TR70 Off-Highway Truck Maintenance Manual: Click Here For Table of
TR70 Off-Highway Truck Maintenance Manual: Click Here For Table of
TABLE OF
CONTENTS
TR70
Off-Highway Truck
Maintenance Manual
MODEL: General
PURPOSE:
DETAIL:
It has been brought to our attention that 'Viton' material used in manufacture of oil seals and 'O' rings, produces
a highly corrosive acid (Hydrofluoric) when subjected to temperatures above 315° C.
The resulting contamination can have extreme consequences on human tissue since it is almost impossible to
remove after contact.
We therefore recommend the following procedure when it is necessary to inspect any equipment that has been
subjected to a high temperature i.e. fire.
a. Visually inspect for any gaskets or seals which have suffered from heat; they will appear black and sticky.
c. Make enquiries to ascertain the material composition. Any Fluoro-elastomer (Viton, Fluorel or Tecmoflon)
should be considered dangerous but natural rubber and nitrile are non-hazardous.
d. If Fluoro-elastomer seals have been used, then the affected area MUST be decontaminated before
undertaking further work.
e. Disposable Heavy Duty Gloves (Neoprene) MUST be worn and the affected area decontaminated by
washing thoroughly with Limewater (Calcium Hydroxide solution).
f. Any cloths, residue and gloves used MUST be safely discarded after use.
Note: Burning of the discarded items is NOT RECOMMENDED, except in an approved incineration process
where the gaseous products are treated by alkaline scrubbing.
Proper service and repair is important to the safe, reliable operation of all motor vehicles. The service
procedures recommended and described in this publication, are effective methods for performing service
operations. Some of these service operations require the use of tools specially designed for the purpose.
The special tools should be used when, and as recommended.
It is important to note that this publication contains various WARNINGS and NOTES which should be
carefully read in order to minimize the risk of personal injury to personnel, or the possibility that improper
service methods will be followed which may damage the vehicle or render it unsafe. It is also important to
understand these WARNINGS and NOTES are not exhaustive. It is not possible to know, evaluate and
advise the service trade of ALL conceivable ways in which service might be carried out, or, of the possible
hazardous consequences of each way. Consequently, no such broad evaluation has been undertaken.
Accordingly, anyone who uses a service procedure, or tool, which is not recommended, must first satisfy
themselves thoroughly that neither their safety, nor vehicle safety, will be jeopardized by the service
method he/she selects.
Two types of heading are used in this manual to attract your attention.
1. WARNING - This symbol is used when an operating procedure, practice, etc., which, if not correctly
followed could result in personal injury or loss of life. Look for this symbol to point out important safety
precautions. It means - ATTENTION! BECOME ALERT! YOUR SAFETY IS INVOLVED!
2. Note - This is used when an operating procedure, practice, etc., which, if not strictly observed, could result in
damage to or destruction of equipment.
WARNING
Never use parts which are altered, modified, or weakened in operation. This can seriously jeopardize
the integrity of the machine and could result in property damage or serious personal injury.
100 CHASSIS
0010 Chassis, Hood and Fenders 1918 Rev 1
110 ENGINE
0030 Engine and Mounting 1923 Rev 2
0050 Air Cleaner 1925
0130 Power Takeoff 1914
120 TRANSMISSION
0010 Transmission and Mounting 1932
0070 Commercial Electronic Control (CEC) Shift System 1575 Rev 2
0070 Commercial Electronic Control 2 (CEC2) 2128 Rev 2
0090 Power Takeoff 1915
0100 Transmission Oil Filter 1931
130 DRIVELINE
0010 Front Driveline 1577
0020 Rear Driveline 1578
300 MISCELLANEOUS
0020 Lubrication System 2030 Rev 3
0070 Service Tools 2037 Rev 2
0080 Standard Bolt and Nut Torque Specifications 1238
0090 Unit Storage 1239
* * * *
SM - 2409
Max
1 536 4 270
Body (5-0)
(14-0)
Depth
3 940
(12-11)
1080 610
(3-6) (2-0) Vehicle Clearance Diameter (SAE) 22.4 m (73-6)
1 500 8 380
(4-11) (27-6)
2 995 (9-10)
4 445 (14-7)
8 380
(27-6)
5 290 (17-4) 6 580
4 940 (16-2) (21-7)
6 200
(20-4)
59˚
ENGINE TRANSMISSION
Make/Model .................................... Detroit Diesel 12V 2000 Make/Model .............................................. Allison M6600AR
Type ............................. 4 Cycle, Turbocharged/Aftercooled. automatic electronic control with soft shift feature.
Electronic Management Remote mounted in the frame. Integral TC 682 torque
Gross Power @ 2 100 rev/min .................................. 567 kW converter and planetary gearing. Six speeds forward, two
(760 hp, 770 PS) reverse. Automatic converter lockup action in all speed
Net Power @ 2 100 rev/min ..................................... 522 kW ranges. With body up, gear range is limited to 1st forward
(700 hp, 710 PS) only. Downshift inhibitor. Intregal hydraulic retarder.
SM 1911 7-00 1
General Information - TR70 Off Highway Truck
Section 000-0000
DRIVE AXLE Parking
Heavy duty axle with single reduction spiral bevel gear Application of rear brakes by springs in brake disc pack.
differential, full floating axle shafts, and planetary reduction Hydraulically released.
at each wheel. Hold-off Pressure .................................. 83 bar (1 200 lbf/in²)
Emergency
SUSPENSION
Push button solenoid control applies service and parking
Front: King pin strut type independent front wheel brakes. Automatically applies when engine is switched off.
suspension by self-contained, variable rate, nitrogen/oil Parking brake applies should system pressure fall below a
cylinders. predetermined level.
Rear: Variable rate nitrogen/oil cylinders with A-frame Brakes conform to ISO 3450, SAE J1473 OCT 90.
linkage and lateral stabilizer bar.
Rear:
Type ............................... Oil cooled, multiple friction discs, ELECTRICAL
completely sealed from dirt and water. Type ............................................. 24 Volt, Negative Ground
Braking Surface, Total .................. 67 390 cm² (10 445 in²) Battery ......... Two, 12 Volt, 165 Ah each, Maintenance Free
Accessories ................................................................ 24 Volt
Alternator .................................................................. 70 Amp
Starter ........................................................................... 9 kW
2 SM 1911 7-00
General Information - TR70 Off-Highway Truck
Section 000-0000
BODY Typical Noise Levels
Longitudinal 'V' type floor with integral transverse box- Operator Ear (ISO 6394) ............................................ 81 dbA
section stiffeners. The body is exhaust heated and rests on
resilient impact absorption pads. *Exterior Sound Rating (SAE J88 JUN 86) ................ 91 dbA
* - The above result is for the mode giving the highest
Body floor wear surfaces are high hardness (450 BHN) exterior sound level when measured and operated as per
abrasion resistant steel. Yield strength of plates 1 200 MPa the prescribed procedures of the standard. Results shown
(174 000 lbf/in²). All other wear surfaces are high hardness are for the vehicle in base configuration.
(360-440 BHN) abrasion resistant steel. Yield strength of
plates 1 000 MPa (145 000 lbf/in²). Note: Noise Level Exposure to the operator and bystander
personnel may be higher depending upon proximity to
Plate Thicknesses: buildings, rock piles, machinery etc.. The actual job site
Floor ......................................................... 19 mm (0.75 in) Noise Level Exposure must be measured and applicable
Side .......................................................... 10 mm (0.39 in) regulations complied with in respect to Employee Hearing
Front, lower ............................................... 10 mm (0.39 in) Protection.
* * * *
SM 1911 7-00 3
GENERAL INFORMATION - Welding Procedure
Section 000-0010
Welding
WARNING
Welding and flame cutting cadmium plated
WARNINGS metals produce odourless fumes which are
Before any welding is done on a machine toxic. Recommended industrial hygiene
equipped with any electronic systems, practice for protection of the welding operator
disconnect the following (if applicable) in this from the cadmium fumes and metallic oxides
order: Battery earth cable, battery supply requires enclosure ventilation specifically
cable, alternator earth cables, alternator supply designed for the welding process. A
cables and electrical connections at the engine respiratory protective device such as the
ECM, transmission ECU, body control lever, M.S.A. 'Gasfoe' respirator with G.M.A. cartridge
hydraulics ECU and cab bulkhead to avoid will provide protection against cadmium,
damage to electrical components. Turn off fumes and metallic oxides. The 'Gasfoe'
battery master switch to isolate the batteries respirator has been approved by the U.S.
before disconnecting any components. Bureau of Mines: Approval number 23B-10,
After welding connect all of the above in the and is designed to protect against gases,
reverse order. vapours, and/or metal fumes.
SM 2172 10-02 1
General Information - Welding Procedure
Section 000-0010
3. Pre-heat area to 100° C (212° F), measured 3 - 4" 3 - 4" either side of repair prior to gouging. On
either side of repair. Avoid local overheating. completion of gouging grind to remove thin carbon
layer.
4. Weld completely using E-7016 electrodes. Care
must be taken to ensure electrodes are protected from 2. Apply dye-penetrant check to ensure crack has
moisture pick-ups at all times. been completely removed.
5. Allow repair weld to cool slowly. 3. Pre-heat area to 200° C (392° F), measured 3 - 4"
either side of repair. Avoid local overheating.
6. Grind and blend repair to original contour. Paint
heat damaged areas. 4. Weld completely using E-7016 electrodes. Care
must be taken to ensure electrodes are protected from
moisture pick-ups at all times.
The following general procedure should be used for
the repair of defects in alloy steel castings and in the 5. On completion of welding, post-heat repair area to
welds joining steel castings. 400° C (752° F), measure 3 - 4" either side of repair.
1. Completely ARC-AIR gouge or grind out the crack 6. If welding has to be interrupted for any reason, e.g.
until sound metal is reached. If ARC-AIR method is overnight, post-heat immediately as in Step 5.
employed, pre-heat area to 200° C (392° F), measure
* * * *
2 SM 2172 10-02
CHASSIS - Chassis, Hood and Fenders
Section 100-0010
SM - 2511
1
2
11
10
14
12
13
5
9 8
8 7
7 6
3
6
1 - Frame Assembly 11 - Bolt
2 - Bushing 5 - Bolt 8 - Washer 12 - Hardened Washer
3 - Engine Guard 6 - Nut 9 - Bolt 13 - Locknut
4 - Transmission Guard 7 - Lockwasher 10 - Washer 14 - Spring Disc
Fig. 1 - Exploded View of Chassis and Guards
SM 1918 R1 08-03 1
Chassis - Chassis, Hood and Fenders
Section 100-0010
MAINTENANCE SM - 2554
2 4
Inspection 5
WARNINGS
Before any welding is done on a machine
equipped with the Detroit Diesel DDEC IV
system, disconnect the following in this order:
5
Battery earth cable, battery supply cable, 3
alternator earth cables, alternator supply
cables, electrical connections at the engine
ECMs and transmission ECU to avoid damage
to electrical components. Turn off ignition key 1 - Hood Assembly 4 - Bolt
switch to isolate the batteries before 2 - Plate 5 - Hardened Washer
3 - Bolt
disconnecting any components.
After welding connect all of the above in the Fig. 2 - Exploded View of Hood and Mounting
reverse order.
frame is bent or twisted, no welding should be done
until the parts are straightened or realigned.
Before any welding is done ensure all paint has Successfully welded repairs will depend to a great
been removed from the area to be welded. extent upon the use of the proper equipment, materials
Failure to do so may result in hazardous fumes and the ability of the welder. The Service Department
being given off from the paint. can be consulted regarding the feasibility of welding
repairs.
WARNING
Welding and flame cutting cadmium plated Painting
metals produce odourless fumes which are A check of the condition of the paint should be made
toxic. Recommended industrial hygiene approximately twice a year and chassis repainted if
practice for protection of the welding operator necessary.
from the cadmium fumes and metallic oxides
requires enclosure ventilation specifically
designed for the welding process. A WARNING
respiratory protective device such as the Welding, burning, heating or dressing surfaces
M.S.A. 'Gasfoe' respirator with G.M.A. cartridge previously painted using polyurethane paint
will provide protection against cadmium, produces fumes which are toxic. Surfaces
fumes and metallic oxides. The 'Gasfoe' must be prepared using paint stripper prior to
respirator has been approved by the U.S. area being reworked. Recommended Industrial
Bureau of Mines: Approval number 23B-10, Hygiene and Safety Rules should be be
and is designed to protect against gases, followed for protection of the welding operator
vapours, and/or metal fumes. from fumes.
Electric arc welding is recommended for all chassis If painting of the actual frame of the unit is required,
welding. Since the nature and extent of damage to the thoroughly clean the areas to be painted. Apply a
frame cannot be predetermined, no definite repair primer coat of red oxide and then a finish coat of
procedure can be established. As a general rule polyurethane enamel.
however, if parts are twisted, bent or pulled apart, or a
2 SM 1918 R1 08-03
Chassis - Chassis, Hood and Fenders
Section 100-0010
SM - 2555
23 22
15
21
11
11 7
18 12
6
7
24
1918 12
11
20 2 7
4 8 12
3
13
14 16 11
10 5 18
11
12 7
19
7 4
12 3
1
9
12 7 11 17
12 1819
67˚
POSITION ON DELIVERY
SM 1918 R1 08-03 3
Chassis - Chassis, Hood and Fenders
Section 100-0010
SM - 2513
3
4
4
5
3
4
4
5
3
4
4
5
3
4
4
5
6
6
9
8
8
7 9
8
8
7
4 SM 1918 R1 08-03
Chassis - Chassis, Hood and Fenders
Section 100-0010
SM - 2556
5
3
3
4
6
1
3
7
3
4
9
8
2
5
3
3
4
SM 1918 R1 08-03 5
Chassis - Chassis, Hood and Fenders
Section 100-0010
SM - 2557
11
10 10 6 12 11
25 11
27 12
4
3 10 12
7
11
2 9
8
11 10 10
11 12
10 29 5
12
13 11
11
4 10 10
10 11 12 21 28
14 23 26
1
22
11 12
23 22
24 24
19 23
21 23
17 30 11
20 10
9 16
8
10 18
19 19 15 21
22 23
10 10
11 11
19 19
11 21
10 19
19 22
* * * *
6 SM 1918 R1 08-03
ENGINE - Engine and Mounting
Section 110-0030
SM - 2465
6
6
8
8
7
5
LIFTING POINTS
1
9
14
15 12
4 10
9
3
13
12
21 12 16
10 19
24
23 18
17
22
2 20
12
11 21 25
SM 1923 R2 03-04 1
Engine - Engine and Mounting
Section 110-0030
elements. Impurities are filtered out as the oil passes 2. Programmable Read Only Memory (PROM) -
through the elements and out through another Located in the ECM and encoded with the operating
passage in the filter adaptor. software. Additional information is programmed into
the EEPROM. This information controls the
There are four spin-on type fuel filters mounted on horsepower rating, torque curve, maximum engine
the right hand side of engine (1), two primary fuel speed and engine protection devices. The ECM
filters (3) and two secondary fuel filters (4). Primary processes this information and sends electronic
fuel filters (3) are in the fuel flow and act as strainers signals to the Electronic Unit Injectors (EUI) where the
and secondary fuel filters (4) filter the fuel after precise amount of fuel is injected into the engine.
having passed through primary fuel filters (3).
3. Electronic Unit Injectors (EUI) - The EUI is a
lightweight, compact unit that injects diesel fuel directly
DETROIT DIESEL ELECTRONIC into the combustion chamber. The amount of fuel
CONTROL (DDEC) injected and the beginning of injection timing is
determined by the ECM. The ECM sends a command
Description pulse which activates the injector solenoid.
Refer to Fig. 2.
The EUI performs four functions:
After welding connect all of the above in the 4. Electronic Foot Pedal - The electronic foot pedal
reverse order. provides an electrical signal to the engine's fuel
control system in proportion to the degree of pedal
The engine is equipped with DDEC IV which which actuation.
continually monitors the engine and warns the
operator when a problem develops. The DDEC IV Note: The engine MUST be started with foot 'OFF'
system also takes action to prevent damage to the the electronic foot pedal.
engine and, provides the serviceman with diagnostic
capabilities so that problems can be corrected 5. Stop Engine Light - When the 'Stop Engine' light
quickly and easily. comes on, the computer has detected a major
malfunction in the engine that requires immediate
1. Electronic Control Module (ECM) - Receives attention. It is the operators responsibility to shut
electronic inputs from the driver as well as from down the engine to avoid serious damage.
mounted sensors that provide information
electronically, such as oil pressure and temperature 6. Check Engine Light - When the 'Check Engine'
and intake manifold pressure. This information is light comes on, the computer has detected a fault in
used to control both the quantity of fuel injected and the engine. The fault should be diagnosed and
injection timing. corrected at the earliest opportunity.
2 SM 1923 R2 03-04
Engine - Engine and Mounting
Section 110-0030
SM - 2529
STOP
5
7
1,2
6
TEST TEST
8 9
7. Diagnostic Test Point - Plug in connector for 9. Receiver ECM Diagnostic Request Switch -
diagnostic data reader (DDR). Operates as a diagnostic request switch when:
a - the engine is not running and ignition is 'On'.
8. Master ECM Diagnostic Request/Stop Engine b - the engine is idling and not in an engine protection
Override Switch - Operates as a diagnostic request condition.
switch when: Pressing and releasing the switch will flash out the
a - the engine is not running and ignition is 'On'. engine codes. Pressing the switch a second time will
b - the engine is idling and not in an engine protection stop the engine codes flashing.
condition. Note: Inactive codes are displayed on Check Engine
Pressing and releasing the switch will flash out the Light and active codes are displayed on Stop Engine
engine codes. Pressing the switch a second time will Light. Code 25 means no codes present.
stop the engine codes flashing.
Note: Inactive codes are displayed on Check Engine
Light and active codes are displayed on Stop Engine Operation
Light. Code 25 means no codes present. Numbers in parentheses refer to Fig. 2.
Operates as a Stop Engine Override Switch when the
engine is in a rampdown protection mode for any of The DDEC system operates from a 24 volt supply.
the following: However, in the event of a loss of power supply, the
Low Coolant Level system will operate at reduced voltage. At reduced
High Coolant Temperature voltage the electronic control system will detect a
Low Oil Pressure malfunction and the check engine light on the dash
High Oil Temperature panel will illuminate.
SM 1923 R2 03-04 3
Engine - Engine and Mounting
Section 110-0030
and a change in engine operation will be noticed. The Whenever check engine light (6) or stop engine light
engine will operate only at reduced rev/min until the (5) comes on, the DDEC computer will determine
battery voltage reaches a point where it will no longer where the problem is and will store this information in
function and the engine will shut down. The machine its memory. If the malfunction is intermittent, the
can still be operated when the check engine light is lights will come on and go off as the computer
illuminated, however, the fault should be diagnosed senses the changing engine condition.
and corrected at the earliest possible opportunity.
A special diagnostic data reader (DDR) is available
Note: When the stop engine light on the dash panel that can be plugged into the engine computer memory
illuminates, the computer has detected a major to extract information related to the cause of the
malfunction in the engine that requires immediate problem. Once the malfunction has been corrected,
attention. It is the operators responsibility to shut the DDEC system will return the engine to normal
down the engine to avoid serious damage. operation. The DDR can now distinguish between
active codes and those stored in the historic code
The machine is equipped with the DDEC engine memory. The malfunction code recorded in ECM (1)
protection system, which records the stop engine memory will remain until it is erased by a technician.
malfunction in ECM (1). The stop engine and check
engine lights illuminate when the engine protection
system is initiated. The engine will immediately WARNINGS
reduce to 70% of the available torque. Rampdown The operator of a DDEC-equipped vehicle
then commences over a 30 second period and must not attempt to use or read a DDR of any
reduces the engine to 40% of the available torque. kind while the vehicle is operating. Doing so
can result in loss of control, which may cause
To allow for the possibility of the engine protection vehicle damage and may result in personal
system being activated while the machine is injury.
operating in a critical situation, a stop engine override
switch (8) is provided. If the switch is pressed and When engine or electronics system
released during rampdown, the 30 second timer will diagnosis is required on a DDEC-equipped
reset, restoring torque to the level immediately vehicle, this must be done by a person other
following illumination of stop engine (5) and check than the operator. The operator must maintain
engine (6) lights. The switch must be pressed and control of the moving vehicle while the
released again to obtain a subsequent override. assistant performs the diagnosis.
Note: The operator must continue to reset the When the engine is not running and the ignition is on,
automatic engine protection system by pressing and or, the engine is idling and not in an engine protection
releasing stop engine override switch (8) at intervals of condition, engine faults can be diagnosed by the
approximately 15 to 20 seconds. operator. Pressing and releasing diagnostic request
switch (8) will cause check engine light (6) or stop
Note: ECM (1) will record the number of times the engine light (5) to flash a code number indicating the
override is activated after the fault occurs. Available fault, e.g. flash twice - pause - flash five times -
Torque is the actual torque available from the engine pause indicates a code 25. Code 25 indicates all
when the fault occurred based on the actual rev/min systems are operating correctly. Pressing the switch
when the fault occurred. a second time will stop the engine codes flashing.
Refer to 'DDEC IV Diagnostic Codes' table for other
The engine should not be restarted after it has been code descriptions.
shut down after activation of the engine protection
system unless the problem has been diagnosed and Note: Only one light will be flashing at any one time.
corrected. When code flashing is initiated, the active codes (or
code 25) will be flashed on stop engine light (5), then
Conditions that will cause the Stop Engine Light to the inactive codes (or code 25) will be flashed on
come on are; Low Coolant Level, High Coolant check engine light (6). When all of the inactive codes
Temperature, Low Oil Pressure and High Oil have been flashed, the process of flashing the codes
Temperature. will repeat until the conditions for code flashing are
no longer satisfied.
4 SM 1923 R2 03-04
Engine - Engine and Mounting
Section 110-0030
SM 1923 R2 03-04 5
Engine - Engine and Mounting
Section 110-0030
6 SM 1923 R2 03-04
Engine - Engine and Mounting
Section 110-0030
SM 1923 R2 03-04 7
Engine - Engine and Mounting
Section 110-0030
8 SM 1923 R2 03-04
Engine - Engine and Mounting
Section 110-0030
4. Remove mounting hardware securing the hood on 15. Identify all electrical harnesses and cables
the vehicle. Remove hood assembly from the vehicle. attached to engine (1) for ease of installation and
disconnect from engine (1).
5. Disconnect electrical connections from the radiator
guard and remove mounting hardware securing the 16. Disconnect driveline from engine coupling and
radiator guard on the vehicle. Remove radiator guard secure clear of engine (1). Refer to Section
from the vehicle. 130-0010, FRONT DRIVELINE.
6. Place a suitable container under the engine drain 17. Remove tandem pump from the engine power
port, remove drain plug and drain the oil. After takeoff. Refer to Section 230-0050, TANDEM PUMP.
draining, reinstall drain plug in the engine sump and
tighten securely. Note: The hydraulic lines can be left attached to the
tandem pump.
WARNING
Harmful gas. Before disconnecting any air WARNING
conditioner lines refer to Section 260-0130, Heavy assembly. To prevent personal injury
AIR CONDITIONING. Refrigerant will rapidly and property damage, be sure lifting device is
freeze all objects with which it comes into of adequate capacity and properly secured to
contact, and it can cause serious damage to do the job safely.
the skin and eyes.
SM 1923 R2 03-04 9
Engine - Engine and Mounting
Section 110-0030
18. Attach suitable lifting equipment to the lifting 7. Loosen air conditioner compressor drive belt and
points on engine (1) assembly and raise lifting remove compressor from engine (1). Refer to Section
equipment to take up the slack. Refer to Fig. 1. 260-0130, AIR CONDITIONING.
19. Remove locknuts (16), lockwashers (12), bolts 8. Remove mounting hardware securing alternator
(14) and hardened washers (15) securing front guard to engine (1). Remove alternator guard.
mounting brackets (9) to mounting crossmember
(13). Remove locknuts (25), snubbing washers (23) 9. Loosen alternator mounting bolt to allow slack in 'V'
and bolts (24) securing rear mounting brackets (21) belts. Remove 'V' belts.
to the frame.
Note: Adjuster screw and link assembly will have
20. Check to make certain that all necessary line and been released when removing radiator assembly from
electrical disconnections have been made before the vehicle.
lifting engine (1).
10. Remove bolt and lockwasher securing screw and
21. Carefully lift engine (1) assembly clear of the link assembly to alternator. Support alternator and
frame and move to a clean work area. Securely remove mounting hardware. Remove alternator from
mount engine (1) assembly to a work stand. engine (1).
22. If required, attach suitable lifting equipment to the 11. If necessary, damper can be removed from the
front mounting crossmember (13) assembly and raise flywheel after the power takeoff assembly is
lifting equipment to take up the slack. removed. Refer to Section 110-0130, POWER
TAKEOFF.
23. Remove locknuts (20), bolts (19) and snubbing
washers (18) securing mounting crossmember (13) 12. With power takeoff assembly removed, remove
to the frame. mounting hardware and damper from engine (1). If
necessary, remove mounting hardware from flange
24. Carefully lift mounting crossmember (13) clear of coupling and remove flange coupling from damper.
the frame and move to a clean work area for further
disassembly. 13. Remove and discard filters (2, 3 & 4) from engine
(1), as described in 'Maintenance'. Cover engine inlet
ports to prevent entry of dirt.
DISASSEMBLY
Numbers in parentheses refer to Fig. 1. 14. Refer to 'Engine Manufacturers Service Manual' if
engine service or repair is required.
1. Remove bolts (10) and lockwashers (12) securing
front mounting brackets (9) to engine (1). Remove
front mounting brackets (9). INSPECTION
Numbers in parentheses refer to Fig. 1.
2. Remove bolts (10 & 11) and lockwashers (12)
securing rear mounting brackets (21) to engine (1). 1. Inspect rubber isolation mounts (17 & 22) for
Remove rear mounting brackets (21). damage and replace if required.
3. If required, remove rubber isolation mounts (22) 2. Check rear mounting brackets (21), front mounting
from rear mounting brackets (21). brackets (9), mounting crossmember (13) and
brackets on the frame for cracks and/or damage.
4. If required, remove rubber isolation mounts (17) Repair or replace as necessary.
from mounting crossmember (13).
3. Inspect engine damper and flange coupling for
5. Remove mounting hardware securing fan to engine damage and repair or replace as required.
(1) then remove fan.
10 SM 1923 R2 03-04
Engine - Engine and Mounting
Section 110-0030
Note: Tighten all fasteners without special torques 10. If removed, install rubber isolation mounts (17) to
specified to standard torques listed in Section front mounting crossmember (13).
300-0080, STANDARD BOLT AND NUT TORQUE
SPECIFICATIONS. 11. If removed, install rubber isolation mounts (22) in
rear mounting brackets (21). Secure rear mounting
1. Remove covers from engine filter ports and install brackets (21) to engine (1) with bolts (10 & 11) and
new filters (2, 3 & 4) on engine (1), as described in lockwashers (12). Tighten bolts (10 & 11) to a torque
'Maintenance'. of 230 Nm (170 lbf ft) lubed.
2. Install damper to rear of engine (1) and secure 12. If removed, secure front mounting brackets (9) to
with mounting hardware as removed at 'Removal'. engine (1) with bolts (10) and lockwashers (12).
Install flange coupling to damper and secure with Tighten bolts (10) to a torque of 230 Nm (170 lbf ft)
mounting hardware as removed at 'Removal'. lubed.
7. Install poly 'V' belts to the fan pulley and 3. Attach suitable lifting equipment to engine (1) lifting
crankshaft pulley. points and carefully position engine (1) in the frame.
8. Adjust poly 'V' belts by turning the adjusting screw 4. Secure rear mounting brackets (21) to the frame
clockwise until the correct tension is obtained. Refer with bolts (24), snubbing washers (23) and locknuts
to 'Drive Belt Adjustments'. When correct tension is (25) as shown in Fig. 1. Tighten bolts (24) to a torque
obtained tighten fan hub mounting bolts to a torque of of 915 Nm (675 lbf ft) lubed.
100 Nm (74 lbf ft).
5. Secure front mounting brackets (9) to mounting
9. Position fan to fan pulley on engine (1) and secure crossmember (13) with bolts (14), hardened washers
with mounting hardware. Tighten bolts in a star (15), lockwashers (12) and and locknuts (16) as
shaped pattern to a torque of 34 Nm (25 lbf ft). shown in Fig. 1. Tighten bolts (14) to a torque of
170 Nm (230 lbf ft) lubed.
SM 1923 R2 03-04 11
Engine - Engine and Mounting
Section 110-0030
6. Connect driveline to the engine coupling. Refer to 19. Connect battery positive connections to battery
Section 130-0010, FRONT DRIVELINES. terminal posts. Connect battery earth connections to
battery terminal posts.
7. Install tandem pump on power takeoff assembly
and secure with mounting hardware. Refer to Section 20. Ensure all lines, harnesses and cables are
230-0050, TANDEM PUMP. secured with clips and clamps as removed during
removal. Ensure no lines are chaffing on sharp edges
8. Using suitable lifting equipment, install the radiator or resting against areas where heat will be evident.
assembly to the frame and secure with mounting Ensure all drain plugs and cocks are secured tightly.
hardware. Refer to Section 210-0040, RADIATOR
AND MOUNTING. 21. Fill the cooling system with coolant specified in
Section 300-0020, LUBRICATION SYSTEM. Check
9. Adjust 'V' belts by loosening locknut and turning the coolant level as described in Section 210-0000,
screw assembly clockwise until the correct tension is COOLING SYSTEM.
obtained (refer to 'Drive Belt Adjustments'). When
correct tension is obtained tighten locknut. 22. Fill the engine with lube oil specified in Section
300-0020, LUBRICATION SYSTEM. Check oil level
10. Tighten bolt securing alternator to engine as described under 'Maintenance'.
mounting bracket and bolt securing link assembly to
alternator to a torque of 81 - 95 Nm (60 - 70 lbf ft). 23. Check all line and pipe connections for leaks prior
to starting the vehicle. Tighten as required.
11. Remove caps from all cooling lines and connect
lines to the radiator assembly and engine (1) 24. Start up the engine and bring the engine oil to
assembly as identified at removal. operating temperature. Check all lines and fittings for
leaks and tighten as required.
12. Install air cleaner intake pipe and exhaust piping
to engine turbocharger. Tighten mounting clamps 25. Ensure parking brake is applied and remove
securely. wheel blocks from all road wheels.
14. Remove caps from fuel lines and fittings and Note: Carry out the following maintenance
connect fuel lines to engine (1) as identified at removal. procedures in conjunction with additional procedures
listed in Section 300-0020, LUBRICATION SYSTEM.
15. Connect all electrical harnesses and cables to
engine (1) (with the exception of battery connections)
as identified at removal. Every 10 Hours (Daily)
Engine (1): Visually check engine for damage, loose
16. Connect air conditioning lines to the compressor or frayed belts and listen for any unusual noises.
as identified at removal. On completion of engine Check the turbocharger for leaks.
installation the air conditioning system will require to
be charged. Refer to Section 260-0130, AIR Engine (1) Oil Level: Check engine oil level and add
CONDITIONING. oil if low.
17. Using suitable lifting equipment, install radiator 1. Cold Level - Before starting up after a major shut
guard assembly to the frame. Secure with the down period the oil level should be up to the
required mounting hardware and connect electrical MAXIMUM mark.
connections as identified at removal.
2. Hot Level - Shut down the engine and wait 5
18. Using suitable lifting equipment, install hood minutes. The oil level should be up to, but not over,
assembly into position on the vehicle. Secure hood the MAXIMUM mark (hot level).
assembly with mounting hardware removed at
removal.
12 SM 1923 R2 03-04
Engine - Engine and Mounting
Section 110-0030
After First 150 Hours of Operation 3. Start new primary fuel filter (4) on the filter adaptor
Engine (1): Drain engine oil and refill. Refer to and tighten it by hand until the gasket contacts the
Section 300-0020, LUBRICATION SYSTEM for oil adaptor fully with no side movement of the filter
specification. evident. Tighten an additional 1/2 of a turn.
Engine Oil Filters (2): Replace oil filters as follows: Note: Mechanical tightening of fuel filters (4 & 5) is
not recommended, and may result in seal and/or
1. Using filter wrench, remove and discard all oil cartridge damage. Tighten fuel filters by hand only.
filters (2) from engine (1). Inspect the sealing surface
of the filter to ensure that the seal ring stayed with 4. Repeat step 3 for remaining primary fuel filter (4)
the filter. If not, remove it from the filter adaptor. and both secondary fuel filters (5).
2. Clean the filter adaptor with a clean, lint free cloth. 5. Start the engine and check for leaks. If any leaks
are noted, have them corrected.
3. Lightly coat new oil filter (2) seal with clean engine
oil as specified in Section 300-0020, LUBRICATION
SYSTEM. After First 200 Hours of Operation
Coolant: Check coolant level and condition of
4. Start a new oil filter (2) on the filter adaptor and coolant inhibitor as described in Section 210-0000,
tighten it by hand until the seal touches the adaptor COOLING SYSTEM.
filter head. Tighten an additional 2/3 of a turn after
contact.
Every 500 Hours
Note: Mechanical tightening of oil filters (2) is not Engine (1): Drain engine oil and refill. Refer to
necessary and will distort or crack the adaptor. Section 300-0020, LUBRICATION SYSTEM for oil
Tighten oil filters by hand only. specification.
5. Repeat steps 3 and 4 for remaining oil filters (2). Engine Water Pump: Inspect water pump drain hole
and clean if required.
6. Start and run the engine for a short period and
check for oil leaks. If any leaks are noted, have them Engine Oil Filters (2): Replace oil filters (2) as
corrected. described in 'After first 150 hours of operation'.
7. After the engine has been stopped long enough Fuel Filters (4 & 5): Replace primary fuel filters (4)
(approximately 20 minutes) for the oil from various and secondary fuel filters (5) as described in 'After
parts of engine (1) to drain back to the crankcase, first 150 hours of operation'.
check oil level and add oil to bring it to the proper
level on the dipstick. Refer to Section 300-0020, Coolant: Check coolant level and condition of
LUBRICATION SYSTEM for oil specification. coolant inhibitor as described in Section 210-0000,
COOLING SYSTEM.
Fuel Filters (4 & 5): Replace primary fuel filters (4)
and secondary fuel filters (5) as follows:
Drive Belt Adjustments
Note: There is a fuel system shut off valve on the Every 100 Hours: Check all drive belt tensions and
discharge side of secondary fuel filter (5). Closing adjust if required. Check and adjust air conditioning
this valve will prevent loss of fuel prime at time of compressor belts as described in Section 260-0130,
filter replacement. AIR CONDITIONING.
1. Close shut off valve at secondary fuel filters (5) Every 2 000 Hours: Replace all drive belts.
and, using filter wrench, remove and discard all fuel
filters (4 & 5) from engine (1). Note: Replace all belts in a set when one is worn.
Single belts of similar size should not be used as a
2. Fill the replacement filters and coat the gaskets substitute for a matched belt set as premature belt
slightly with clean fuel oil as specified in Section wear can result due to belt length variation. All belts
300-0020, LUBRICATION SYSTEM. in a matched belt set are within 0.81 mm (0.032 in) of
their specified centre distances.
SM 1923 R2 03-04 13
Engine - Engine and Mounting
Section 110-0030
Using belt tension gauge, adjust the belt tension to the Belts should be neither too tight nor too loose. Belts
following values: that are too tight impose excess loads on the
crankshaft, fan and alternator bearings, shortening both
Fan - Poly 'V' Belt belt and bearing life. Excessively overtightened belts
'New' Belt Tension - 2670 - 2935 N (600 - 660 lbf) can result in crankshaft breakage. A loose belt will slip
'Used' Belt Tension - 2295N (515 Ibf) and may cause damage to accessory components.
* * * *
14 SM 1923 R2 03-04
ENGINE - Air Cleaner
Section 110-0050
SM - 1532
DESCRIPTION SM - 1898
An electrical air restriction gauge (15, Fig. 3) indicates While the indicator light indicates the need for
when air restriction levels reach the maximum servicing, it does not give as precise a measurement
allowable limit. When air restriction levels are reached, as a water manometer or vacuum gauge. Refer to
SM 1925 7-00 1
Engine - Air Cleaner
Section 110-0050
SM - 2434
7
8
9
8,9
6 15
5
14
4 13
3
12
4
16
4
1 6
5
2 4
10
4
16 11
4
'Measuring Air Restriction'. over service. When restriction readings finally indicate
a change, remove primary element (2) carefully and
Safety element (3) is installed in each air cleaner clean/replace as required. Refer to 'Primary Element'.
assembly inside of primary element (2). This element
increases the reliability of the air cleaner’s protection Never attempt to clean safety element (3). Change
of the engine from airborne dirt. It protects the engine safety element (3) after every third primary element (2)
from dirt admitted by a damaged primary element (2), service.
or dirt that might be dropped into the air cleaner
assembly while servicing primary element (2). Make sure vacuator valve (6) is not damaged or
plugged and that the joint with cover assembly (4) is
not broken. If vacuator valve (6) is lost or damaged,
MAINTENANCE replace it to maintain pre-cleaner efficiency and normal
Numbers in parentheses refer to Fig. 1, unless filter element service life.
otherwise specified.
Check condition of clamps (4 & 6, Fig. 3), hump hoses
(5 & 16, Fig. 3) and tube assemblies (10 & 11, Fig. 3).
WARNING Tighten/replace as necessary.
Always shutdown the engine before servicing
air cleaner.
Air Cleaner Assembly
The air cleaner elements should be serviced only Numbers in parentheses refer to Fig. 1, unless
when the maximum allowable restriction has been otherwise specified.
reached, as indicated by air cleaner restriction
indicator light. The elements should not be serviced on Note: Air cleaner body (1) should be thoroughly
the basis of visual observation as this would lead to cleaned twice a year. Do not apply heat in any form to
2 SM 1925 7-00
Engine - Air Cleaner
Section 110-0050
air cleaner body (1). 2. Remove primary element (2) from air cleaner body (1).
1. Release latches (5) on cover assembly (4) and 3. Using a damp cloth and a suitable solvent, wipe out
remove cover assembly from air cleaner body (1). all excess dust from air cleaner body (1) and allow to
dry.
2. Remove primary element (2) and safety element (3)
from air cleaner body (1). 4. If the major contaminant on primary element (2) is
light dust, direct a jet of compressed air, not exceeding
3. Slacken clamp (6, Fig. 3) and disconnect hump 6.9 bar (100 lbf/in2), against the pleats of the element.
hose (5, Fig. 3) from air cleaner body (1). The air jet should be directed in the opposite direction
of normal operating air flow. Move the air jet up and
4. Remove bolts (1, Fig. 3) and hardened washers down the pleats, holding the air nozzle 25 mm (1.0 in)
(2, Fig. 3) securing the air cleaner assembly to the away from the pleats, to prevent rupturing the element
platform. with either the nozzle or air jet.
5. Remove the air cleaner assembly from the platform 5. In cases where the dust cake on primary element
for cleaning. (2) contains oil or carbon, air will not clean effectively.
Using manufacturers recommended solution and
6. Open mounting bands (3, Fig. 3) and remove from warm water, not exceeding 48° C (120° F), soak
air cleaner body (1). Open clamp (9, Fig. 3) and primary element (2) for fifteen minutes. Element
remove cap assembly (7, Fig. 3) and tube extension should be gently agitated to assist cleaning process.
(8, Fig. 3) from air cleaner body (1).
Note: It is possible to modify an old agitator type
7. Blank off air cleaner body (1) outlets with tape or washing machine for primary element (2) cleaning. Do
cardboard. Reach inside body with a compressed air not soak or agitate primary element (2) in the solution
nozzle or brush and remove dust from the body. for more than fifteen minutes. Prolonged exposure
softens vertical seams in the element.
8. Remove all loose dust from air cleaner body (1) and
remove tape or cardboard from body outlets. 6. Rinse washed element thoroughly with a low
pressure stream of water, not exceeding 0.7 bar
Note: Assembly and installation of the air cleaner (10 lbf/in2), opposite from the normal air flow, until
assembly is the reverse of disassembly and removal. rinse water runs clear.
SM 1925 7-00 3
Engine - Air Cleaner
Section 110-0050
10. Install cover assembly (4) on air cleaner body (1) (air cleaner outlet) increases. This vacuum is generally
and secure with latches (5). measured as 'restriction in mm (inches) of water'.
4. Install cover assembly (4) on air cleaner body (1) c. With the manometer held vertically and the engine
and secure with latches (5). drawing maximum air, the difference in height of the
water columns in the two legs is measured as the air
cleaner restriction.
Recommendations
Numbers in parentheses refer to Fig. 3. d. If the restriction exceeds the levels indicated,
engine performance will be affected. Primary filter
1. Under no condition should the vehicle be operated element should be cleaned or replaced.
without both filter elements in each air cleaner
assembly. Vacuum Gauge
a. Remove air restriction gauge (15), elbow (14) and
2. It is very important that hump hoses (5 & 16) and nipple (13) from reducer (12).
tube assemblies (10 & 11) from the air cleaner
assembly to the engine be airtight or the purpose of b. Connect the hose from the vacuum gauge to
the air cleaner will be completely defeated. All clamps reducer (12) and, with the engine drawing maximum
(4 & 6) should be checked frequently and tightened to air, take a note of the reading on the gauge.
prevent leaks.
c. If the restriction exceeds the levels indicated, engine
3. Keep new or cleaned filter elements on hand for performance will be affected. Primary filter element
replacement to prevent unnecessary downtime of the should be cleaned or replaced.
vehicle.
