating of moving parts. Because of its extraordinary abilities, BLRM mechanism is also used in high voltage circuit breakers and can be charged both manually or automatically( using a charging electromotor ), This mechanism has many accessories such as tripping coil, closing coil, electromotor for charging, auxiliary contacts (6 No +7 Nc),anti pumping relay and can be equipped with under voltage system, pressure switch for monitoring the pressure of the gas inside the poles ace. to the customer 's request. Primary Relay Installation on FP C.B. In adcition to the possibility of using of secondary relays the design of FP C.B. and its poles are suitable for installation of any kinds of primary relays which protect the network against overcurrent & short circuit. In case of increasing the current and becoming over than set value on the relay, tripping command will transfer to open it. Since the primary overcurrent relay getting the needed energy for its performance from the network and it is not necessary to use another source,the FP C.B.s with primary relays are tested in the factory before delivery from the accurate performance point of view. ELECTRICAL ENDURANCE: The optimum design of FP C.B. causes the minimum arc energy- low arcing contact wearing and long electrical endurance. The value of interrupted current is the main parameter for electrical endurance and for inspection of arcing parts of poles the front graph should be considered. ‘BLM operating Mechanism FPCB. with primary relay Number ot breaks. BLAM OL5 pjglkey FP O55 le als BMS BLRM SL3 pS Seth Go jae aSlee uly pb 99 abd ad Biel oy oye ANU slate! LU Slagyet ULE 61K 9) ays OT Ch pany tle Soe FAS 6 Dynan dom 5 tor slat cage, OS, 255 U5 gle 15> BLRM ol 3 Pesores ris 2s thy One Get a ey cle 5 dle SS) SAS SESS y5,L4 psig XM Leny 92.9 0342 Say al day (6 NO 47 NC) FP 28 LIS 5.49 Spoil 2 J ai Gish ST slays FP ys Glaads Gol Sb 3) asl SKA yp ode Se we SE bl sly ag StS spily sh dy Ghd ply Ubaii OL, 9 OL Ls! Luis jal, Fema eieneeiies erie res es jabs pos shade aT os sRterenenies Def obs Ou be IS ay CSAs pul eh aly Slo 5) 0 phoIl yy SAIL aye 2 Slee Cae Sli Oh Qe Gog BI PIS en dy 4 dbp Oi Deeds 7 alee ome BLL pe aS pT GEIS APM HF BUSS os ALB ope poe by SS tna pas ol ee Gl Soo Bere yo FP aS Ga gests Sosy enols SSSI lps NaS et BSS 5 fA p> sly bal jal ty ke et hl Ole Olds shay Ue C3 (lye Geet ye paar 99 cual dS hee Ss Glélys chs LS SS IL erly be SIS aan Wiring diagram of BLRM operating Mechanism: MU MCA ‘Pressure switch,A ferminals, § Auxiliary contacts ‘NOTE: Circuit diagram shows operating mechanism when circait breaker is in off position closing spring charged and tripping spring ‘uncharged. Mechanical Eundurance FP C.B.s are maintenance free C.B.s and their inspection and services is limited to the cleaning of the poles - lubricating and inspection of operating mechanism. Mechanical endurance of circuit breakers should be 2000 co according to the IEC 62271-100 standards. FP C.B.s are capable to perform 5000 CO (25 times of IEC recommendation) and the pa ameter has been tested in intemational Italian CES! laboratories successfully. For inspection & lubrication of FP C.B.s the mentioned intervals in the below table is recommended. 2 KalSaplys SLANS E51 FP ojai glaats OF ay) es Maintenance Free 2 Sb SAS Sa okt a og gad Uyely hess hb A Ooo + pal ul ste (sable okt ag oly T/ De Hel oe NEL pA atk eae) culos S c5 Uy) CEST Ba Leb Spey GK, jl Oteab! Rese PP AS dey uty Seb ee Ashe oy Type of service Every 6 months Every year Description Ph it eb se Sil tely Jag hl Pasty Vie el nt Cleaning of external parts For polluted Condition For normal condition ‘Cleaning of the external surfaces of poles Sil Psst Jephbdele PS 95001 Joa perl 165 lubrication Forpolluted Condition For normal coniton Lubrieaion ace. To the Instruction no, ps 95001, jis LM yp Onto iS ob Fh As pel 3k wp jee biden ee des Inspection of arcing parts cs SS Inspection should be done acs. to the page § graph. x Ap sl Ste eeyaT salgh 965 Wei ea BE eat sheer MIO Sagal Pe sn aie speci o{ das =) J Si eee pressure of the poles: Incase of pressure Switch Gas of the poles in 20° instalation nerval ould ’be 3.5 bar for ether ambient we 2 0r3 years, Hemp. reier to the page 4 graph. Leech bodies dei! Since the breakers are using some mechanical parts, the reduction of friction for proper function of parts by suitable lubrication is important as the other mechanical systems. ‘To make easier, the necessary points for lubrication could be divided in 3 categories and for each category the recommended lubricant has been mentioned (Refer to instruction No.PS 95001) Fig. Labriction of BLRM op. mechanism 3 a 1= BLRM operating mechanism 2. internal parts of BLRM 3+ linkage system between op. mechanism & poles. Important note : dry lubricants is used for moveable parts of FP poles in the factory and itis for life of C.B. any kind of repairment on the poles out of factory is not allowed and company would not be responsible. SBD oi gat Mobil 28 grease ‘er mobipiex 47 greae So uengorquy waa ouomEeT EBL soi Gols J) JSten5s FP pad gus yet GBs ANS Cool fod Sethe SIE PS dss plat pel pw alae ab Labi aay 95 glee 4 Lab Se sale Jae SiRlal Opes Oss yo Se ALD prenatal GLls p96 1651), Li Daye po Ctl ISIS Se GOAN SLs 51) Spee ly eel Cane day 5 SII) 9 Up GY BL FPS 5 IR cly st oh eB wet e Bary cba ady Bay bibles NR Sle Jil el See ott 99 z5T Sean gra) 2 pal als se CPS 4D+Fy ole () JX2) BLRM ob 3 935) BIRMSUS pjtSe cll pce -1 os) AIS abe ap jslKag leh costae al (7 JS) FP 2 pes Se ISI, EF FPLIS Jp bal ly S1BlOags jhey Ge pleco ay ay Ase hinge Set ae FEED onome 1 Fig? LLayication of BLRM imernal pars, alk Dielectric Tests 7] pace |. | typed a tecesl Coe | tee|A|B|C|D|E| F| sete Priel rower eau iach | Jet Le Pa »o ee? a 2 } 2 |20| «0 : | 948 | 580 | 476 | 841 | conmund 5 28 ns 5 si | x i | 6 4 | 2590 | 740 125 al 210 | $40. 35 224 | 1 gsy | 492 | 268 |—] i 290 | 20 z 36 |-28) 50 35] 170 70 iT ot F362 [ae 2 +6 | 320| 540 |1035| oo ‘Operating cycle acc.to IEC Standards : * 0-3 min-co-3 min-co_* 0-0.3 see-co-15 sec-co * co-15 sec-co FACTORY Kim 5 Tehran Tek (408 241) ax : (498 241), 28 Ofce Tol 3 Fax : (498 21) 554806, Sales Of & web ste ww. paresn Sales Otis . Zanian RAN 0718 19 290720 (98241)72907 Fax: (+98241)7290711 a THAT 8 wo LUI} cS ob sto: wn pars com

You might also like