Project Schedule for Managers

This document contains a project schedule with tasks organized in a work breakdown structure (WBS). It lists tasks, their duration, predecessors, and assigned resources. The schedule contains multiple high level tasks like 1.0 and 2.0 with subordinate tasks below them to be completed sequentially. A milestone task is used to mark the completion of each high level task with zero duration.

Uploaded by

Mervana Mograby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views2 pages

Project Schedule for Managers

This document contains a project schedule with tasks organized in a work breakdown structure (WBS). It lists tasks, their duration, predecessors, and assigned resources. The schedule contains multiple high level tasks like 1.0 and 2.0 with subordinate tasks below them to be completed sequentially. A milestone task is used to mark the completion of each high level task with zero duration.

Uploaded by

Mervana Mograby
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Project Schedule - xxxx

Task
WBS # Task Action Duration Predecessor Resource
Use the leave duration blank - subordinate tasks identify actual duration
same leave predecessor blank - no predecessor
measure leave resource blank - put in subordinate tasks
(Min or
1.0 xxx Hrs.)
1.1 1 Do task 1
resource-a, Use the same measure for all durations(Min or Hrs.)

1.1.1 2 Do sub-task 1.1 x min 1 specialist-name


1.1.2 3 Do sub-task 1.2 x min 2 etc.
1.1.3 4 Do sub-task 1.3 x min 3 etc.
1.2 5 Do task x min 2 etc.
1.3 6 Do task x min etc. etc.
1.4 7 Do task x min etc. etc.
as many tasks as needed etc. etc.
1.xx xxx completed 0 min This is a milestone with zero duration
2.0 10 yyy
resource-b,
2.1 11 Do task 11 x min person-2
2.2 12 Do task x min 11 etc.
2.3 13 Do task x min 12 etc.
2.4 14 Do task x min etc. etc.
2.5 15 Do task x min etc. etc.
as many tasks as needed etc. etc.
2.xx yyy completed 0 min Use the same measure (Min or Hrs.)
Project Schedule - xxxx

Task
WBS # Task Action Duration Predecessor Resource