SERVICE TOOLS
MEASURING AIR RESTRICTION Refer to Section 300-0070, SERVICE TOOLS for part
Numbers in parentheses refer to Fig. 3. numbers of service tools referenced in this section and
general service tools required. These tools are
As a dry air cleaner element becomes loaded with available from your dealer.
dust, the vacuum on the engine side of the air cleaner
* * * *
4 SM 1925 7-00
ENGINE - Power Takeoff
Section 110-0130
3. Disconnect driveline from yoke (22) at the PTO 8. Attach a suitable lifting device to the PTO assembly
assembly. Refer to Section 130-0010, FRONT and remove bolts (23 & 25) and lockwashers (24)
DRIVELINE. securing PTO assembly to the engine flywheel
housing. Carefully lower PTO assembly from the
4. Drain oil from power takeoff housing by removing flywheel housing and move to a clean work area for
drain plug (6) from flywheel cover case (1). Reinstall disassembly.
drain plug (6) securely.
SM 1914 7-00 1
Engine - Power Takeoff
Section 110-0130
SM - 2421
26 29
2
18
4 3
6
17
12 11
1 6 16
13 19
11 9
6 22
2
17
10
15
14 8 7
10
21
27
5 20
28
23,25
6 24
22 - Yoke
1 - Flywheel Cover Case 8 - Lockwasher 15 - Driveshaft 23 - Bolt
2 - Dowel Pin 9 - Oil Seal 16 - Locknut 24 - Lockwasher
3 - Bolt 10 - Bearing 17 - Snap Ring 25 - Bolt
4 - Lockwasher 11 - Bearing 18 - Gasket 26 - PTO Cover
5 - Oil Seal 12 - Driven Gear 19 - Hardened Washer 27 - Coupling
6 - Plug 13 - Plug 20 - Breather 28 - Adaptor
7 - Bolt 14 - Drive Gear 21 - Breather Cap 29 - Plug
Fig. 2 - Exploded View of Power Takeoff Assembly
2. Remove bolts (3 & 7) and lockwashers (4 & 8) from 8. If necessary, note locations and remove dowel pins
PTO cover (26). Pull PTO cover (26) and gasket (18) (2) from flywheel cover case (1) and breather
from flywheel cover case (1). Discard gasket (18). assembly (20, 21, 27 & 28) from PTO cover (26).
4. Remove snap rings (17) from pump and driveshaft 1. Wash all parts thoroughly in a suitable solvent and
bores. Drive bearings (10 & 11) from PTO cover (26) dry all but bearings (10 & 11) with compressed air. Dry
with a sleeve or soft steel drift. Drive on the outer race bearings (10 & 11) with a clean lint free cloth.
of bearings (10 & 11) taking care not to damage the
bearings. 2. Check the condition of splines and teeth on gears
(12 & 14), driveshaft (15) and yoke (22) for burrs or
5. Slide drive gear (14) from driveshaft (15) and pull signs of wear.
driven gear (12) from flywheel cover case (1).
3. Lubricate bearings (10 & 11) with oil and check
6. Pull driveshaft (15) from flywheel cover case (1). operation by spinning bearings by hand. DO NOT spin
Pry oil seal (5) from flywheel cover case (1). bearings with compressed air. Inspect bearing bores
for out of roundness. Replace bearings, if required.
7. Pull bearings (10 & 11) from flywheel cover case (1)
with a suitable bearing puller. 4. Inspect flywheel cover case (1) and PTO cover (26)
for cracks. If either flywheel cover case (1) or PTO
2 SM 1914 7-00
Engine - Power Takeoff
Section 110-0130
cover (26) are damaged, both parts must be replaced 6. Install driven gear (12) and driveshaft (15) into
as an assembly. flywheel cover case (1). Slide drive gear (14) over
driveshaft (15) to its proper location.
5. Visually check oil seal lip contact surfaces on
driveshaft (15) and yoke (22) for nicks, dents, 7. Install new gasket (18) on PTO cover (26) and
scratches, wear, or corrosion. Replace as necessary. assemble PTO cover (26) to flywheel cover case (1).
Secure PTO cover (26) to flywheel cover case (1) with
bolts (3 & 7) and lockwashers (4 & 8).
ASSEMBLY
Numbers in parentheses refer to Figs. 2. 8. Install yoke (22), hardened washer (19) and locknut
(16) on driveshaft (15) end. Tighten locknut (16) to a
Note: Prior to assembly, lubricate all seal lips and torque of 950 - 1 085 Nm (700 - 800 lbf ft).
surfaces with lubricant specified in Section 300-0020,
LUBRICATION SYSTEM.
INSTALLATION
Note: Tighten all fasteners without special torques Numbers in parentheses refer to Figs. 1 & 2.
specified to standard torques listed in Section
300-0080, STANDARD BOLT AND NUT TORQUE Note: When reassembling PTO assembly to engine
SPECIFICATIONS. flywheel housing, and tandem pump to PTO assembly,
be sure to align match marks inscribed during
disassembly.
WARNING
To prevent personal injury and property Note: Tighten all fasteners without special torques
damage, be sure lifting device is properly specified to standard torques listed in Section
secured and of adequate capacity to do the job 300-0080, STANDARD BOLT AND NUT TORQUE
safely. SPECIFICATIONS.
1. If removed, install dowel pins (2) in flywheel cover 1. Using suitable lifting equipment, position PTO
case (1) and breather assembly (20, 21, 27 & 28) in assembly on engine flywheel housing. Secure the
PTO cover (26), as noted at disassembly. PTO assembly to the engine flywheel housing with
bolts (23 & 25) and lockwashers (24).
2. Install new oil seal (5) in centre bore of flywheel
cover case (1) so that it is flush with flywheel cover 2. Using suitable lifting equipment, position tandem
case (1) face. See Fig. 1. pump over its mounting studs and secure with nuts
and lockwashers removed during removal.
Note: When installing new oil seals, install them with
the oil lip (larger of the two lips with the spring behind 3. Reconnect driveline to yoke (22). Refer to Section
it) facing inward. Care should be taken to prevent 130-0010, FRONT DRIVELINE.
damage to seal lips during assembly.
4. Remove oil level plug (6) from the front of PTO
3. Press bearings (10 & 11) into their bores in flywheel cover (26) and fill PTO assembly with lubricant
cover case (1). specified in Section 300-0020, LUBRICATION
SYSTEM, until oil flows from the oil level port. Install oil
4. Press bearings (10 & 11) into their respective bores level plug (6) in PTO cover (26) and tighten securely.
in PTO cover (26). Turn PTO cover (26) over and
install snap rings (17). 5. Start the engine and bring oil to correct operating
temperature. Check for leaks and correct as necessary.
5. Install new oil seal (9) into centre bore in PTO cover
(26) so that it is flush with PTO cover (26) face. See 6. Remove wheel blocks from all road wheels.
Fig. 1.
SM 1914 7-00 3
Engine - Power Takeoff
Section 110-0130
* * * *
4 SM 1914 7-00
TRANSMISSION - Transmission and Mounting
Section 120-0010
SM - 2443
20 21 24
32
23 33
22 34
37 35,36
3
49
20 4
47
21 53
46 19
48
44 29
28
13 54
14
27 2 53
26 30 5
31
25
6
15 7
10
11
50 12
47
51 46
52 48 45
44
1 12
16 42
9 11 10 43
39
41 8
38 15 17 40
18
40 - Drain Cock
26 - Key 41 - Adaptor
1 - Transmission 27 - Padlock 42 - Adaptor
2 - Trunnion 14 - Gasket 28 - Bolt 43 - Snubbing Washer
3 - Bolt 15 - Clamp 29 - Cover Plate 44 - P-clip
4 - Washer 16 - Filler Hose 30 - Level Gauge 45 - Bracket
5 - Locknut 17 - Filler Tube 31 - Ring 46 - Lockwasher
6 - Bolt 18 - Elbow 32 - Bolt 47 - Nut
7 - Hardened Washer 19 - Connector 33 - Strip 48 - Bolt
8 - Nut 20 - Nut 34 - Retainer 49 - P-clip
9 - Mounting Bracket - RH 21 - Sleeve 35 - Shim 50 - Bolt
10 - Bolt 22 - Nylon Tube 36 - Shim 51 - Hardened Washer
11 - Lockwasher 23 - Elbow 37 - Input Yoke 52 - Nut
12 - Isolation Mount 24 - Breather 38 - Nut 53 - Isolation Mount
13 - Filler Cap 25 - Adaptor 39 - Output Yoke 54 - Mounting Bracket - LH
Fig. 1 - Exploded View of Transmission and Mounting
SM 1932 7-00 1
Transmission - Transmission and Mounting
Section 120-0010
When the pump turns faster than the turbine, the Transmission Oil Cooler
torque converter is multiplying torque. When the The transmission oil is cooled by a separate oil cooler
turbine approaches the speed of the pump the stator mounted between the radiator and transmission to
starts to rotate with the pump and turbine. When this maintain transmission oil within its required operating
occurs, torque multiplication stops and the torque temperature range. Refer to Section 210-0060,
converter functions as a fluid coupling. TRANSMISSION OIL COOLER.
2 SM 1932 7-00
Transmission - Transmission and Mounting
Section 120-0010
Note: It is important that the electrical connections are transmission (1) and move bracket and valve clear of
removed in the order listed in step 4 to prevent the transmission (1).
damage to the electrical components.
17. Remove mounting hardware supporting mounting
4. Disconnect battery equalizer ground connection brackets for body hoist lines to the top of
from the batteries. Disconnect battery cables from transmission (1).
terminal posts (ground cable first). Disconnect battery
equalizer positive connection. Disconnect electrical 18. Remove mounting hardware securing kick-over
connections at the ECU. valve mounting bracket to the top of transmission (1).
5. Using suitable lifting equipment, support 19. Slacken nut (20) and move nut (20) and nylon tube
transmission guard and remove mounting hardware (22) assembly free from connector (19) in the top of
securing the guard to the frame. Remove transmission transmission (1).
guard.
20. Detach clamps (15) and remove filler hose (16)
6. Disconnect driveline from input yoke (37) at the from filler tube (17) and adaptor (25).
front of transmission (1). Refer to Section 130-0010,
FRONT DRIVELINE. 21. Install suitable lifting eyes into the holes provided
at the top of transmission (1) housing and secure a
7. Disconnect driveline from output yoke (39) at the suitable lifting device to the eyes. Take up slack in the
rear of transmission (1). Refer to Section 130-0020, chain or cable.
REAR DRIVELINE.
22. Remove locknuts (5), bolts (3) and washers (4)
8. Place a suitable container under drain cock (40), securing trunnion (2) to the frame.
loosen drain cock and drain oil from transmission (1).
After draining, tighten drain cock (40) securely. 23. Remove bolts (6), hardened washers (7), snubbing
washers (43) and nuts (8) securing mounting brackets
9. Disconnect the transmission retarder linkage at (9 & 54) to frame.
transmission (1).
24. Check to make certain that all hydraulic lines and
10. Place a suitable container under the steering tank electrical connections fitted to transmission (1) have
drain plug, remove drain plug and drain the oil from the been disconnected before moving transmission (1).
steering tank. After draining, reinstall drain plug.
25. Carefully manoeuvre transmission (1) out of the
11. Disconnect steering lines from the steering pump frame mounting and lower onto a suitable dolly or pallet.
and remove mounting hardware securing steering
lines to transmission (1). Cap all open line ends and 26. Move transmission (1) assembly to a suitable work
steering pump fittings to prevent entry of dirt. area or onto a work stand for further disassembly, if
necessary.
12. Disconnect transmission oil cooler lines and oil
filter lines from transmission (1). Cap all open lines
and fittings to prevent entry of dirt. DISASSEMBLY
Numbers in parentheses refer to Fig. 1.
13. Disconnect hydraulic line from lockup drop out
valve at the front right hand side of transmission (1). Note: Refer to the transmission manufacturers
Service Manual if transmission service or repair is
14. Disconnect all remaining hydraulic lines attached required.
to transmission (1). Cap all open lines and fittings to
prevent entry of dirt. 1. Remove bolts (32), strip (33), retainer (34) and
shims (35 & 36) securing input yoke (37) on
15. Disconnect all electrical connections and cables transmission (1). Pull input yoke (37) from
attached to transmission (1). transmission (1).
16. Remove mounting hardware securing accumulator 2. Pull trunnion (2) assembly from transmission (1)
valve mounting bracket to the front left hand side of and remove ring (31) from trunnion (2), if required. If
necessary, remove isolation mounts (53) from
SM 1932 7-00 3
Transmission - Transmission and Mounting
Section 120-0010
trunnion (2). 6. Coat output shaft splines and threads, and lip of oil
seal with a thin layer of EP, NLGI molybdenum
3. Remove nut (38) securing output yoke (39) on grease. Install output yoke (39) on output shaft by
transmission (1). Pull output yoke (39) from tapping lightly until the yoke is seated. If output yoke
transmission (1). (39) is a tight fit, heat output yoke (39) to 121° C
(250° F) maximum prior to assembly, using either of
4. Remove bolts (10) and lockwashers (11) securing the methods described in step 3.
mounting brackets (9 & 54) to transmission (1).
Remove mounting brackets (9 & 54). 7. Secure output yoke (39) on output shaft with nut
(38). Tighten nut (38) to a torque of 950 - 1 355 Nm
5. If necessary, remove isolation mounts (12) from (700 - 1 000 lbf ft).
mounting brackets (9 & 54).
8. After assembly has cooled, check torque of bolts
(32) and nut (38) and retighten to their required
ASSEMBLY torques.
Numbers in parentheses refer to Fig. 1.
4 SM 1932 7-00
Transmission - Transmission and Mounting
Section 120-0010
6. Install filler hose (16) to filler tube (17) and adaptor level as described in Section 220-0040, STEERING
(25) and secure with clamps (15). AND BRAKE CONTROL TANK.
7. Secure accumulator valve mounting bracket to the Note: It is important that the electrical connections are
front left hand side of transmission (1) assembly with made in the order listed in step 21 to prevent damage
mounting hardware removed during removal. to the electrical components.
8. Secure kick-over valve mounting bracket to top of 21. Connect electrical connections at the ECU.
transmission (1) assembly with mounting hardware Connect battery equalizer positive connection.
removed during removal. Connect battery cables to battery terminal posts
(ground cable last). Connect battery equalizer ground
9. Secure body hoist lines mounting brackets to the connection.
top of transmission (1) assembly with mounting
hardware removed during removal. 22. Start the engine and make an operational check
while the engine is running of all lines and connections
10. Connect all electrical connections and cables to disconnected during removal of transmission (1).
transmission (1) as tagged at removal. Check for leaks and tighten lines and fittings as
required.
11. Connect transmission oil cooler lines to
transmission (1) and oil filter lines to transmission oil 23. Ensure parking brake is applied, remove the body
filter as tagged at removal. prop pins and lower the body. Refer to Section
270-0010, BODY AND MOUNTING. Remove wheel
12. Connect steering pump hydraulic lines as tagged chocks from all road wheels.
at removal and secure lines to transmission (1) with
mounting hardware removed during removal.
MAINTENANCE
13. Connect hydraulic line from lockup drop out valve
to front right hand side of transmission (1). Periodic Inspections
For easier inspection, the transmission should be kept
14. Connect any remaining hydraulic lines which were clean. Make periodic checks for loose bolts and
removed during removal. Ensure all hydraulic lines are leaking oil lines. Check the condition of electrical
securely tightened. harnesses and connections regularly.
15. Connect transmission retarder linkage at The transmission breather should be checked
transmission (1). regularly and as frequently as necessary, depending
on the operating conditions of the vehicle. A badly
16. Install rear driveline to output yoke (39) at the rear corroded or plugged breather restricts proper
of transmission (1) and secure with mounting breathing and causes a buildup of condensation and
hardware removed during removal. Refer to Section subsequent oil deterioration.
130-0020, REAR DRIVELINE.
17. Install front driveline to input yoke (37) at the front Oil Level Check
of transmission (1) and secure with mounting
hardware removed during removal. Refer to Section
130-0010, FRONT DRIVELINE. WARNING
When checking the oil level, be sure that the
18. Using suitable lifting equipment, support parking brake is applied and all road wheels
transmission guard and secure guard to the frame with are securely blocked.
mounting hardware removed during removal.
Check the transmission oil level and add oil if low,
19. Fill transmission (1) assembly with oil specified in every 10 hours/daily. Use only oil of the type specified
Section 300-0020, LUBRICATION SYSTEM, and check in Section 300-0020, LUBRICATION SYSTEM.
the oil level as described under 'Oil Level Check'.
Because the transmission oil cools, lubricates and
20. Fill steering tank with oil specified in Section transmits hydraulic power it is important that the
300-0020, LUBRICATION SYSTEM, and check the oil proper oil level be maintained at all times. If the oil
SM 1932 7-00 5
Transmission - Transmission and Mounting
Section 120-0010
level is too low, the converter and clutches will not SM - 1250
receive an adequate supply of oil. If the oil level is too
high, the oil will aerate and the transmission will
overheat. It is absolutely necessary that the oil put into
the transmission be clean.
6 SM 1932 7-00
Transmission - Transmission and Mounting
Section 120-0010
SM 1932 7-00 7
Transmission - Transmission and Mounting
Section 120-0010
6. During the stall check the transmission oil for mechanical troubleshooting, as outlined in the
temperature should rise while the engine is under load 'Mechanical Trouble Shooting' charts, before carrying
and drop when the transmission is returned to neutral. out electrical troubleshooting procedures.
Should the temperature fail to drop it indicates that
there is a problem with the converter.
WARNING
7. After making allowances for elevation, a low engine Be sure to apply the parking brake, switch off
speed may indicate the engine is not delivering full the engine and block all road wheels before
power. Refer to engine service manual for engine troubleshooting the vehicle. Should it be
repair information. necessary to run the engine, it is imperative
that an operator be present in the cab at all
times, even at idle.
Electronic Troubleshooting
Refer to Section 120-0070, CEC SHIFT SYSTEM for
general electrical troubleshooting. For more detailed SPECIAL TOOLS
electrical troubleshooting refer to the Allison There are no special tools required for the procedures
Transmission Commercial Electronic Control (CEC) outlined in this section. Refer to Section 300-0070,
Troubleshooting Manual SA2712A. SERVICE TOOLS for part numbers of service tools
which should be used in conjunction with procedures
outlined in the transmission manufacturers service
Mechanical Troubleshooting manual, and general service tools required. These
It is recommended to follow the procedures laid down tools are available from your dealer.
8 SM 1932 7-00
Transmission - Transmission and Mounting
Section 120-0010
SM 1932 7-00 9
Transmission - Transmission and Mounting
Section 120-0010
10 SM 1932 7-00
Transmission - Transmission and Mounting
Section 120-0010
* * * *
SM 1932 7-00 11
TRANSMISSION - CEC Plus II Shift System
Section 120-0070
SM - 1966
4 7
11
TEST
10
DO NOT
SHIFT
4
5D
3
2
1
N
R1
9
R2
12
DO NOT
SHIFT
6 5
2
10 13 1 MANUAL AUTO POWER ECONOMY
14
17
15
BODY
16
18
HYD CONTROL VALVE
1 - Electronic Control Unit (ECU) 7 - Manual Mode Warning Light 13 - Circuit Breakers
2 - Battery Equalizer 8 - Check Trans Warning Light 14 - Lockup Valve & Temp Control
3 - CEC Interface Box 9 - Check Trans Switch 15 - Main Control Valve
4 - Gear Shift Selector 10 - Do Not Shift Warning Light 16 - Speed Sensor
5 - Mode Selection Switch 11 - In-converter Indicator Light 17 - Reverse Hoist Press Switch
6 - Manual Mode Switch 12 - Digital Data Line 18 - Body Up Proximity Switch
7. Manual Mode Warning Light - Illuminates to alert 11. In-convertor Indicator Light - Illuminates when
the operator when the transmission has been switched the transmission is in torque converter drive. It goes
to operate in the manual mode. The light should be 'Off' when Lockup is engaged. In order to avoid
'Off' during normal operation. unnecessary waste of fuel, if traffic or other road
conditions permit, the operator should modify throttle
8. Check Trans Warning Light - Illuminates to alert of position, or gear held, to achieve a steady road speed
a minor fault in the transmission shift system or with the torque converter lockup engaged (light 'Off').
abnormal transmission temperature. The light will
come 'On' when the ignition key switch is turned to 12. Digital Data Line - Located in the right hand side
position '1' to provide a bulb and system check and of the transmission control tower. Plug in connector for
should go 'Off' a few seconds after the engine is diagnostic data reader (DDR).
started and the transmission oil pressure rises.
The check trans warning light will come 'On' during CEC PLUS II ELECTRICAL CIRCUITS
operation, if the ECU has detected a minor fault in an Note: The following circuits refer to both colour coded
electrical component or abnormal transmission oil wires (vehicle harnesses) and number coded wires
temperature. If transmission oil temperature is too (Allison harnesses). For ease of explanation, the
high, stop the vehicle, select neutral 'N', and increase number codes are used in the text.
engine speed to allow a greater flow of oil to the cooler
until oil temperature drops to normal operating range. Note: Where wire colours are indicated in the circuits
In most cases, a minor fault triggering the check trans followed by the Allison number in brackets, this
warning light will not prevent normal operation from indicates which Allison wire the vehicle harness wire
continuing but, depending on the nature of the will connect to.
problem, the ECU could take action to protect the
transmission from damage, such as preventing Note: Refer to Section 190-0000, CIRCUIT
operating in high gear ranges. If the check trans light DIAGRAMS, for vehicle electrical circuits. Refer to
comes 'On', have the problem diagnosed and Section 190-0270, SWITCHES AND SENSORS, for
corrected at the earliest opportunity. location and description of transmission switches and
sensors.
F
H27 - Check Trans W/L W/B
S53
R/W R/W
1
P1 205
W
Z
B
N2 - Voltage Regulator
S52
F7
B
U/G
R
G
W/B
W/B
E
S4 - Test Switch W/B B B
W/B 330A W/B W
S7 - Park/Emergency Brake Switch R 308 R W/U
H27 U/P 87A U/P U/P
S19 - Dipswitch G/U G/U
2
S4 B
216A B
S22 - Body Up W/light Switch 306
R
S51 - Reverse Hoist Pressure Switch
W/B
R R
G/U
D
F7
S52 - Manual Mode Keyswitch W/R R/U
W/B 330 R/W
U/R U/R U/R
U/G
322
F2 W/R 341 R/P R/P
S62 - Retarder On Switch Y Y
S62 211
R
F4
3
U/W 75 U/W
K17
U/P
R/U
U W/Y 45 U
B
TO S22 K1
INTERFACE BOX RELAYS TO S22
W/B
R
C
F3
1 - ECU Initial Start R R G/W
p
S7 222
S51
W/P 203 W/P
F6
2 - ECU Supply N2
B
B
B N2 W 87 W U/P
R/P
R
W/B R
G/W
U/W
W N2 306
F1
4 - Transmission Check
R
U
G
W
B
Y
R
5 - Reverse Warning
B
DDL
R/Y
G/U
W/P
222 U/R
235 G
G
R/P U/W
315
313
311
310
309
305
INTERFACE BOX FUSES 203 Y
215 R/Y
1 - 8 Amp 5 - 5 Amp 213
5
211 U/W
F5
U
B
U
G
2 - 5 Amp 6 - 8 Amp
R/P
B/O
B/O
3 - 8 Amp 7 - 5 Amp
A
R/P
4 - 5 Amp G
214 G/U
R
G/R
201
216A B/O
208 U
B/O
WIRE COLOURS 209 B/W
W
234
6
G/R
B - Black O - Orange 231 W/U
202 U/G
N - Brown Y - Yellow 223 R/Y
J3 230
TRANSMISSION
J1A
U - Blue P - Purple
R - Red W - White
J1B
G - Green S - Slate
E.C.U.
L - Light Green
SM - 1967
5
Transmission - CEC Plus II Shift System
Section 120-0070
SM - 1968
WARNINGS
The ECU can be damaged by improper welding
B(306)
procedures. GRD
VANNER
W/P(203)
12V
Any time the battery equalizer is
24V 208
disconnected from the batteries, remove W/P(203)
W ECU
ground cable first, and reconnect last, to FUSE 3 209
+ 381
prevent damaging the component.
-
Note: When frame or other welding is required, the +
-
following procedure must be followed to protect the
electronic components:
B(306)
Turn ignition keyswitch to position '0' to shut down the
engine and disconnect the batteries.
Fig. 3 - ECU Memory Power (12 volts)
Disconnect battery equalizer ground connections from
the batteries. Disconnect battery cables from terminal
Refer to Fig. 3. Current flows from the battery through
posts (ground cable first). Disconnect battery equalizer
lines 381, 203, Fuse 3 and line 203 to the ECU. The
positive connections. Disconnect electrical
circuit is completed to ground through lines 208 or 209
connections at the ECU. On completion of all welding
and line 306.
reconnect electrical connections in the reverse order
to disconnections.
Circuit Breakers
Note: Both 12 and 24 volt circuits are present in the
Refer to Fig. 4. When circuit breakers are switched
CEC interface box. Extreme care must be taken, when
'ON' current (24 volts) flows through Fuse 1 and Line
making repairs to the system, to avoid damaging the
308 to Relays 3, 5 & 6 and Check Trans indicator light.
ECU by introducing 24 volts into a 12 volt circuit.
Current also flows through Fuse 2 and Line 235 to
provide operating power for the shift selector. Circuits
Ecu Memory Power are completed to ground through ECU and Lines 208,
209 and 306.
The ECU draws 12 volts at a maximum of 10
milliamps (mA) continuously to store trouble codes
and throttle position sensor calibration values. The Ignition Keyswitch
ECU stores two trouble codes at a time in its memory.
Refer to Fig. 5. When ignition keyswitch is turned to
If the memory power is disconnected trouble codes
position '1', current (24 volts) flows through Cable
and throttle position calibration values will be lost.
330A to Relay 1 and back to ground through Line 306,
Memory power must be reconnected, the engine
energising the solenoid. Solenoid in relay 1 closes
started, and the vehicle may have to be put into
switch, allowing current (12 volts) to flow through Line
operation, to restore trouble codes. Throttle position
87, Fuse 6, Switch and Lines 202A and 223A to the
calibration values will be recalculated by the ECU
ECU. Circuit is completed to ground through Lines
when power is restored and engine started.
208, 209 and 306.
SM - 1969
BATTERIES
R
+
+
-
-
FUSE 1
B(306)
R/G
GRD FUSE 2
VANNER
(235) R R R(308)
12V
CHECK
24V R R R TRANS
SHIFT 3 5 6 LIGHT
SELECTOR
B(306)
B(306) R4
U/P
208 (87A)
ECU
209
SM - 1970
FROM
IGN. SW. W/B(330A) U/G(223)
W/U(202A)
RELAY 1
(N.O.)
W(87) FUSE 6 W
+
BATTERIES
- B(306)
W(381)
+
-
GRD
24V
12V
208
ECU
209
VANNER
SM - 1971
W/B(330) FUSE 7 W
RELAY 2 B(306)
B(306)
GRD
24V
12V
VANNER
Neutral Start Circuit to ground when selector is in Neutral through Line 210,
Refer to Fig. 7. The Neutral Start circuit prevents the ECU, Lines 208 or 209 and Line 306. Solenoid in
engine from being started unless the shift selector is in Relay 6 closes Switch, allowing current (24 volts) to
Neutral position. When ignition keyswitch is turned to flow through Line 308, Switch and Line 45 to start
position '1', current (24 volts) flows through Line 341 solenoid. Refer to SECTION 190-0000, CIRCUIT
and Fuse 4 to Relay 6, energizing solenoid. Current DIAGRAMS for continuation of starter circuitry.
continues through Line 231 to shift selector, and goes
SM - 1972
VANNER
GRD
12V
24V
B(306)
+
BATTERIES
-
+ SHIFT
- SELECTOR
B(306)
G/R 210
(231)
RELAY 6 208
IGN. W/R W/R R/P(341) FUSE 4
SW. ECU
209
SOLENOID
TERMINAL TO CAB TO START
R(308) U(45)
WIRING SOLENOID
Check Trans Light When the engine is started, a switch in the ECU
The Check Trans light has two functions: to warn the closes, allowing current (24 volts) to flow through the
operator of a system failure and to flash trouble codes circuit made by Fuse 7, Lines 330, 215, 208 or 209
when the test switch is activated. and 306. Relay 4 solenoid is energized, opening relay
switch and turning 'Off' the Check Trans light.
Normal Operation And Warning Should the ECU detect a system failure, it will open
Refer to Fig. 8. When the ignition keyswitch is turned internal switch, deactivating relay 4 solenoid. Relay
to position '1', current (24 volts) flows through the switch closes, turning 'On' the Check Trans light to
circuit made by Fuse 1, Lines 308 and 87A, turning warn operator of failure.
'On' the Check Trans light.
SM - 1973
FUSE 7
R/W
24V
VANNER
12V
B(306) W/R
GRD ECU
(330)
B(306) 208
G/W 209
(215)
R
B(306)
+
+
-
-
Obtaining Trouble Codes With Test Switch depressed, ECU closes internal switch, energizing
Refer to Fig. 9. When the test switch is depressed, relay solenoid which opens relay switch, turning Check
circuit to ground from ECU through line 216A and 306 Trans light off. ECU opens and closes internal switch
is completed, signalling ECU to supply diagnostic to flash trouble codes with Check Trans light. The
codes to Check Trans light. When test switch is engine must be running.
FUSE 7 SM - 1974
R/W
24V
VANNER
12V
B(306) W/R
GRD ECU
(330)
B(306) 208
G/W 209
(215)
R
B(306)
+
+
-
-
Reverse Alarm ECU and back to ground through Lines 208 or 209 and
Refer to Fig. 10. When the shift selector is placed in Line 306. Solenoid closes Switch, allowing current to
Reverse, ECU closes circuit allowing current (24 volts) flow through Line 308, Switch and Line 75 to reverse
to flow through Line 308 and Fuse 1 to Relay 5, alarm. Refer to SECTION 190-0000, CIRCUIT
energizing solenoid. Current flows through Line 214 to DIAGRAMS for continuation of Reverse Alarm circuitry.
SM - 1975
RELAY 5
R(308)
U/W(75)
FUSE 1 TO REVERSE RELAY
R(308) R(308)
ECU
208
G(214)
209
BATTERY
DISCONNECT
RELAY B(306) B(306)
R
GRD
24V
12V
+
+
-
-
BATTERIES VANNER
Fig. 10 - Reverse Alarm
Reverse Hoist Pressure Switch being moved to the 'Raise' position, current is
Refer to Fig. 11. The Reverse Hoist Pressure switch is interrupted and ECU will shift transmission to Neutral.
a safety feature to prevent the vehicle from backing up To obtain Reverse again, switch must be opened and
while the body is being raised. Current from the ECU shift selector must first be placed in Neutral or a
flows through line 305, microswitch and line 309. If forward range. This interlock will not prohibit shifts to a
pressure switch is opened by the body control valve forward range while body is being raised.
SM - 1976
SHIFT
SELECTOR
B(309)
ECU W(305)
Parking Brake Interlock prevents a shift out of Neutral. This interlock will not
Refer to Fig. 12. The Parking Brake Interlock prevents inhibit shifting if the parking brake is applied while the
a shift out of Neutral when the parking brake is transmission is operating in reverse or any forward
applied. When the parking brake is applied, switch range.
opens, breaking the circuit to ground. The ECU then
SM - 1977
VANNER
GRD
12V
24V
208
B(306) R(222) N.C. B(309)
ECU
209 N.O.
EMERGENCY
+
+
-
-
SM - 1978
BODY-UP
VANNER PROXIMITY SW.
P/R
GRD
24V
12V
24V
P/G
B(306)
208 B(309)
B(306)
ECU U(310)
209
+
+
-
-
Shift Selector Illumination one bulb burns out, both lamps will cease functioning.
Refer to Fig. 14. When the panel light switch is closed, Circuit is completed to ground through lines 234 and
current (24 volts) flows through Line 230 to the shift 147 to the panel ground.
selector. Lamps are 12 volts, wired in series, so that if
SM - 1979
BATTERIES
+
SHIFT
-
SELECTOR
R/Y(230) B/W(234) B(306) B(306)
TO PANEL
LIGHT SW.
LAMPS
24V
12V
GRD
VANNER
SM - 429
MODE
SELECTION
SECONDARY MODE
SWITCH
HARNESS - J3
Manual Mode Switch connected to Line 309 and ECU will change operation
Refer to Fig. 17. of transmission from automatic to manual.
1. With ignition keyswitch at position '2' and manual
mode switch 'On' (closed) indicator light on console Note: Both switches must be closed and transmission
will illuminate. in neutral to obtain manual mode.
2. When mode selection switch is in the Power Note: CEC wires B (309) and 311 are 12 volt and
(closed) position and manual mode switch is in the W/B wires at manual mode switch are 24 V. Improper
'On' (closed) position, Lines 311, 313 and 315 are all connection of wires could lead to CEC damage.
SM - 430
IND. LIGHT
MANUAL MODE
MODE SELECTION SECONDARY MODE
SWITCH SWITCH HARNESS - J3
24V SUPPLY
FROM IGN. SWITCH
SM - 1980
1
3
ENGINE
C B A
1 - Throttle Pedal Assembly
2 - Sensor and Harness - Engine
3 - Sensor and Harness - Transmission TRANSMISSION
VALVE BODY SOLENOIDS grades. When the oil temperature falls below 121° C
The hydraulic circuits and valves within the electro- (250° F) the Check Trans light will go off. Refer to
hydraulic valve bodies are controlled by continuous Section 190-0270, SWITCHES AND SENSORS.
power solenoids. The solenoids are located in
separate valve bodies and they shift the valve spools
to direct hydraulic oil to the various clutch packs within
ELECTRONIC FOOT PEDAL
the transmission. Refer to Fig. 18. The dual control electronic foot pedal
provides an electronic signal to the engine's fuel
control system in proportion to the degree of pedal
TEMPERATURE SENSOR actuation, an electronic signal is also sent to the
Temperature Sensor is mounted in the lockup valve transmission ECU.
body cover. The ECU constantly monitors
transmission oil temperature and will not permit shifts Note: The electronic controlled engine will override the
to occur when the oil temperature is -24° C (-10° F) or electronic foot pedal position until the engine is
below. At this temperature, operation is restricted to warmed up to the correct operating temperature. The
Neutral and both the Do Not Shift and Check Trans engine MUST be started with the foot 'OFF' the
lights will be on. From -22° C (-9° F) to -7° C (+19° F) electronic foot pedal.
operation will be restricted to Neutral, First and
Reverse. Once transmission oil temperature reaches The control system continually monitors the engine
121° C (250° F) the Check Trans light will come on and warns the operator when a problem develops. The
and the ECU will restrict operation to Reverse, Neutral system also takes action to prevent damage to the
and First through Fourth gears. Temperatures can engine and provides the serviceman with diagnostic
easily exceed 121° C (250° F) when the retarder is capabilities. Refer to Section 110-0030, ENGINE AND
being used to help slow the vehicle while descending MOUNTING.
SM - 1981
SPEEDOMETER
WIRE 205
20 30
10 40
ECU 0 50
Both the Check Trans and Do Not Shift lights will come
'On' when the ignition keyswitch is turned to position
'1'. The Check Trans light will stay on until the engine
FINDING TROUBLE CODES Fig. 20 is an electrical circuit view showing the terminal
numbers and wire numbers for the CEC J1A, J1B and
Check Trans Light J3 harnesses connecting the various components of
Running the engine and depressing the test switch will the system.
cause the ECU to enter the diagnostic mode. The
ECU will cause the Check Trans light to flash a trouble Fig. 21 shows the locations of the terminals in Fig. 20
code, if present. in their connectors. Check for intermittent shorts or
open circuits by moving harnesses with VOM probes
For example: FLASH - PAUSE - FLASH - FLASH - connected to the applicable terminals. For step-by-
FLASH - LONG PAUSE denotes a Code 13. step procedures for finding shorts or open circuits in
harnesses or components, refer to Allison Commercial
If more than one trouble code is stored in the memory, Electronic Control (CEC) Troubleshooting Manual
the most important code will be flashed first. The SA 2712A.
problem indicated by the first code must be corrected
and the code cleared from the memory before another Note: Both 12 and 24 volt circuits are present in the
code can be found. control box interface. Extreme care must be taken,
when making any repairs to the system, to avoid
damaging the ECU by introducing 24 volts into a 12
Diagnostic Data Reader volt circuit.
Using a diagnostic data reader, both codes can be
found at the same time. Plugging the diagnostic data When troubleshooting leads to replacement of the
reader into the Digital Data Line (DDL) connector ECU, always check for an over voltage condition. If too
(12, Fig. 1) under the dash panel, on the steering high a voltage damaged the ECU and the condition is
column mounting bracket, will automatically cause the not corrected the replacement ECU may also be
ECU to enter the diagnostic mode. Ignition keyswitch damaged.
must be turned to position '1'.
Voltage limits for the ECU are:
CLEARING TROUBLE CODES 9 volts - minimum
Trouble codes should always be cleared from the ECU 16 volts - continuous
memory after repairs are made. To clear the trouble 18 volts - 10 minutes
codes, make sure the ignition keyswitch is turned to 24 volts - 2 minutes
position '1', depress the test switch, shift into Reverse
and wait a few seconds, then shift back to Neutral. If
the codes do not clear, turn the ignition keyswitch is
Probable Cause:
WARNINGS a. Throttle sensor failure.
To prevent any unexpected shift during b. Shorts or open circuits in harness wiring.
removal of wiring harnesses, shut down
engine and switch 'OFF' both circuit breakers. Remedy:
1. Check cable for binding.
Be sure to apply the parking brake, shut
off the engine and block all road wheels before 2. Connect VOM probes to sensor terminals A & C
any troubleshooting of the main valve body (L, Fig. 21). If reading is not between 9 000 and
solenoids. Accidental activation of a solenoid 15 000 ohms replace sensor.
while the engine is running could cause the
vehicle to run away. 3. Connect VOM probes to sensor terminals A & B
(L, Fig. 21). Stroke sensor slowly from closed to full
throttle position and back. If VOM reading does not
Code 13 - Low Battery Voltage increase smoothly from at least 500 ohms to
System Response: 15 000 ohms, replace sensor.
1. If transmission is in neutral, Check Trans and Do
Not Shift lights will come on. If forward or reverse is 4. Connect one VOM probe to vehicle ground, other to
selected, shift will not occur. sensor terminals A, B & C. VOM meter should not
record continuity.
2. If transmission is in forward or reverse and a shift is
made, the code will be set in memory and no lights will 5. Check J1B harness wiring for shorts or open circuits.
come on. Shifts may be erratic or not made.
6. If fault cannot be located, replace ECU.
Probable Cause:
a. Insufficient voltage supplied to ECU.
b. Intermittent open circuit on power to ECU.
Code 22 - Transmission Output Shaft
c. Intermittent or partial short to ground on power to ECU. Speed Sensor
System Response:
Remedy: The Check Trans and Do Not Shift lights will come on.
1. Check battery voltage with VOM. Fully charged All shifts will be prevented and lockup clutch
batteries should measure 28 ± 1 volt. disengaged. If this happens due to wheel lockup
(panic braking) or wheel spinning, the engine must be
2. Check vehicle charging system. With engine shut down, ignition keyswitch turned to position '0' and
running, voltage regulator should put out 28 volts. then back to position '1', engine restarted, and Neutral,
Charge and recheck batteries. Reverse and Neutral selected to reset ECU.
SM - 432
MAIN VALVE
J1A HARNESS J1B HARNESS BODY HARNESS
CONNECTORS
TO ECU CONNECTORS AT
CONNECTOR TO MAIN VALVE
SHIFT SELECTOR BODY COVER
TO
CONTROL
BOX
INTERFACE
MAIN
CONTROL
VALVE
SOLENOID
CONNECTORS
DIGITAL DATA
LINE CONNECTOR
LOCKUP VALVE
SOLENOID
AND TEMP
SENSOR
TO CONTROL
BOX INTERFACE TO P/BRAKE SW
CONNECTORS
AT LOCKUP
VALVE BODY COVER
LOCKUP VALVE BODY HARNESS
CONNECTORS AT
TRANSMISSION
OUTPUT SHAFT
SPEED SENSOR
TO SECONDARY
MODE SWITCHES CONNECTORS AT
THROTTLE
POSITION SENSOR
CONNECTORS AT
TRIM BOOST
VALVE
SELECTION MODE
HARNESS CONNECTOR
TO ECU
SM - 433
D - J1A HARNESS
C - J3 HARNESS CONNECTOR TO ECU CONNECTOR TO
SHIFT SELECTOR
M - SPEED SENSOR N - DIGITAL DATA LINE 1/2 SHIFT/TRIM BOOST J1B HARNESS
CONNECTOR CONNECTOR - J1A HARNESS VALVE BODY CONNECTOR CONNECTOR TO
1/2 SHIFT/TRIM
BOOST VALVE
5. If fault cannot be located, replace ECU. 3. Check oil cooler and lines for blockage.
2. Check for shorts or open circuits in J1A harness Note: A CODE 33 may erase a previously diagnosed
wiring. Refer to Fig. 20 for applicable terminals and CODE 24.
wire numbers.
