Upgrade of KJO’s Public Address &
General Alarm System
Contract: GT629IT19
Date:
INSPECTION CHECKLIST
DESCRIPTION: PAGA Cable Inspection
LOCATION: AREA:
DRAWING#: FROM STN# TO STN#:
PAGING STATION
CABLE TAG#:
MANUFACTURER:
INSPECTION ITEMS Results Remarks
1. Check length of the cable meter
2. Check Insulation Resistance of the
cable
3. Check Continuity of the cable Ok Not ok
4. Check the no. of Cable Core for Paging
16 Core >16 Core <16 Core
Stations
5. Check the No. of Cable Core for
4 Core >4 Core < 4 Core
Speaker
6. Check the flexible conduit installed
Yes No
with all required accessories
7. Check the Cable Tray Installed for ~Length
Yes No
cable laying
8. Check Conduit Installed for cable ~Length
Yes No
laying
~Length
9. Check Underground cable laying Yes No
10. Check Excavation Required for ~Length
Yes No
Underground Cable Laying
11. Check Scaffolding Required for New ~Height
Yes No
Cable Laying
Project Manager Name: Abdul Raheem - Survey Engineer Name:
Signature / Date Signature / Date