Remedy:
3. If fault cannot be found using steps 1 & 2, install a 1. Check transmission oil level.
new shift selector and reconnect all harness
connectors. Test drive the vehicle and check for 2. Check cooling system.
presence of trouble code. If trouble code recurs,
replace new shift selector with old, check connectors 3. Connect VOM probes to pins C & D on lockup valve
and wiring again. If trouble code is still present, body connector (K, Fig. 21). VOM reading should be
replace ECU. 5 000 to 130 000 ohms.
Probable Cause:
a. Transmission oil temperature too high. WARNING
Only authorised warranty outlets are permitted
Remedy: to open the PROM access cover. Warranty may
1. Check transmission oil level with engine at idle. be void if opened by unauthorized personnel.
Note: Solenoids in main valve body are lettered A, B, 3. If in Step 1 VOM reading was not within limits,
C, D, E, F and G from left to right. remove lockup valve body cover or trim boost valve
body cover and remove connector from solenoid.
Remedy: Connect VOM probes to solenoid terminals. If VOM
1. Disconnect J1B harness from main valve body probes to solenoid terminals reading is not 12 - 24
connector. Connect VOM probes to pins in main valve ohms, replace solenoid.
body connector corresponding to solenoid indicated by
trouble code. Refer to Figs. 20 & 21. VOM should read 4. If in Step 3 VOM reading was within limits, check
12 - 24 ohms. lockup valve body or trim boost valve body harnesses
for shorts or open circuits.
2. Check J1B harness for shorts or open circuits in
circuits corresponding to solenoids indicated by
trouble code if correct reading was obtained in Step 1. Code 54 - Solenoid Chain (A, B, C, D & E))
System Response:
3. If in Step 1 VOM reading was not within limits, The Check Trans and Do Not Shift lights will come on,
remove main valve body cover and disconnect all shifts will be prevented and the lockup clutch will be
harness from solenoid indicated by trouble code. disengaged.
Connect VOM probes to solenoid terminals. If VOM
reading is not 12 - 24 ohms, replace solenoid. Probable Cause:
a. Failed solenoid.
4. If in Step 3 VOM reading was within limits, check main
valve body harness for shorts or open circuits in circuits b. J1B harness not properly connected to main valve
corresponding to solenoid indicated by trouble code. body harness connector.
3. If correct reading was obtained from all solenoids in b. Short or open circuit in J1B or main valve body
Step 2, check J1B harness circuits for shorts or open harness.
circuits.
Remedy:
4. If incorrect reading was obtained for one or more Use same procedure for checking 'F' solenoid as
solenoids in Step 2, remove valve body cover and shown for Codes 41 thru 45 (A thru E Solenoids).
disconnect harness from solenoids in question.
Connect VOM probes to solenoid terminals and check
for correct reading of 12 - 24 ohms. If problem is not in Code 69 - ECU Test (Software Error)
solenoid check main valve body harness for shorts or System Response:
open circuits. ECU will turn itself off. The Check Trans and Do Not
Shift lights will come on, all shifts will be prevented,
Note: Solenoids in main valve body are lettered A, B, and the lockup clutch disengaged.
C, D, E, F and G from left to right.
Probable Cause:
Error in software (programming) inside ECU
Code 61/63 - Splitter High Solenoid (G) which prevents normal operation of shift system.
System Response:
1. Below 500 rev/min, the Check Trans light only will Remedy:
come on. Shifts may not occur. 1. Replace ECU.
Note 1 - Transmission will not shift. Note 3 - Other instrument panel lights operate.
Note 2 - Shift system operates normally. Note 4 - Other instrument panel lights do not operate.
SPECIAL TOOLS
The Special Tools listed in the following tables are
required for servicing the CEC Plus II Shift System
and are available from your dealer.
SPECIAL TOOLS
TOOL NUMBER TOOL NAME
15268971 PRO-LINK Diagnostic Data Reader (DDR)
15268973 CEC I and II Cartridge for DDR
15268975 DDR and CEC I and II Cartridge Assembly
15269231 CEC Off-Highway Diagnostic Service Kit
15269038 Portable Printer for use with DDR, complete with 110 V AC Adaptor
15269039 Portable Printer for use with DDR, complete with 220 V AC Adaptor
15269040 Printer Paper for use in above printer - 5 Rolls
15270344 NoFlash Electro Contact Cleaner
SPECIAL TOOLS
The following tools are contained in CEC Off-Highway Diagnostic Service Kit - 15269231
TOOL NUMBER TOOL NAME
15269232 Wire Cutter, Stripper and Terminal Crimper
15269233 Jumper Wire Set
15269234 Terminal Crimper
15269235 Terminal Remover - Metri Pack (J1A, J1B, J3 and Shift Selector Connector Terminals)
15269236 Terminal Remover - Speed Sensor and Throttle Position Sensor Terminals
15269237 Terminal Remover - Depress holding prong on ECU and DDL Connector Terminals
15269238 PROM Remover
15269239 High Impedance Digital Multimeter Kit
15269240 AMP Pin Remover - Remove terminal pins from Interface and Shift Selector Connectors
15269241 Terminal Crimper - Weatherpac
* * * *
10 11
3 9
CONNECTOR TO
TERMINATION
RESISTOR
EARTH
2
SHIFT
4 E.C.U. SELECTOR
TRANS. HARNESS
12 5
INTERFACE MODULE
GHJ
KLM
7
DIAGNOSTIC
8 REF. CONSOLE HARNESS CONNECTOR
VEHICLE
CONNECTION
(V)
CEC–2 COMPONENTS
K
C
UE
A
BL
L
B
SM2128 R2 07-03 1
Transmission - C.E.C. 2
Section 120-0070
Power Module - The Power Module is located on the 1 2 3 8 9
SM2940
side of the battery box (Fig.3). The Power Module
contains ignition run fuses and relays, and a timer relay
for the shutdown function of the ECU. The ignition
fuses and relays open power to the ECU. On power
shut down the timer relay remains open for a 30 4
second period to allow the ECU to down load
5
information and close down properly (Fig. 4).
SM2680 6
1 2 3 4 5 6 7
10 7
A C B
1. Check Trans. Relay 7. Converter Drive Relay
2. Neutral Start Relay 8. On Board Weighing Relay
3. Reverse Relay 9. Rear View Camera Relay
4. Body Up Relay 10. Ignition Signal Fuse
5. Delta P Relay A. Manual/Automatic Key
6. Lock Up Off Relay B. Power/Economy Key
C. Manual Mode Light
Fig. 5- Interface Box
2 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
SM2667 SM2669
SPEED SENSOR ENGINE SPEED SENSOR
MODE LIGHT
1
MODE BUTTON MODE
2
3
TURBINE SPEED SENSOR
4
DISPLAY
5
D
N
DIAGNOSTIC R1
BUTTON R2
When drive 'D' is selected, the transmission right-of-way to a loaded vehicle, the transmission can
automatically upshifts and downshifts through all six be left in the selected range and the vehicle held
forward ranges as required by loads and travel speeds. stationary with the service brakes.
Selecting a lower range (4th, 3rd etc.) limits the highest
range to which the transmission will automatically upshift. However, when stopped for a more extended period
with the engine left running, shift the transmission to
If a lower range is selected while moving forward, the neutral to avoid unnecessary heat buildup and apply
transmission automatically downshifts sequential to the parking brake.
the selected lower range at maximum controlled engine
speeds. Downshifts will not occur until vehicle is
slowed by use of the service brakes and/or retarder. WARNING
Always select Neutral and apply the parking brake
When shifting from neutral to start from a standstill, before leaving the operator’s seat.
or to reverse direction, decelerate the engine to idle
speed. To move forward, select drive 'D' and
accelerate the engine to the vehicle load and speed Speed Sensors - 3 off speed sensors (Fig. 7); Input,
requirements. The transmission will automatically Turbine and Output Speed, provide information to the
upshift from 1st through 6th ranges as travel speed ECU. The input speed signal is generated by the gear
increases. teeth on the top PTO gear. The turbine speed signal is
generated by the serrations on the tone wheel. The
With the throttle fully depressed, and the mode output speed sensor signal is generated by a toothed
selection switch in the Power position, the member attached to the output shaft. The speed ratios
transmission upshifts to the next higher range when between the various speed sensors allow the ECU to
the engine attains maximum rated speed, since determine if the transmission is in the selected range.
maximum power train output is needed under this Hydraulic problems are detected by comparing the
condition. speed sensor information for the current range to that
At lower throttle settings where minimum power train ranges speed sensor information programmed in the
performance is required, the transmission will upshift ECU memory.
to the next higher range at less than maximum
rated engine speed. Mode Selection Switch - Gives the option to select
between transmission Power and Economy shift
Upgrades or soft spots might slow travel speed, even schedules. The transmission must be in Neutral before
at full throttle, requiring transmission downshifts to the switch will function.
maintain maximum powertrain performance. When this
occurs, the transmission downshifts automatically. The transmission torque converter is equipped with a
lockup clutch which, when engaged by the ECU, locks
Shift the transmission to the next lowest range if the converter pump and turbine together as a single
transmission 'Hunting' or 'Shift Cycling' occurs. unit and allows power to be transmitted mechanically
from the engine directly to the transmission gearing on
When temporarily stopped, such as for yielding the a 1:1 ratio. When the lockup clutch is disengaged, the
SM2128 R2 07-03 3
Transmission - C.E.C. 2
Section 120-0070
torque converter acts as a fluid coupling, multiplying SM2670
5 1
torque when engine speed is significantly higher than
transmission output shaft speed.
The Economy mode is designed for applications Check Trans Warning Light (Fig. 8) - Illuminates to
involving lighter loads and level duty cycles or where alert of a minor fault in the transmission control system
fuel economy is more important than performance. or abnormal transmission temperature. The light will
come 'On' when the ignition key switch is turned to
In the Economy mode, the ECU controls operation of position '1' to provide a bulb and system check and
the lockup clutch with a timed, preprogrammed should go 'Off' a few seconds after the engine is
schedule where in second through sixth gears the started and the transmission oil pressure rises.
lockup clutch is disengaged only long enough to allow The check trans warning light will come 'On' during
the torque converter’s fluid coupling to absorb shift operation, if the ECU has detected a minor fault in an
shock. Otherwise, the lockup clutch is engaged and no electrical component or abnormal transmission oil
torque multiplication takes place in second through temperature. If transmission oil temperature is too high,
sixth gears. stop the vehicle, select neutral 'N', and increase engine
speed to allow a greater flow of oil to the cooler until oil
Manual Mode Switch - The manual mode facility is temperature drops to normal operating range. In most
designed as a Service Technician facility to allow stall cases, a minor fault triggering the check trans warning
checks and clutch pressure checks to be implemented light will not prevent normal operation from continuing
by Service Personnel, and permit movement of the but, depending on the nature of the problem, the ECU
vehicle, if necessary, to a repair area. With the manual could take action to protect the transmission from damage,
mode switch in the 'On' position, the body up interlock such as preventing operating in high gear ranges. If the
and hoist interlock pressure switch mechanisms are check trans light comes 'On', have the problem
disengaged! This allows unauthorised selection of diagnosed and corrected at the earliest opportunity.
reverse or any forward gear with the body raised,
constituting a safety hazard. Operators must not use Converter Mode Light - Illuminates when the
the manual mode facility when working the vehicle! It is transmission is in torque converter drive. It goes 'Off'
recommended that the mode selection key is removed when Lockup is engaged. In order to avoid
from the unit and retained in a safe place until required unnecessary waste of fuel, if traffic or other road
by Service personnel. conditions permit, the operator should modify throttle
position, or gear held, to achieve a steady road speed
Note: The manual mode can only be used if the mode with the torque converter lockup engaged (light 'Off').
selection switch is in the Power position and the The Lockup relay in the interface box (Fig. 5) is also
transmission is in neutral. activated by the 20 bar (290 psi) pressure switch on
the foot brake pedal. When this switch is activated the
Manual Mode Warning Light - This light is located on converter in light will be illuminated due to the
the front face of the CEC–2 interface box. The Manual transmission dropping out of converter lock up,
Mode Warning Light illuminates to alert the operator avoiding engine stall. (Ref. Fig. 24)
when the transmission has been switched to operate in
4 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
SM2666
MAIN CONNECTOR - ALL MODELS MAIN VALVE BODY
(Solenoids A - G)
LOCKUP CONNECTOR
ALL MODELS
TRIM BOOST CONNECTOR (K Solenoid and sump
(Solenoid J) temperature sensor)
5610, 6610
C.E.C.2 FUNCTIONS
1. Check Transmission - Relay within the Interface
Box triggers the Transmission Check Light on the dash
panel, when the transmission ECU senses a fault.
Fig. 11 - Hold in Range (Body Mag-Pick Up Switch)
2. Neutral Start - Neutral start relay inside the interface
box will not close unless the Transmission Shift 4. Bed Hoist Interlock (Reverse Hoist Interlock) - The
Selector is in the neutral position, thus preventing the ECU shifts the transmission to neutral (N) if the body is
engine ignition circuit being energised. raised when the transmission is in a selected reverse
gear (R). To over-ride this function, stop the truck, shift
SM2128 R2 07-03 5
Transmission - C.E.C. 2
Section 120-0070
gear shift selector to neutral, than back to reverse. The
ECU receives a signal from a pressure switch located 6. Lock in Gear - The Lock in gear feature is designed
on the raise circuit on the body control valve. (Ref. Fig. to protect the transmission from damage should wheel
12). spinning or lock-up occur due to poor traction or panic
SM2932
braking. The ECU will delay making a shift for several
seconds and then, if the condition fails to correct itself,
locks the gear to prevent any further shifting. The
check transmission light will illuminate. If this occurs,
the ECU must be reset before normal operation may
be resumed.
To reset the ECU if the transmission is locked in gear,
stop the truck, select neutral gear (N), apply the park
brake and turn the ignition key to '0' position. Wait 10
seconds, then turn the ignition key to restart engine.
Select Reverse gear (R) then neutral (N). The check
transmission light should go off.
6 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
ELECTRICAL DIAGRAMS
Transmission ECU Power Diagrams
SM2921
Fig. 14 -
Transmission ECU Power via the power module mounted on the trucks battery
box (Ref. Fig. 15, 16 & 18). Inside the power module
Refer to Fig. 14
there are 4 relays, 1 timer relay and 7 power fuses.
With the ignition key (S2) in the off position - The
Battery Disconnect Relay (K2), Ignition Run Relay
After the ignition run relay (K23) has been energised,
(K23), Neutral Start Relay and Starter Relay (K1) are all
24 Volts is permitted to access the Power Module.
de-energised.
Inside the power module the 4 relays (A through D) are
energised allowing 24 Volt power to access the
Turning the ignition key (S2) to position 'R' energises
transmission and engine ECUs via the 7 power fuses.
the battery disconnect relay (K2). This allows 24 Volts
The timer relay (Fig. 19) allows the transmission and
to access the bus-bar from the batteries (G2). 24 Volts
engine ECUs to remain powered for at least 30
power is also on stand-by at the alternator (G1) and
seconds after the ignition key has been switched off
starter relay (K1).
(position '0'). This allows all operating data to be
downloaded into the ECU memory.
Turning the ignition key (S2) to position '1' energises
ignition run relay (K23). By energising ignition run relay
The truck will not be able to start up unless the
(K23), 24 Volts power from the bus-bar is directed to
transmission gear shift selector is in the neutral (N)
the power module (Ref. Fig. 18), via engine ECU fuse
position. An electrical signal via wire number 123 (Ref.
(F3) and transmission ECU fuse (F7).
Fig. 14), from the transmission ECU will energise the
neutral start relay, Only if the gear shift selector is in
Both the transmission and engine ECUs are powered
SM2128 R2 07-03 7
Transmission - C.E.C. 2
Section 120-0070
SM2922
Fig. 15 -
SM2923
Fig. 16 -
8 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
neutral (N). When the key switch is turned to position SM2679
Release delay
On-off pulse
On-pulse
Off-pulse SET DIAL TO 'Release delay'
0.6 - 6 sec
4 6 - 60 sec
0.6 - 6 min
6 - 60 min SET DIAL TO '6 - 60 sec'
5 4
5
3
6 SET DIAL TO '3'
6
2
LOCK IN POSITION
10 7 USING ARALDITE OR
1
SIMILAR
6 2
4 3
Fig.18- Power Module 3. Hold in Range - This is a body raise function. The
ECU prevents any up-shifts when the body is raised
while in a forward gear. When the body is raised the
body up magnetic switch (S22) signals the body up
relay (4) within the interface box (Ref. Fig. 17). The
SM2128 R2 07-03 9
Transmission - C.E.C. 2
Section 120-0070
SM2930
Fig. 21 -
SM2929
Fig. 22 -
10 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
SM2933
body up relay (4) completes the hold in range signal via
wire 163 back to the ECU shifter connector (S), pin 27.
12 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
the Hi-Retard Relay, located inside the centre console
(Ref. Fig. 26), is energised completing the Hi-Retard
request back to ECU vehicle connector (V), pin 28,
wire 178.
SM2935
Fig. 27 -
SM2937
SM2128 R2 07-03 13
Transmission - C.E.C. 2
Section 120-0070
Y
A
R
G
inputs and out puts for transmission functions. The 3
VEHICLE
connections are; CONNECTION
(V)
K
(V) Vehicle Connector - Gray Colour
C
UE
A
BL
L
B
(S) Shifter Connector - Black Colour TRANSMISSION
E CONNECTION
U
BL (T)
SHIFTER
(T) Transmission Connector - Blue Colour CONNECTION
(S)
Refer to Fig. 30, 31 & 32 for generic connecor pin Fig.29 - ECU
identifications.
WARNING
Before any welding is done on a machine equipped with an C.E.C. 2 system, disconnect the following
in this order: Battery earth cable, battery supply cable, alternator earth cables, alternator supply cables
and electrical connections at the engine ECM, transmission ECU and cab bulkhead to avoid damage to
electrical components. Turn off ignition key switch to isolate the batteries before disconnecting any
components. After welding connect all of the above in the reverse order.
SM2927
GRAY
16
32
17
No. COLOUR WIRE# DESCRIPTION
1 R 136-V1 Main Power to ECU
3 O 132-V3 Converter Drive Warning Light
4 W 113-V4 Reverse Alarm
6 N 123-V6 Neutral Start
14 N 177-V14 Reverse Hoist Interlock
16 R 136-V16 Battery Power
17 B 143-V17 ECU Earth
22 N 112-V22 Overspeed Warning Light
26 K 146-V26 Engine Run Signal
27 W 154-V27 Lock Up Off Signal
28 O 178-V28 Retarder Apply
29 O 137-V29 Park Brake Interlock
30 G 117-V30 Delta P Switch
31 Y 161-V31 Isolated Return
32 B 143-V32 ECU Earth
Fig.30 - ECU Vehicle Connector (V)
14 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
SM2926
BLACK
16
32
17
No. COLOUR WIRE# DESCRIPTION
1 W 142-S1 Diagnostic connector (High)
3 K 124-S3 Shift Selector Power
4 Y 146-S4 Ignition Sense (Diagnostic Connector)
5 O 170-S5 PSS, Data Bit 1
6 G 171-S6 PSS, Data Bit 2
7 U 172-S7 PSS, Data Bit 4
8 Y 173-S8 PSS, Data Bit 8
9 N 174-S9 PSS, Parity
10 G 175-S10 PSS Mode Input
11 Y 119-S11 ECU To Manual Mode Switch
12 G 182-S12 CAN Controller Shield (J1939)
13 R 183-S13 CAN Controller, High (+) (J1939)
14 U 180-S14 PSS Display
16 R 136-S16 Battery Power
17 U 151-S17 Diagnostic Connector (Low)
27 U 163-S27 Range Inhibit Signal
28 Y 126-S28 Secondary Mode Switch
29 B 184-S29 CAN Controller, Low (-) (J1939)
30 N 157-S30 Speedometer Drive
31 G 115-S31 Check Transmission
32 B 143-S32 Battery Return
SM2128 R2 07-03 15
Transmission - C.E.C. 2
Section 120-0070
SM2925
BLUE
16
32
17
No. COLOUR WIRE# DESCRIPTION
1 O 102-T1 Solenoid Power, Solenoids F, G & I
2 N 121-T2 Solenoid Power, Solenoid K
3 G 107-T3 Solenoid Power, Solenoid J or H
4 W 120-T4 F Solenoid, Low
5 G 103-T5 B Solenoid, Low
6 N 129-T6 E Solenoid, Low
7 W 104-T7 A Solenoid, Low
8 G 111-T8 I Solenoid, Low
9 K 124-T9 TPS Power
10 U 156-T10 TPS Input
13 Y 195-T13 Transmission Identification
14 N 141-T14 Engine Speed Sensor, High
15 O 149-T15 Turbine Speed Sensor, High
16 Y 139-T16 Output Speed Sensor, High
17 Y 130-T17 Solenoid Power, Solenoids A & B
19 Y 116-T19 Solenoid Power, Solenoids E, D & C
20 O 128-T20 K Solenoid, Low
21 U 131-T21 G Solenoid, Low
22 W 110-T22 J or H Solenoid, Low
23 W 127-T23 D Solenoid, Low
24 U 101-T24 C Solenoid, Low
25 G 135-T25 Analog Return
27 N 147-T27 Sump Temperature Sensor Input
30 O 150-T30 Engine Speed Sensor, Low
31 U 140-T31 Turbine Speed Sensor, Low
32 G 148-T32 Output Speed Sensor, Low
16 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
5. Display starts with the code position, which will be (F) Event Counter - Determines how many times
d1, d2 etc. This is followed by the two digit main the code has occurred without being cleared from
code, then the two digit sub-code. the memory.
Clearing Codes
1. For Active Codes - Press and hold the mode button
for 3 to 5 seconds.
SM2128 R2 07-03 17
Transmission - C.E.C. 2
Section 120-0070
Abbreviations; DNS - Do Not Shift, Transmission will not respond to the shift selector when the transmission check light is illuminated.
SOL OFF - All Solenoids Off.
GPO - General Purpose Output, Output signal from ECU to control vehicle components to allow special operating mode.
18 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
Abbreviations; DNS - Do Not Shift, Transmission will not respond to the shift selector when the transmission check light is illuminated.
SOL OFF - All Solenoids Off.
GPO - General Purpose Output, Output signal from ECU to control vehicle components to allow special operating mode.
SM2128 R2 07-03 19
Transmission - C.E.C. 2
Section 120-0070
Abbreviations; DNS - Do Not Shift, Transmission will not respond to the shift selector when the transmission check light is illuminated.
SOL OFF - All Solenoids Off.
GPO - General Purpose Output, Output signal from ECU to control vehicle components to allow special operating mode.
20 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
Temperature Resistance
-40°C (-40°F) 200 ohms
20°C (68°F) 300 ohms
110°C (230°F) 400 ohms
SM2128 R2 07-03 21
Transmission - C.E.C. 2
Section 120-0070
SPECIAL TOOLS
The Special Tools listed in the following tables are
required for servicing the CEC 2 Shift System and are
available from your dealer.
SPECIAL TOOLS
TOOL NUMBER TOOL NAME
15275098 Diagnostic Data Reader (DDR) Multikit (Includes Reader, Cartridge, Cables)
15275180 CEC 2 Diagnostic Card
15269038 Portable Printer for use with DDR, complete with 110 V AC Adaptor
15269039 Portable Printer for use with DDR, complete with 220 V AC Adaptor
15269040 Printer Paper for use in above printer - 5 Rolls
15270344 NoFlash Electro Contact Cleaner
SPECIAL TOOLS
The following list of tools are required to service CEC 2
wiring harnesses.
SPECIAL TOOLS
TOOL NUMBER TOOL NAME
15275719 Sealed Splice (14-16 AWG)
15275720 Sealed Splice (18-22 AWG)
15275721 Crimper - Deutsch Connector, Transmission Harness Bulkhead, J1939 Connector
15269234 Crimper (Alternate) - Delphi Packard (DDL connector)
15275722 Crimper (Alternate) - Throttle Position Sensor
15275723 Wire Stripper
15275724 Remover - Delphi Packard (DDL Connector), Sump Temperature Sensor
15275725 Remover - Throttle Position Sensor
15275726 Remover - Deutsch Connector
15275727 Crimper - Throttle Position Sensor, Delphi Packard (DDL Connector)
15275728 Crimper - Speed Sensors, Throttle Position Sensor,
15275729 Crimper - Repair of broken cable using appropriate Sealed Splice
15275730 Remover - Deutsch Connector (Optional DDL)
15269241 Crimper (Alternate) - Throttle Position Sensor
15275731 Remover - ECU Connectors, Shift Selector Connection
15275732 Connector Repair Kit - Transmission Harness Bulkhead Connector
15275733 Guide Pin - Transmission Harness Bulkhead Connector
15275734 Insertion Tool - Transmission Harness Bulkhead Connector
15275735 Terminal Remover - Transmission Harness Bulkhead Connector
15275736 Crimper - ECU Connectors, Shift Selector Connection
22 SM2128 R2 07-03
Transmission - C.E.C. 2
Section 120-0070
GLOSSARY
Detailed below is a glossary of abbreviation used
withing the C.E.C. 2 descriptions.
Abbreviation Termination Point
AGND Analog Return (Ground)
ASOL Solenoid A - Main Valve Body Cover
BSOL Solenoid B - Main Valve Body Cover
CSOL Solenoid C - Main Valve Body Cover
DDRD Diagnostic Data Reader - Deutsch
DDRP Diagnostic Data Reader - Packard
DSOL Solenoid D - Main Valve Body Cover
ECU-S Electronic Control Unit - Selector (S) Connector
ECU-T Electronic Control Unit - Transmission (T) Connector
ECU-V Electronic Control Unit - Vehicle (V) Connector
ESOL Solenoid E - Main Valve Body Cover
FSOL Solenoid F - Main Valve Body Cover
GSOL Solenoid G - Main Valve Body Cover
H/JSOL Solenoid H/J - Trim Boost or 1-2 Cover
ISOL Solenoid I - Solenoid I - 1-2 Cover
J1939 J1939 Data-link From ECU Selector (S) Harness
KSOL Solenoid K - Lockup Cover
LOW Low or 1-2 Cover
LU Lockup Cover
MNVB Main Valve Body Cover
NE Input (Engine) Speed Sensor
NO Output Speed Sensor
NT Turbine Speed Sensor
PSS Primary Shift Selector
RNGTRM Chassis Ground Ring Terminal
SCI Serial Communication Interface
TB Trim Boost Cover
TEMP Sump Temperature Sensor - Lockup cover
TPS Throttle Position Sensor
VIM Vehicle Interface Module
VIW Vehicle Interface Wiring
* * * *
SM2128 R2 07-03 23
Transmission - C.E.C. 2
Section 120-0070
* * * *
24 SM2128 R2 07-03
TRANSMISSION - Power Takeoff
Section 120-0090
SM - 2422
22
25
24
27
28 9
10
6
23
26
18
19
13
15,16,17
9 21
11
20
8
7
12
2
3 5
14
4
1
1 - Snap Ring 8 - Pinion Shaft 15 - Shim 0.07 mm (0.003 in) 22 - Hose Assembly
2 - Bearing 9 - Bearing 16 - Shim 0.20 mm (0.008 in) 23 - Elbow
3 - Snap Ring 10 - Pinion Gear 17 - Shim 0.50 mm (0.020 in) 24 - Bushing
4 - Output Shaft 11 - Set Screw 18 - Bolt 25 - Connector
5 - Driven Gear 12 - Housing 19 - Lockwasher 26 - Adaptor
6 - Pipe Plug 13 - Pipe Plug 20 - Pipe Plug 27 - Coupling
7 - 'O' Ring 14 - Bearing 21 - Elbow 28 - Adaptor
DESCRIPTION REMOVAL
Numbers in parentheses refer to Fig. 1. Numbers in parentheses refer to Fig. 1.
SM 1915 7-00 1
Transmission - Power Takeoff
Section 120-0090
parking brake and switch off the engine. suitable puller tool into the internally splined output
shaft (4) and pull output shaft, together with bearing
2. Turn steering wheel in both directions several times (14) from driven gear (5).
to relieve pressure in the steering circuit. Block all road
wheels. 6. Remove snap rings (1 & 3) and bearing (14) from
output shaft (4) if necessary.
3. Match mark the steering pump housing and power
takeoff housing (12) to facilitate assembly. Remove 7. Remove driven gear (5) and bearing (2) from
steering pump from power takeoff housing (12) housing (12). Remove bearing (2) from driven gear (5).
following procedures outlined in Section 220-0050,
STEERING PUMP.
INSPECTION
4. Disconnect hose assembly (22) from elbow (21) and Numbers in parentheses refer to Fig. 1.
cap hose assembly and adaptor to prevent entry of
dirt. 1. Clean all parts, except bearings (2, 9 & 14), in a
suitable solvent and dry with compressed air.
5. Attach suitable lifting equipment to the power takeoff
assembly and remove bolts (18) and lockwashers 2. Clean bearings (2, 9 & 14) in volatile mineral spirits,
(19). Lift the power takeoff assembly and shims (15, and wipe dry with clean, lint-free cloth. Lubricate with
16 & 17) from the torque converter housing. Keep light oil, and spin by hand to check for wear and
shims (15, 16 & 17) with power takeoff housing (12) to roughness. Replace with new bearings if excessively
assure correct installation. Cover torque converter worn, or if operation is rough or noisy.
housing to prevent entry of dirt.
3. Check the condition of splines and teeth on all gears
Note: Identify or mark the number and thickness of and shafts for burrs or signs of excessive wear.
shims (15, 16 & 17) removed. This procedure is
necessary so as not to alter the backlash of the gears 4. Pinion shaft (8) and output shaft (4) should not be
during assembly. rough, worn, cracked or damaged. If either shaft is
distorted, it should be replaced.
Note: The gasket used at the steering pump mounting
face should be discarded and replaced at installation. 5. Check all threaded parts and tapped holes for
stripped or battered condition.
1. Remove the 'stake' mark from set screw (11), then 7. Gear teeth should not be worn, cracked or broken.
remove set screw (11).
8. Any small nicks, scratches or burrs should be
2. Place housing (12) on the bed of an arbor press smoothed up with a fine stone or crocus cloth, and
with the steering pump mounting flange facing part cleaned in solvent and dried with lint-free cloth.
downward. Remove pipe plug (13) and press pinion
shaft (8) out of housing (12).
ASSEMBLY
Note: If an arbor press is unavailable, the pinion shaft Numbers in parentheses refer to Fig. 1. Refer to
can be driven out of the housing using a soft drift and Fig. 2 for location of parts within housing (12).
hammer.
1. With housing (12) in position with steering pump
3. Remove and discard 'O' ring (7) from pinion shaft (8). mounting face up, press bearing (2) into bearing bore
in housing (12).
4. With housing (12) positioned mounting flange face up,
lift out pinion gear (10) and bearings (9) as an assembly. Note: Be sure bearing is seated by tapping outer race
Remove bearings (9) from pinion gear (10). with a soft drift and hammer.
5. Remove snap ring (1) from housing (12). Insert a 2. Install snap ring (3) onto output shaft (4).
2 SM 1915 7-00
Transmission - Power Takeoff
Section 120-0090
INSTALLATION
Numbers in parentheses refer to Fig. 1.
WARNING
To prevent personal injury and property
damage, be sure wheel chocks and lifting
equipment are properly secured and of
adequate capacity to do the job safely.
4. Press bearing (14) onto opposite end of output shaft 4. Hold or block either the power takeoff drive gear, or
(4) and install snap ring (1). Be sure bearing (14) is the converter charging pump driven gear, whichever is
seated against output shaft (4) shoulder, with shielded the case, so that it cannot revolve.
side of bearing facing toward snap ring (1) (facing out).
5. Set the dial indicator to a zero reading then, with a
5. Rotate driven gear (5) and check for any visible screwdriver, turn pinion gear (10) back and forth as far
signs of drag. as possible. The maximum allowable backlash is from
0.381 - 0.635 mm (0.015 - 0.025 in).
6. Press bearings (9) into bearing bores of pinion gear
(10). Be sure bearings are seated against shoulder in 6. If the dial indicator reading is less than 0.381 mm
pinion gear. (0.015 in) additional shims (15, 16 & 17) will have to be
installed. A greater reading than 0.635 mm (0.025 in)
7. Position pinion gear (10) and bearings (9) assembly means that some shims (15,16 & 17) will have to be
in housing (12). Install a new 'O' ring (7) on pinion removed.
shaft (8). Insert pinion shaft (8) through pinion gear
(10) and bearings (9), lining up set screw hole in pinion 7. After the correct backlash is obtained, remove the
shaft (8) with set screw hole in housing (12). block preventing the gear from revolving. Install pipe
plug (6) in housing (12) and secure the power takeoff
SM 1915 7-00 3
Transmission - Power Takeoff
Section 120-0090
assembly in position with bolts (18) and tighten lines and fittings as required.
lockwashers (19).
11. Ensure parking brake is applied and remove wheel
8. Remove blanking caps from elbow (21) and hose chocks from all road wheels.
assembly (22) and install hose assembly (22).
* * * *
4 SM 1915 7-00
TRANSMISSION - Transmission Oil Filter
Section 120-0100
SM - 2442
5
3
4
OUT
IN 2 INSIDE R.H.
OUT FRAME RAIL
IN
TOP FRONT R.H.S.
TRANSMISSION
7
6
SM 1931 7-00 1
Transmission - Transmission Oil Filter
Section 120-0100
REMOVAL INSTALLATION
Numbers in parentheses refer to Fig. 1, unless Numbers in parentheses refer to Fig. 1, unless
otherwise specified. otherwise specified.
5. Support filter assembly (1) and remove bolts (6) and 4. Remove blanking caps and connect filter inlet line
lockwashers (7) securing filter assembly (1) to (2) and filter outlet line (3) on adaptors (4) on filter
mounting bracket on the right hand frame rail. Remove assembly (1), as tagged during removal.
filter assembly (1) and drain oil from assembly into a
suitable container. 5. Start the engine and check for leaks. Tighten lines,
fittings and filter locking collar as required.
6. If filter assembly (1) is being replaced, remove
adaptors (4) to use on new filter assembly (1). 6. Check transmission oil level and add oil if required.
Refer to Section 120-0010, TRANSMISSION AND
7. If filter element (2, Fig. 2) is only being replaced, MOUNTING for correct fill level, and, use only oil as
disassemble filter assembly (1) and replace element specified in Section 300-0020, LUBRICATION
(2, Fig. 2) as described under 'Changing Filter SYSTEM.
Element'.
7. Ensure parking brake is applied, remove the body
8. If required, remove filter inlet line (2) and filter outlet prop pins and lower the body. Refer to Section
line (3) from the transmission. Cap open line ends and 270-0010, BODY AND MOUNTING.
fittings to prevent entry of dirt.
8. Remove wheel chocks from all road wheels.
2 SM 1931 7-00
Transmission - Transmission Oil Filter
Section 120-0100
5. Remove and discard 'O' ring (3) from filter head (1).
6. Clean housing (5) with clean fuel oil and dry with a
clean lint free cloth. Lubricate new 'O' ring (3) and
install on filter head (1).
1 - Filter Head 7. Install new element (2) on filter head (1), making
2 - Element sure plastic insert in element centre contacts spiral
3 - 'O' Ring snap ring on filter head (1).
4 - Pressure Switch
5 - Housing
8. Install housing (5) over element (2) and secure
Fig. 2 - Exploded View of Transmission Oil Filter tightly with locking collar.
* * * *
SM 1931 7-00 3
DRIVELINE - Front Driveline
Section 130-0010
SM - 1982
ENGINE 2
2
1
TRANSMISSION
3
3
4 4
1 - Driveline Assembly
2 - Universal joint
3 - Capscrew
4 - Capscrew
DESCRIPTION REMOVAL
The function of the driveline is to transmit rotating Numbers in parentheses refer to Fig. 1.
power from one point to another in a smooth and
continuous action while allowing a degree of
movement or misalignment of the components it WARNINGS
connects. To prevent personal injury and property
damage, be sure wheel blocks, blocking
The drivelines must operate through constantly materials and lifting equipment are properly
changing relative angles between the components secured and of adequate capacity to do the job
they are mounted to and must also be capable of safely.
changing length while transmitting torque.
Rotating shafts can be dangerous. You
A typical driveline consists of universal joints which can snag clothes, skin, hair, hands, etc. This
allow some misalignment and permit the driveline to can cause serious injury or death. Do not go
pivot in any direction, and, a light rigid hollow slip under a vehicle when the engine is running.
yoke and splined shaft assembly forming a slip joint.
Note: Extra care should be taken when handling
The slip joint accommodates length variations drivelines since carelessness can result in premature
generated during operation, preventing tension or failure of the components. Chips, dents, burrs, or any
compression loads from causing serious damage to other deformity of universal joints will prevent accurate
the components. mating. This will cause misalignment, which is
accompanied by vibration and excessive wear.
Note: Extra care should be taken when handling the
driveline since chips, dents, burrs or deformity on 1. Position the vehicle in a level work area, apply the
any rotating mass creates vibration and excessive parking brake and switch off the engine.
wear during any operation.
SM 1577 12-98 1
Driveline - Front Driveline
Section 130-0010
2. Turn steering wheel in both directions several SM - 088
times to relieve pressure in the steering circuit. Block
all road wheels. APPLY PRESSURE MAXIMUM PERMISSABLE
HERE BY HAND GAP IS 0.2 mm (0.008 in)
3. Match mark universal joints (2) and their mating
surfaces to ensure correct mating alignment when
installing driveline assembly (1). STRAIGHTEDGE
DISASSEMBLY
Numbers in parentheses refer to Fig. 1. Fig. 2 - Checking Parallelism
Universal Joint
1. Place the yoke end of driveline assembly (1) in a ASSEMBLY
soft jawed vice, clamping on the tube of shaft. Numbers in parentheses refer to Fig. 1.
Note: Do not distort the tube withn excessive grip. Universal Joint
1. Place the yoke end of driveline assembly (1) in a
2. Remove capscrews (3) and universal joints (2) from soft jawed vice, clamping on the tube of shaft.
driveline assembly (1).
Note: Do not distort the tube withn excessive grip.
3. Place the shaft end of driveline assembly (1) in a
soft jawed vice. 2. Install universal joints (2) to yoke end of driveline
assembly (1) and secure with capscrews (3). Tighten
4. Remove capscrews (3) and universal joint (2) from capscrews (3) to a torque of 128 - 142 Nm
driveline assembly (1). (95 - 105 lbf ft).
3. Check the surfaces of the components that Note: Tighten all fasteners without special torques
universal joints mate against for parallelism. Refer to specified to standard torques listed in Section
Fig 2. 300-0080, STANDARD BOLT AND NUT TORQUE
SPECIFICATIONS.
4. Check the condition of mounting capscrews and
replace if required. Note: Extra care should be taken when handling
drivelines since carelessness can result in premature
failure of the components. Chips, dents, burrs, or any
2 SM 1577 12-98
Driveline - Front Driveline
Section 130-0010
SM 1577 12-98 3
Driveline - Front Driveline
Section 130-0010
* * * *
4 SM 1577 12-98
DRIVELINE - Rear Driveline
Section 130-0020
SM - 1983
TRANSMISSION
2
1 4
DIFFERENTIAL
4
2
1 - Driveline Assembly
2 - Universal joint
3 - Capscrew
4 - Capscrew
DESCRIPTION REMOVAL
The function of the driveline is to transmit rotating Numbers in parentheses refer to Fig. 1.
power from one point to another in a smooth and
continuous action while allowing a degree of
movement or misalignment of the components it WARNINGS
connects. To prevent personal injury and property
damage, be sure wheel blocks, blocking
The drivelines must operate through constantly materials and lifting equipment are properly
changing relative angles between the components secured and of adequate capacity to do the job
they are mounted to and must also be capable of safely.
changing length while transmitting torque.
Rotating shafts can be dangerous. You
A typical driveline consists of universal joints which can snag clothes, skin, hair, hands, etc. This
allow some misalignment and permit the driveline to can cause serious injury or death. Do not go
pivot in any direction, and, a light rigid hollow slip under a vehicle when the engine is running.
yoke and splined shaft assembly forming a slip joint.
Note: Extra care should be taken when handling
The slip joint accommodates length variations drivelines since carelessness can result in premature
generated during operation, preventing tension or failure of the components. Chips, dents, burrs, or any
compression loads from causing serious damage to other deformity of universal joints will prevent accurate
the components. mating. This will cause misalignment, which is
accompanied by vibration and excessive wear.
Note: Extra care should be taken when handling the
driveline since chips, dents, burrs or deformity on 1. Position the vehicle in a level work area, apply the
any rotating mass creates vibration and excessive parking brake and switch off the engine.
wear during any operation.
SM 1578 12-98 1
Driveline - Rear Driveline
Section 130-0020
2. Turn steering wheel in both directions several SM - 088
times to relieve pressure in the steering circuit. Block
all road wheels. APPLY PRESSURE MAXIMUM PERMISSABLE
HERE BY HAND GAP IS 0.2 mm (0.008 in)
3. Match mark universal joints (2) and their mating
surfaces to ensure correct mating alignment when
installing driveline assembly (1). STRAIGHTEDGE
DISASSEMBLY
Numbers in parentheses refer to Fig. 1. Fig. 2 - Checking Parallelism
Universal Joint
1. Place the yoke end of driveline assembly (1) in a ASSEMBLY
soft jawed vice, clamping on the tube of shaft. Numbers in parentheses refer to Fig. 1.
Note: Do not distort the tube withn excessive grip. Universal Joint
1. Place the yoke end of driveline assembly (1) in a
2. Remove capscrews (3) and universal joints (2) from soft jawed vice, clamping on the tube of shaft.
driveline assembly (1).
Note: Do not distort the tube withn excessive grip.
3. Place the shaft end of driveline assembly (1) in a
soft jawed vice. 2. Install universal joints (2) to yoke end of driveline
assembly (1) and secure with capscrews (3). Tighten
4. Remove capscrews (3) and universal joint (2) from capscrews (3) to a torque of 312 - 325 Nm
driveline assembly (1). (230 - 240 lbf ft).
3. Check the surfaces of the components that Note: Tighten all fasteners without special torques
universal joints mate against for parallelism. Refer to specified to standard torques listed in Section
Fig 2. 300-0080, STANDARD BOLT AND NUT TORQUE
SPECIFICATIONS.
4. Check the condition of mounting capscrews and
replace if required. Note: Extra care should be taken when handling
drivelines since carelessness can result in premature
failure of the components. Chips, dents, burrs, or any
2 SM 1578 12-98
Driveline - Rear Driveline
Section 130-0020
SM 1578 12-98 3
Driveline - Rear Driveline
Section 130-0020
* * * *
4 SM 1578 12-98
FRONT AXLE - Wheel, Rim and Tyre
Section 140-0040
SM - 228
DESCRIPTION
The wheel is mounted on the axle spindle with two WARNING
tapered roller bearings mounted in the hub. The brake Tyre explosion hazard. Gases that build up
disc is bolted to the wheel. The tyre rim consisting of a inside an air inflated tyre mounted on a rim
base assembly, bead seat band and flanges is during welding and/or heating of rim
mounted on the wheel with clamps and nuts. components can ignite, causing an explosion
of the tyre and rim components. This warning
The wheel itself is a large cylindrical casting with the also applies to Nitrogen gas inflated tyres.
bearing bores and other finished surfaces machined Ignition will not occur in a Nitrogen gas
after the wheel is cast. atmosphere; but the pressure build up from
the applied heat may be sufficient to cause a
The rim assembly consists of a rim base, inner and blowout severe enough to injure or kill. Never
outer flanges, bead seat band, 'O' ring and lock ring. weld or otherwise apply heat on rim
components with the tyre mounted on the rim,
The wheel rim assembly is designed to be replaced whether the tyre is inflated or deflated, to
with a pre-assembled tyre and rim. prevent injury or property damage from the
potential tyre explosion! Also, do not attempt
to repair rims or rim components by welding or
PREPARATION FOR SERVICING heating, even if the tyre is not mounted on the
rim. It is recommended to scrap questionable
rim parts unless specific permission and repair
WARNING procedures are obtained in writing either from
Before loosening rim clamps or performing the company or the rim manufacturer.
any service on the tyre or rim components, to
prevent personal injury and property damage,
completely deflate tyre by removing the valve REMOVING TYRE AND RIM ASSEMBLY
cap and core. Insert a thin wire through the Numbers in parentheses refer to Fig. 1.
valve to be sure the valve is not plugged. Even
a flat tyre, in some cases, will retain sufficient If the tyre and rim assembly is to be replaced with a
air pressure to blow off a rim component with pre-assembled tyre and rim assembly, it is not
enough force to cause injury or death.
WARNING
To prevent personal injury and property
damage, be sure wheel blocks, blocking
materials and lifting equipment are properly
secured and of sufficient capacity to do the job
safely.
WARNING
When lifting tyre from rim, be sure the
equipment is of sufficient capacity and
properly secured to do the job safely.
WARNING
When lifting tyre onto rim, be sure the
equipment is of sufficient capacity and
properly secured to do the job safely.
7. Install lock ring (3) in groove of rim (4). Use pry bar 2. Install clamps (1) and start wheel nuts (2) on wheel
for this operation, as illustrated in Fig. 5. studs (3). Gradually tighten wheel nuts opposite each
other, until all nuts are snug, torque tighten wheel nuts
8. Force bead seat band (2) past 'O' ring groove in rim (2) to 690 Nm (510 lbf ft).
(4) by prying, or with lift truck forks. Use blocking Re-tighten nuts after a few hours operation.
between the forks and tyre to prevent tyre damage.
Lubricate area of rim adjacent to 'O' ring groove with a Note: Wheel rim fastener torque should be checked
thin solution of soap and water or another approved regularly, particularly on new machines or newly-
lubricant which is not harmful to rubber. Avoid using an installed wheels, to maintain the required wheel rim-
excessive amount of lubricant. Insert a new 'O' ring (7, clamp load. A newly installed wheel or a new machine
Fig. 1) in the groove of the rim behind the lock ring. should be checked at 30 day intervals until rim
fasteners show no significant torque loss from the
9. Lift tyre upwards to effect a seal between bead seat previous check. After that, a 90 day torque check
band (2) and 'O' ring (7, Fig. 1). In some cases the tyre interval should be adequate.
SM - 2559
1 - Lockwire
2 - Bolt
3 - Plate
4 - Shim Pack
5 - Outer Bearing Cone
6 - Outer Bearing Cup
7 - Wheel
8 - Spindle
9 - Inner Bearing Cone
10 - Inner Bearing Cup
11 - Washer
12 - Snap Ring
13 - Seal
14 - Bushing
15 - Bolt
16 - Lockwasher
17 - Brake Disc
18 - Bolt
19 - Lockwasher
20 - Cover
21 - Gasket
WHEEL 1. Block the front and rear of all wheels, except the
one to be raised. Jack up or lift machine so its weight
Removal and Disassembly is no longer on that wheel.
Numbers in parentheses refer to Fig. 6.
2. Deflate tyre completely, and remove the tyre and
rim assembly from the wheel. Follow instructions
WARNINGS under 'Removing Tyre and Rim Assembly'.
To prevent personal injury and property
damage, be sure wheel blocks, blocking
materials and lifting equipment are properly WARNING
secured and of sufficient capacity to do the job To prevent possible personal injury, relieve the
safely. pressure in the braking system. The exact
procedure must be followed as described in
To prevent personal injury and property Section 250-0000, BRAKING SYSTEM
damage, completely deflate tyre by removing SCHEMATIC.
the valve cap and core. Insert a thin wire
through valve to be sure valve is not plugged. 3. Relieve the pressure in the braking system. Refer to
Even a flat tyre, in some cases, will retain Section 250-0000, BRAKING SYSTEM SCHEMATIC.
sufficient air pressure to blow off a rim Disconnect brake hydraulic line at brake calliper.
component with enough force to cause injury
or death.
BEARING ADJUSTMENT
INITIAL SEATING GAUGING BOLT SHIM PACK FINAL BOLT
BOLT TORQUE TORQUE THICKNESS TORQUE
No. of Nm lbf ft No. of Nm lbf ft mm in All Nm lbf ft
Bolts Bolts Bolts
6 54 40 2 54 40 Ave. Gap Ave. Gap 6 224 165
+ 0.025 + 0.001
5. Install inner cone (9), washer (11), snap ring (12) 14. Install gasket (21) and cover (20) and secure to
and seal (13) in wheel end facing spindle. Seal lip wheel (7) with bolts (18) and lockwashers (19).
must be facing out.
15. Install brake calliper, connect brake hydraulic line
6. With suitable lifting equipment slide wheel (7) and bleed braking system. Refer to Section
assembly onto spindle (8). 165-0020, BRAKE PARTS.
7. Install outer bearing cone (5) on spindle (8) and seat 16. Install tyre and rim assembly as described under
in outer bearing cup (6). 'Mounting Tyre and Rim Assembly on Machine'.
10. Reassemble plate (3) without shims (4) and using Even with these precautions remember
that air-blast is a potential hazard. Tyre
inflation should be carried out away from busy
working areas.
SM - 208
WARNING
To avoid personal injury and property damage,
never stand or sit in front of a mounted tyre
during tyre inflation. Use a clip-on air chuck
with a long hose and stand to one side while
the tyre is being inflated.
WARNING
To prevent personal injury and property
damage, always prevent flammable vapours
that could produce tyre explosions, from being
pumped into tyres during inflation, by
observing the following precautions:
A.
Use an air compressor and reservoir located
inside a heated building, when available, so
that alcohol, methanol, or other flammable
antifreeze liquids are not needed in the air
tanks to prevent moisture freezing in the tank
and lines in subfreezing temperatures.
B. Fig. 7 - Typical Safety Cage
Make sure that paints, lacquers, paint thinners,
or similar materials that produce volatile,
flammable vapours are not used or stored near
the air intake of the compressor that supplies WARNING - Continued
the air for inflating tyres. The compressor recommended concentration to prevent
should be isolated from all such sources of condensate freezing are below hazardous
flammable vapours. levels for tyre inflation.
C. F.
Be sure to thoroughly flush and blow off all Another source of hazardous flammable
flammable solvents used for cleaning the air vapours in tyres is the tyre bead lubricant.
compressor inlet screen before using the Always use bead lubricants that do not
compressor for tyre inflation, or any other introduce flammable vapours into the tyre.
purpose.
D.
Do not charge batteries, either in or out of a Inflation
machine, near the air inlet of a compressor Note: Always use tyre inflation equipment with an air
used for inflating tyres. Charging batteries filter that removes moisture from the air supply, when
produces highly explosive hydrogen gas which available, to prevent moisture corrosion of internal rim
can be readily drawn into a nearby compressor parts.
inlet and pumped into the tyre.
E. 1. If the tyre is off the machine, it should be placed in a
Never exceed the specified concentration of safety cage before inflating. See Fig. 7.
alcohol when adjusting the alcohol vaporiser,
or adding alcohol to the auxiliary air tank, used 2. Inflate all tyres with ratings of 16-ply and above to
on machine air systems to prevent freezing or 5.2 bar (75 lbf/in²) to seat beads and seal 'O' ring, then
moisture condensate in below-freezing adjust to the recommended pressure.
temperatures. Excessive alcohol, added to the
machines air tanks in this manner can produce 3. For recommended operating air pressure, refer to
flammable vapours that will be pumped into a the chart under the heading, 'Tyre Inflation Pressures'.
tyre when this air supply is used for tyre
inflation if the tyre inflation kit is not equipped
with a moisture filter. Alcohol added to
machine air systems in
observing the gauge at the pressure regulator. STAY TYRE EXPLOSION HAZARD
AWAY FROM THE TYRE.
SM - 218
AT LEAST 15 m (50 ft) AT LEAST 460 m
(1 500 ft)
without removing the tyre from the rim. Use tyre repair
WARNING plugs and follow the directions given by the
There is always a possibility of a tyre manufacturer.
explosion whenever the smell of burning
rubber or excessively hot brakes is detected. The tyre must be removed from the rim to repair larger
The danger is also present when a fire on the punctures or cuts. Irregular shaped punctures or cuts
machine reaches the tyre and wheel area. less than 13 mm (0.5 in) in size can be repaired with a
Under such conditions, all personnel must plug and hot patch. Insert a repair plug into the hole to
avoid approaching the machine in a manner keep out moisture and to back up the hot patch. Trim
that could result in injury should an explosion the plug off flush with the inside of the casing, buff,
actually occur. Move the machine to a remote and apply the hot patch according to the instructions
area only if it can be done without endangering supplied with the hot-patch equipment.
the operator or other personnel in the area.
Punctures 13 mm (0.5 in) or larger, large cuts, or
bruise breaks require sectional or reinforced
TYRE MAINTENANCE vulcanized repair. Cover the repair patch with a layer
of cushion gum after application to the tubeless tyre to
Tyre Repairs ensure an airtight repair. Any cords of the inside ply
Prompt repair of tyre injuries will prevent small injuries that are exposed in bugging and are not covered with
from enlarging and causing tyre failure. Use the best repair patch must be coated with cushion gum to
tyre facilities available. If good repair facilities are not prevent air leakage into the carcass plies on tubeless
available, have the nearest dealer make the necessary tyres.
repairs.
Maintain Good Haul Roads Proper Handling of Tubeless Tyres and Rims
Because haul roads are considered temporary roads, Tubeless tyres should be stored vertically. Horizontal
they are frequently neglected. The better the haul stacking may compress the tyre walls making inflation
road, the longer the tyre and machine life of off-the- difficult. If tyres are stored in racks, the lower
highway equipment. supporting members should provide as broad a
surface as possible to the tyre tread to avoid a
Although it takes time and effort to maintain good haul concentration of load.
roads, delay and cost of tyre and machine breakdowns
caused by poor haul roads is many times greater. The beads of tubeless tyres must be protected from
damage or a faulty air seal will result. Do not use
hooks, cables, or chains in contact with the tyre beads
Inspect Tyres Regularly when lifting these tyres. If forklift trucks are used for
A systematic plan for tyre inspection will more than handling they should be equipped with broad, well
pay for itself in lowered tyre costs per hour of rounded arms to distribute the load and prevent
operation. All tyres should be checked regularly for damage to the tyre bead. When handling tyres with the
cuts, bruises, fabric breaks, excessive or uneven fork truck do not scrape the fork across the bead.
wear, embedded foreign matter, and any other
damage which can be repaired. A considerable Tubeless tyre rims perform an important function as
increase in tyre service can be realized if tyre injuries part of the assembly air seal. Proper care therefore
are repaired before they have progressed to the must be taken not to distort or mutilate the rim parts
irreparable stage. The rim mounting nuts should be because they must mate properly to form part of the
checked periodically and tightened to the basic air chamber. Since the rim base, bead seat
recommended torque. bands, and flanges are endless, distortion may
prevent easy assembly as well as possibly resulting in
no seal.
Prevent Overloading
Off-the-highway machines are designed to carry a Never drop, tumble, or roll rim parts.
maximum allowable payload. Excessive loading will
overstress both the machine and tyres and shorten the If rim parts are stored outdoors they should be given a
life of both. protective coat of a good commercial primer.
WARNING
Do not attempt repair of wheel components.
Twisted or damaged 'O' ring Replace 'O' ring (lubricate)
Tyre cuts and snags Repair tyre damage
Bead area awl holes Repair inner liner (preferred)
Leakage between tyre bead trim With tyre removed from rim:
Clean tyre beads in rim contact area
Clean rim with wire brush
Inspect 5 degree tapered bead seat band and the rim base in the bead
seating area to determine if the transverse weld trims are flat or concave.
Replace defective part(s).
Note: Weld trim should follow rim contour.
Mount tyre using a lubricant such as Murphy's Tyre and tube Mounting
Compound, or equivalent, on tyre beads and rim bead seat area.
* * * *
SM - 2561
SM 2045 7-00 1
Rear Axle - Differential
Section 160-0020
REMOVAL 10. Remove the self locking nuts which secure the
Numbers in parentheses refer to Fig. 1. differential housing to the axle banjo housing. Each
time a nut is removed, deeply scribe one of the flats on
the nut. The nuts should not be reused more than five
WARNINGS times.
To prevent personal injury and property
damage, be sure wheel chocks, blocking 11. Turn the four thread protectors in to break the seal
materials and lifting equipment are properly between the differential assembly and banjo housing.
secured and of adequate capacity to do the job If this does not move the differential assembly out
safely. enough, either remove the thread protectors and insert
longer bolts in the four holes, or use a suitable bar to
A come-a-long or chain fall with a pry the differential assembly away from the banjo
minimum capacity of one ton is required for housing and studs. If a bar is used, caution should be
removal and installation of a differential exercised to prevent damaging the mounting surfaces.
assembly.
12. Pull the differential assembly away from the banjo
1. Position the vehicle in a level work area, raise the until it clears the studs of the axle banjo housing, then
body and install the body prop pins. Refer to Section carefully lower the differential assembly.
270-0010, BODY AND MOUNTING.
13. Move differential assembly to a clean work area for
2. Apply the parking brake and switch off the engine. disassembly.
2 SM 2045 7-00
Rear Axle - Differential
Section 160-0020
12. Remove six of the bolts (39) which hold plain case
(38) and flanged case assembly (28) together.
4. Cut and remove lockwires (1), then remove bolts 16. Separate the four spider pinion gears (36) from
(23) and locks (24). spider (35) and bearings (37). Do not remove spider
pinion gears (36) or bearings (37) unless worn or
5. Unscrew and remove bearing adjusters (25). damaged.
6. Remove bearing cap bolts (21), then remove 17. Remove remaining side gear (30) and thrust
bearing caps (22) from carrier housing (19). Salvage washer (32) from flanged case assembly (28).
dowel bushings (20) that are seated in the bolt holes
between the bearing caps and the differential housing. 18. Make sure that identifying marks are stamped on
the side of ring gear (29) and flanged case assembly
7. With 'C' clamp still secured to ring gear (29), lift the (28) for assembly purposes.
differential assembly from carrier housing (19). See
Fig. 2. 19. Remove remaining bolts (31), then separate
flanged case assembly (28) from ring gear (29) by
8. Remove side bearing cups (26) and cones (27), tapping the edge of the ring gear with a soft-faced
using a bearing puller. Wire the bearing races together hammer .
for mating in assembly, and tag them for mating to
plain case (38) and flanged case assembly (28), from 20. Remove dowel pins (33) from plain case (38) and
which they were removed. flanged case assembly (28) only if they are damaged
and have to be replaced.
Note: In conjunction with the bearing puller, use a
round steel disc, approximately 95 mm (3.75 in) 21. Place flanged case assembly (28) on a bench so
diameter and 10 mm (0.38 in) thick. This will serve as that bolts (40) are facing upwards.
a centre for the puller screw to push against. Puller
arms must not exert a force on the bearing roller 22. Remove bolts (39) which hold flanged case
separator cage. assembly (28) together. Carefully separate flanged
case assembly (28), taking care not to loose springs
9. Position the differential assembly vertically on a (41).
bench so that a portion of ring gear (29) can be
clamped securely in a soft-jawed vice. 23. Remove reaction plate (42), clutch plates (44) and
friction plates (43) from flanged case assembly (28)
10. Loosen bolts (39) holding plain case (38) and only if they are damaged and have to be replaced.
SM 2045 7-00 3
Rear Axle - Differential
Section 160-0020
5. Separate retainer (9), cup (13) and oil seal (12) from
carrier housing (19), then remove shims (11). Wire
shims (11) together to aid in assembly.
9. Remove cones (14) from pinion gear (15) shaft 2. Immediately after cleaning, dry all parts, except
using a suitable bearing puller. bearings, with compressed air, or lint-free cloth.
Bearings are better left to air dry, then inspected and
10. Tap cup (17) and shims (18) from carrier oiled thoroughly with gear lubricant for protection from
housing (19). corrosion.
4 SM 2045 7-00
Rear Axle - Differential
Section 160-0020
3. With the parts cleaned, coat parts immediately with surfaces of retainer (9). The outer machined surface
light oil to prevent corrosion. If parts are not to be on the hub of the bearing cage must be concentric with
assembled immediately, treat them with a good rust the bearing cup bore within 0.05 mm (0.002 in) total
preventative and wrap them with treated paper or indicator reading (T.I.R.).
other suitable material designed to prevent corrosion.
12. The outer machined surface (OD) on retainer (9)
4. Replace all gaskets, 'O' rings and seals with new must be concentric within 0.05 mm (0.002 in) T.I.R.
parts. with the surface into which oil seal (12) fits.
5. Before installing the differential assembly to the 13. The threads and bores of bearing caps (22) and
banjo, clean the inside and outside of the banjo carrier housing (19) must be concentric within
housing to remove any foreign material. 0.127 mm (0.005 in) T.I.R. and must be square with
the pinion bore within 0.08 mm (0.003 in) when
6. Oil seal (12) rides on a special sleeve (6), which is on checked at points 254 mm (10 in) from the centre line
yoke (5) to provide a smooth contact surface. If the of the pinion bore.
sleeve is rough or worn, pull it from the yoke and install
a new one. Heat the new sleeve to 177 - 205o C Note: Bearing caps (22) and carrier housing (19) can
(350 - 400° F) in oil to expand it for installation. If oil only be replaced as an assembly.
heating equipment is not available, heat the bushing
evenly to 205o C (400o F). This takes about 1 minute using 14. The machined mating surfaces of plain case (38)
a torch with a heating tip. Use a Tempilstik or other and flanged case assembly (28) must be square with
temperature gauge to make sure sleeve (6) is hot the axis of the cases within 0.08 mm (0.003 in) T.I.R..
enough. Slide heated sleeve on the yoke and tap lightly The mating diameters of the cases must also be
with a hammer to seat it. concentric within 0.08 mm (0.003 in) T.I.R..
SM 2045 7-00 5
Rear Axle - Differential
Section 160-0020
as Dimension 'X', and the loosely fitting bearing SM - 098
cup (17) (see previous note) in the pinion gear shaft
GAUGING DISTANCE
bore of carrier housing (19).
MEASURE GAUGING DISTANCE
WITH ESTIMATED, OR ORIGINAL
b. Install bearing cone (16) and bearing cone (14) on SHIM PACK INSTALLED.
pinion gear (15). Install cup (13) into retainer (9) until
it bottoms against the retainer shoulder. Install pinion ADJUST SHIM PACK TO GIVE
PROPER GAUGING DISTANCE
gear assembly (14, 15 & 16) and retainer (9) into
WITHIN 0.08 mm (0.003 in) OF
carrier housing (19). Secure retainer (9) with eight ETCHED DIMENSION ON TAIL
bolts (10) equally spaced. BEARING END OF PINION GEAR.
SHIM PACK
c. Rotate pinion gear (15) and tighten bolts (10) until
the pinion gear cannot be rotated by hand to seat the
bearing rollers firmly.
Fig. 5 - Measuring Gauging Distance
d. Place a flat plate approximately 450 mm (18 in) long
across the two bearing cap (22) mounting surfaces in SM - 099
carrier housing (19) as shown in Fig. 6. The plate must
lie perfectly flat between the bearing cap mounting
surfaces and must be clean and free of burrs.
2. Determine shim pack (11) thickness so as to allow Fig. 6 - Checking Shim Requirements
pinion gear (15) 0.025 - 0.08 mm (0.001 - 0.003 in) Using Inside Micrometer
axial end play as follows:
3. Remove bolts (10) and remove retainer (9) from
a. With pinion gear (15) installed as previously carrier housing (19). Adjust shim pack (18) to the
described in Steps 1a through 1f, rotate pinion gear required thickness as calculated in Step 1g and
(15) and tighten the eight bolts (10) evenly spaced, replace the ground bearing cup (17) with bearing cup
to 110 Nm (80 lbf ft) torque to seat the bearing (17) to be installed permanently.
rollers firmly.
4. Install pinion gear assembly (14, 15 & 16) in carrier
b. Remove bolts (10) and reinstall two of them 180° housing (19) as previously described in Steps 1 and 2.
apart. Tighten the two bolts alternately in 30 Nm
(20 lbf ft) increments to a final torque of 110 Nm 5. Install oil seal (12) into retainer (9) flush with the
(80 lbf ft). retainer surface at the top of the seal bore.
c. Measure the gap between retainer (9) and carrier 6. Install measured shim pack (11) as calculated in
housing (19) adjacent to the two installed bolts and Step 2d on retainer (9) and install the assembly on
record the average measurement as Dimension 'C'. carrier housing (19). Align slot in retainer (9) with the
lubrication holes in shims (11) and carrier housing (19)
d. The correct thickness of shim pack (11) is: and install retainer assembly in carrier housing.
0.48 mm (0.019 in) + Dimension 'C' - Dimension 'B'
(Step 1f) - Dimension 'A' (Step 1e). This shim pack 7. Install bolts (10) connecting retainer (9) to carrier
thickness should provide 0.05 mm (0.002 in) axial housing (19) and tighten to a torque of 156 Nm
end play of pinion gear (15). (115 lbf ft). Install set screws (8) in retainer (9).
6 SM 2045 7-00
Rear Axle - Differential
Section 160-0020
8. Lubricate the lip of sleeve (6) and spline of pinion SM - 101
gear (15) with multipurpose grease No. 2. Lubricant
and insert 'O' ring (7) into yoke (5).
10. Install plate (3) and secure to pinion gear (15) with
bolts (2). Tighten bolts (2) to a torque of 290 Nm
(213 lbf ft).
2. Locate springs (41) in flanged case assembly (28) using the bearing spreader tool which can be
and align mating parts of flanged case assembly (28). fabricated as shown in Fig. 17.
3. Secure mating parts of flanged case assembly (28) 7. Install other side gear (34) and thrust washer (32),
with bolts (40). with grooved side of washer mating with machined
surface of side gear, in plain case (38).
4. Align identification marks that were made during
disassembly on ring gear (29) and flanged case 8. Assemble plain case (38) to ring gear (29) and
assembly (28). flanged case assembly (28), making certain that thrust
washers (32) do not slip off dowel pins (33). Turn plain
5. Install bolts (31) and tighten to a torque of 700 Nm case (38) until the mating mark made during
(515 lbf ft). disassembly lines up with the mark made on flanged
case assembly (28).
Spider and Component Parts Assembly 9. Apply retaining compound to bolts (39) and install
1. Press thrust washer dowel pins (33) into holes in four bolts (39) equally spaced. Tighten bolts (39) to a
plain case (38) and flanged case assembly (28), if torque of 271 Nm (200 lbf ft).
removed.
10. Check assembly for free gear rotation and correct
2. Lubricate inner walls of flanged case assembly (28) if necessary. Install remaining bolts (39) and tighten to
and plain case (38) and all component parts with gear a torque of 271 Nm (200 lbf ft).
lubricant. Refer to Section 300-0020, LUBRICATION
SYSTEM, for proper lubricant. 11. Press side bearing cones (16) squarely and firmly
over machined cylinders of plain case (38) and flanged
3. Position one thrust washer (32), grooved side facing case assembly (28).
towards side gear in bore of flanged case assembly (28).
4. Install first side gear (30) machined surface against Ring Gear Assembly to Carrier Housing
thrust washer (32) in flanged case assembly (28). Bearing adjusters (25) have two basic functions:
pre-loading cups (26) and cones (27); and positioning
5. Install bearings (37) in spider pinion gears (36) and ring gear (29) to obtain the correct backlash between
install bearings and spider pinion gears on spider (35), the ring gear and pinion gear (15). See Fig. 7. The
if removed. bearing adjuster (25) located on the same side of
pinion gear (15) as ring gear (29), pushes the ring gear
6. Lay complete spider assembly in pinion grooves in toward the pinion gear. Bearing adjuster (25), located
face of flanged case assembly (28). Spread bearings on the opposite side of pinion gear (15) than the ring
(37) against shoulders of flanged case assembly (28), gear, pushes the ring gear away from the pinion gear.
SM 2045 7-00 7
Rear Axle - Differential
Section 160-0020
The ring gear assembly must be installed onto carrier SM - 102
housing (19) so that cups (26) and cones (27) are
properly pre-loaded; correct backlash exists between
ring gear (29) and pinion gear (15), and satisfactory
tooth pattern is established between ring gear and RING GEAR RUNOUT
pinion gear. READING TAKEN AS
SHOWN, AND MUST
NOT EXCEED ± 0.08 mm
These conditions can be obtained by using the (0.003 in).
following procedures:
3. Using a micrometer, take a measurement diagonally of notches and tightening up the opposite adjuster an
across bearing cap (22) lock pads and record it for equal number of notches.
reference later.
8. When a satisfactory backlash tolerance has been
4. Install bearing adjusters (25) in their respective established, check the gear tooth pattern as described
bearing caps (22). under the heading 'Adjustments'.
5. Place a dial indicator in the position shown in 9. If gear tooth pattern is not correct, some correction
Fig. 9, to check ring gear backlash. Tighten bearing can be made by systematically loosening and
adjuster (25) on the ring gear side until the backlash tightening the bearing adjusters (25), as previously
between ring gear (29) and pinion gear (15) reads described, but in every instance re-check the backlash
0.000 on the dial indicator. tolerance. If a favourable gear tooth pattern cannot be
established within the backlash tolerance, it will be
6. Tighten the opposite bearing adjuster (25) until necessary to alter, add or remove, shims (18) between
another measurement across bearing cap (22) lock bearing cup (17) and carrier housing (19) and alter
pads indicates a 0.05 - 0.13 mm (0.002 - 0.005 in) shims (11) by the same amount.
expansion when compared to the measurement
recorded in Step 3. 10. When altering these shims as described in 'Pinion
Cage Group', disregard all procedures given for
7. At this point the backlash tolerance between ring comparing the micrometer (measured) dimension and
gear (29) and pinion gear (15) should be 0.30 - 0.46 mm etched dimension on pinion gear (15) tail shaft end.
(0.012 - 0.018 in) on gear sets with a 3.73:1 gear ratio.
If this tolerance has not been obtained at this point, it 11. The procedures for keeping differential side
can be accomplished without changing the bearing bearing preload, backlash and favourable gear tooth
preload by backing off one adjuster a certain number pattern within specifications is strictly a 'try, check, and
try again' method.
8 SM 2045 7-00
Rear Axle - Differential
Section 160-0020
12. After a satisfactory preload, backlash and gear 3. Gear tooth patterns can be interpreted by referring
tooth pattern is obtained, make certain that the retainer to Figs. 10 through 15.
bolts (10) are tightened to a torque of 156 Nm
(115 lbf ft). Again check backlash tolerance and gear a. If a contact pattern similar to that shown in
tooth pattern. Fig. 10 is obtained, the adjustment is correct.
13. Tighten bearing cap bolts (21) to a torque of b. If the contact area is on the inner side of the ring
644 Nm (475 lbf ft) and tie with lockwire (1). The gear teeth, see Fig. 11, move ring gear away from
lockwire passes over the top of bearing cap (22) and pinion by turning bearing adjusters equal amounts
through the heads of the respective bolts. The same until the proper bearing pattern is obtained.
procedure is to be followed for both bearing caps.
c. If the contact area is on the outer part of the ring
14. A final measurement across bearing cap (22) pilot gear teeth, see Fig. 12, move ring gear toward pinion
pads must indicate a 0.05 mm (0.002 in) to 0.13 mm by turning bearing adjuster.
(0.005 in) expansion, after ten ring gear revolutions
under a light load, when compared to the original d. If the contact area is along the root of the ring
measurement recorded in Step 3. This ensures that gear teeth, see Fig. 13, move the pinion out by
the side bearings have the proper preload. adding shims.
15. Install adjuster locks (24) and secure with bolts (23). e. If the contact area is along the top edge of the ring
Tighten bolts (23) to a torque of 33 Nm (24 lbf ft) and gear teeth, see Fig. 14, move the pinion in by
tie with lockwire (1). removing shims.
SM - 105
ADJUSTMENTS
When adjusting a noisy differential that has been in
service for some time, more harm than good can
result. Changes in adjustment will frequently
concentrate the bearing area on a small portion of the
teeth which often results in failure. Therefore, it is
advisable to know exactly what the end result will be
before adjustments are made in an old differential.
SM 2045 7-00 9
Rear Axle - Differential
Section 160-0020
SM - 107 SM - 109
Fig. 12 - Excessive Backlash Fig. 14 - Pinion Out Too Far - Remove Shims
SM - 108 SM - 110
MOVE GEAR IN THIS DIRECTION
FOR CORRECTION IN FIG. 13
Fig. 13 - Pinion In Too Far - Add Shims Fig. 15 - Correct Movement for Adjustment
10 SM 2045 7-00
Rear Axle - Differential
Section 160-0020
10. Install the axle shafts, then replace and secure the After draining and refilling an axle, the planetary
driving flange cover to the wheels. Refer to Section gearing should be checked after 10 hours of operation.
160-0030, AXLE GROUP.
1. Check the level in planetaries at oil level plug. If the
11. Fill the drive axle, planetary reservoirs and oil level is low, add oil. This check point is a minimum
differential with the proper grade and quantity of check point only. If the oil level is above the check
lubricant specified in Section 300-0020,LUBRICATION point, do not drain off oil.
SYSTEM.
2. Add oil if needed. The oil level is correct when oil
MAINTENANCE flows from the lube level check plug in the banjo.
These checks should be made every 10 hours until oil
Periodic Inspection level in the differential is maintained.
SM 2045 7-00 11
Rear Axle - Differential
Section 160-0020
SM - 112
in mm
1/8 3.2
ONE-4340 STL. OR EQUIV.-HDN.-GRIND
1/4 6.4
3/8 9.5
7/16 11.1
1/2 12.7
5/8 15.9
3/4 19.1
29/32 23.0
1 25.4
1 1/8 28.6
ACME THD.
1 1/4 31.8
1 3/8 34.9
1 1/2 38.1
APPROX ONE-4340
STL.-HDN.-GRIND 1 7/8 47.6
2 50.8
2 1/32 51.6
2 1/8 54.0
2 15/32 62.7
2 3/4 69.9
4 3/4 120.7
4 7/8 123.8
5 1/2 139.7
5 3/4 146.0
5 31/32 151.6
6 7/8 174.6
7 1/2 190.5
9 1/2 241.3
12 SM 2045 7-00
Rear Axle - Differential
Section 160-0020
DIAGNOSIS CHART
CONDITION REASON REMEDY
Vibration. Broken gear teeth. Replace damaged gear.
Excessive runout of pinion or flanged case. Disassemble, correct or replace faulty part.
Continual noise. Bearing worn. Replace worn parts.
Gears damaged or worn. Replace gears.
Noise on drive. Ring and pinion gear adjustment tight. Adjust.
Noise on coast. Bearing damaged. Replace bearings.
Loose ring and pinion gear adjustment. Adjust gears.
Excessive pinion gear end play. Adjust.
Noise on turns. Worn spider gears or side gears. Replace gears.
Worn or damaged spider bushings. Replace bushings.
Loss of lubricant. Oil seals worn. Replace seal.
Loose nuts. Tighten nuts to correct torque.
Cracked housing. Repair or replace housing.
* * * *
SM 2045 7-00 13
REAR AXLE - Axle Group
Section 160-0030
SM - 235
* Shown in Fig. 2.
PLANETARY
Description and Operation Axle shaft (26) is driven by the differential and turns
Numbers in parentheses refer to Fig. 1. sun gear (9) to which it is splined. Sun gear (9)
meshes with and rotates planetary pinions (8). Since
The planetary gearing is a single stage planetary gear ring gear (22) is splined to the wheel spindle it cannot
assembly. This assembly contains sun gear (9), turn and forces the planetary carrier (14) to rotate.
planetary carrier (14) with planet pinions (8) and ring This results in planetary carrier (14) being the output to
gear (22), to provide gear ratio to the drive wheels. the drive wheels.
SM 1184 2-98 1
Rear Axle - Axle Group
Section 160-0030
SM - 236
Planetary Gearing - Towing 1. Position the vehicle in a level work area with
Numbers in parentheses refer to Fig. 1. magnetic plug (18) at its lowest point. Apply the
parking brake and switch off the engine.
2 SM 1184 2-98
Rear Axle - Axle Group
Section 160-0030
holes. A hoist should be used, as shown in Fig. 3, to Note: If ring gear carrier (1) is replaced, the wheel
support the assembly during removal. Remove studs bearing adjustment must be checked and corrected
(21) if damaged. as required, as described in Section 160-0050,
WHEEL, RIM AND TYRE.
7. Remove and discard 'O' ring (13) and place
planetary assembly on a clean work surface with gear 1. Insert snap rings (11) in planet pinion (8) grooves.
side up. Oil bearing sets (10) and insert spacers (7) and
bearings (10) in planet pinions (8).
8. Remove nuts (24), bolts (4) and washers (6) from
planet pinion (8) assemblies. Slide planet pinion (8) 2. Install new 'O' rings (5) in planetary carrier (14).
assemblies from planetary carrier (14). Slide assembled planet pinions into their respective
positions in planetary carrier (14).
9. Separate pinion bearing (10) sets and spacers (7)
from planet pinions (8) and remove snap rings (11) 3. Insert planet pins (12) through planet pinion (8)
from internal grooves of planet pinion (8). assemblies into planetary carrier (14) bores. Install
washers (6) on bolts (4) and insert bolts (4) through
10. Remove and discard 'O' rings (5) from planetary planetary carrier (14) and planet pinions (8). Install
carrier (14). nuts (24) on bolts (4) and tighten securely. Check
planet pinions (8) for free rotation.
INSPECTION
Numbers in parentheses refer to Fig. 2. WARNING
To prevent personal injury and property
1. Clean all parts thoroughly in suitable solvent and dry damage, be sure lifting equipment is of
with moisture-free compressed air or a clean, lint-free adequate capacity and properly secured to do
cloth. Allow bearings to air dry and dip in clean the job safely.
planetary lubricant.
4. Install new 'O' ring (13) in its groove in planetary
2. Inspect all parts for damage. Repair or replace as carrier (14). Place the planetary assembly in position
necessary. on the wheel. Mesh planet pinions (8) with ring gear
(22) and push the planetary assembly into place.
3. Inspect all pinions, gears and splines for excessive Install studs (21), if removed, and install nuts (20).
wear, cracked or broken teeth and pitted or scored
surfaces. If replacing planet pinions or sun gear, be 5. If sun gear (9) was removed during 'Disassembly',
sure the new pinions or gear have the same number of slide sun gear (9) over splines of axle shaft (26) and
teeth as the old ones so torque multiplication will install snap ring (27). Install ring (2) on axle shaft (26)
remain the same. and insert axle shaft assembly into the spindle and
SM 1184 2-98 3
Rear Axle - Axle Group
Section 160-0030
banjo housing, pushing the axle shaft part way into the SM - 238
differential side gear. Mesh sun gear (9) with planet
pinions (8).
6. Push axle shaft (26) and sun gear (9) inward as far
as they will go. With a steel rule and straight edge,
measure from cover mounting surface on planetary
carrier (14) to the end of axle shaft (26). Note as
dimension 'A'. See Fig. 4.
Note: If the end play is too small, the axle shaft is not
pushed completely into the differential side gear. If the
end play is greater than the allowable maximum, either
the axle shaft end or the driving flange thrust cover, or
both are excessively worn. To correct this, replace
cover (16) first. If the end play is still too great, a new
axle shaft must be installed.
REAR AXLE
WARNINGS
Description and Operation Heavy machine. Make sure lifting device or
Numbers in parentheses refer to Fig. 6. jack has proper lifting capacity and is
adequately secured to do the job safely.
The rear axle assembly consists of banjo (1) assembly Personal injury and damage may result if
and A-frame (39). The banjo provides the housing for machine falls or jack or lifting device
the differential and axle shafts which drive the wheels, collapses.
and spindles (2) to which the wheels are mounted. The
banjo also connects the rear wheels to the chassis To prevent possible personal injury,
through A-frame (39), link (16), and the rear ride relieve the pressure in the braking system. The
cylinders. exact procedure must be followed as
described in Section 250-0000, BRAKING
The rear axle is centrally mounted on the rear frame SYSTEM SCHEMATIC.
crossmember with a tapered pin (12) and component
parts, which allows the axle to oscillate as the truck 1. Position the vehicle in a level work area, apply the
moves over uneven terrain. parking brake and switch off the engine.
4 SM 1184 2-98
Rear Axle - Axle Group
Section 160-0030
SM - 1380
30 - Hardened Washer
31 - Bolt
32 - Pin
17 - Spacer 33 - Bolt
18 - Snap Ring 34 - Hardened Washer
19 - Bearing 35 - Hardened Washer
20 - Lube Fitting 36 - Locknut
8 - Retainer 21 - Lube Fitting 37 - Axle Shaft
9 - Washer 22 - Coupling 38 - Snap Ring
1 - Banjo 10 - Split Cup 23 - Elbow 39 - A-Frame
2 - Spindle 11 - Spacer 24 - Nut 40 - Nipple
3 - Stud 12 - Tapered Pin 25 - Bolt 41 - Bushing
4 - Bearing Ring 13 - Bearing 26 - Bolt 42 - Connector
5 - Hardened Spacer 14 - Lube Line 27 - Magnetic Plug 43 - Breather Line
6 - Oscillation Stop 15 - Breather 28 - Plug 44 - Elbow
7 - Tapped Retainer 16 - Link 29 - Bolt 45 - Spacer
2. Turn the steering wheel in both directions several deteriorate the rubber.
times to relieve pressure in the steering system. Operate
the treadle valve continuously to relieve pressure in the 4. Jack up or lift the vehicle so its weight is no longer
braking system. Block all road wheels. resting on the tyres of the axle assembly. Securely
block the vehicle in this position.
3. Disconnect brake, cooling, breather and lubrication
lines. Drain all the lubricant from the axle, brake assemblies 5. Remove four bolts from the driveline flange and
and planetary assemblies into suitable containers. Refer swing-driveline away from the differential. Punch mark
to Section 160-0020, DIFFERENTIAL, and, Section both flanges to facilitate installation. Refer to
165-0030, BRAKE PARTS. Cap all open lines and fittings Section 130-0020, REAR DRIVELINE.
to prevent entry of dirt.
6. If necessary remove the tyre and rim assemblies as
Note: Avoid spilling lubricant on tyres, as it will described in Section 160-0050, WHEEL, RIM AND TYRE.
SM 1184 2-98 5
Rear Axle - Axle Group
Section 160-0030
7. Position a hydraulic jack under the axle at the 6. Remove lube line (14), elbow (23) and lube fitting
differential housing, being sure jack is of suitable (21) from link (16).
capacity and proportions to lift and balance the axle
assembly. Place wheeled dollies at both ends of the 7. Remove breather line (43) and elbow (44) from
axle for wheels to rest on when the axle is lowered. banjo (1).
Raise axle just enough to take weight off centre
tapered pin (12). 8. If differential is to be removed, remove nuts (36),
hardened spacers (5) and hardened washers (35).
8. Remove lower ends of rear ride cylinders. Refer to Using suitable lifting equipment, remove differential
Section 180-0050, RIDE CYLINDER. assembly from banjo (1). Refer to Section 160-0020,
DIFFERENTIAL.
9. Remove bolt (33), hardened washer (34) and pin
(32) which mount link (16) to the chassis. Remove 9. If required, remove magnetic plug (27) and plug (28)
spacers (17). from banjo (1).
10. Remove nut (24), washers (9) and bolt (25) 10. If required, remove snap rings (38) and axle shafts
attaching A-frame (39) to the chassis. Remove split (37) from spindles (2).
cups (10) from tapered pin (12).
11. Drive tapered pin (12) out of the chassis using a Inspection
soft drift. As tapered pin (12) moves out, remove 1. Clean all metal parts in a suitable solvent, using a
spacers (11). Lower the axle assembly onto the brush to clean bearings. Dry all parts on a clean
wheeled dollies and roll out from beneath the vehicle. surface and allow bearings to dry naturally. Make sure
parts are free from dirt.
3. Remove bolts (29) and hardened washers (30) Note: Tighten all fasteners without special torques
securing oscillation stop (6) to banjo (1). Remove specified to standard torques listed in Section
oscillation stop (6) and spacer (45). 300-0080, STANDARD BOLT AND NUT TORQUE
SPECIFICATIONS.
4. Remove bolt (33), hardened washer (34) and pin
(32) which mount link (16) to banjo (1). Remove Note: If heating of banjo (1) is required to assemble
spacers (17). spindles (2) and banjo (1), banjo interference areas
must cool to 66° C (150° F) maximum before welding.
5. Remove link (16) from banjo (1) brackets. Remove For welding spindles (2) to banjo (1) preheat spindles
snap rings (18) and bearings (19) from link (16). and banjo to 150° C (300° F) minimum in weld area
and maintain during welding.
6 SM 1184 2-98
Rear Axle - Axle Group
Section 160-0030
WARNING WARNING
To prevent personal injury and property To prevent personal injury and property
damage, be sure lifting equipment is of damage, be sure lifting equipment is of
adequate capacity and properly secured to do adequate capacity and properly secured to do
the job safely. the job safely.
1. If axle shafts (37) have been removed from spindles 1. After banjo (1) and its components are
(2) install axle shafts in the spindles and secure with reassembled, roll the assembly under the vehicle and
snap rings (38). align under the chassis.
2. If removed, install magnetic plug (27) and plug (28) 2. Using a hydraulic jack of suitable capacity and
in banjo (1). proportions to lift and balance the axle assembly, raise
the axle assembly into position in the chassis. Insert
3. If differential was removed, position differential in spacers (11) and, using a soft drift, drive in tapered pin
banjo (1) and secure with nuts (36), hardened (12).
spacers (5) and hardened washers (35). Refer to
Section 160-0020, DIFFERENTIAL. 3. Install split cups (10) and washers (9) on tapered
pin (12) and secure with bolt (25) and nut (24).
4. Install elbow (44) in banjo (1) and connect breather
line (43) to elbow (44). Note: Since tapered pin (12) relies on bolt (25)
clamping to spread out and seat split cups (10) against
5. Install lube fitting (21) and elbow (23) in link (16) the pin for retention at initial assembly, the pin tends to
and connect lube line (14) to elbow (23). loosen up after the vehicle is in operation. Positive
seating is required and accomplished by re-tightening
6. Install bearings (19) in link (16) and secure with bolts (25) after the first few hours of operation, and
snap rings (18). Position link (16) assembly in banjo thereafter, until bolts (25) retain their torque.
(1) brackets and install spacers (17). Secure link (16)
to banjo (1) with pin (32), hardened washer (34) and 4. Align link (16) assembly and spacers (17) with the
bolt (33). chassis and install pin (32). Secure pin (32) to the
chassis with hardened washer (34) and bolt (33).
7. Position spacer (45) and oscillation stop (6) on
banjo (1) and secure with bolts (29) and hardened 5. Install rear ride cylinders to the chassis and axle
washers (30). assembly as outlined in Section 180-0050, RIDE
CYLINDER.
8. Install bearing (13) in A-frame (39). Fit retainer (8)
and tapped retainer (7) to A-frame (39) and secure 6. With the axle group securely fastened to the rear
with bolts (26). If removed, install lube fitting (20) in ride cylinders and the two sections of the chassis at
A-frame (39). link (16) and A-frame (39), release and remove the
hydraulic jack.
9. Position A-frame (39) assembly to banjo (1) and
secure with bolts (31). Tighten bolts (31) to a torque of 7. Align the punch marks, as marked during removal,
2 034 Nm (1 500 lbf ft). on the driveline and differential flanges, and secure
with four bolts. Refer to Section 130-0020, REAR
DRIVELINE.
Installation
Numbers in parentheses refer to Fig. 6. 8. If removed, replace tyre and rim assemblies as
outlined in Section 160-0050, WHEEL, RIM AND
Note: Tighten all fasteners to standard torques listed TYRE.
in Section 300-0080, STANDARD BOLT AND NUT
TORQUE SPECIFICATIONS. 9. Remove blanking caps and reconnect all brake,
cooling, breather and lubrication lines. Refer to Section
Note: Tighten all hydraulic lines fitted with ORFS 160-0020, DIFFERENTIAL, and, Section
connections, as described in Section 230-0000, BODY 165-0030, BRAKE PARTS.
SYSTEM SCHEMATIC. Renew all 'O' rings where
used.
SM 1184 2-98 7
Rear Axle - Axle Group
Section 160-0030
10. Fill banjo, planetaries and disc brake assemblies AXLE DIAGNOSIS
with lubricant specified in Section 300-0020, Noises originating in the tyres, transmission or
LUBRICATION SYSTEM. driveline might be attributed by mistake to the axle.
Therefore, all possible sources of noise should be
11. Lubricate the rear axle assembly through lube investigated before deciding the axle is at fault.
fittings (20 & 21) with lubricant specified in
Section 300-0020, LUBRICATION SYSTEM. True axle noises may be located by lifting or jacking
the truck until all driving wheels are clear of the floor or
12. Bleed the braking system as described in ground. Securely block the truck in this position. Run
Section 165-0030, BRAKE PARTS. power train at moderate speed. Be certain all tyres are
off the ground and, to prevent damage to the
differential, see that neither rear brake drags.
MAINTENANCE
Proper lubrication of the axle group is essential if axles
are to deliver the service intended. Refer to Section SPECIAL TOOLS
300-0020, LUBRICATION SYSTEM for lubrication There are no special tools required for procedures
intervals and lubricant specifications. outlined in this section. Refer to Section 300-0070,
SERVICE TOOLS, for part numbers of general service
tools and sealants required. These tools and sealants
are available from your dealer.
AXLE DIAGNOSIS
CONDITION REASON REMEDY
Noise Insufficient or incorrect lubricant Check level; fill with proper type and
grade lubricant
Wheel bearings scored or rough Replace bearings
Gear teeth in planetary chipped Replace gear
Loss of lubricant Lubricant level too high Drain and fill to proper level
Lubricant foams excessively Drain and fill with correct type and
grade lubricant
Worn or broken oil seal Replace oil seal
Restricted breather vent Clean vents
Loose nuts or bolts Tighten nuts or bolts
Gain of lubricant Restricted differential housing vent Clean vent
Planetaries running hot Insufficient or incorrect lubricant Check level; fill with proper type and
grade of lubricant
Pinion bearings seized Replace bearings
* * * *
8 SM 1184 2-98
REAR AXLE - Wheel, Rim and Tyre
Section 160-0050
SM - 203
DESCRIPTION
Each drive wheel is mounted on its spindle with two WARNING
tapered roller bearings. All the weight of the truck Tyre explosion hazard. Gases that build up
resting on the drive axle is supported by the wheels inside an air inflated tyre mounted on a rim
and bearings; none of the weight is supported by, or during welding and/or heating of rim
transmitted through, the axle shafts. This type of components can ignite, causing an explosion
construction is known as 'Full Floating'. of the tyre and rim components. This warning
also applies to Nitrogen gas inflated tyres.
The wheel itself is a large cylindrical casting with the Ignition will not occur in a Nitrogen gas
bearing bores and other finished surfaces machined atmosphere; but the pressure build up from the
after the wheel is cast. applied heat may be sufficient to cause a
blowout severe enough to injure or kill. Never
The dual rim assembly consists of two rim bases, inner weld or otherwise apply heat on rim
and outer flanges, bead seat bands, 'O' rings and lock components with the tyre mounted on the rim,
rings. whether the tyre is inflated or deflated, to
prevent injury or property damage from the
The tyre and rim assembly is designed to be replaced potential tyre explosion! Also, do not attempt to
with a pre-assembled tyre and rim. repair rims or rim components by welding or
heating, even if the tyre is not mounted on
the rim. It is recommended to scrap questionable
PREPARATION FOR SERVICING rim parts unless specific permission and repair
procedures are obtained in writing
either from the company or the rim manufacturer.
WARNING
Before loosening rim clamps or performing any
service on the tyres or rim components, to REMOVING TYRE AND RIM ASSEMBLY
prevent personal injury and property damage, Numbers in parentheses refer to Fig. 1.
completely deflate BOTH TYRES of dual
assembly by removing the valve caps and If the tyre and rim assembly is to be replaced with a
cores. Insert a thin wire through valves to be pre-assembled tyre and rim assembly, it is not
sure valves are not plugged. Even a flat tyre, in necessary to remove the tyre from the rim on the truck.
some cases, will retain sufficient air pressure to The tyre and rim may be removed from the truck as an
blow off a rim component with enough force to assembly, and transported to a more desirable location
cause bodily injury or death. for removing the tyre from the rim.
SM - 204
WARNING
To prevent personal injury and property
damage, be sure wheel blocks, blocking
materials and lifting equipment are properly
secured and of sufficient capacity to do the job
safely.
WARNING
Fig. 5 - Installing Typical Lock Ring
When lifting tyre onto rim, be sure the
equipment is of sufficient capacity and properly
secured to do the job safely. thin solution of soap and water or another approved
lubricant which is not harmful to rubber. Avoid using an
1. If tubeless tyre valve assembly was removed from excessive amount of lubricant. Insert new 'O' ring (6,
rim, install this assembly in the rim valve hole and Fig. 1) in groove of the rim behind lock ring.
tighten securely.
9. Lift the tyre upwards to effect a seal between bead
2. Tyre installations are performed in basically the same seat band (2) and 'O' ring (6, Fig. 1). In some cases the
manner whether the rim (4) is on or off the truck. For tyre will automatically spring out, making this step
off-truck installations, lay the rim on blocks or a unnecessary.
mounting stand with 'O' ring groove up. The rim should
be just off the floor enough so the tyre rests on the rim
and does not touch the floor. Blocks should not extend
MOUNTING TYRE AND RIM ASSEMBLY
more than 13 mm (0.5 in) beyond the rim base, so they ON WHEEL
won’t interfere with inner flange (5). Numbers in parentheses refer to Fig. 1.
SM - 202
(510 lbf ft). Re-tighten nuts after a few hours operation. WHEEL
Note: Wheel rim fastener torque should be checked Removal and Disassembly
regularly, particularly on new trucks or newly-installed Numbers in parentheses refer to Fig. 6.
wheels, to maintain the required wheel rim-clamp load.
A newly installed wheel or a new truck should be
checked at 30 day intervals until the rim fasteners WARNING
show no significant torque loss from the previous To prevent personal injury and property
check. After that, a 90 day torque check interval damage, be sure wheel blocks, blocking
should be adequate. materials and lifting equipment are properly
secured and of sufficient capacity to do the job
safely.
11. If required, remove bearing cups (8 & 9) from wheel. 5. Install new 'O' ring (14) on wheel driver (13). Refer to
Section 165-0030, BRAKE PARTS.
7. Lubricate outer bearing cone (7) with lubricant 15. Install planetary gear assembly and fill planetary
specified in Section 300-0020, LUBRICATION and differential assemblies with lubricant specified in
SYSTEM. Install outer bearing cone (7) on spindle (11) Section 300-0020, LUBRICATION SYSTEM. Install
and seat in outer bearing cup (8). tyre and rim assembly as described under 'Mounting
Tyre and Rim Assembly on Machine'.
8. Install ring gear (5) on end of spindle (11).
Note: Ensure all dirt, grease and oil is completely TYRE INFLATION
removed from plate (3), shim pack (4) and end of
spindle (11) to allow accurate setting of the bearing pre-
load. WARNING
To prevent personal injury and property
9. Install plate (3), without shim pack (4) on end of damage, the tyre and rim assembly should be
spindle (11), and secure with eight bolts (2). Tighten placed in a safety cage before inflating. If no
bolts (2) evenly in equal increments to 'Gauging Bolt safety cage is available or tyre is on the
Torque', as specified in 'Bearing Adjustment Table', machine, the tyre and rim assembly should be
while rotating and bumping wheel (6) assembly. wrapped with safety chains or with lash cables
before inflating.
10. Remove bolts (2) and tap the wheel (6) assembly to
free bearings. Even with these precautions remember that air-
blast is a potential hazard. Tyre inflation should
11. Reassemble plate (3) without shim pack (4) and be carried out away from busy working areas.
using only two bolts (2) located 180° apart, adjacent to
gauging holes in plate (3). Tighten bolts (2) evenly in
equal increments to 'Gauging Bolt Torque' (ref. 'Bearing WARNING
Adjustment Table'), while rotating and bumping wheel To avoid personal injury and property damage,
(6) assembly. never stand or sit in front of a mounted tyre
during tyre inflation. Use a clip-on air chuck
12. Determine gap between plate (3) and end of spindle with a long hose and stand to one side while
(11) at both gauging holes. To determine gap, use a the tyre is being inflated.
depth micrometer in both gauging holes to measure
distance from outer face of plate (3) to end of spindle
(11). Using a micrometer, measure thickness of plate WARNING
(3). Subtract plate thickness reading from depth gauge To prevent personal injury and property
readings. damage, always prevent flammable vapours
that could produce tyre explosions, from being
13. Average the two readings, obtained at Step 12, in pumped into tyres during inflation, by
increments of 0.03 mm (0.001 in) and round off to the observing the following precautions:
next higher 0.03 mm (0.001 in). This is the average
gap. The required shim pack (4) thickness is equal to A.
the average gap plus 0.18 mm (0.007 in). Use an air compressor and reservoir located
inside a heated building, when available, so
14. Install required shim pack (4), plate (3) and bolts (2) that alcohol, methanol, or other flammable
on end of spindle (11). Tighten bolts (2) evenly in equal antifreeze liquids are not needed in the air
increments to 'Final Bolt Torque' (ref. 'Bearing tanks to prevent moisture freezing in the tank
Adjustment Table'), while rotating and bumping wheel and lines in subfreezing temperatures.
(6) assembly. Secure bolts (2) with lockwire (1).
SM - 208
B.
Make sure that paints, lacquers, paint thinners,
or similar materials that produce volatile,
flammable vapours are not used or stored near
the air intake of the compressor that supplies
the air for inflating tyres. The compressor
should be isolated from all such sources of
flammable vapours.
C.
Be sure to thoroughly flush and blow off all
flammable solvents used for cleaning the air
compressor inlet screen before using the
compressor for tyre inflation, or any other
purpose.
D.
Do not charge batteries, either in or out of a
machine, near the air inlet of a compressor
used for inflating tyres. Charging batteries Fig. 7 - Typical Safety Cage
produces highly explosive hydrogen gas which
can be readily drawn into a nearby compressor
SM - 1040
inlet and pumped into the tyre.
E.
Never exceed the specified concentration of
alcohol when adjusting the alcohol vaporiser,
or adding alcohol to the auxiliary air tank, used
on machine air systems to prevent freezing or
moisture condensate in below-freezing
temperatures. Excessive alcohol, added to the
machines air tanks in this manner can produce
flammable vapours that will be pumped into a
tyre when this air supply is used for tyre
inflation if the tyre inflation kit is not equipped
with a moisture filter. Alcohol added to
machine air systems in recommended
concentration to prevent condensate freezing
are below hazardous levels for tyre inflation.
F.
Another source of hazardous flammable
vapours in tyres is the tyre bead lubricant.
Always use bead lubricants that do not
introduce flammable vapours into the tyre.
Inflation
Fig. 8 - Nitrogen Tyre Inflation Kit
Note: Always use tyre inflation equipment with an air
filter that removes moisture from the air supply, when
available, to prevent moisture corrosion of internal rim 2. Inflate all tyres with ratings of 16-ply and above to
parts. 5.2 bar (75 lbf/in²) to seat beads and seal 'O' ring, then
adjust to the recommended pressure.
1. If the tyre is off the truck, it should be placed in a
safety cage before inflating. See Fig. 7. 3. For recommended operating air pressure, refer to the
chart under the heading, 'Tyre Inflation Pressures'.
NITROGEN TYRE INFLATION b. Safety relief valve, 8.6 bar (125 lbf/in²), that will
Note: All Warnings and procedures under 'Tyre assure an upper limit to the pressure available for tyre
Inflation' will apply, except for differences covered by inflation.
this passage.
c. A 15.2 m (50 ft) length of flexible hose with
In certain environments it is recommended that tyres interconnecting fittings. On the tyre end of the hose is
be inflated with dry nitrogen gas, and that the resulting a large bore quick connect/disconnect clip-on chuck.
oxygen content of the inflation does not exceed 5%. All
machines whose tyres are factory inflated with dry 2. The pressure regulator is connected to a nitrogen
nitrogen gas will be identified by a decal on the body or compressed gas cylinder available from local suppliers.
frame.
3. The usual procedure for using this type of equipment
Nitrogen gas improves tyre pressure retention, is as follows:
increases tyre life by reducing carcass oxidation from
within, minimizes rim rust and has no detrimental a. Connect nitrogen tyre inflation kit to nitrogen
effects on the tyre. It also reduces the potential of a compressed gas supply. DO NOT connect clip-on
tyre explosion because it is an inert gas and will not chuck to the tyre valve at this time.
support combustion inside the tyre.
b. Open valve on nitrogen supply.
The same tyre inflation pressure used for air inflation
should be used for nitrogen inflation. Tyre valves c. With flexible hose and clip-on chuck connected to
formerly used with air inflation are entirely satisfactory nitrogen tyre inflation kit assembly but not connected
for use with nitrogen gas. to the tyre, adjust pressure regulator so that its output
pressure is not more than 1.4 bar (20 lbf/in²) higher
than the desired tyre inflation pressure.
Nitrogen Tyre Inflation Kit
d. Connect clip-on chuck to the tyre valve. The tyre will
now inflate. Tyre pressure can be monitored by
WARNINGS observing the gauge at the pressure regulator. STAY
DO NOT USE charging assembly, Part No. AWAY FROM THE TYRE.
9359489, for tyre inflation because this
assembly does not include a pressure e. When desired inflation pressure has been achieved,
regulator, safety relief valve, and adequate back off the regulator or close the valve on the
pressure gauging which is mandatory for tyre compressed gas cylinder.
inflation purposes. Tyre volume is as much as
90 times greater than the average accumulator f. Remove the clip-on chuck and adjust the tyre
volume and hence it takes very much longer to pressure with the tyre gauge in the usual manner.
inflate a tyre - up to 40 minutes or more for very
large tyres.
Re-inflation of a Mounted Tyre
Nitrogen gas cylinders used to inflate To re-inflate a tyre with dry nitrogen gas which is now
tyres are generally charged to approximately inflated with air, proceed as follows:
152 bar (2 200 lbf/in2). A tyre blowout and/or rim
failure could occur if inflation equipment is not 1. Exhaust the tyre until only air at atmospheric
properly used. Proper nitrogen charging pressure remains in the tyre.
equipment and personnel training for its use is
a must to avoid over inflation. 2. Re-inflate the tyre using only dry nitrogen gas to
4.15 bar (60 lbf/in²) gauge as a minimum, or to bead-
1. A nitrogen tyre inflation kit is available from your seating pressure as a maximum.
dealer and consists of the following. Refer to Fig. 8.
3. Adjust to the service inflation pressure required:
a. Pressure regulator, 0 - 13 bar (0 - 200 lbf/in2), with
two dual pressure gauges. a. If the required service inflation pressure is LESS
than 4.1 bar (60 lbf/in²), remove the clip-on chuck and
3. Place the lip of the hydraulic tool in one of four 9. After lock ring, bead seat band and rim flange have
breaking slots between the bead seat band and the rim been removed, inner bead must be broken loose by
flange. following the procedure outlined for the outer bead,
(steps 3 through 7).
SM - 218
TYRE MAINTENANCE A retreaded tyre has the old tread removed entirely and
a new tread cured directly onto the body of the tyre. A
Tyre Repairs tyre can be recapped or retreaded if the cord body is
Prompt repair of tyre injuries will prevent small injuries free of cuts, bruises and separation, and is thoroughly
from enlarging and causing tyre failure. Use the best sound, including previous repairs.
tyre facilities available. If good repair facilities are not
available, have the nearest dealer make the necessary
repairs. TYRE CARE
To obtain maximum service from off-the-highway tyres,
Minor cuts, snags, or punctures should be repaired a few common-sense precautions should be followed.
upon discovery. Skive with a sharp pointed knife
around any cut in the tyre tread area that is of
sufficient depth or shape to hold pebbles or dirt. The Maintain Correct Inflation
angle of the skive should be no more than sufficient to The most common cause of tyre damage is improper
expel all foreign material and should extend no deeper inflation. Both over-inflation and under-inflation are
than the breaker. The skive should go to the bottom of detrimental to tyre life. Tyre pressure should be
the hole. Tyres with shallow cuts, if treated promptly, checked daily, preferably before the machine is placed
may be allowed to continue in service. If the cut in operation. Refer to 'Tyre Inflation Pressures' for tyre
extends deeper into the tyre carcass, the tyre should pressure.
be removed for repair.
The valve cores should be checked for leaks. Keep in
Ordinary tubeless tyre punctures can be repaired mind that valve cores are delicate mechanisms that
without removing the tyre from the rim. Use tyre repair wear out in service; therefore, they should be replaced
plugs and follow the directions given by the when they become worn. Each tyre should be equipped
manufacturer. with a valve cap to prevent dirt from damaging the
valve core and causing air leakage.
The tyre must be removed from the rim to repair larger
punctures or cuts. Irregular shaped punctures or cuts
less than 13 mm (0.5 in) in size can be repaired with a Maintain Good Haul Roads
plug and hot patch. Insert a repair plug into the hole to Because haul roads are considered temporary roads,
keep out moisture and to back up the hot patch. Trim they are frequently neglected. The better the haul road,
the plug off flush with the inside of the casing, buff, the longer the tyre and truck life of off-the-highway
and apply the hot patch according to the instructions equipment.
supplied with the hot-patch equipment.
Although it takes time and effort to maintain good haul
Punctures 13 mm (0.5 in) or larger, large cuts, or bruise roads, the delay and cost of tyre and truck breakdowns
breaks require sectional or reinforced vulcanized repair. caused by poor haul roads is many times greater.
Cover the repair patch with a layer of cushion gum after
application to the tubeless tyre to ensure an airtight
repair. Any cords of the inside ply that are exposed in
Inspect Tyres Regularly
bugging and are not covered with repair patch must be A systematic plan for tyre inspection will more than
coated with cushion gum to prevent air leakage into the pay for itself in lowered tyre costs per hour of
carcass plies on tubeless tyres. operation. All tyres should be checked regularly for
cuts, bruises, fabric breaks, excessive or uneven wear,
embedded foreign matter, and any other damage which
Recapping and Retreading can be repaired. A considerable increase in tyre
There are two general methods employed in restoring service can be realized if tyre injuries are repaired
the tread surface of off-the-highway tyres: recapping, before they have progressed to the irreparable stage.
and retreading. The rim mounting nuts should be checked periodically
and tightened to the recommended torque.
A recapped tyre has a new tread cured right over the
old tread surface.
Prevent Overloading hooks, cables, or chains in contact with the tyre beads
Off-the-highway trucks are designed to carry a when lifting these tyres. If forklift trucks are used for
maximum allowable payload. Excessive loading will handling they should be equipped with broad, well
overstress both the truck and tyres and shorten the life rounded arms to distribute the load and prevent
of both. damage to the tyre bead. When handling tyres with the
fork truck do not scrape the fork across the bead.
Prevent Tyre Contact With Oil Tubeless tyre rims perform an important function as
PREVENT TYRE CONTACT WITH PETROLEUM part of the assembly air seal. Proper care therefore
PRODUCTS. Rubber that is exposed to oil, petrol, or must be taken not to distort or mutilate the rim parts
grease becomes soft and spongy and deteriorates because they must mate properly to form part of the
rapidly. Always avoid driving trucks equipped with basic air chamber. Since the rim base, bead seat
rubber tyres through a puddle of petrol, fuel oil, bands, and flanges are endless, distortion may prevent
lubricating oil, or grease. Never let a tyre stand in an oil easy assembly as well as possibly resulting in no seal.
or grease spot overnight.
Never drop, tumble, or roll rim parts.
Store Tyres Properly If rim parts are stored outdoors they should be given a
The best of care given to tyres in service by operators protective coat of a good commercial primer.
and maintenance personnel can be completely nullified
by careless storage. Time is not the only contributing Similar parts should be stacked neatly to prevent
factor to the deterioration of rubber products. Therefore, distortion.
tyres that are to be stored must be protected from light,
heat, oils, dirt, moisture, and ozone. Stored tyres Babbit or lead hammers, not sledge hammers, should
should be carefully covered with a tarpaulin or some be used in assembling rims.
other suitable material, such as opaque plastic sheets,
to prevent contact with the contaminants listed. 'O' rings are seals and should be carefully stored in a
cool, dry place where they will not be injured or
damaged.
Proper Handling of Tubeless Tyres and
Rims Valve cores also should be stored in a cool, dry and
Tubeless tyres should be stored vertically. Horizontal clean place.
stacking may compress the tyre walls making inflation
difficult. If tyres are stored in racks, the lower
supporting members should provide as broad a surface SPECIAL TOOLS
as possible to the tyre tread to avoid a concentration of Refer to Section 300-0070, SERVICE TOOLS, for part
load. numbers of special tools outlined in this section and
general service tools required. These tools are
The beads of tubeless tyres must be protected from available from your dealer.
damage or a faulty air seal will result. Do not use
WARNING
Do not attempt repair of wheel components.
Twisted or damaged 'O' ring Replace 'O' ring (lubricate)
Tyre cuts and snags Repair tyre damage
Bead area awl holes Repair inner liner (preferred)
Leakage between tyre bead trim With tyre removed from rim:
Clean tyre beads in rim contact area
Clean rim with wire brush
Inspect 5 degree tapered bead seat band and the rim base in the bead
seating area to determine if the transverse weld trims are flat or concave.
Replace defective part(s).
Note: Weld trim should follow rim contour.
Mount tyre using a lubricant such as Murphy's Tyre and tube Mounting
Compound, or equivalent, on tyre beads and rim bead seat area.
* * * *
WARNINGS
Use only hydraulic oils meeting specifications
outlined in Section 300-0020, LUBRICATION
SYSTEM. DO NOT use BRAKE FLUID (J1703).
Use of improper fluids is destructive to rubber
components of brakes resulting in loss of
braking and possible catastrophic failure.
SM 1916 7-00 1
Brake Parts - Front Axle
Section 165-0020
SM - 043
BRAKE PAD REMOVAL AND 2. Turn the steering wheel in both directions several
INSTALLATION times to relieve pressure in the steering system. Block
Numbers in parentheses refer to Fig. 2. all road wheels. Remove tyre and rim, as described in
Section 140-0040, WHEEL, RIM AND TYRE.
Note: Tighten all fasteners without special torques
specified, to torques listed in Section 300-0080, 3. Loosen two bolts (2) securing large torque pins (3)
STANDARD BOLT AND NUT TORQUE at the end of the brake head. It is not necessary to
SPECIFICATION. loosen or remove the two smaller torque pins (6) at
opposite end.
WARNINGS 4. Move the two unlocked torque pins (3) away from
To prevent personal injury and property the brake disc.
damage, be sure blocking or lifting equipment
is of sufficient capacity and properly secured 5. Attach a bleeder line and open bleeder valve (1).
to do the job safely. Use a screwdriver or pry bar inserted between the
brake disc and brake pads to press pistons (11) back
Use extreme caution to prevent personal into torque plate (15) piston bores, as far as possible.
injury when removing wheel. The exact Close bleeder valve.
procedure must be adhered to as described in
Section 140-0040, WHEEL, RIM AND TYRE. 6. Rotate brake pads (4 & 5) out of the opened end of
the brake.
To prevent personal injury, keep hands
and fingers etc. clear of the area between the 7. Install new brake pads (4 & 5) by placing friction
brake disc and the brake head pistons. material next to the brake disc and rotating into
position in the brake head.
1. Position the vehicle in a level work area, apply the
parking brake and shutdown the engine. 8. Push the two unlocked pins (3) toward the brake disc.
2 SM 1916 7-00
Brake Parts - Front Axle
Section 165-0020
9. Thread the two loosened bolts (2) in until bolts seat BRAKE REMOVAL AND DISASSEMBLY
in grooves of pins (3). This can be checked by limited Numbers in parentheses refer to Fig. 2, unless
axial movement of pins as the bolts are being seated. otherwise specified.
Tighten bolts (2) to a torque of 30 - 38 Nm (22 - 28 lbf ft).
Note: Make sure torque pins (3 & 6) do not touch the WARNINGS
brake disc. If they do, loosen bolts (2) and adjust pins To prevent personal injury and property
to clear disc by 1.5 to 3.0 mm (0.060 to 0.120 in). damage, be sure blocking or lifting equipment
Check to make sure that bolts (2) fully engage in pins is of sufficient capacity and properly secured
and retighten bolts. to do the job safely.
10. Depress the brake pedal until brake pads (4 & 5) Use extreme caution to prevent personal
contact the brake disc. injury when removing wheel. The exact
procedure must be adhered to as described in
Section 140-0040, WHEEL, RIM AND TYRE.
WARNING
Ensure the steering and brake control tank is To prevent personal injury, follow the
maintained at the proper level at all times. procedure given for relieving the pressure in
Refer to Section 220-0040, STEERING AND the braking system and exercise extreme
BRAKE CONTROL TANK. caution when loosening brake pipes or lines.
11. When new brake pads are installed on a truck, the 1. Position the vehicle in a level work area, apply the
brake pad friction material should be burnished in parking brake and switch off the engine.
accordance with the following procedure to achieve
maximum braking performance: 2. Turn the steering wheel in both directions several
times to relieve pressure in the steering system.
a. Drive truck at 8 - 15 km/h (5 - 10 mile/h) with brakes Operate the treadle valve continuously to relieve
applied at just enough pressure to produce a pressure in the brake accumulators. Block all road
noticeable drag. Heavy smoke and foul odour from the wheels. Remove tyre and rim, as described in Section
brake pad friction material is normal during this 140-0040, WHEEL, RIM AND TYRE.
procedure.
3. Carefully loosen brake pipes at base of both
Note: An infrared thermometer pointed at the disc accumulators to check that pressure has released.
after stopping, can safely and easily determine the Re-tighten brake pipes.
brake disc temperature. Refer to 'Special Tools'.
4. Remove hydraulic oil inlet line at brake head
b. Continue cycle until the brake disc achieves a assembly. Plug the line and brake head to prevent
temperature of 315 - 370o C (600 - 700o F). entry of dirt.
c. Permit the brake disc to cool to a temperature of 5. Remove bolts (4, Fig. 1) and washers (5, Fig. 1)
less than 95o C (200o F). from mounting at spindle and remove brake head
assembly to working area.
d. Repeat Steps a and b.
6. Disassemble brake head assembly in sequence of
e. Allow brake disc to cool to within 10o C (50o F) of index numbers. Items (1, 2 & 3) may be left in torque
ambient temperature. plate (15) when servicing packings (13), seals (10),
backup rings (14) and boots (12), if desired.
f. Repeat Steps a and b until full braking performance
(per applicable government regulations) is achieved. 7. Repair kits are available which include new boots
(12), backup rings (14), packings (13) and seals (10)
in quantities sufficient to rebuild a calliper brake head.
All parts included in a repair kit should be replaced
each time a brake head is rebuilt.
SM 1916 7-00 3
Brake Parts - Front Axle
Section 165-0020
8. Inspect brake pads (4 & 5) per Step 1 in the to press pistons the remainder of the way into piston
'General Inspection Procedure'. bores. Snap open end of boot (12) into groove of
piston.
9. Clean torque plate (15) making sure no solvent
remains in the oil passages or grooves. Inspect dust 6. Install seals (10) and piston plugs (9) into open end
boot and seal grooves, and, land areas between of piston bores of torque plate (15).
grooves for damage or cracks. Minor nicks and
scratches may be blended with crocus cloth. Replace 7. Attach cover plate (8) to torque plate with bolts (7)
torque plate (15) if corrosion is excessive or dust boot and washers (16). Tighten bolts (7) to a torque of
and seal grooves are damaged, prohibiting proper 380 Nm (280 lbf ft).
rebuild of brake head.
8. When installing torque pins (3 & 6) and bolts (2)
10. Inspect pistons (11) for minor scratches and nicks make sure the groove in the pin is directly under the
and blend with crocus cloth. If piston is badly nicked or bolt so that bolt (2) can perform its locking and
scratched or if the chrome plate is worn off, replace retaining function.
piston.
Note: Lubricate torque pins (3 & 6) with a corrosion
11. Torque pins (3 & 6) which are deeply grooved resistant lubricant prior to installation, to facilitate next
should be replaced. pin removal.
1. Lubricate packings (13), seals (10) and pistons (11) Note: Tighten all fasteners without special torques
with petroleum base lubricating oil or vaseline. specified to torques listed in Section 300-0080,
STANDARD BOLT AND NUT TORQUE
SPECIFICATION.
WARNING
Do not use brake fluid (SAE J1703).
WARNINGS
2. Install backup rings (14), packings (13) and boots To prevent personal injury and property
(12) into torque plate (15) piston bores. Lubricate per damage, be sure blocking or lifting equipment
Step 1. is of sufficient capacity and properly secured
to do the job safely.
3. Install pistons (11) in torque plate (15) as follows:
Position lubricated piston (11) into dust boot (12) and Use extreme caution to prevent personal
piston bore, holding piston at a slight angle. Insert injury when installing wheel. The exact
forefinger between piston and dust boot and rotate procedure must be adhered to as described in
forefinger around piston OD, lifting dust boot ID over Section 140-0040, WHEEL, RIM AND TYRE.
OD of piston. Make sure OD lip of dust boot remains in
the groove in the piston bore. 1. Install washers (5) on bolts (4).
4. After piston (11) is through dust boot (12), centre 2. Position brake head over brake disc on brake
piston by feel over packing (13). Apply, by hand, a mounting plate, aligning holes. Install assembled bolts
turning thrusting pressure, working piston into and (4) and washers (5) through mounting plate and into
through packing. torque plate. Tighten bolts (4) to a torque of 610 Nm
(450 lbf ft).
5. When assured pistons (11) are through packings
(13), pressure other than hand pressure may be used Note: Ensure torque pins (3 & 6, Fig. 2) do not touch
4 SM 1916 7-00
Brake Parts - Front Axle
Section 165-0020
the brake disc. If they do, loosen bolts (2) and adjust air bubbles. Close bleeder valve and release the brake
pins to clear disc by 1.5 - 3.0 mm (0.060 - 0.120 in). treadle. Remove bleeder line.
Check to make sure that bolts (2, Fig. 2) fully engage
in pins and tighten bolts to a torque of 30 - 38 Nm Note: This system is equipped with accumulators
(22 - 28 lbf ft). which maintain pressure in the system even after
engine shutdown. However, If the system pressure is
3. Remove plugs from brake head and hydraulic inlet zero, it will be necessary to start the engine to charge
line and attach hydraulic inlet line at brake head. the system prior to bleeding. Always shutdown the
engine before starting bleeding procedure.
4. Bleed the braking system as described under the
heading 'Bleeding' in this section. 4. Repeat Steps 1 through 3 at each brake head
assembly.
5. Install tyre and rim. Refer to Section 140-0040,
WHEEL, RIM AND TYRE.
MAINTENANCE
Every 10 Hours of Operation (Daily)
BLEEDING Inspect brake assembly to ensure that all bolts are
Numbers in parentheses refer to Fig. 2. tight and there are no leaks. Inspect for boot
deterioration.
In order to obtain satisfactory braking, the system
should be bled as follows to eliminate any air in the Check oil level in the steering and brake control tank
hydraulic brake lines: and add oil if low. Refer to Section 220-0040,
STEERING AND BRAKE CONTROL TANK, for
1. Check oil level in the steering and brake control correct fill level and Section 300-0020, LUBRICATION
tank and add oil if low. Refer to Section 220-0040, SYSTEM, for oil specification.
STEERING AND BRAKE CONTROL TANK, for
correct fill level and Section 300-0020, LUBRICATION Every 250 Hours of Operation
SYSTEM, for oil specification. Check the brake pads and discs for wear and adjust or
replace where necessary. Test for proper function.
2. Securely connect a bleeder line to bleeder valve (1),
and place loose end of line in clean container. Note: This service interval applies to normal driving.
Check the pads more frequently under more severe
conditions. Thickness of pad friction material should
WARNING never be allowed to wear below 3 mm (0.12 in).
Loosen bleed nipples carefully. The braking
system operates at high pressure.
SPECIAL TOOLS
3. Depress brake treadle valve and gradually open Refer to Section 300-0070, SERVICE TOOLS, for part
bleeder valve (1). Bleeder valve should remain open numbers of the non-contact infrared thermometer and
until oil exhausting from the bleeder valve is free from general service tools required. These tools are
available from your dealer.
* * * *
SM 1916 7-00 5
BRAKE PARTS - Rear Axle
Section 165-0030
DESCRIPTION AND OPERATION plates (30). The rotating discs are compressed
Numbers in parentheses refer to Figs. 1 and 2. between the splined plates and are held stationary,
thus keeping the wheels from rotating. As long as
Service Brakes there is no hydraulic pressure at port 'F', Fig. 2,
Note: The service brakes are of 'Upright Design', i.e. parking brake will be applied. When hydraulic oil
requiring pressure to hold the brakes on. pressure is applied at port 'F', Fig. 2, parking brake
will be released.
The rear service brakes are hydraulically actuated to
slow or stop drive wheel rotation. When the service
brake treadle in the operators' compartment is REMOVAL
depressed, or when the retarder control lever on the Numbers in parentheses refer to Figs. 1 and 2.
centre console is actuated, with the retarder selection
switch at the disc brake position, hydraulic pressure
is transmitted to port 'D', Fig. 2, on the disc brake WARNINGS
assembly. Hydraulic pressure entering port 'D', Fig. To prevent personal injury and property
2, forces service piston (31) against the brake disc damage, be sure wheel blocks, blocking
pack consisting of damper assemblies (28), rotating materials and lifting equipment are properly
friction discs (29) and splined plates (30). secured and of sufficient capacity to do the
job safely.
The rotating friction discs, which are driven by the
wheel, through wheel drivers (5) and disc drivers Hydraulic fluid will remain within the
(27), are compressed between splined plates (30). braking system after engine shutdown.
This slows down and stops rotation of the driving Operate the treadle valve continuously until
wheels. The force applied against the disc pack is the pressure has dissipated before carrying
directly proportional to the degree of which the out any work on the braking system or serious
service brake treadle is depressed. injury could result.
When the service brake treadle or retarder control Use extreme caution to prevent personal
lever is released, hydraulic pressure against service injury when removing wheels. The exact
piston (31) is relieved, brake return springs (36) procedure must be followed as described in
tension against heads of retaining pins (35) forces Section 160-0050, WHEEL, RIM AND TYRE.
the pins to return service piston (31) to its original
position, thus, relieving the pressure against the Note: Before removing and disassembling disc brake
brake disc pack. assemblies, measure and record the amount of wear
of the brake disc and damper plates. Refer to 'Disc
Assembly Wear Measurement Procedure', under
Parking Brakes 'Inspection' in this section, for the measurement
Note: The parking brake is of 'Inverted Design', i.e. procedure and the maximum allowable wear limits.
requiring pressure to hold the brakes off.
1. Position the vehicle in a level work area, apply the
The parking brakes are controlled by the park/ parking brake and switch off the engine.
emergency brake control mounted on the instrument
panel. The parking brakes are applied by spring 2. Turn the steering wheel in both directions several
tension and released by hydraulic pressure. With the times to relieve any pressure in the steering circuit.
control pulled 'OUT', hydraulic oil enters port 'F', Fig. Operate the treadle valve continuously to relieve any
2, flows through a channel in disc housing (25) into a pressure in the braking system. Block all road
passage behind parking piston (23). Hydraulic oil wheels.
pressure forces parking piston (23) against the
tension of springs (20 & 21), keeping pressure off of 3. Remove plug (47) and drain cooling oil from disc
the damper assemblies (28), thereby keeping brake assembly into a clean container. Reinstall plug.
pressure off the disc pack. With the control pushed
'IN', hydraulic pressure at port 'F', Fig. 2, is released, 4. Open bottom bleeder valve (52) and drain brake
pressure against parking piston (23) is released. hydraulic oil into a clean container. Close bleeder
Spring (20 & 21) tension forces the parking piston valve.
against damper assembly (28) and disc pack
consisting of rotating friction discs (29) and splined
SM 2038 7-00 1
Brake Parts - Rear Axle
Section 165-0030
SM - 2550
SPINDLE
BEARING
SECTION E-E
2 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 2551
Note: To minimize loss of brake hydraulic oil when 5. Tag and disconnect brake cooling lines from ports
the brake tubes are removed from the brake 'B' and 'C' on piston housing assembly (41). See
assemblies, remove the air breather from the steering Fig. 2. Plug lines and ports to prevent ingress of dirt
and brake control tank and connect a vacuum pump and hold oil in lines and tank.
to the breather port. Evacuate the air in the tank to a
vacuum of 0.5 - 0.7 bar (15 - 20 inches of mercury). 6. Tag and disconnect service brake tube from port 'D'
SM 2038 7-00 3
Brake Parts - Rear Axle
Section 165-0030
SM - 2552
42 43
28 31 33 34 36 32 35 37 38 39 41
50
45
44 49
51
48 52
46 47
24 56 25 4 27 28 29 30 29
40
18 26
12 13 14 20 21 23
17
3 10 11
9 53
15 16
19 55 22
4 5 8 1 2
6 7 54
4 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
on piston housing assembly (41). See Fig. 2. Plug a clean flat surface with spring housing (14) side up.
tube and port to keep out dirt and hold oil in tube.
17. Repeat Steps 3 through 16 to remove the opposite
7. Tag and disconnect parking brake tube from port 'F' disc brake assembly.
on piston housing assembly (41). See Fig. 2. Plug
tube and port to keep out dirt and hold oil in tube.
DISASSEMBLY
8. Remove wheel assembly from the truck as Numbers in parentheses refer to Fig. 3.
described in Section 160-0050, WHEEL, RIM AND
TYRE.
WARNING
9. Lay wheel down with wheel driver (5) up. To prevent personal injury and property
damage, ensure lifting equipment is of
10. Remove and discard 'O' ring (8) from outer sufficient capacity and properly secured to do
diameter of wheel driver (5). the job safely.
11. Remove bolts (7) and hardened washers (6) 1. Remove bolts (9) and hardened washers (53)
securing wheel driver (5) to wheel. Using a suitable securing seal housing (10) to disc driver (27) and
lifting device, lift wheel driver from wheel. remove seal housing.
12. Remove and discard 'O' ring (4) from spindle. 2. Remove and discard 'O' ring (4) from outer
diameter of disc driver (27).
13. Remove and discard bolts (54) securing inner seal
housing (1). Remove seal housing from spindle. 3. Remove face seal (11) from disc driver (27) and
Remove and discard 'O' ring (2) from seal housing. discard toric rings of face seal. Retain metallic
elements unless scratched or damaged.
14. Remove face seal (3) from spindle and discard
toric rings of face seal. Retain metallic seal elements 4. Using a suitable lifting device attached to disc driver
and set aside for 'Inspection'. (27), carefully lift disc driver from disc brake assembly.
15. Remove one bolt (12) and hardened washer (13) from 5. Using a suitable lifting device, turn disc brake
spring housing (14) and one socket head screw (43) and assembly over, with piston housing assembly (41) up.
hardened washer (42) from piston housing assembly
(41), remove both bolts from as close to 12:00 o’clock 6. Remove and discard 'O' ring (51) from piston
position as possible. Install a lifting eye in each bolt hole. housing assembly (41).
16. Attach a suitable lifting device to disc brake 7. If necessary, remove caps (57) and bleeder valves
assembly (at lifting eyes installed in Step 15) and take (48 & 52) from piston housing assembly (41).
up slack. Remove nut (50) and hardened washer (49).
Using lifting device, carefully remove disc brake 8. If necessary, remove plug (47) and 'O' ring (46)
assembly from spindle. Place disc brake assembly on
SM 2038 7-00 5
Brake Parts - Rear Axle
Section 165-0030
from piston housing assembly (41). Discard 'O' ring. SM - 116
18. Remove and discard 'D' section seals (38 & 39)
Fig. 7 - Removing/Installing 'D' Section Seal
from piston housing assembly (41). See Fig. 7.
6 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 120
WARNING
Return springs (36) are under compression.
To prevent personal injury and property
damage, use care when removing bolts (33)
and retaining plates (34).
WARNING
Spring housing (14) is under pressure from
spring (20 & 21) compression. To prevent
personal injury and property damage, use care
when removing socket head screws (15) and
hardened washers (16).
SM 2038 7-00 7
Brake Parts - Rear Axle
Section 165-0030
at a time. Using a suitable lifting device, lift spring SM - 125
housing (14) from disc housing (25). Refer to Fig. 12.
27. Remove springs (20 & 21) from parking piston (23).
See Fig. 12.
29. Remove and discard seal (22) from parking Fig. 14 - Removing/Installing Parking Piston
piston (23). See Fig. 15. Remove spacer ring (58)
from parking piston (23).
SM - 128
SM - 124
Fig. 15 - Removing/Installing Parking Piston Seal
SM - 129
Fig. 12 - Removing/Installing Spring Housing Fig. 16 - Removing/Installing Typical Disc Housing Seal
8 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 2553
2. Depress service brake treadle or, with retarder Splined Plate Thickness
selection mode switch in the disc brake position, New Plate ... 2.413 ± 0.064 mm (0.095 ± 0.0025 in)
place retarder control lever in the applied position. Worn Plate - Minimum
This will pressurize the service brake piston cavity. Permissible Size ...................... 2.29 mm (0.090 in)
3. Carefully remove pipe plug (1) from piston housing (6). Damper Plate Thickness
New Damper
4. Insert a depth micrometer into the pipe plug hole Plate ................. 6.9 ± 0.051 mm (0.270 ± 0.020 in)
and measure distance from end of retainer pin (2) to Compression 'Set' after use ..... 5.84 mm (0.230 in)
SM 2038 7-00 9
Brake Parts - Rear Axle
Section 165-0030
3. After cleaning and drying, coat all parts with light oil
to prevent corrosion.
Note: When using metallic rings which have satisfied 11. Check all disc (29) and plate (30) contact
inspection requirements, a slight 'overlap' condition, surfaces for nicks, pits or corrosion. Check teeth of
related to the original orientation of the seal faces, discs and plates for wear and damage.
could occur and cause initial light leakage which will
stop when the assembly has been 'run in'. 12. Check finished surfaces of all other parts for
scored or worn surfaces. Repair or replace as necessary.
5. Before installing the disc brake assembly, clean all
exterior surfaces to remove any foreign material.
ASSEMBLY
6. Inspect all splines for cracked or broken teeth, Numbers in parentheses refer to Fig. 3.
excessive wear and pitted or scored surfaces. Repair
or replace as necessary. Note: Tighten all fasteners without special torques
specified to standard torques listed in Section
7. Check for pitted, scored or worn mating surfaces of 300-0080, STANDARD BOLT AND NUT TORQUE
housings. SPECIFICATIONS.
8. Check all threaded holes and threaded parts for dirt Note: All 'O' rings, seals and all contacting surfaces
or damaged threads. Repair or replace as necessary. must be clean and lubricated at assembly.
10 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 132
10. Install springs (20 & 21) in bores in parking piston
(23). See Fig. 12.
Fig. 20 - Disc Driver Installed in Typical Disc Housing 13. Install five socket head screws (15) and hardened
washers (16) in holes under protruding ears on spring
housing (14). Tighten socket head screws (15)
alternately, one turn at a time, to draw spring housing
WARNING (14), against the tension of springs (20 & 21), down
To prevent personal injury and property to disc housing (25). Tighten socket head screws
damage, make sure lifting equipment is of (15) to a torque of 260 - 280 Nm (190 - 210 lbf ft).
adequate capacity and properly secured to do
the job safely. 14. Install bolts (12) and hardened washers (13) in
remaining holes in spring housing (14) and disc
1. With a suitable lifting device, place disc housing housing (25). Tighten bolts (12) to a torque of
(25) on a clean level surface, with spring housing (14) 260 - 280 Nm (190 - 210 lbf ft). See Fig. 11.
end up.
15. With a suitable lifting device, turn disc housing
2. If removed, install dowels (18) in disc housing (25). (25) over and place on a clean flat surface, spring
housing (14) side down. See Fig. 19.
3. Stretch new seal (24) slightly. Lubricate seal groove
in disc housing (25) and seal (24) with 'Wynns S.T.P.' 16. If removed, install dowels (26) in disc housing (25).
to aid seal installation. Install seal (24). See Fig. 16.
17. With a suitable lifting device attached to disc
4. Lubricate spacer ring (56) with 'Wynns S.T.P' and driver (27), position disc driver inside disc housing
install in disc housing (25) as shown in Fig. 17. (25), with large splined end up. See Fig. 20. Block up
disc driver with 50 mm x 100 mm (2 in x 4 in) blocks.
5. If removed, install dowels (19) in parking piston (23).
18. Install damper assembly (28) in disc housing
6. Lubricate new seal (22) and groove in outer (25), aligning teeth of damper with splines in disc
diameter of parking piston (23) with 'Wynns S.T.P.'. housing. See Fig. 10. Ensure cork side of damper
Install seal (22). See Fig. 15. faces downward toward parking piston (23).
7. Lubricate spacer ring (55) with 'Wynns S.T.P' and Note: Prior to installing friction discs (29), apply a
SM 2038 7-00 11
Brake Parts - Rear Axle
Section 165-0030
coating of oil, of the type used in the system, to the SM - 133
discs.
12 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 137 SM - 138
Fig. 24 - Installing Piston Housing on Disc Housing Fig. 25 - Tightening Piston Housing to Disc Housing
SM - 140
DISC BRAKE
ASSY PORT F
3/8 NPT
PORTABLE ADAPTOR
HAND POWERED
3/8 NPT
OIL PUMP
CONNECTOR
7.6 litre
(2 US gal)
3/8 NPT 9.5 mm (0.375 in) MEDIUM
CAPACITY
CONNECTORS PRESSURE HOSES
1 830 mm (6.0 ft) LONG
Fig. 26 - Typical Pressure Test Setup for Service and Parking Brakes
33. Install new 'O' ring (37) on piston housing hardened washers (42), in holes under protruding
assembly (41) as shown in Fig. 23. ears on piston housing assembly (41). Tighten socket
head screws (43) alternately, one turn at a time, to
34. With a suitable lifting device, turn piston housing draw piston housing assembly down snug on disc
assembly (41) over, with service piston (31) down. housing (25). Tighten socket head screws (43) to a
torque of 260 - 280 Nm (190 - 210 lbf ft).
35. If removed, install bleeder valves (48 & 52) and
caps (57) in piston housing assembly (41). 39. Install socket head screws (43) and hardened
washers (42) in piston housing assembly (41).
36. If plug (47) was removed, install new 'O' ring (46) Tighten socket head screws (43) to a torque of
on plug and install plug in piston housing assembly (41). 260 - 280 Nm (190 - 210 lbf ft). See Fig. 25.
37. Using a suitable lifting device attached to piston Note: Be careful that disc driver (27) does not slide
housing assembly (41), position piston housing out of disc housing (25) when turning disc brake
assembly (41) on disc housing (25), making sure assembly over.
dowel pin holes in housing are aligned with dowels
(26) on disc housing. Gradually lower piston housing 40. Refer to Fig. 26 for typical pressure test setup.
onto disc housing. See Fig. 24. Position brake assembly vertically with bleeder
valves (48 & 52, Fig. 2) at the 12:00 o’clock position.
38. Install five socket head screws (43), with Connect a portable hand pump filled with clean brake
SM 2038 7-00 13
Brake Parts - Rear Axle
Section 165-0030
hydraulic oil to Port 'D', Fig. 2, and pressurize service SM - 139
brake piston cavity to 52 bar (750 lbf/in2). See Fig. 27.
INSTALLATION
Numbers in parentheses refer to Figs. 1 and 2.
WARNING
Fig. 28 - Pressurizing Parking Brake Assembly
To prevent personal injury and property damage,
ensure lifting equipment is of adequate capacity
and properly secured to do the job safely. studs (44) of disc brake assembly through holes in
spindle flange, making sure 'O' ring (51) remains in
1. Install new 'O' ring (51) in counterbore on mounting counterbore on piston housing assembly.
face of piston housing assembly (41).
4. Install nuts (50) and hardened washers (49) on
2. Remove one bolt (12) and hardened washer (13) studs (44). Tighten nuts (50) to a torque of
from spring housing (14) and one socket head screw 1 166 - 1 193 Nm (860 - 880 lbf ft). Remove lifting
(43) and hardened washer (42) from piston housing device and lifting eyes and reinstall bolts (12) and
assembly (41), both bolts from as close to 12:00 socket head screws (43) and hardened washers (13 &
o’clock position as possible. Install a lifting eye in 42) and tighten bolts and socket head screws to
each bolt hole. specified torque.
3. With a suitable lifting device attached to the disc Note: Prior to installing face seal (11), clean face seal
brake assembly, at the lifting eyes installed in Step 2, (11) and toric rings in '1.1.1. Trichlorethane' liquid.
position disc brake assembly on spindle. When
installing right-hand brake assembly, 'INLET' port Note: Seal installation kit (ref. Special Tools)
should be at the top. When installing left-hand brake comprises of seal sleeve, seal driver and a spring.
assembly, 'INLET' port should be at the bottom. Insert
14 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 450 SM - 451
SM - 452
DISC
DRIVER
SEAL METALLIC
ELEMENT
TORIC
RING
SEAL
SPRING
DRIVER
SEAL PARKING
SLEEVE PISTON
SPRING
HOUSING
5. Insert seal sleeve tool (Fig. 29) in spring housing (14) 7. Install one half of face seal (11) with 'O' ring and
until it is in as far as it can go. toric ring fitted, toric ring end first, inside seal sleeve
and into spring housing (14).
6. Insert seal installation kit spring on one half of face
seal (11) and install toric ring on face seal. The 8. Press home face seal (11) with seal driver (Fig. 30)
spring prevents the toric ring from riding up the ramp until inside face of seal driver is flush with outside face
on face seal (11) hence leading to easier installation. of seal sleeve. See Fig. 31.
SM 2038 7-00 15
Brake Parts - Rear Axle
Section 165-0030
9. Remove seal driver from spring housing (14) and SM - 148
slowly remove seal sleeve. When seal driver and seal
sleeve are removed, withdraw the spring from face
seal (11). Apply a thin film of oil to metal contacting
surface of face seal (11).
10. Install toric ring in other half of face seal and install
in seal housing (10), toric ring side down. Refer to Figs.
32 & 33. Install seal installation tool (Fig. 34 'B') over face
seal and press face seal into housing. See Fig. 35.
Remove seal installation tool.
11. Coat 'O' ring (4) with grease and install in groove Fig. 32 - Seal Housing (10)
of disc driver (27). Apply a thin film of oil to metal
contacting surface of face seal (11). Install seal
SM - 149
housing (10), with half seal installed, over disc driver
(27). Secure seal housing to disc driver with bolts (9)
and hardened washers (53).
12. Install one half of new face seal (3), toric ring side
inward, over spindle. Using seal installation tool (Fig.
34 'A'), press seal into disc driver (27) by tapping tool Fig. 33 - Half of Seal (11) Installed in Seal Housing
with a soft hammer. Remove seal installation tool.
SM - 150
13. Install other half of new face seal (3), toric ring
side inward, into inner seal housing (1). Using seal
installation tool (Fig. 34 'A'), press seal into seal
housing. Remove seal installation tool.
14. Coat 'O' ring (2) with grease and install in groove
on seal housing (1). Install seal housing (1), with face
seal (3) installed, and secure with new bolts (57).
WARNING
Use extreme caution to prevent personal injury
when installing wheels. The exact procedure
must be followed, as described in Section
160-0050, WHEEL, RIM AND TYRE.
16 SM 2038 7-00
Brake Parts - Rear Axle
Section 165-0030
SM - 1486
2 1
4,5
6,7 11 12
1 2
13
8,9,10 TO MAIN AIRLINE
14,15
18,19
16,17
inserting wheel driver (5) on disc driver (27), not to seals are properly seated, to prevent oil leaks.
damage 'O' ring (8) and to align wheel driver splines
with splines on disc driver. Note: Be sure to uncap and install only one hydraulic
line at a time to prevent loss of oil from brake
19. Fill service brake pack with 11 litres (3 US gal) of hydraulic oil tank. The vacuum pump, installed during
clean hydraulic oil, of the same type used in the brake removal, cannot retain oil in tank if more than one line
cooling circuit. Pressurize the brake assembly with 2 bar is uncapped at a time.
(30 lbf/in2) air pressure through Port 'B' (Inlet), Fig. 2, with
the opposite Port 'C' (Outlet), Fig. 2, plugged. 20. Remove plugs and install service brake hydraulic
tube in port 'D', Fig. 2, as tagged at removal.
Note: Refer to Fig. 36 for typical brake pressure test
setup. Blanking plates for ports 'B' and 'C' may be 21. Remove plugs, and install parking brake hydraulic
fabricated as shown in Figs. 39 and 40. tube in port 'F', Fig. 2, as tagged at removal.
While rotating the wheel, observe for air pressure loss 22. Remove plugs and install cooling lines in ports 'B'
on the air supply hose gauge. Less than 0.14 bar and 'C', Fig. 2, as tagged at removal.
(2 lbf/in2) air pressure loss in 15 minutes is
satisfactory. If the air pressure loss is greater than 23. Remove vacuum pump from brake hydraulic oil
0.14 bar (2 lbf/in2) in 15 minutes, rotate the wheel tank, installed during removal and reinstall air
additionally to reseat all seals and pressurise the breather, in tank.
brake assembly to 2 bar (30 lbf/in2). If the brake
assembly again leaks more than 0.14 bar (2 lbf/in2) air 24. Fill steering and brake control tank with hydraulic
pressure in 15 minutes, loosen the wheel retainer oil specified in Section 300-0020, LUBRICATION
bolts, rotate the wheel to reseat the seals, and tighten SYSTEM. Refer to SECTION 220-0040, STEERING
the bolts. Repeat the air pressure test to be sure the AND BRAKE CONTROL TANK, for correct fill level.
SM 2038 7-00 17
Brake Parts - Rear Axle
Section 165-0030
Note: If brake discs, service and/or parking pistons,
piston housing, or the complete brake assembly have WARNING
been replaced, a new brake-disc-stack-height Loosen bleeder valves carefully. The braking
measurement should be taken as described under system operates at high pressure.
'Disc Assembly Wear Measurement Procedure',
under 'Inspection' in this section. This dimension 5. Depress service brake pedal and gradually open
should then be stamped on the machined surface of bleeder valve (52). Bleeder valve should remain open
pipe plug (45, Fig. 1) hole location for future until oil coming from bleeder valve is free of air
reference. bubbles. Close bleeder valve and release brake
pedal.
BLEEDING
Note: Recharge the system when necessary by
Numbers in parentheses refer to Fig. 1. repeating Step 2.
18 SM 2038 7-00
IN
0.62
0.50
0.47
0.38
0.26
0.25
0.22
0.19
0.18
0.12
0.06
0.03
0.177
0.139
0.130
SM 2038 7-00
9.6
6.6
6.3
5.6
4.8
4.6
3.0
4.5
3.5
3.3
MM
15.7
12.7
11.9
1.52
0.76
IN
5.50
4.00
3.00
2.56
2.50
2.00
0.81
1.68
1.12
1.00
6.00
0.75
0.72
20.00
SPRING COMPRESSOR TOOL
MM
140
101
152
508
76.2
65.0
63.5
50.8
20.5
42.7
28.4
25.4
19.0
18.2
100 SQ.
STOCK
ITEM #1 - HANDLE
.250 DIA.
HOLE THRU.
KNURL
DIA. HOLE
ITEM #5 - 'T' HANDLE
(WELDMENT)
19
Brake Parts - Rear Axle
Section 165-0030
SM - 126
0.56 - 3 HOLES
in mm
EQUALLY SPACED
0.12 3.0
0.50 12.7
0.56 14.22
0.62 15.7
1.00 25.4
1.62 41.1
2.00 50.8
2.50 63.5
MATERIAL: 3.25 82.5
PLAIN CARBON STEEL 3.31 84.0
9.38 238
15.88 403
26.25 668
SM - 1487 SM - 1488
117 16 108 16
77.8 4.45 77.8 4.45
+- 0.13 +- 0.13
14 R51.6 R51.6
7.1 14 7.1
+- 0.13 +- 0.13
66.7 +- 0.25
66.7 +- 0.25
28.4
42.9
57
42.9
42.9
R0.50
/0.76 R0.50
½in NPT R15 /0.76
R0.13/0.25 R15 R0.13/0.25
Fig. 39 - Fabrication of Blanking Plate for Port 'B' Fig. 40 - Fabrication of Blanking Plate for Port 'C'
* * * *
20 SM 2038 7-00
SUSPENSION SYSTEM - Ride Cylinder
Section 180-0030
SM - 1544
*1 - Pipe Plug
2 - Relief Valve
3 - Ball Bearing
4 - Bolt
5 - Locknut
*6 - Valve Assembly
*7 - Check Valve
8 - Hardened Washer
9 - Wiper
10 - Seal
11 - Wear Ring
12 - Backup Ring
13 - Piston
14 - Inner Tube
15 - 'O' Ring
*16 - Shear Key
17 - Bolt
18 - Tube
19 - Seal Retainer
20 - End Cap
21 - Lube Fitting
22 - 'O' Ring
23 - Seal
24 - Piston Rod
25 - Wear Ring
* - Shown on Fig. 3
DESCRIPTION AND OPERATION Oil and compressed nitrogen fill the inside of tube (18).
Numbers in parentheses refer to Fig. 1. When the wheel hits a bump, piston rod (24) is forced
into tube (18). Inward movement of piston rod (24)
The front ride cylinder suspends the front wheel and compresses the nitrogen within tube (18) thereby
spindle from the chassis and absorbs road shock as slowing the piston rod travel speed. As piston rod (24)
the wheel travels over rough and uneven surfaces. moves inward in tube (18), oil pressure unseats ball
REMOVAL
Numbers in parentheses refer to Fig. 2.
WARNINGS
Pressurized cylinders. Release pressure as
described under 'Relieving Cylinder Pressure'
before removing valves or fittings. Accidental
release of pressure will result in personal injury
and property damage.
5. Jack up ride cylinder until tyre is off the ground and WARNING
block steering arm in position. To prevent personal injury and property
damage, be sure blocking materials and lifting
6. Remove front tyre and rim. Refer to Section equipment are properly secured and of
140-0040, WHEEL, RIM, AND TYRE. adequate capacity to do the job safely.
7. Remove cotter pins and castle nuts attaching tie rod 1. Remove locknuts (5) and bolts (4) securing end
and steering cylinder to steering arm. Secure both tie cap (20) to tube (18). Remove end cap (20).
rod and steering cylinder away from the work area.
SM - 1546
6 4
1-7 17
12 11
8
20
25
10
13
5 15
9 22
16
3 2
24 30
29 14
21 22
18
12
30
31
19
28
23
27
26
2. Remove and discard 'O' ring (22) and backup ring 5. The spindle can be removed from piston rod (24) by
(12) from end cap (20). applying hydraulic pressure through the annular groove
machined on the spindle taper. This can be done by
3. Drain oil from ride cylinder assembly into a suitable removing the small plug from the spindle, and
container. connecting a hand pump or high pressure grease gun.
Refer to Fig. 4.
4. Remove bolts (26) and hardened washers (27) securing
cover (28) to piston rod (24). Remove cover. 6. Remove bolts (17) and hardened washers (8)
securing piston (13) to the top of piston rod (24).
Note: Piston rod (24) must be separated from spindle
for proper disassembly and assembly. It is best to 7. Install a lifting eye in the top of piston rod (24) and
disassemble and assemble the piston rod from the top attach to an adequate lifting device. Slide piston rod
of the cylinder so that holes in the piston rod do not (24) and piston (13) out from the top of tube (18) as
have to pass over seals. an assembly.
PLUG ASSEMBLY
Numbers in parentheses refer to Fig. 3.
Fig. 4 - Spindle Annular Groove For Separating Tapers
WARNING
Note: When removing piston rod (24), seal retainer (19) To prevent personal injury and property
and inner tube (14) should come out as an assembly. If damage, be sure blocking materials and lifting
they do not come out intact after removing piston rod equipment are properly secured and of
(24), remove inner tube (14) and seal retainer (19) adequate capacity to do the job safely.
individually from tube (18).
Note: Apply a light coating of clean hydraulic oil to all
8. Slide piston (13) up piston rod (24) and remove ball components as they are assembled. This facilitates
bearing (3). the assembly procedure. Make sure that all work is
done in a clean area so that no contaminants can get
Note: Do not misplace ball bearing (3). into the oil.
9. Remove piston (13) and remove wear ring (11) from Note: For proper assembly procedure, seal (10) and
the piston. wiper (9) should not pass over holes in piston rod (24).
10. Remove and discard 'O' ring (15) from inner 1. Install new seal (23), backup ring (12) and 'O' ring
tube (14). (22) to seal retainer (19). Press seal retainer (19)
assembly down into tube (18) until the retainer bottoms
11. Remove and discard 'O' ring (22), backup ring (12) at the lower end of the tube. Refer to Fig. 5.
and seal (23) from seal retainer (19).
2. Install new 'O' ring (15) on inner tube (14). Insert
12. Remove and discard seal (10) and wiper (9) from inner tube (14) into tube (18). Refer to Fig. 5.
tube (18). Remove wear ring (25).
3. Install wear ring (11) to piston (13) and install
piston assembly to piston rod (24). Slide piston (13) up
INSPECTION piston rod (24) enough to install ball bearing (3) in the
Numbers in parentheses refer to Fig. 3. piston rod.
1. Wash all parts thoroughly in a suitable solvent. Dry 4. Secure piston (13) assembly to piston rod (24) with
all parts with compressed air. Check all inner and outer bolts (17) and hardened washers (8). Do not tighten
grooves in seal retainer (19) for cleanliness. bolts (17) at this time.
2. Inspect tube (18), piston rod (24) and piston (13) for 5. Install wear ring (25) in tube (18) with wear ring joint
scores, scuffing or small ridges in the walls. Use a fine in line with lube fitting (21).
stone to smooth out any defective areas. If damage is
too extensive, replace the defective component. 6. Install seal (10) and wiper (9) in tube (18).
3. Inspect all cylinder assembly components for signs 7. Insert piston rod (24), piston (13) and wear ring (11)
of unusual distortion or excessive wear. Replace through the top of tube (18) as an assembly. Make sure
defective components. ball bearing (3) is correctly positioned in piston rod (24).
SM - 194
8. Install new 'O' ring (22) and backup ring (12) to end
cap (20). Secure end cap (20) to the top of tube (18)
with bolts (4) and locknuts (5). Tighten locknuts (5)
evenly to a torque of 260 - 285 Nm (190 - 210 lbf ft).
Fig. 6 - Installing Piston Rod in Outer Tube. Note: A periodic inspection should be made to ensure
proper torque is maintained on bolts (26).
Note: A convenient method for pressing piston rod (24) 10. Manually grease the ride cylinders through lube
into tube (18) is as follows. Refer to Fig. 6. fitting (21) until excess grease can be seen at relief
valve (2). Refer to Section 300-0020, LUBRICATION
a) Using two 915 mm (36 in) long pieces of 12 mm SYSTEM, for specification of grease required.
(0.5 in) threaded rod stock, four washers and nuts,
connect end cap (20) (outboard side facing inward) to
the outer tube. INSTALLATION
Numbers in parentheses refer to Fig. 2.
b) Support one end of a hydraulic jack against end
cap (20) and the other end against a block of wood
long enough to extend beyond the circumference of WARNING
piston rod (24). This will prevent a metal-to-metal To prevent personal injury and property
contact between the jack and piston rod; avoiding damage, be sure blocking materials and lifting
possible piston rod/piston damage. equipment are properly secured and of
adequate capacity to do the job safely.
c) Extend the jack until piston rod (24) is flush with
tube (18). 1. Using suitable lifting equipment, position front ride
cylinder assembly to chassis mounting surface.
d) Remove the jack, threaded rod stock, nuts and
washers. Remove any wood debris left from the Note: It may be helpful to use two guide studs
wood block. approximately 25 mm (1 in) in diameter and 200 mm (8
in) long to guide the front ride cylinder into position on
e) Move piston rod (24) and piston (13) assembly to the frame’s horse collar.
CHARGING THE RIDE CYLINDER 1. Support the chassis near the ride cylinder with
Numbers in parentheses refer to Fig. 7, unless blocking and/or a hydraulic jack with adequate
otherwise specified. capacity.
WARNING
Pressurized cylinders. Release pressure as WARNING
described below before removing valves or Pressurised cylinders. Keep valve core
fittings. Accidental release of pressure will depressed until all gas is bled from cylinder.
result in personal injury and property damage. Failure to release all pressure may result in
personal injury or property damage.
Note: The truck must be empty and on a level surface
prior to relieving ride cylinder pressure. 4. Depress charging valve (4) core again to be sure all
pressure has been relieved.
A high pressure nitrogen pressure 6. Install valve chuck (2, Fig. 8) to cylinder charging
regulator must be used with the charging valve (4) as follows: Rotate 'T' handle of valve chuck
assembly. Failure to use a pressure regulator (2, Fig. 8) counter-clockwise until it stops. Screw the
could cause property damage, personal injury, swivel nut down on valve until it seats. Turn the small
or death. hex on the charging valve two to three turns counter-
clockwise to unseat the valve internally. Rotate 'T'
1. Remove pipe plug (2) from check valve (3). Attach hose handle clockwise until it seats, opening check valve
from a pressure pump filled with hydraulic oil specified in (valve core) in charging valve (4).
Section 300-0020, LUBRICATION SYSTEM, to check
valve (3). Remove charging valve (4). 7. To check the amount of pressure in the nitrogen
bottle, close cylinder valve (4, Fig. 8) and open tank
Note: Approximately 14 bar (200 lbf/in²) pressure is valve (6, Fig. 8). Open valve on the nitrogen bottle
required to open the check valve allowing oil to flow slowly and note the reading on pressure gauge
through the fitting into the cylinder. If a pump is not available (5, Fig. 8). The available pressure in the nitrogen bottle
to overcome this check valve cracking pressure: must be over 31 bar (450 lbf/in²).
10. With cylinder valve (4, Fig. 8) open and tank valve Fig. 8 - Charging Assembly
(6, Fig. 8) closed, bleed pressure gauge (5, Fig. 8) and
hoses through bleeder valve (10, Fig. 8). Loosen the Refer to Section 300-0070, SERVICE TOOLS, for part
swivel nut and remove valve chuck (2, Fig. 8) from numbers of the charging assembly shown in
charging valve (4). Fig. 8, additional parts required for simultaneous
charging of both ride cylinders, general service tools
Note: On new or rebuilt cylinders, the seals and wipers and adhesives required. These parts, tools and
may grip the piston rods tighter and make it difficult to adhesives are available from your dealer.
obtain the height shown in Fig. 7. If this happens, the
cylinders should be charged as accurately as possible, To simultaneously charge the ride cylinders, the
the machine operated for several days, and then the charging assembly can be modified as follows:
cylinder re-checked.
a. Disconnect hose (1) assembly from cylinder
11. Check cylinder charging valve (4) for leakage with valve (4) and install a tee piece in cylinder valve (4).
soapy water. If core is leaking, depress it quickly once
or twice to reseat the core. If leakage persists, replace b. Connect hose (1) assembly to one branch of the
core. Tighten charging valve lock nut and replace valve tee piece and secure.
cap. Tighten valve cap so that it cannot be removed
by hand. c. To make the second hose assembly, connect both
additional hoses together with a coupling. Install a
12. After charging the cylinders, the machine should be valve extension in a chuck valve and install the
operated to allow seals to settle and oil to mix with chuck valve assembly on the hose assembly.
nitrogen. If the cylinders bottom out or do not meet the
reference height when charged to the correct pressure, d. Connect the second hose assembly to the
and the truck is not being overloaded, the oil level may remaining branch of the tee piece and secure.
be incorrect. The ride cylinders should be discharged,
refilled with oil, and recharged as described above.
MAINTENANCE
SPECIAL TOOLS Visually check ride cylinder heights daily. Lubricate the
ride cylinders at service intervals and with lubricant
Numbers in parentheses refer to Fig. 8. specified in Section 300-0020, LUBRICATION SYSTEM.
WARNING
This vehicle is equipped with precharged nitrogen gas cylinders of more than 2.8 bar (40 lbf/in2).
Special permits may be required when transporting the vehicle or cylinders by any method while
cylinders are charged. For shipment, contact the appropriate agency in the country involved.
Consult your dealer for further permit information.
* * * *
SM - 1369
PASSAGE 'A'
SM - 1543
1 - Ride Cylinder
2 - Spacer 5 - Bolt 8 - Anti-seize Lubricant 11 - Locknut
3 - Pin 6 - Bolt 9 - Bolt 12 - Pin Assembly
4 - Bolt Assembly 7 - Lube Fitting 10 - Washer 13 - Hardened Washer
3. Place a 35 mm (1.38 in) spacer between the frame cylinder (1) and rear axle housing brackets. Remove
and oscillation stop on both sides. spacers (2).
4. Relieve nitrogen pressure from BOTH rear ride 7. Remove bolt (6) and hardened washer (13) securing
cylinders. Refer to 'Relieving Cylinder Pressure', in pin assembly (12) through upper end of ride cylinder (1)
this section. and frame mounting. Drive pin assembly (12) out of
frame and upper ride cylinder (1) eyes and remove
5. Attach a suitable lifting device or 'come-along' to ride spacers (2).
cylinder (1). If a 'come-along' is used, place a bar or
heavy pipe through both body prop pin holes in the 8. Lower ride cylinder (1) assembly and move to a
frame. Attach the 'come-along' to the bar or pipe. Place clean work area for disassembly.
a suitable strap or chain around ride cylinder (1) and
take up the slack. 9. If required, repeat Steps 5 through 8 to remove
second ride cylinder (1).
Note: Lower end of ride cylinder (1) must be
disconnected before upper end.
DISASSEMBLY
6. Remove locknut (11), washers (10) and bolt (9) Numbers in parentheses refer to Fig. 3.
securing pin (3) through lower end of ride cylinder (1)
and rear axle housing brackets. Drive pin (3) out of ride 1. Remove clamp (30), bolts (27) and plate (29)
SM - 1378
4. Carefully remove tube (19) from piston rod (1) 7. Place piston rod (1) assembly securely into position
assembly. in a press bed with piston rod eye down. Press piston
rod (1) out of seal retainer (12).
5. Remove bolts (18) and washers (5) from piston (17)
end of piston rod (1) assembly. 8. Remove and discard 'O' ring (15) and backup ring
(14) from seal retainer (12) outer groove.
Note: Lower end of ride cylinder (1) must be 3. Remove cap from nitrogen charging valve (2) at top
attached first. of ride cylinder. Turn hex nut on charging valve
1/4 to 1/2 turn anticlockwise and depress the valve
2. Apply an anti-seize lubricant (8) to pin (3). core. If no gas escapes, continue to turn hex nut in 1/4
turn increments until nitrogen releases as the charging
3. Install spacers (2) in place as pin (3) is driven valve core is depressed.
through banjo housing bracket and lower ride cylinder
(1) mounting eyes. Install washer (10) on bolt (9) and 4. Repeat step 3 for second ride cylinder.
install bolt (9) through pin (3) and mounting brackets.
Secure bolt (9) with washer (10) and locknut (11). 5. Remove blocking or release pressure on the
hydraulic jack and allow the vehicles weight to retract
4. Install upper end of ride cylinder (1) to frame by ride cylinder rods.
installing spacers (2) in place as pin assembly (12) is
being driven through frame and upper ride cylinder (1) Note: Ride cylinders will not be fully retracted due to the
eyes. Secure pin assembly (12) to frame with hardened spacers between the oscillation stops and frame rail.
washer (13) and bolt (6).
SM - 160
FRAME
1 - Lube Fitting
2 - Nitrogen Charging Valve
3 - Plug SPACER
4 - Check Valve 35 mm (1.38 in)
5 - Check Valve TOP OF SEAL
RETAINER
DIMENSION 'A'
RIDE POSITION
TRUCK EMPTY
mm in
374 - 381 14.75 - 15.00
BANJO
ASSY
WARNING WARNINGS
Pressurized cylinders. Keep valve core Pressurized cylinders. Release pressure as
depressed until all gas is bled from cylinder. described under 'Relieving Cylinder Pressure',
Failure to release all pressure may result in before removing valves or fittings. Accidental
personal injury or property damage. release of pressure will result in personal injury
and property damage.
6. Depress nitrogen charging valve (2) core again to
ensure all pressure has been relieved. A high pressure nitrogen pressure
regulator must be used with the charging
assembly. Failure to use a pressure regulator
Charging Instructions could cause property damage, personal injury,
Numbers in parentheses refer to Fig. 6, unless or death.
otherwise specified.
1. Remove pipe plug (3) from check valve (5). Loosen
Note: To ensure that both ride cylinders will be equally check valve (4) slowly until groove in check valve
charged to the correct pressure, both cylinders should thread is exposed. This opens a bleed path from the
be charged simultaneously as shown in Fig. 6. inside of the cylinder to the atmosphere. Attach hose
from a pressure pump filled with hydraulic oil specified
Note: The pressure of a confined gas varies directly in Section 300-0020, LUBRICATION SYSTEM, to
with its temperature. Hence, extreme changes in ride check valve (5).
cylinder ambient temperature will change its nitrogen
charge volume and, consequently, its operating height. Note: Approximately 14 bar (200 lbf/in2) pressure is
It might be necessary, therefore, to add or remove required to open the check valve allowing oil to flow
nitrogen to maintain proper cylinder height as ambient through the fitting into the cylinder.
temperature changes.
Note: To readjust oil level, the truck must remain
stationary for at least 10 hours to avoid, and release,
SM - 1372
1 - Lube Fitting
2 - Nitrogen Charging Valve
3 - Pipe Plug
4 - Check Valve (upper)
5 - Check Valve (lower)
6 - Ride Cylinder
7 - Hose
8 - Tee Piece
9 - Pressure Gauge
10 - Charging Assembly
11 - Nitrogen Bottle
12 - Valve Chuck
13 - Pressure Regulator
Fig. 6 - Charging Two Ride Cylinders Simultaneously
Note: If both cylinders do not extend evenly, check 10. With cylinder valve (4, Fig. 7) open and tank valve
front ride struts. Both front struts should be extended (6, Fig. 7) closed, bleed pressure gauge (9) and
equally (both can be fully collapsed). Also check hoses (7) through bleeder valve (10, Fig. 7). Loosen the
that machine is on a flat, level surface and the body swivel nuts and remove valve chucks (12) and hoses
is empty. (7) from nitrogen charging valves (2).
Note: Cylinder height 'A' shown in Fig. 5 is intended to Note: On new or rebuilt cylinders, the seals and wipers
be for REFERENCE only. Cylinders should be charged may grip the piston rods tighter and make it difficult to
according to the pressure chart below and NOT solely obtain the correct height shown in Fig. 5. If this
on the basis of monitoring cylinder height. happens, the cylinders should be charged as
accurately as possible, the vehicle operated for several
Note: It is advised to charge the ride struts by an days, and then the cylinder re-checked.
additional 1.4 bar (20 lbf/in²) to allow for pressure lost
while carrying out pressure checks. 11. Check nitrogen charging valves (2) for leakage with
soapy water. If either core is leaking, depress it quickly
9. When required pressure has been attained, close the once or twice to reseat the core. If leakage persists,
valve on nitrogen bottle (11) and tank valve (6, Fig. 7) replace core. Tighten charging valve lock nut and
securely. Turn small hex on nitrogen charging valves replace valve cap. Tighten valve cap so that it cannot
(2) clockwise to close valves internally. Rotate 'T' be removed by hand.
bar lbf/in² 13. After charging the cylinders, the machine should be
Standard Body 8.3 120 operated to allow seals to settle and oil to mix with
nitrogen. The vehicle, with rated load, should have a 35
Rock Body 9.0 130 mm (1.38 in) gap or more, between the oscillation
Refer to Section 300-0070, SERVICE TOOLS, for part d. Connect the second hose assembly to the remaining
numbers of the charging assembly shown in Fig. 7, branch of the tee piece and secure.
WARNING
This vehicle is equipped with precharged nitrogen gas cylinders of more than 2.8 bar (40 lbf/in2).
Special permits may be required when transporting the vehicle or cylinders by any method while
cylinders are charged. For shipment, contact the appropriate agency in the country involved.
Consult your dealer for further permit information.
* * * *
COMPONENT DESIGNATIONS
SM 1924 7-00 1
Electrical System - Circuit Diagrams
Section 190-0000
Fuses, Relays and Warning Lights CEC Fuses and Relays - Located in Interface Box
Fuses, relays and warning lights which were not Fuses - Current Ratings Relay Functions
described under 'Component Designations' on the
previous page, are identified in the following tables. 1 - 8A 1 - ECU Initial Start
2 - 5A 2 - ECU Supply
3 - 8A 3 - Retarder (Not Used)
FUSES - Located in Fuse Box 4 - 5A 4 - Transmission Check
Current 5 - 5A 5 - Reverse Warning
Column Fuse No. Circuit Rating 6 - 8A 6 - Neutral Start
7 - 5A
1 Spare -
2 Spare -
3 Engine ECM 5A WARNING LIGHTS - Located in Dash Panel
4 Spare -
5 Fuel Solenoid 5A A Front Brake Accumulator Pressure
A 6 Spare - B Rear Brake Accumulator Pressure
7 CEC 10A C Low Steering Accumulator Pressure
8 Park Brake/Brake Lights 5A D Low Steering and Brake Tank Oil Level
9 Spare - E Parking Brake
10 Warning Lights 5A F Main Beam
11 Instruments 5A G Direction Indicators
12 Body-up Circuit 5A H Body-up
13 Wiper/Washer/Horn 10A J Alternator Charging
14 Wiper Self Park 10A K Engine Oil Pressure
15 Horn 10A L Engine Coolant Temperature
16 Spare - M Engine Diagnostic Light (Stop)
17 Heater & Air Cond. 25A N Engine Coolant Level
18 Spare - P Engine Diagnostic Light (Warning)
B 19 Lights & Dipped Beam 10A Q Air Cleaner Restriction
20 Main Beam 10A R Engine Diagnostic Light (Fluid)
21 Direction Indicators 5A S Transmission Oil Temperature
22 Hazards 5A T Check Transmission
23 Spare - U Disc Brake Hydraulic Oil Temperature
24 Headlamp Flash 10A V Steering Filter Restriction
25 Spare - W Retarder On
26 Front Brakes Press Red'n 5A X Transmission Oil Filter Restriction
27 Lockup Drop-out Solenoid 5A Y Converter Drive
28 Retarder Controls 5A Z Manual Mode
29 Reverse Alarm 5A
C 30 Spare -
31 Electric Window 10A
32 Worklamp/Cab Light/Radio 5A
33 Cigarette Lighter 10A
34 Spare -
35 Air Suspension Seat 15A
36 Spare -
Engine
Reverse Flasher
Run
Body Trans
X
up Filter
Horn X X
Dipped Main
Beam X
Beam
2 SM 1924 7-00
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433A
15307288 Rev A
SM 1924 7-00 3
Electrical System - Circuit Diagrams
Section 190-0000
SM - 12433B
15307288 Rev A
4 SM 1924 7-00
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433C
15307288 Rev A
SM 1924 7-00 5
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433D
15307288 Rev A
6 SM 1924 7-00
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433E
CEC D75
15307288 Rev A
SM 1924 7-00 7
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433F
CEC 211
CEC 222 CEC 309
15307288 Rev A
8 SM 1924 7-00
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433G
15307288 Rev A
SM 1924 7-00 9
10
Section 190-0000
Electrical System - Circuit Diagrams
SM - 2433H
SM 1924 7-00
Section 190-0000
Electrical System - Circuit Diagrams
SM - 2433J
SM 1924 7-00
Section 190-0000
Electrical System - Circuit Diagrams
SM - 2433L
SM 1924 7-00
15307288 Rev A
SM 1924 7-00 15
Electrical System - Circuit Diagrams
Section 190-0000
SM - 2433N
OPTIONAL EQUIPMENT
15307288 Rev A
* * * *
16 SM 1924 7-00
ELECTRICAL SYSTEM - Circuit Diagrams
Section 190-0000
COMPONENT DESIGNATIONS
Wire Colours:
TERMINAL DESIGNATIONS IN ACCORDANCE WITH DIN 72 552 B - Black O - Orange
N - Brown Y - Yellow
* NOTE: S22 SHOWN IN BODY-UP POSITION U - Blue P - Purple
S7 SHOWN IN PARK BRAKE APPLIED POSITION R - Red W - White
G - Green S - Slate
L - Lt Green K - Pink
L - LEFT R - RIGHT F - FRONT B - BACK
DIODE FUSE
SM 2245 07-03 1
Electrical System - Circuit Diagrams
Section 190-0000
SM2921
2 SM 2245 07-03
Electrical System - Circuit Diagrams
Section 190-0000
SM2941A
SM 2245 07-03 3
Electrical System - Circuit Diagrams
Section 190-0000
SM2941B
4 SM 2245 07-03
Electrical System - Circuit Diagrams
Section 190-0000
SM2941C
SM 2245 07-03 5
Electrical System - Circuit Diagrams
Section 190-0000
SM2941D
6 SM 2245 07-03
Electrical System - Circuit Diagrams
Section 190-0000
SM2941E
CEC 309
SM 2245 07-03 7
Electrical System - Circuit Diagrams
Section 190-0000
SM2923
10 SM 2245 07-03
Electrical System - Circuit Diagrams
Section 190-0000
SM2921J
SM 2245 07-03 11
Electrical System - Circuit Diagrams
Section 190-0000
SM2930
14 SM 2245 07-03
Electrical System - Circuit Diagrams
Section 190-0000
SM2941G
SM 2245 07-03 15
Electrical System - Circuit Diagrams
Section 190-0000
Fuses, Relays and Warning Lights WARNING LIGHTS - Located in Dash Panel
Fuses, relays and warning lights which were not
A Front Brake Accumulator Pressure
described under 'Component Designations' on the
B Rear Brake Accumulator Pressure
previous page, are identified in the following tables. C Low Steering Accumulator Pressure
D Low Steering and Brake Tank Oil Level
FUSES - Located in Fuse Box E Parking Brake
F Main Beam
Current
G Direction Indicators
Column Fuse No. Circuit Rating
H Body-up
1 Spare - J Alternator Charging
2 Spare - K Engine Oil Pressure
3 Engine ECM 5A L Engine Coolant Temperature
4 Spare - M Engine Diagnostic Light (Stop)
5 Fuel Solenoid 5A N Engine Coolant Level
A 6 Spare - P Engine Diagnostic Light (Warning)
7 CEC 2 - Trans. ECU 10A Q Air Cleaner Restriction
8 Park Brake/Brake Lights 5A R Engine Diagnostic Light (Fluid)
9 Spare -
10 Warning Lights 5A S Transmission Oil Temperature
11 Instruments 5A T Check Transmission
12 Body-up W/L 5A U Disc Brake Hydraulic Oil Temperature
V Steering Filter Restriction
13 Wiper/Washer/Horn 10A W Retarder On
14 Wiper Self Park 10A X Transmission Oil Filter Restriction
15 Horn 10A Y Converter Drive
16 Spare - Z Engine Overspeed
17 Heater & Air Cond. 25A
18 Spare -
B 19 Lights & Dipped Beam 10A
20 Main Beam 10A
21 Direction Indicators 5A
22 Hazard Warning Lamps 5A
23 Spare -
24 Headlamp Flash 10A
25 Spare -
26 Front Brakes Press Red'n 5A
27 Lockup Drop-out Solenoid 5A
28 Retarder Controls 5A
29 Reverse Alarm 5A
C 30 Spare -
31 Electric Window 10A
32 Worklamp/Cab Light/Radio 5A
33 Cigarette Lighter 10A
34 Heated Mirrors 15A
35 Air Suspension Seat 15A
36 Spare -
Engine
Reverse Flasher
Run
Body Trans
X
up Filter
Horn X X
Dipped Main
Beam X
Beam
16 SM 2245 07-03
Electrical System - Circuit Diagrams
Section 190-0000
SM2680 SM2940
1 2 3 4 5 6 7 1 2 3 8 9
10 7
A B C D A C B
1. Control Fuse 6. Transmission ECU Fuse 1. Check Trans. Relay 7. Converter Drive Relay
2. Engine Master ECM Fuse 7. Transmission ECU Fuse 2. Neutral Start Relay 8. On Board Weighing Relay
3. Engine Receiver ECM Fuse A. Ignition Sense Relay 3. Reverse Relay 9. Rear View Camera Relay
4. Engine Master ECM Fuse B. Engine ECM Power Relay 1 4. Body Up Relay 10. Ignition Signal Fuse
5. Engine Receiver ECM Fuse C. Engine ECM Power Relay 2 5. Delta P Relay A. Manual/Automatic Key
D. Trans. ECU Power Relay 6. Lock Up Off Relay B. Power/Economy Key
C. Manual Mode Light
Fig. 15 - Power Module Fig. 17- Interface Box
SM2679
L. E. D.
Release delay
On-off pulse
On-pulse
Off-pulse SET DIAL TO 'Release delay'
0.6 - 6 sec
6 - 60 sec
0.6 - 6 min
6 - 60 min SET DIAL TO '6 - 60 sec'
4
5
3
6
SET DIAL TO '3'
LOCK IN POSITION 2
USING ARALDITE OR
1
SIMILAR
* * * *
SM 2245 07-03 17
Electrical System - Circuit Diagrams
Section 190-0000
18 SM 2245 07-03
ELECTRICAL SYSTEM - Switches and Sensors
Section 190-0270
SM - 2541
21 RETARDER
VALVE
17 12
19 18 BODY
HEADER
11
TANK BRAKE MANIFOLD VALVE
14 6
1
16 15 3
2
4 7
13
5 10
ENGINE
TRANSMISSION 8 HYDRAULIC
TANKS
22 9
DESCRIPTION Engine
Numbers in parentheses refer to Fig. 1, unless The DDEC IV engine management system monitors
otherwise specified. the engine at all times and sends a signal to the
engine stop light (6, Fig. 3) and engine warning light
This section describes the location and function of the (7, Fig. 3) on the dash panel to alert the operator of a
various switches and sensors fitted to the vehicle to fault in the engine circuit. Refer to Section 110-0030,
monitor all major components and systems. Gauges ENGINE AND MOUNTING.
and indicator/warning lights mounted on the dash
panel relay this information to the operator. Engine Oil Pressure Sender/Switch (2) - Combined
sender and switch unit, located in an elbow at the front
Note: Always make sure all gauges, indicator/warning of the engine.
lights and controls are working properly before
operating the vehicle. The pressure switch sends a signal to illuminate
engine oil pressure warning light (5, Fig. 3) to indicate
when the engine oil pressure drops below the safe
operating pressure.
SM - 3307
1 2
15 P
20 30
10 RPM x100 20 20
20 MPH 20
10 40
5 25
2 6 km/h 20
0 30 0 50
STOP
ENG TRANS
OIL PRESS OIL PRESS
1 4 7
120
140
ENG TRANS
WATER TEMP 3 5 50
OIL TEMP
150
1 - Tachometer/Hourmeter Gauge
2 - Engine Oil Pressure Gauge 4 - Fuel Gauge 6 - Transmission Oil Pressure Gauge
3 - Engine Water Temperature Gauge 5 - Transmission Oil Temperature Gauge 7 - Speedometer/Odometer Gauge
The pressure sender sends a signal to the Engine Oil Tachometer/Hourmeter (1, Fig. 2) - Driven from the
Pressure Gauge (4, Fig.2). The gauge should read in engine ECM, the tachometer indicates the engine speed
the lower end of the green zone at normal operating in revolutions per minute (rev/min). Never accelerate the
speeds and may fall to the lower end of the yellow engine to speeds indicated by the red zone on the dial
zone at engine idle. Stop the engine if the gauge does face. A digital hourmeter is incorporated in the tachometer
not rise above the red zone until the fault is corrected. to record total hours of engine operation.
SM - 3306
9 10 11 12
1 2
1 21
13 14 15 16
5 17
2 22
STOP
6 18
3 23
7 19
4 24
8 20
3. After a few seconds, the digits will flash in in-converter indicator light (20, Fig. 3) to indicate
sequence. Depress the button until the desired when the transmission is in torque converter drive.
number is displayed the release the button for a few The light goes out when transmission lockup is
seconds until the next digit flashes. engaged.
4. Repeat step 3 to obtain the desired impulses/ Transmission Oil Filter Pressure Switch - Located
revolution. The tachometer is now calibrated. in the transmission oil filter head. Sends a signal to
transmission oil filter restriction indicator light (23, Fig.
3) to indicate that the filter is restricted and that the
Transmission element requires to be changed. Refer to Section
Transmission Oil Pressure Sender (3) - Located at 120-0100, TRANSMISSION OIL FILTER.
the top of the converter housing, the pressure sender
sends a signal to the Transmission Oil Pressure Transmission Oil Temperature Sender/Switch (5) -
Gauge (6, Fig.2) to indicate clutch application Combined sender and switch unit, located at the outlet
pressure. The reading will vary during shifts and with port for the transmission oil cooler.
varying speeds and loads. The needle should remain
in the green zone during normal operation but might The temperature switch sends a signal to illuminate
rise into the upper red zone for short periods under transmission oil temperature warning light (17, Fig. 3)
heavy loading. When the load decreases, the needle when the transmission oil temperature rises above the
should return to the green zone and may fall safe operating temperature.
momentarily into the lower red zone. If the needle
remains in either of the extreme zones for extended The temperature sender sends a signal to the
periods, stop the vehicle until the fault is corrected. Transmission Oil Temperature Gauge (5, Fig. 2) to
indicate converter-out oil temperature. The gauge
Converter Drive Pressure Switch (4) - Located on should read in the green zone during normal
the right hand side of the transmission at the lockup operation.
valve body. Sends a signal to illuminate transmission
Air Cleaner
Body and Disc Brake Cooling Air Cleaner Restriction Gauges - Located in the air
Disc Brake Hydraulic Temperature Switch (10) - cleaner outlet pipes, the gauges send a signal to
Located in the disc brake oil return tube to indicate if illuminate air cleaner restriction indicator light
the disc brake cooling oil is overheating. The oil (4, Fig. 3) to indicate that the air cleaner(s) is restricted
temperature switch sends a signal to illuminate disc and that the element requires to be cleaned/changed.
* * * *
SM - 2437
20 34 25
33
21 24
32
1 19
24
23
18 15 26
16
5 28
17 6 7 8
21 27
31
22
29
20
30 21
4 18
14
13
17
21
3
22
12
11
10
9 2
SM 1927 7-00 1
Fuel System - Fuel Tank, Lines and Mounting
Section 200-0010
SM - 2539
33 12 18 13
36 35
12
34 13
AT REAR
ENGINE MOUNT R.H.S.
5
1 20 21 24 15
PORT 22
6 TOP OF
ENGINE
4 16
SECONDARY
FILTERS 16
23 25
3 25 24
32 30
31
19 22
17 21 26
FROM FUEL 14
PUMP
23 27
5 7
7
10 8 1
2
5 11
29 4
9 28
PRIMARY FILTERS
1. Position the vehicle in a level work area, raise the 8. Identify and tag fuel lines (3 & 4, Fig. 2) connected
body and install the body safety pins. Refer to to fuel tank (1) and, with a suitable container available
Section 270-0010, BODY AND MOUNTING. to catch leakage, disconnect fuel lines (3 & 4, Fig. 2)
from fuel tank (1). Cap open line ends to prevent entry
2. Apply the parking brake and switch off the engine. of dirt.
3. Turn the steering wheel in both directions several 9. Using a suitable lifting device, support fuel tank (1)
times to relieve any pressure in the steering system. and take up any slack. Remove bolts (23), hardened
Block all road wheels. washers (24), nuts (25) and shims (19) (if fitted)
securing lower mounting bracket (16) to hoist bracket.
4. Close fuel shut off valve (10, Fig. 2) at the fuel filters
to prevent loss of fuel prime at the engine. 10. Remove bolts (20), hardened washers (21) and
locknuts (22) securing securing clamps (17) and upper
5. Remove filler cap (5) from fuel tank (1). Discard mounting brackets (18) to fuel tank (1). Remove fuel
gaskets (6 & 7) from filler cap (5) if damaged. tank (1) from vehicle.
7. With a suitable container in position, remove drain 1. Remove fuel strainer (29) from fuel tank (1).
plug (2) and drain fuel from fuel tank (1). Reinstall
drain plug (2) when fuel tank (1) is completely drained. 2. Remove screws (33) securing fuel level sender (32)
2 SM 1927 7-00
Fuel System - Fuel Tank, Lines and Mounting
Section 200-0010
to fuel tank (1) and remove fuel level sender (32). 6. If removed, install rubber isolation mount (27) into
Check condition of rubber sealing ring on fuel level mounting bracket (16). Secure mounting bracket (16)
sender (32) and replace if required. to fuel tank (1) using bolt (26) and snubbing washer
(28). Do not fully tighten bolt (26) at this stage.
3. Remove screws (12) securing level gauge (9 &11)
to fuel tank (1) and remove level gauge (9 & 11).
Check condition of gasket (10) on level gauge (9 & 11) INSTALLATION
and replace if required. Numbers in parentheses refer to Fig. 1.
4. Remove bolts (13), lockwashers (14), cover plate (3) Note: Tighten all fasteners to standard torques listed
and 'O' ring (4) from fuel tank (1). Discard in Section 300-0080, STANDARD BOLT AND NUT
'O' ring (4). TORQUE SPECIFICATIONS.
2. Cover plate (3) port in fuel tank (1) can be used as 2. Remove blanking caps from fuel lines (3 & 4, Fig. 2)
an opening to remove dirt and sludge from the bottom and connect fuel lines to fuel tank (1) as identified at
of fuel tank (1) with a clean dry cloth. Remove drain removal. Tighten fuel lines securely.
plug (2) and flush fuel tank (1) with clean diesel fuel to
remove any remaining dirt particles. Reinstall drain 3. Connect electrical connections to fuel level sender
plug (2) and tighten securely. (32) and install cover (34) over fuel level sender (32).
3. Ensure gasket (10) is located on level gauge (9 & 11) 7. Start the engine and run for a few minutes to ensure
and position level gauge (9 & 11) in fuel tank (1). Secure fuel is being supplied to the engine. Check for leaks at
level gauge (9 & 11) to fuel tank (1) with screws (12). fuel lines and tighten if required.
4. Install fuel strainer (29) in fuel tank (1). If removed 8. Remove body safety pins and lower the body.
install new gaskets (6 & 7) in filler cap (5) and install Remove wheel chocks from all road wheels.
filler cap assembly loosely to prevent entry of dirt.
5. Ensure that plug (15) and drain plug (2) are securely
tightened in fuel tank (1).
SM 1927 7-00 3
Fuel System - Fuel Tank, Lines and Mounting
Section 200-0010
SM - 2441 Operation
Numbers in parentheses refer to Fig. 3.
2
Attach the fast fuel nozzle to receiver (1) and turn the
handle to the 'On' position. As fuel enters the tank, it
forces the air inside the tank through the hollow stem
in fuelling vent (2). When the fuel level in the tank
nears the top, two hollow floating balls force the third
ground ball against an 'O' ring seal and stops the flow
of air from the tank. Fuel continues to flow into the tank
and pressure begins to build. At approximately 0.4 bar
(5.5 lbf/in2), a diaphragm operated piston inside the
nozzle starts to shut off the flow of fuel and system line
pressure picks up and brings the nozzle to the 'Off'
position. The nozzle is then disconnected from
receiver (1).
1
MAINTENANCE
Numbers in parentheses refer to Fig. 1.
1 - Receiver 2 - Fuelling Vent
3 - Plug Prior to starting the vehicle check the fuel level. Fuel
Fig. 3 - Fast Fuelling Option tank (1) should be filled at the end of each shift to
prevent condensation from gathering in the tank.
FAST FUELLING - Optional Ensure vent hole in filler cap (5) is clear to prevent a
vacuum from building up in fuel tank (1). Check
Numbers in parentheses refer to Fig. 3, unless
condition of all fuel lines.
otherwise specified.
When filling fuel tank (1) check that there is no buildup
A fast fuel system can be installed in the fuel tank as an
of dirt and sludge at fuel strainer (29). Remove and
option. It involves replacing cover plate (3, Fig. 1)
clean fuel strainer (29) and filler cap (5) as required.
with a flange and nipple receiver (1) and plug (15, Fig. 1)
From time to time make a visual check on the
with diesel fuelling vent (2). Receiver (1) is located
electrical connections at fuel level sender (32).
near the bottom of the tank for bottom filling which
helps eliminate foaming that occurs during the
The condition of fuel tank (1) mounting should be
traditional 'splash fill' method at the top of the tank.
checked carefully. Check isolation mounts (27),
clamps (17) and mounting brackets (16 & 18) for any
The advantages of fast fuelling are:
sign of wear or damage and repair or replace as
a. Reduces the fill time by around two thirds.
required. Check that nuts (22 & 25) and bolts (20, 23 &
b. Reduces foaming which results in a full tank and
26) are securely tightened and that no wear on
more running time between fill-ups.
mounting holes is evident. Tighten nuts (22 & 25) and
c. Reduces spillage because the nozzle automatically
bolts (20, 23 & 26) as required.
shuts off when the tank is full.
d. Reduces accidents because refuelling is done from
ground level.
* * * *
4 SM 1927 7-00
FUEL SYSTEM - Electronic Foot Pedal
Section 200-0051
SM - 2540
1
28
27
25 26
24
23 3 4
16
22 17
21 20 18
19
15 5 17,18
6
7
26,27
11 10
14 13 12
9 10 29,30 ENGINE
REF. 8,9
31
8 FLOORPLATE
DESCRIPTION REMOVAL
Numbers in parentheses refer to Fig. 1. Numbers in parentheses refer to Fig. 1.
Note: The engine MUST be started with foot 'OFF' 1. Position the vehicle in a level work area, ensure
pedal assembly (1). the body is fully lowered, apply the parking brake and
switch off the engine.
SM 2031 7-00 1
Fuel System - Electronic Foot Pedal
Section 200-0051
2. Turn steering wheel in both directions several 1. Position pedal assembly (1) on plate assembly
times to relieve any pressure in the steering circuit. (10) and secure with bolts (17) and lockwashers (18).
Block all road wheels.
2. Secure plate assembly (10) and pedal assembly
3. Disconnect electrical harness (31) from the mating (1) to the cab floor plate with mounting bolts (8) and
engine harness. lockwashers (9) removed during removal.
4. Move cab floor mat back and clear from pedal 3. Connect electrical harness (31) to the mating
assembly (1) and mounting plates. engine harness.
5. Remove mounting bolts (8) and lockwashers (9) 4. Position floor mat on cab floor and ensure that
securing plate assembly (10) and pedal assembly (1) pedal assembly (1) is free to operate.
to cab floor plate. Remove plate assembly (10) and
pedal assembly (1). 5. Remove wheel blocks and start the engine. Ensure
that pedal assembly (1) operates correctly.
6. Remove bolts (17) and lockwashers (18) securing
pedal assembly (1) to plate assembly (10). Remove Note: The engine MUST be started with the foot
pedal assembly (1) from plate assembly (10). 'OFF' pedal assembly (1).
INSTALLATION MAINTENANCE
Numbers in parentheses refer to Fig. 1. Limited repair of the electronic foot pedal assembly is
by replacement of parts only. Refer to vehicle Parts
Note: Tighten all fasteners to standard torques listed Book for part numbers of overhaul kits.
in Section 300-0080, STANDARD BOLT AND NUT
TORQUE SPECIFICATIONS.
* * * *
2 SM 2031 7-00
COOLING SYSTEM - Cooling System
Section 210-0000
SM - 3147
1
13
13
12
12
16
10
12 THERMOSTATS
12
ENGINE
WATER 2
PUMP
TO ENGINE 4
(AIR COOLER
PIPE AT TURBO)
5 15
14
11
TO ENGINE
OIL COOLER
3
1 - Radiator
2 - Engine Water Pump 7 - Coolant Pipe 12 - Deaeration Lines
3 - Engine Oil Cooler 8 - Coolant Pipe 13 - Coolant Lines
4 - Disc Brake Oil Cooler 9 - Make-up Line 14 - Coolant Pipe
5 - Coolant Pipe 10 - Thermostat Housings 15 - Coolant Pipe
6 - Transmission Oil Cooler 11 - Coolant Pipe 16 - Header Tank
SM 2278 04-04 1
Cooling System - Cooling System
Section 210-0000
OPERATION
Numbers in parentheses refer to Fig. 1.
WARNING
Do not remove the pressure control cap from
The engine water pump (2) draws coolant from the
the header tank or attempt to drain the coolant
radiator bottom tank, through coolant pipes (14 & 15)
until the engine has cooled. Once the engine
and into engine water pump (2). Engine water pump (2)
has cooled, use extreme caution when
pumps coolant through disc brake oil cooler (4) and into
removing the cap. Always release pressure
transmission oil cooler (6). Coolant flows through
from the system by depressing the pressure
transmission oil cooler (6), through coolant pipe (7)
relief button on the cap. Remove cap slowly as
and into engine oil cooler (3) and water jackets.
the sudden release of pressure from a heated
cooling system can result in a loss of coolant
When thermostats are closed, coolant flows through
and possible personal injury (scalding) from
engine coolant pipe and back into engine water
the hot liquid.
pump (2).
PREVENTIVE MAINTENANCE Check cooling fan for cracks, loose rivets and bent
or loose blades. Check fan mounting and tighten if
Numbers in parentheses refer to Fig. 1.
required. Replace the cooling fan if required.
To ensure the continued efficient functioning of the
cooling system, certain checks and operations should
Check all cooling lines, pipes and components for leaks.
be performed at regular intervals.
2 SM 2278 04-04
Cooling System - Cooling System
Section 210-0000
After first 200 hours: 2. Allow engine to cool and open pressure control cap
Check coolant level. Check and replenish inhibitor on header tank.
concentration.
3. Drain the coolant from the engine and radiator into a
Note: Failure to use and maintain coolant and coolant suitable container. Drain engine coolant at blanking
inhibitor mixture at sufficient concentration levels can plugs on engine banks at flywheel housing.
result in damage to the cooling system and its related
components. Conversely, over-concentration of coolant 4. Refill cooling system with clean soft water and a
and/or inhibitor can result in poor heat transfer, leading good radiator cleaning compound.
to engine dropout, or both. Always maintain
concentrations at recommended levels. 5. Start the engine and operate the truck for fifteen (15)
minutes to circulate the solution thoroughly.
SM 2278 04-04 3
Cooling System - Cooling System
Section 210-0000
4. Repeat the operation by alternately filling the engine formulation) and if these compounds are combined a
with clean, soft water and blowing out with air until green sludge will be produced. This sludge will deposit
flushing water runs out clean. on cooling system passages and reduce heat transfer
from the engine to coolant.
5. Remove the flushing gun from the water manifold
and reinstall thermostats in the thermostat housings. Methyl alcohol-based antifreeze is not recommended
for use because of its effect on the nonmetallic
components of the cooling system and its low boiling
Back Flushing Radiator point. Methoxy propanol-based antifreeze is also not
1. Disconnect coolant lines at the thermostat housings. recommended for use because it is not compatible
with fluoroelastomer seals found in the cooling system.
2. Disconnect coolant pipe from the water pump inlet
and block off the make-up line connection at coolant Soluble oil additives are not approved for use in the
pipe. Clamp the flushing gun to the coolant pipe end cooling system. A small amount of oil adversely
and fill the radiator with clean, soft water from the affects heat transfer; 1.25% concentration increases
flushing gun. the fire deck temperature 6% and 2.5% concentration
increases fire deck temperature 15%.
3. Apply air pressure gradually increasing to a
pressure of 0.7 bar (10 lbf/in²). DO NOT EXCEED
THIS PRESSURE. Supplemental Coolant Additives (SCA)
SCA's provide protection for the cooling system
4. Alternatively fill the radiator with clean, soft water components. The coolant must have the proper
and flush with air until water runs out clear. concentration of SCA's. Detroit Diesel Maintenance products
are recommended for use in all Detroit Diesel Engines.
4 SM 2278 04-04
Cooling System - Cooling System
Section 210-0000
a. Dip the strip into coolant for one second. Remove Note: Failure to properly maintain coolant with SCA
and shake briskly to eliminate excess fluid. can result in damage to the cooling system and its
related components. Conversely, over-concentration of
b. At 15 seconds after dipping strip, compare % glycol SCA inhibitor can result in poor heat transfer, leading to
(end pad) to colour chart. engine damage. Always maintain concentrations at
recommended levels.
c. At 45 seconds compare additive indicator (middle
pad) to colour chart.
SPECIAL TOOLS
d. At 60 seconds compare nitrite pad to colour chart. Refer to Section 300-0070, SERVICE TOOLS, for part
numbers of the coolant test strips and general service
For best results make the tests while the coolant is tools required. These strips and tools are available
between 10° - 55° C (50° - 130° F). Wait at least 60, but from your dealer.
not longer than, 75 seconds before reading the nitrite
level. Promptly replace and tighten container cap after
each use. Discard unused strips if they have turned
light pink or tan.
* * * *
SM 2278 04-04 5
COOLING SYSTEM - Radiator, Header Tank and Mounting
Section 210-0040
SM - 2544
4 35
5 30
4 30
25
28
4
5 34 33
3
6 32
7 31
6
5 27
4 29
14 30
16 2
15 27
12 13
23
20
8
19
19
9 1 26
17 21
18 24 22
10 11
DESCRIPTION REMOVAL
Numbers in parentheses refer to Fig. 1, unless Numbers in parentheses refer to Fig. 1, unless
otherwise specified. otherwise specified.
SM 2034 7-00 1
Cooling System - Radiator, Header Tank and Mounting
Section 210-0040
SM - 2545
29
5 26 TO ENGINE
(AIR COOLER PIPE
6 27 AT TURBO)
28 30 24
19 21 25
17
40
4
TO BRAKE
COOLER L.H.S.
1 47
43
44 41 46
31
17 23
TO RADIATOR
45 42 TOP TANK
9 R.H.S.
8
20
22
38 16 32
15 36
19 35
37 TO
10 21 ENGINE
11 14 39 (THERMOSTAT
7 HOUSING)
38
2 34 40
3 37
39
13 12
RADIATOR
PIPE
48 17 (BOTTOM)
33 18
16 13
52
51
50
49
39 - Nut
13 - Band Clamp 26 - Filler Cap 40 - Clamp
1 - Header Tank 14 - Deaeration Line 27 - Filler Neck 41 - Bracket
2 - Bolt 15 - Elbow 28 - Gasket 42 - Bolt
3 - Washer 16 - Deaeration Line 29 - Bolt 43 - P-Clip
4 - Heat Shield 17 - Reducer 30 - Overflow Tubing 44 - Bolt
5 - Bolt 18 - Adaptor 31 - Window Nut 45 - Nut
6 - Hardened Washer 19 - Deaeration Line 32 - Adaptor 46 - P-Clip
7 - Bracket 20 - Elbow 33 - Plug 47 - Bolt
8 - Bolt 21 - Deaeration Line 34 - Bracket 48 - Float Level Switch
9 - Washer 22 - Elbow 35 - Bracket 49 - Gasket
10 - Bolt 23 - Adaptor 36 - Bolt 50 - Adaptor Plate
11 - Washer 24 - Adaptor 37 - P-Clip 51 - Bolt
12 - Hose 25 - Adaptor 38 - Bolt 52 - Level Sensor
Fig. 2 - Radiator Header Tank Mounting and Lines
3. Remove mounting hardware securing the hood 6. With a suitable container in position, remove drain
2 SM 2034 7-00
Cooling System - Radiator, Header Tank and Mounting
Section 210-0040
SM - 2546
8
7
2
2 2
3
TO HEADER TANK
1 6
2
5
6
2 4
1
6
TO ENGINE
5
2
6
plug (26) at the bottom of radiator assembly (35) and 12. Remove nuts (4) and lockwashers (5) securing
drain the cooling system. Install drain plug (26) support rods (3) to radiator side columns.
securely when coolant is completely drained.
13. If necessary, remove nuts (4), lockwashers (5),
7. Remove locknuts (16), washers (15) and bolts (14) washers (6) and flexible mountings (7) from bottom
securing screens (19) to ring (2). Remove screens end of each support rod (3). Loosen inside nuts (4),
(19) from the vehicle. lockwashers (5) and washers (6) securing support
rods (3) to chassis brackets. Remove both support
8. Slacken band clamps (2, Fig. 3) and pull silicone rods (3) from radiator side columns and chassis
hoses (1, Fig. 3) away from radiator top tank brackets.
connections.
14. Attach suitable lifting equipment to radiator
9. Slacken band clamps (6, Fig. 3) and slide hose assembly (35) and remove nuts (22), washers (21)
(5, Fig. 3) back over coolant tube (4, Fig. 3) and away and bolts (20) securing radiator assembly (35) on
from radiator bottom tank connection. flexible mounting (8). Remove radiator assembly (35).
10. Identify and disconnect deaeration line (14, Fig. 2) 15. If necessary, remove nuts (24) and bolts (23)
from adaptor (23, Fig. 2) in radiator top tank. securing flexible mountings (8) to chassis mounting
brackets.
11. Ensure all coolant pipes and lines have been
disconnected from radiator assembly (35).
SM 2034 7-00 3
Cooling System - Radiator, Header Tank and Mounting
Section 210-0040
SM - 2547
1,2
1
12,13,14
6
11
9
3 10
3 4
7
8
5 9
6
12,13,14
15,16,17 2
18,19
4 SM 2034 7-00
Cooling System - Radiator, Header Tank and Mounting
Section 210-0040
Note: Joule tube (10) type radiators are designed in 5. If removed, install rubber seals (30, Fig. 1) and
such a way that individual tubes can be replaced baffle plates (27, 28 & 29, Fig. 1) to front of the
without the need to replace the entire radiator core. radiator assembly (35, Fig. 1). Secure baffle plates
(27, 28 & 29, Fig. 1) to radiator assembly (35, Fig. 1)
Note: It may be necessary to remove several with bolts (32, Fig. 1), lockwashers (33, Fig. 1) and
undamaged joule tubes (10) in order to gain access to washers (34, Fig. 1).
the damaged tube.
6. Secure shroud (1, Fig. 1) and ring (2, Fig. 1)
Note: The top and bottom ends of joule tube (10) are assembly to radiator assembly (35, Fig. 1) with
distinguished by the top end of the tube having a long washers (13, Fig. 1) and bolts (12, Fig. 1).
length of tube bare of grilling and the bottom end being
fitted with a locating washer.
Header Tank
3. Removal of joule tube (10) and rubber ferrules (11) Numbers in parentheses refer to Fig. 2.
is as follows:
1. Remove bolts (29) securing filler neck (27)
a. Insert a lever under the locating washer of joule assembly to header tank (1). Remove filler neck (27)
tube (10) and exert pressure to push the tube into assembly and discard gasket (28).
top tank (1).
2. Remove bolts (51) securing adaptor plate (50) and
b. Carefully pull joule tube (10) clear of bottom tank float level switch (48) assembly to header tank (1).
(2) and pull out from top tank (1). Remove adaptor plate (50), gasket (49) and float level
switch (48) from header tank (1). Discard gasket (49).
c. Remove and discard rubber ferrules (11) from top
tank (1) and bottom tank (2). 3. If required, remove lock nut from float level
switch (48) and remove float level switch from adaptor
4. Replacement of joule tube (10) and rubber ferrules plate (50).
(11) is as follows:
4. Remove level sensor (52) from header tank (1).
a. Lightly coat outside diameter of new rubber
ferrules (11) and tube holes in top tank (1) and 5. Remove window nut (31) from header tank (1).
bottom tank (2) with petroleum jelly.
6. Assembly of header tank (1) is the reverse of
b. Press rubber ferrules (11) by hand into the tube disassembly. Be sure to use new gaskets (28 & 49)
holes in the top and bottom tanks (1 & 2), taking when assembling filler neck (27) assembly and
care that the flange of each rubber ferrule (11) fits adaptor plate (50) assembly to header tank (1).
flush on the respective tank plate face. It may be
necessary to lightly tap the top of rubber ferrule (11)
flange with a hammer to ensure a flush fit. INSTALLATION
Numbers in parentheses refer to Fig. 1, unless
c. Lightly coat the bore of rubber ferrules (11) and otherwise specified.
each end of joule tube (10) with petroleum jelly.
Note: Tighten all fasteners to standard torques listed
d. Enter the top (longer) end of joule tube (10) into in Section 300-0080, STANDARD BOLT AND NUT
rubber ferrule (11) in top tank (1) and press upward TORQUE SPECIFICATIONS.
until the short end of the tube is clear of rubber
ferrule (11) flange in bottom tank (2). 1. If removed, position flexible mountings (8) on
chassis mounting brackets and secure with bolts (23)
e. Carefully enter the bottom of joule tube (10) into and nuts (24).
rubber ferrule (11) in bottom tank (2) taking care that
the tube does not damage rubber ferrule (11) by 2. Using suitable lifting equipment, position radiator
scoring. Press down firmly until the locating washer assembly (35) on flexible mountings (8) and secure
rests on the flange of rubber ferrule (11). with bolts (20), washers (21) and nuts (22).
SM 2034 7-00 5
Cooling System - Radiator, Header Tank and Mounting
Section 210-0040
3. Install nut (4), lockwasher (5), washer (6) and one Header Tank
half of flexible mounting (7) on the bottom end of each Numbers in parentheses refer to Fig. 2, unless
support rod (3). Install support rods (3) in chassis otherwise specified.
support brackets and secure with opposite half of
flexible mountings (7), washers (6), lockwashers (5) 1. Using suitable lifting equipment, position header
and nuts (4). tank (1) on the platform and secure with bolts (2) and
hardened washers (3).
Note: Before securing support rods (3) to mounting
brackets on radiator side columns, align the radiator 2. Slide hose (12) over bottom connection on header
core assembly to be parallel with the leading end of tank (1) and secure to header tank (1) with band
the cooling fan. Adjust fan ring (2) to obtain adequate clamps (13).
fan tip clearance.
3. Connect deaeration lines (14, 19 & 21) to elbows
4. Install nuts (4) and lockwashers (5) on top end of (15, 20 & 22) and tighten lines securely.
support rods (3) and secure support rods (3) to
mounting brackets on radiator side columns with 4. Connect deaeration line (16) to adaptor (18) and
lockwashers (5) and nuts (4). tighten line securely.
5. Connect deaeration line (14, Fig. 2) to adaptor (23, 5. Connect overflow tubing (30) to filler neck (27).
Fig. 2) and tighten securely.
6. Connect electrical connections to float level switch
6. Slide coolant tubes (1, Fig. 3) over radiator top tank (48) and level sensor (52).
connections. Secure coolant tubes (1, Fig. 3) to
radiator top tank connections with band clamps
(2, Fig. 3). Initial Fill and Start-up
Numbers in parentheses refer to Fig. 2, unless
7. Slide hose (5, Fig. 3) over radiator bottom tank otherwise specified.
connection. Secure hose (5, Fig. 3) to coolant tube
(4, Fig. 3) and radiator bottom tank connection with 1. Refer to Section 210-0000, COOLING SYSTEM for
band clamps (6, Fig. 3). correct selection of heavy duty coolant.
8. Install screens (19) on ring (2) and secure with bolts 2. Ensure drain plug (26, Fig. 1) is securely closed
(14), washers (15) and locknuts (16). and fill the cooling system through filler neck (27)
on header tank (1). Fill with coolant until coolant
9. Using suitable lifting equipment, position radiator reaches the bottom of filler neck (27) and holds at that
guard assembly on the front of the chassis and secure level.
with mounting hardware removed during removal.
Refer to Section 100-0010, CHASSIS, HOOD AND 3. Check all line and pipe connections for leaks prior to
FENDERS. starting the vehicle. Tighten as required.
10. Connect all electrical connections to lights in 4. Start the engine and check for leaks. Tighten lines
radiator guard assembly. and fittings and top up coolant level as required.
Window nut (31) should show full at all times. Fit filler
Note: Do not secure hood assembly on the vehicle cap (26).
until vehicle has been started and checked for leaks.
Refer to 'Initial Fill and Start-up'. 5. Using suitable lifting equipment, position hood
assembly on the vehicle and secure with mounting
hardware removed during removal. Refer to
Section 100-0010, CHASSIS, HOOD AND FENDERS.
6 SM 2034 7-00
Cooling System - Radiator, Header Tank and Mounting
Section 210-0040
The most convenient method of use is to prepare a 8. For surfaces with stubborn deposits, it may be
concentrated solution by mixing the powder in hot necessary to repeat steps 5 through 7, brushing the
water in a tank and then adding the concentrated surfaces between stages using a stiff bristle brush.
solution to water contained in the radiator.
9. Leave radiator core assembly to dry before
Note: The solvent must always be added carefully to reinstalling the cooling equipment.
water, not water to solvent.
SPECIAL TOOLS
External Cleaning There are no special tools required for procedures
Note: If a build up of dirt is apparent during routine outlined in this section. Refer to Section 300-0070,
inspection, the following cleaning procedure should be SERVICE TOOLS, for part numbers of general service
adopted. tools required. These tools are available from your
dealer.
WARNING
To prevent possible injury when using
compressed air or steam jet, wear adequate
eye protection and do not exceed pressure
values stated.
* * * *
SM 2034 7-00 7
COOLING SYSTEM - Disc Brake Oil Cooler
Section 210-0050
SM - 2548
32 21
TO DISC 21
BRAKE ASSYS
33
33
34 24
15 23
13
10 24
14
22
11 26
12 FROM
DISC BRAKE
OIL FILTERS 25
A
B
18 19 FROM ENGINE
20
3 WATER PUMP
14
2 18 27
14 28 TO TRANSMISSION
16 29 OIL COOLER
4 17 16
9
17
C D
8
7 31
6
30
E 29
1
4
5,6,7
3
DESCRIPTION AND OPERATION Coolant is pumped from the engine water pump to port
Numbers and letters in parentheses refer to Fig. 1. 'A', circulates through cooler tubes in heat exchanger
(2), and exits from port 'E' to the transmission oil
The disc brake oil cooler is connected in the cooling cooler.
system between the engine water pump outlet and
transmission oil cooler. Refer to Section 210-0000, Disc brake cooling oil enters through ports 'C' and 'D'
COOLING SYSTEM. The disc brake oil cooler is from the disc brake oil filters, circulates around cooler
connected in the hydraulic system between disc brake tubes in heat exchanger (2) and exits at port 'B' to the
filters and disc brake assemblies, and is used to cool disc brakes.
disc brake cooling oil.
Note: Oil flow must always flow in the opposite
The disc brake oil cooler consists mainly of heat direction to coolant flow through the disc brake oil
exchanger (2) and two cooler flanges (3), and is cooler.
mounted at the engine front crossmember.
SM 2035 7-00 1
Cooling System - Disc Brake Oil Cooler
Section 210-0050
REMOVAL 11. Loosen clamps (21) and slide coolant tube (22) off
Numbers in parentheses refer to Fig. 1. connection at port 'A'. Drain coolant tube into a
suitable container.
WARNING 12. Loosen clamps (29) and slide coolant tube (30) off
To prevent personal injury and property connection at port 'E'. Drain coolant tube into a
damage, be sure wheel blocks and lifting suitable container.
equipment are properly secured and of
adequate capacity to do the job safely. 13. Support disc brake oil cooler with a suitable lifting
device and remove bolts (32), washers (33) and
1. Position the vehicle in a level work area, apply the locknuts (34) securing disc brake oil cooler mounting
parking brake and switch off the engine. brackets (9 & 10) to mounting bracket on engine front
crossmember. Lower disc brake oil cooler and remove
2. Turn the steering wheel in both directions several to a clean work area for disassembly.
times to relieve pressure in the steering system. Block
all road wheels.
CLEANING AND DISASSEMBLY
3. Remove filler cap from body and disc brake cooling Numbers in parentheses refer to Fig. 1.
tank. With a suitable container in position, remove
drain plug from the bottom of the body and disc brake Note: In the event of a major mechanical failure,
cooling tank and drain the oil. transmission oil cooler assembly should be cleaned
thoroughly or replaced. Do not attempt to clean cooler
4. Using a suitable lifting device, support engine pan cores, after a transmission failure in which metal
guard and remove attaching bolts, nuts, lockwashers particles from worn or broken parts are released into
and washers. Remove engine pan guard from truck. the oil. Replace the cooler cores.
5. Open drain cocks and drain cooling system. Refer In many areas, raw water is extremely corrosive or
to Section 210-0000, COOLING SYSTEM, for scale forming and should be treated to prevent
procedure. damage to the disc brake oil cooler. A properly
maintained cooling system will significantly reduce
6. Slacken bolts (5 & 6) securing cooler flanges (3) to cleaning intervals. Refer to Section 210-0000,
heat exchanger (2) slowly, and drain coolant from disc COOLING SYSTEM.
brake oil cooler into a suitable container.
7. Remove drain plugs on underside of disc brake oil Cleaning Oil Side
cooler and drain oil into a suitable container.
2 SM 2035 7-00
Cooling System - Disc Brake Oil Cooler
Section 210-0050
4. Immerse heat exchanger (2) in the cleaning 3. Install coolant tube (30) on connection at port 'E'
solution. Cleaning action is noticeable by bubbling and and secure with clamps (29).
foaming. The process must be carefully observed and
when bubbling stops, usually between 30 - 60 sec, 4. Install new 'O' ring (12) on oil outlet line (15) and
remove heat exchanger (2) from cleaning solution and secure oil oulet line (15) to port 'B' with split flanges
flush thoroughly with clean, hot water. After cleaning, (11), bolts (13) and lockwashers (14).
dip disc brake oil cooler in light oil.
5. Install new 'O' ring (17) on oil inlet line (19) and
Note: Severely fouled cooler tubes can be cleaned by secure oil inlet line (19) to port 'C' with split flanges
use of a rotary brush if normal cleaning is not (16), bolts (18) and lockwashers (14).
sufficient.
6. Install new 'O' ring (17) on oil inlet line (20) and
secure oil inlet line (20) to port 'D' with split flanges
ASSEMBLY (16), bolts (18) and lockwashers (14).
Numbers in parentheses refer to Fig. 1.
7. Fill the body and disc brake cooling tank with
Note: Tighten all fasteners without special torques hydraulic oil specified in Section 300-0020,
specified to standard torques listed in Section LUBRICATION SYSTEM. Refer to Section 230-0040,
300-0080, STANDARD BOLT AND NUT TORQUE BODY AND DISC BRAKE COOLING TANK for correct
SPECIFICATIONS. fill level. Install filler cap.
1. Install new gaskets (4) to cooler flanges (3) and 8. Ensure all drain cocks on the cooling system are
align cooler flanges (3) and mounting brackets (9 & securely locked and fill cooling system with coolant
10) to heat exchanger (2) as match marked at specified in Section 210-0000, COOLING SYSTEM.
disassembly. Secure with bolts (5 & 6), washers (7)
and nuts (8) tightening alternately to give an even seal 9. Using suitable lifting equipment, install engine pan
around cooler flange area. guard on the truck. Secure engine pan guard to the
truck with bolts, lockwashers, washers and nuts.
2. Install drain plugs in underside of heat exchanger (2).
10. Start the engine and check for leaks. Tighten lines
and fittings as required. Remove wheel blocks from all
INSTALLATION road wheels.
Numbers and letters in parentheses refer to Fig. 1.
SM - 2549
TO
CONVERTOR
22 INLET
32 33
36 23
32 TO ENGINE
33 WATER PUMP
32 25 27
24
35
32
3,4 13
14
D C
13
2 26
B
28,29,30,31
32 33 32
32 33 32
34
1 A
33
32
4,5
8
FROM DISC 9
BRAKE 32
OIL COOLER
10
6 7
12 11
DESCRIPTION AND OPERATION convertor outlet port, circulates around cooler tubes in
Numbers and letters in parentheses refer to Fig. 1. heat exchanger (2), and exits at port 'B' to the
transmission convertor inlet port.
The transmission oil cooler is connected between the
radiator and transmission to maintain transmission oil Note: Oil flow must always flow in the opposite
within its required operating temperature range. Refer direction to coolant flow through transmission oil
to Section 210-0000, COOLING SYSTEM. cooler.
Coolant enters port 'A' from the disc brake oil cooler, Transmission oil temperature switch, located on the left
circulates through cooler tubes in heat exchanger (2), hand side of the transmission, sends a signal to illuminate
and exits at port 'D' to the engine water pump. the transmission oil temperature warning light (on the
dash panel) when transmission oil temperature rises
Oil to be cooled enters port 'C' from the transmission above the safe operating temperature.
SM 2036 7-00 1
Cooling System - Transmission Oil Cooler
Section 210-0060
REMOVAL 11. Remove adaptor (13) from port 'B'. Plug port 'B' to
Numbers in parentheses refer to Fig. 1. prevent entry of dirt.
6. Loosen clamps (32) and slide sleeve (33) over Cleaning Oil Side
coolant outlet elbow (35) from connection at port 'D'.
Drain coolant from coolant outlet elbow (35) into a
suitable container. WARNING
Dangerous fumes. To prevent personal injury,
7. Remove drain plugs on underside of transmission use trichloroethane only in the open or in a
oil cooler (1) and drain oil into a suitable container. well ventilated room.
8. Remove oil inlet line (14) from adaptor (13). Drain 1. Clean transmission oil cooler (1) before sludge
oil inlet line (14) into a suitable container. Cap oil inlet hardens. After transmission oil cooler (1) is completely
line (14) to prevent entry of dirt. drained, circulate a solution of trichloroethane through
the passages surrounding the cooler tubes in heat
9. Remove adaptor (13) from port 'C'. Plug port 'C' to exchanger (2) to remove sludge.
prevent entry of dirt.
2. If cooler tubes are badly clogged, circulate an oakite
10. Remove oil outlet line (26) from adaptor (13). Drain or alkaline solution through heat exchanger (2).
oil outlet line (26) into a suitable container. Cap oil Solution should be circulated through heat exchanger
outlet line (26) to prevent entry of dirt. (2), in the reverse direction to normal flow, for
approximately 15 minutes, after soaking for 10
minutes. The duration of circulation depends on how
badly clogged the cooler tubes are. Flush thoroughly
with clean hot water.
2 SM 2036 7-00
Cooling System - Transmission Oil Cooler
Section 210-0060
1. Install new gaskets (4) to cooler flanges (3 & 5) and 8. Start up engine and check for leaks. Tighten lines
align cooler flanges (3 & 5) to heat exchanger (2), as and fittings as required.
match marked at disassembly. Secure with mounting
hardware tightening alternately to give an even seal 9. Remove wheel blocks from all road wheels.
around cooler flange area.
* * * *
SM 2036 7-00 3
STEERING SYSTEM - Steering System Schematic
Section 220-0000
DESCRIPTION Mounted off the frame at the rear of the steering and
Numbers in parentheses refer to Figs. 2 through 6. brake control tank, the accumulator assembly consists
of a charging valve, end cap, cylinder and piston.
The steering system is of the accumulator type which
provides uniform steering, regardless of engine speed, The charging valve is equipped with a locking feature
and provides a limited amount of reserve steering which, when opened, will allow the precharge to be
pressure should the engine stall. checked or the accumulator charged. The piston acts
as a separator dividing the cylinder into two sections.
A brief description of the individual components used
in the steering system are listed below. Detailed The section nearest the charging valve contains the
service and operating instructions for the individual nitrogen precharge. The other section receives the
components can be found in their relative component hydraulic oil from the steering pump, via accumulator
sections in this manual. valve (4).
SM 1591 12-98 1
Steering System - Steering System Schematic
Section 220-0000
The double relief valve is installed in the lines between The steering filter is mounted off the rear left hand side
the steering cylinders and the steering valve. Its transmission mounting bracket. It is connected in the
purpose is to relieve shock loads on the steering steering line between the accumulator valve and the
cylinders by transferring the excessive pressure steering valve.
applied to the oil by the road shock, to the opposite
end of the cylinders. This shock, if left unchecked, There are two external ports ‘A’ and ‘B’ and an internal
might damage steering linkage components. bypass port ‘C’ in the steering filter assembly.
SM - 1335
Pressure Switch (8) FITTING NUT
2 SM 1591 12-98
SM 1591 12-98
SM - 1988A
A A
B B
LT 6
RT
7 5 7
Section 220-0000
Orange - Pilot Pressure
Yellow - Static Oil
Section 220-0000
Steering System - Steering System Schematic
SM - 1988B
A A
B B
LT 6
RT
7 5 7
T P
C B 8
G2
COMPONENTS 3
1 - Steering and Brake Control Tank
D
2 - Steering Pump
3 - Accumulator E
4 - Accumulator Valve
5 - Steering Valve
6 - Double Relief Valve G1
7 - Steering Cylinder 4
8 - Oil Pressure Switch R A SUPPLY TO
BRAKE CIRCUIT
9 - Oil Level Switch RETURN FROM MONOBLOCK BRAKE VALVE
RETURN FROM DIRECTIONAL CONTROL, RETARDER
10 - Oil Pressure Switch CONTROL, RETARDER SOLENOID VALVES
10
11 - Oil Temperature Switch 12 RETURN FROM TREADLE &
BRAKE MANIFOLD VALVES
12 - Steering Filter
11 TO TANK BREATHER
A A
B B
LT 6
RT
7 5 7
Section 220-0000
Orange - Pilot Pressure
Yellow - Static Oil
Fig. 4 - Steering System Schematic - Engine Running, Steering Valve Left Turn
5
6
Section 220-0000
Steering System - Steering System Schematic
SM - 1988D
A A
B B
LT 6
RT
7 5 7
T P
C B 8
G2
COMPONENTS 3
1 - Steering and Brake Control Tank
D
2 - Steering Pump
3 - Accumulator E
4 - Accumulator Valve
5 - Steering Valve
6 - Double Relief Valve G1
7 - Steering Cylinder 4
8 - Oil Pressure Switch R A SUPPLY TO
BRAKE CIRCUIT
9 - Oil Level Switch RETURN FROM MONOBLOCK BRAKE VALVE
RETURN FROM DIRECTIONAL CONTROL, RETARDER
10 - Oil Pressure Switch CONTROL, RETARDER SOLENOID VALVES
11 - Oil Temperature Switch 10
12 RETURN FROM TREADLE &
BRAKE MANIFOLD VALVES
12 - Steering Filter
11 TO TANK BREATHER
Fig. 5 - Steering System Schematic - Engine Running, Steering Valve Right Turn
SM 1591 12-98
SM - 1988E
A A
B B
LT 6
RT
7 5 7
Section 220-0000
Orange - Pilot Pressure
Yellow - Static Oil
Fig. 6 - Steering System Schematic - Engine Running, Steering Cylinder Shock Load
7
Steering System - Steering System Schematic
Section 220-0000
8 SM 1591 12-98
Steering System - Steering System Schematic
Section 220-0000
* * * *
SM 1591 12-98 9
STEERING SYSTEM - Steering and Brake Control Tank
Section 220-0040
SM - 1989
22
A 21 A
2-3
1
21
20
17
19 18 15
19 10
23-24
6
16 5
13
14
12
B
21
12
22
20
21
B 25
9 6
8 26
7
11 27
DESCRIPTION OPERATION
Numbers in parentheses refer to Fig. 1. Numbers in parentheses refer to Fig. 1, unless otherwise
specified. Letters in parentheses refer to Fig. 3. Refer to
The Steering and Brake Control Tank can be Fig. 2 for hydraulic schematic of steering and brake
identified as item 1 in Section 220-0000, STEERING control tank.
SYSTEM SCHEMATIC, in this manual.
The steering and brake control oil flow is drawn from
The steering and brake control tank (1) is the port 'A', through suction screen (11), by the steering
common oil reservoir for the steering and brake pump mounted on the transmission power takeoff. Oil
control systems. It is mounted off the left hand frame is then pumped to the accumulator valve in the
rail beside the main hydraulic tank. steering circuit and the brake manifold valve in the
brake control circuit. Internal pump leakage oil is
Integral with tank (1) assembly are filter assembly returned to tank (1) at port 'B' from a line at the case
(10), suction screen (11), window nuts (12) and oil drain port on the steering pump.
level switch (23). Access covers (4 & 5) give easy
access to replace filter assembly (10) and suction Port 'C' is plugged and provides a tank drain point.
screen (11).
SM 1592 12-98 1
Steering System - Steering and Brake Control Tank
Section 220-0040
SM - 1567 SM - 1990
TO TANK BREATHER
MANIFOLD VALVES
10
2 11
A B D K J G H
1
9
F
1 - Tank
2 - Steering Pump 10 - Oil Pressure Switch
9 - Oil Level Switch 11 - Oil Temperature Switch
Fig. 2 - Hydraulic Schematic Fig. 3 - Port Locations
Return oil from the steering circuit enters the tank at brake cooling tank. This allows any air entering tank
port 'D' from the accumulator valve. The oil enters (1) to be released to atmosphere, preventing a
filter assembly (10) chamber and flows through a pressure build up in tank (1) assembly. Refer to
centre tube and filter element to tank (1) body. Section 230-0040, BODY AND DISC BRAKE
COOLING TANK.
Should filter assembly (10) become blocked, oil
restriction pressure will increase and oil pressure Return oil from the directional control valve, retarder
switch (10, Fig. 2) will close sending a signal to the control valve and retarder solenoid valve enters tank
steering filter restriction warning light on the right hand (1) at port 'J'.
dash panel, indicating that a filter change is required.
Return oil from the monoblock brake valve enters
Note: Temperature switch (11, Fig. 2) opens when a tank (1) at port 'K'.
temperature of 50° C (122° F) is reached.
Temperature switch (11, Fig. 2) is connected in series An inter-connecting hose assembly (3, Fig. 4) links
with pressure switch (10, Fig. 2), therefore, steering the steering and brake control tank and the body and
filter restriction warning light will not illuminate until disc brake cooling tank. Refer to Section 230-0040,
the oil reaches normal operating temperature. BODY AND DISC BRAKE COOLING TANK.
2 SM 1592 12-98
Steering System - Steering and Brake Control Tank
Section 220-0040
Operate treadle valve continuously to discharge SM - 1991
braking accumulators. Oil should be showing in
middle window nut (12).
If oil is required, remove filler cap (2) and fill tank (1)
with hydraulic oil specified in Section 300-0020,
LUBRICATION SYSTEM, until oil shows in bottom
window nut (12). Fit filler cap (2).
If oil is required, remove filler cap (2) and fill tank (1)
with hydraulic oil specified in Section 300-0020,
1 - Steering and Brake Control Tank
LUBRICATION SYSTEM, until oil shows in top
2 - Body and Disc Brake Cooling Tank
window nut (12). Fit filler cap (2). 3 - Inter-Connecting Hose Assembly
1. Position the vehicle in a level work area, be sure 8. Fill tank (1) to correct level with hydraulic oil
the body is fully lowered, apply the parking brake and specified in Section 300-0020, LUBRICATION
switch off the engine. SYSTEM. Install filler cap (2).
2. Turn the steering wheel in both directions several 9. Remove wheel blocks, start the engine and charge
times to relieve any pressure in the steering system. the steering and brake control systems. Check oil
level as described under 'Checking Oil Level'.
SM 1592 12-98 3
Steering System - Steering and Brake Control Tank
Section 220-0040
Removing Suction Screen 9. Fill tank (1) to correct level with hydraulic oil
Remove and clean suction screen (11) at interval specified in Section 300-0020, LUBRICATION
specified in Section 300-0020, LUBRICATION SYSTEM. Install filler cap (2).
SYSTEM.
10. Remove wheel blocks, start the engine and
charge the steering and brake control systems.
WARNING Check oil level as described under 'Checking Oil
To prevent personal injury and property Level'.
damage, be sure wheel blocks are properly
secured and of adequate capacity to do the job
safely. TANK ASSEMBLY
4. If required, remove inter-connecting hose 2. Turn the steering wheel in both directions several
(3, Fig. 4) from access cover (4). Fit blanking caps times to relieve any pressure in the steering system.
and plugs to hydraulic line and tank port. Remove Operate treadle valve continuously to discharge
bolts (7), lockwashers (8), access cover (4) and braking accumulators. Block all road wheels.
gasket (6) from tank (1). Discard gasket (6).
3. With suitable containers in position, remove drain
5. Reach inside tank (1) and unscrew suction screen plugs from tank (1) and body and disc brake cooling
(11) by turning hex head at the neck of suction tank (2, Fig. 4) and drain the oil. Refer to Section
screen (11). 230-0040, BODY AND DISC BRAKE COOLING
TANK. Reinstall drain plugs in tanks and tighten
securely.
WARNING
Splashing liquid. Wear a suitable face shield 4. Ensure all hydraulic lines connected to tank (1)
when using compressed air to dry tank and assembly are identified for ease of installation and,
components. with suitable containers available to catch leakage,
disconnect all hydraulic lines. Fit blanking caps and
6. Clean suction screen (11) and tank (1) with plugs to all hydraulic lines and tank ports.
paraffin and dry with compressed air. Inspect for
damage and renew if necessary. 5. Remove and tag electrical connections from oil
level switch (23), oil temperature switch (12, Fig. 2)
7. Install suction screen (11) in tank (1) and secure and oil pressure switch (11, Fig. 2).
by turning on hex head at the neck of suction screen
(11).
WARNING
8. Install new gasket (6) and access cover (4) on Heavy tank. Ensure lifting device is of
tank (1) and secure with bolts (7) and lockwashers adequate capacity and properly secured to
(8). Remove blanking cap and plug and install inter- avoid personal injury or property damage.
connecting hose (3, Fig. 4).
4 SM 1592 12-98
Steering System - Steering and Brake Control Tank
Section 220-0040
1. Clean tank (1) and components with paraffin and 4. Fill tank (1) with hydraulic oil specified in
dry with compressed air. Section 300-0020, LUBRICATION SYSTEM. Install
filler cap (2).
2. Inspect tank (1) for weld cracks and security of
internal pipes and weld fitments. 5. Remove wheel blocks, start the engine and charge
the steering and brake control systems. Check oil
3. Check suction screen (11) for damage and renew level as described under 'Checking Oil Level'.
if necessary.
5. Check all hydraulic line connections for leaks and
tighten as required.
Assembly
Numbers in parentheses refer to Fig. 1.
SPECIAL TOOLS
1. If removed, install window nuts (12) and rods (13) There are no special tools required for procedures
in tank (1). outlined in this section. Refer to Section 300-0070,
SERVICE TOOLS, for part numbers of general
2. If removed, install new seal (24) on oil level switch service tools required. These tools are available from
(23) and install level switch assembly in tank (1). your dealer.
* * * *
SM 1592 12-98 5
STEERING SYSTEM - Steering Pump
Section 220-0050
SM - 3342
6 12
36 8
11
18
17
3 25
23
2
1 29
24
32
20
13 14 15 21 26
The steering pump is mounted on the transmission The major pump components include driveshaft (20),
PTO and can be identified as item 2 in Section pump housing (3), swash plate (15), rotating group (21),
220-0000, STEERING SYSTEM SCHEMATIC. control piston (11), bias spring (17), end cover (29) and
pump compensator (6).
The steering pump is an axial piston, variable
displacement (adjustable) pump, capable of high The variable displacement unit incorporates a
pressure operation. It is the common pressure supply mechanism that governs the angle of bearing swash
to both the steering and brake control systems. Output plate (18) which, in turn controls the stroke length of
is controlled to meet system requirements at any given each piston (36) as rotating group (21) assembly and
time. Pump compensator (6) regulates system driveshaft (20) rotate. End cover (29) includes the inlet
pressure at 159 bar (2 300 lbf/in²). and outlet ports. Tapered bearing (14) in pump housing
(3) and tapered bearing (24) in end cover (29) support
The steering pump is assembled for right hand driveshaft (20).
(clockwise) rotation, as viewed from driveshaft (20) end.
SM 2356 01-05 1
Steering System - Steering Pump
Section 220-0050
SM - 395
OUTLET
PORT
INLET
PORT DRIVESHAFT
SHOE PLATE
INTAKE VALVE
PLATE SLOT
CYLINDER BLOCK BORE
OPERATION SM - 553
2 SM 2356 01-05
Steering System - Steering Pump
Section 220-0050
SM - 377
MAXIMUM SHOE PLATE ANGLE DECREASED SHOE PLATE ANGLE ZERO SHOE PLATE ANGLE
(MAXIMUM DISPLACEMENT) (PARTIAL DISPLACEMENT) (MINIMUM DISPLACEMENT)
VIEW A VIEW B VIEW C
REMOVAL
Numbers in parentheses refer to Fig. 5.
WARNING
To prevent personal injury and property
damage, be sure wheel blocks, blocking
materials and lifting equipment are properly 2,3 3,6 7
2. Turn steering wheel in both directions several times Fig. 5 - Plan View of Steering Pump Installation
to relieve pressure in accumulator and steering
system. Block all road wheels.
and, with suitable containers available to
3. With a suitable container in position, remove drain catch leakage, disconnect hydraulic lines. Fit blanking
plug from bottom of steering and brake control tank and caps and plugs to all hydraulic lines and tank ports.
drain the oil. Reinstall the drain plug and tighten
securely. 6. Support steering pump (1) with a suitable lifting
device and remove two mounting bolts (2) and
4. With a suitable container in position, remove drain lockwashers (3). Pull steering pump (1) rearward to
plug from underside of steering pump (1) housing and disengage pump driveshaft from drive coupling (8).
drain the oil.
7. Pull steering pump (1) and gasket (5) straight out
5. Ensure hydraulic lines connected to steering from the mounting flange of pump adaptor (4). Discard
pump (1) assembly are identified for ease of installation gasket (5). Do not remove pump adaptor (4) from its
mounting unless it is to be replaced.
SM 2356 01-05 3
Steering System - Steering Pump
Section 220-0050
17 SM - 3341
16
7 12
8
11
16
10
9 15 31
5
14 29 32
4
13*
3 30
9
28
27
26 25
24
2
1 22
23
21
20
18
4 SM 2356 01-05
Steering System - Steering Pump
Section 220-0050
8. Wash the outside of steering pump (1) thoroughly Pump housing
with a suitable solvent and move to a clean work area
Numbers in parentheses refer to Figs 6 unless
for disassembly.
otherwise stated.
Rotating Group
1. Remove piston assemblies and shoe plate from
cylinder block bores for inspection.
SM 2356 01-05 5
Steering System - Steering Pump
Section 220-0050
scratches with 500 grit paper. Remove burrs with an
India stone. Pistons should move freely over their
WARNING respective rods.
The spring located within the cylinder block is
under high tension and can cause bodily harm.
Ensure retaining ring is removed using the
Swash plate
manufacturers guidelines. 1. Inspect swash plate (18) face for wear, roughness or
scoring. Check the hubs and bearing surfaces for wear
and cracks. Replace if defective.
INSPECTION 2. Inspect bearing swash plates (15) for heavy wear
Numbers in parentheses refer to Fig. 6. and/or cracks. Replace if defective.
2. Inspect inner and outer races of tapered bearings (14 Note: Obtain a new shaft seal kit and a new bearing
& 24) for nicks and pitting. Make sure the inner race kit, if required. Refer to the vehicle Parts Book for kit
turns freely within the outer race. If either of the tapered part numbers. Apply a light film of clean hydraulic oil to
bearings need replaced, both the inner and outer races all new seals to make assembly easier and provide
must be replaced. To remove the outer races from initial lubrication of moving parts.
pump housing (3) or end cover (29) do so using tooling
in accordance with manufacturers guidelines. Assembly of the pump is largely the reverse numerical
sequence to disassembly, but note the following:
3. Inspect valve plate (23) for erosion, excessive wear,
heavy scratches and cracks. If any of the above 1. Lubricate new shaft seal (2) and pump housing (3)
conditions are found, replace the valve plate. bore with petroleum jelly. Using an arbor press and a
suitable shaft seal driver, install shaft seal (2) in pump
4. Inspect spring (17) and rotating group piston parts housing (3). Ensure correct orientation of seal.
for burrs, scratches and cracks. Clean up minor
6 SM 2356 01-05
Steering System - Steering Pump
Section 220-0050
PUMP HOUSING Press outer race until it is fully seated on internal face
(3) of end cover (29).
INNER RACE
OUTER RACE OF TAPERED
6. Taking inner races of tapered bearings (14 & 24),
OF TAPERED BEARING (14) lubricate races and driveshaft (20) with clean hydraulic
BEARING (14)
oil. Fit bearing races to their respective ends of
driveshaft (20).
TEFLON
MATERIAL
SHAFT 7. Install driveshaft (20) in pump housing (3) as follows.
SEAL (2)
DRIVE SHAFT (20) Take a piece of shim stock or teflon material large
enough to roll into a funnel and protect the seal (2)
faces. Insert the teflon into shaft seal (2) as shown in
Fig. 8.
Fig. 8 - Driveshaft Installation
8. Pre-assemble bearing swash plate (15) to swash
plate (18) using screws (16). Taking spring and locating
2. Secure shaft seal (2) in pump housing with retaining
over domed locator on top of swash plate (18), insert
ring (1).
swash plate assembly and spring into bore of pump
housing (3). Spring should sit over stepped edge of
Note: Only install crush ring (13) if the following
bore.
parts; pump housing (3), drive shaft (20), shaft
bearings (14 & 24) and end cover (29) remain the
9. Fit 'O'-ring (9) over piston control end. Now locate
same and have not been needed to be replaced due
piston control (11) into bore of pump housing (3).
to wear or damage.
Torquing plug (12) to 15 - 25 Ibf ft (21-34 Nm).
3. Install crush ring (13) into bore of pump housing (3),
10. Pre-assemble the rotating group (21); apply a thin
ensure ring is seated against face of pump housing (3).
coat of clean hydraulic oil to the piston assemblies.
Lubricate the bores of the cylinder block with clean
4. Install a new outer race of tapered bearing (14) in
hydraulic oil and install pistons into cylinder bores.
pump housing with an arbor press. Make sure outer
race is orientated correctly to accommodate the inner
11. Align the rotating group with the bearing swash
race. Press the outer race in until it mates with the
plate (18) assembly. Install rotating group and valve
crush ring (13).
plate (23) into pump housing.
5. Install a new outer race of tapered bearing (24) in
12. Taking roll pin (26), press into end cover (29),
end cover , with an arbor and press. Make sure outer
ensure the split is orientated away from bearing (24),
race is orientated correctly to accommodate inner race.
within 5 degree of the centre line. Pin should protrude
from face of end cover (29) within the range stated.
Refer to Fig. 9. This will endure that the valve plate
(23) is located correctly.
Note:
If any of the following parts- pump housing (3), drive
shaft (20), shaft bearings (14 & 24) or end cover (29)
are replaced for any reason during servicing, the crush
ring (13) can no longer be used. To ensure correct
.173±.005 bearing location, shims (15501799) must be used in
Fig. 9 - Piston Assembly Tolerances place of the ring (13). This calls for the following steps
to be carried out:
SM 2356 01-05 7
Steering System - Steering Pump
Section 220-0050
Shim installation / Measurement: bolts (2) and lockwashers (3).
Note: For shim kit service Part No. refer to SERVICE 3. Remove caps and connect outlet and inlet lines to
TOOL section 300-0070 steering pump (1). Before connecting the case drain line,
fill steering pump (1) with clean hydraulic oil specified in
A. Measure the thickness of the existing crush Section 300-0020, LUBRICATION SYSTEM. Connect
ring (13). the case drain line to steering pump (1).
B. Stack a number of shims together, to a thickness a Note: It is very important that the pump cavity is
few thousands of an inch less than the measurement of completely filled with hydraulic oil. This will ensure
the existing ring (13). proper lubrication of the internal parts of the pump
when it is initially operated.
C. Insert shims (15501799) into pump housing (3) in
place of the ring (13). 4. Fill the steering and brake control tank with clean
hydraulic oil specified in Section 300-0020,
D. Assembly the pump housing (3), shaft bearings (14 LUBRICATION SYSTEM. Refer to Section 220-0040,
& 24), and end cover (29). Now install the end cover STEERING AND BRAKE CONTROL TANK for correct
screws (32) and torque to 87 - 107 Ibf ft (118 - 145 Nm) oil level.
E. Using a dial indicator, measure the drive shaft (20) 5. Refer to 'PUMP STARTING PROCEDURE' for
end play. Acceptable range is within 0.001" clearance proper pump priming and start-up procedure.
to 0.002" interference. Add shims (15501799) to
achieve desired result. Note: If no movement of the
shaft (20) is observed, the shims must be removed and PUMP STARTING PROCEDURE
repeat steps D & E. Numbers in parentheses refer to Fig. 6.
F. Finish pump assembly. 1. Make sure the reservoir and circuit are clean and
free of dirt and debris prior to filling with hydraulic fluid.
Fill the reservoir with filtered oil to a level sufficient to
INSTALLATION prevent vortexing at suction connection to pump inlet.
Numbers in parentheses refer to Fig. 5.
Note: It is good practice to clean the system by
Note: Tighten all fasteners to standard torques listed in flushing and filtering the system using an external
Section 300-0080, STANDARD BOLT AND NUT slave pump. Before starting the pump, fill with fluid
TORQUE SPECIFICATIONS. through one of the ports. This is particularly important
if the pump is above the fluid level of the reservoir.
Note: Tighten all hydraulic lines fitted with ORFS
connections, as described in Section 220-0000, 2. When initially starting the pump, remove all trapped
STEERING SYSTEM SCHEMATIC. Renew all air from the system. This can be done by loosening the
'O' rings where used. pump outlet fittings or connections before starting the
pump. or by using an air bleed valve. All inlet
connections must be tight to prevent air leaks.
WARNING
To prevent personal injury and property 3. Once the pump is started, it should prime within a
damage, be sure wheel blocks, blocking few seconds. If the pump does not prime, check to
materials and lifting equipment are properly make sure there are no air leaks in the inlet line and
secured and of adequate capacity to do the job connections. Also check to make sure that trapped air
safely. can escape at the pump outlet.
1. Coat steering pump (1) shaft splines with 4. After the pump is primed, tighten the loose outlet
molybdenum disulphide grease and place steering connections, then operate for five to ten minutes
pump (1) and gasket (5) on pump adaptor (4) mounting unloaded to remove all trapped air from the circuit. If
flange. the reservoir has a sight gauge, make sure the fluid is
clear- not milky. Add fluid to the reservoir up to the
2. Push steering pump (1) inward to engage pump proper fill level.
driveshaft with drive coupling (8) and PTO drive.
Secure steering pump (1) to pump adaptor (4) with two 5. The pump must be started with less than 40% of
8 SM 2356 01-05
Steering System - Steering Pump
Section 220-0050
normal system pressure. This is done by backing off If it is, there is either excessive restriction in the case
the steering pressure relief valve so that the pump will drain line (obstructed or possibly a kinked line), or the
start under no-load conditions. leakage rate in the pump is too high. In either case, the
cause should be corrected.
2. Be sure the pump case drain line is free from
obstructions that restrict the pump case drain flow 5. The system pressure can then be set by screwing
back to tank and cause high case drain pressure which adjusting screw in until a system pressure of
can lead to an early pump failure. 159 bar (2 300 lbf/in²) is attained. The case tank
3. Before starting the engine after pump installation, pressure differential should still not exceed
remove the remaining case drain plug from the pump 0.07 - 0.14 bar (1 - 2 lbf/in²).
and an appropriate plug from the hydraulic tank and 6. Shut off the engine, bleed off hydraulic pressure and
install 0 - 3.5 bar (0 - 50 lbf/in²) gauges in both ports, remove the gauges.
as well as a gauge in the pressure circuit which can be
read for setting the steering system pressure. Be sure 7. Remove wheel blocks from all road wheels, start the
to back out adjusting screw in compensator assembly engine and check steering system for proper operation.
(1) until it is flush with the compensator body.
4. Start the engine and monitor the system pressure
gauge. Pressure should register within 30 seconds. If
not, re-check to assure that the system is properly SPECIAL TOOLS
filled with oil and that there is no restriction to the pump Details of recommended manufacturer tools to follow,
inlet. once confirmation and approval has been given from
pump manufacturer.
With the engine at Maximum No Load rev/min, read the
pressures on both the tank and the pump case. At no Refer to Section 300-0070, SERVICE TOOLS for part
time should the case pressure be more than numbers of special tools referenced in this section and
0.07 - 0.14 bar (1 - 2 lbf/in²) above the tank pressure. general service tools and adhesives required. These
tools and adhesives are available from your dealer.
* * * *
SM 2356 01-05 9
THIS PAGE IS INTENTIONALLY LEFT BLANK
STEERING SYSTEM - Accumulator
Section 220-0080
SM - 171
DESCRIPTION TESTING
Numbers in parentheses refer to Fig. 1.
SM 1205 2-98 1
Steering System - Accumulator
Section 220-0080
and releasing it quickly once or twice. Recheck for the body is completely lowered, apply the parking
leakage, if leakage continues then discharge the brake and switch off the engine.
accumulator as described under 'Discharging
Nitrogen' in this section, then replace the valve core. 2. Turn steering wheel in both directions several
Tighten locknut (1D) to 11 Nm (100 lbf in) and times to relieve pressure in accumulator and steering
replace the valve cap (1A) finger tight. system. Block all road wheels.
2 SM 1205 2-98
Steering System - Accumulator
Section 220-0080
DISCHARGING NITROGEN
WARNINGS Numbers in parentheses refer to Fig. 1.
Do not use Oxygen or any gas other than
Nitrogen to charge an accumulator. Oxygen Make sure charging valve (1) is closed internally by
under pressure coming into contact with oil or turning locknut (1D) clockwise. Remove valve cap
grease will cause a violent explosion. Always (1A) and valve core (1B) from charging valve
double check to make sure you are using assembly (1). Slowly turn locknut (1D) counter-
Nitrogen to prevent personal injury and clockwise to open charging valve assembly (1).
property damage.
DO NOT remove charging valve (1) until all the gas
A high pressure nitrogen pressure has been completely evacuated.
regulator must be used with the charging
assembly. Failure to use pressure regulator
could cause property damage, personal injury WARNING
or death. Do not try to discharge the accumulator by
depressing charging valve core (1B).
1. Attach line (1) and the swivel nut to charging valve
(1, Fig. 1) as described in Steps 1 through 4 under
the heading 'Testing Pre-Charge Pressure'. Be sure REMOVAL
valves (4 & 6) are closed. Numbers in parentheses refer to Fig. 3.
7. Rotate 'T' handle of valve chuck (2) counter- 4. Disconnect hydraulic line from underside of
clockwise until it stops, tighten charging valve accumulator. Cap the line and accumulator port to
locknut (1D, Fig. 1) to 11 Nm (100 lbf in), loosen the prevent ingress of dirt.
swivel nut and remove gauging head.
5. Support the accumulator using an adequate sling
8. Check accumulator charging valve (1, Fig. 1) for and lifting device. Remove nuts (1), washers (2) and
leakage using soapy water. Reinstall valve cap mounting straps (3).
(1A, Fig. 1) and tighten finger tight.
SM 1205 2-98 3
Steering System - Accumulator
Section 220-0080
INSPECTION
Numbers in parentheses refer to Fig. 1
6. Remove accumulator (4) from it's mounting 5. Inspect threads of bolts (8) and threads in cylinder
bracket and move to a clean area for disassembly. (12) for damage. Replace all parts worn or damaged
beyond repair.
DISASSEMBLY
Numbers in parentheses refer to Fig. 1. ASSEMBLY
Numbers in parentheses refer to Fig. 1.
WARNING 1. Lubricate ‘O’ rings (3 & 6), backup ring (5), seal
Accumulators are charged with Nitrogen. The rings (7) and inside of cylinder (12) with hydraulic oil
service pressure is 55 bar (800 lbf/in²) at 21° C prior to assembly.
(70° F). Do not attempt to remove any valves
or fittings until all nitrogen pressure is 2. Install new seal rings (7) and wear rings (11) on
completely relieved to prevent personal injury piston (10). Insert piston (10) into cylinder (12) with
and property damage. seal rings (7) end toward open end of cylinder.
1. Make sure all nitrogen gas has been released 3. Place new backup ring (5) and ‘O’ ring (6) on end
before starting to disassemble the accumulator. cap (4). Oil outside diameter of end cap and insert
Refer to section on 'Discharging Nitrogen'. into cylinder (12).
2. Remove charging valve (1) from shield (2). 4. Align bolt holes in flange of cylinder (12) with those
of end cap (4) and insert bolts (8) and washers (9).
3. Remove shield (2) from end cap (4) by using the Tighten bolts (8) to a torque of 271 - 298 Nm
hex head to unscrew the shield. Remove and discard (200 - 220 lbf ft).
‘O’ ring (3) from end cap (4).
5. Place ‘O’ ring (3) on shield (2) and screw shield (2)
4. Remove bolts (8) and washers (9) from end cap into end cap (4). Tighten shield (2) to a torque of
(4). Remove end cap (4) from cylinder (12) and 102 - 135 Nm (75 - 100 lbf ft).
remove ‘O’ ring (6) and backup ring (5) from end cap
(4). Discard 'O' ring and backup ring. 6. Install charging valve (1). Tighten locknut (1D)
4 SM 1205 2-98
Steering System - Accumulator
Section 220-0080
clockwise to 11 Nm (100 lbf in) to close charging 4. Install hydraulic line securely to the oil inlet port at
valve. Insert valve core (1B), replace valve cap (1A) bottom of accumulator.
and tighten finger tight.
5. Charge accumulator with Nitrogen gas as
7. Test accumulator hydraulically for leakage or described under the heading 'Charging the
failure at 255 - 276 bar (3 700 - 4 000 lbf/in²). Accumulator' in this section.
Discharge after testing.
6. Check oil level in the steering and brake control
tank and add oil if necessary. Refer to Section
INSTALLATION 220-0040, STEERING AND BRAKE CONTROL TANK
Numbers in parentheses refer to Fig. 3. for correct oil level and, Section 300-0020,
LUBRICATION SYSTEM for oil specification.
Note: Tighten all fasteners to torques listed in
Section 300-0080, STANDARD BOLT AND NUT 7. Remove wheel blocks from all road wheels and
TORQUE SPECIFICATIONS. start the engine. Operate the steering and check
hydraulic lines for leaks. Tighten lines and fittings as
Note: Tighten all hydraulic lines fitted with ORFS required.
connections, as described in Section 220-0000,
STEERING SYSTEM SCHEMATIC. Renew all 8. Recheck oil level in the steering and brake control
'O' rings where used. tank and add oil if necessary.
WARNINGS MAINTENANCE
To prevent personal injury and property Inspect the accumulator regularly for any signs of
damage, be sure wheel blocks, blocking leakage or damage.
materials and lifting equipment are properly
secured and of adequate capacity to do the job Every 500 hours
safely. Check the Nitrogen pre-charge pressure at the
accumulator, prior to checking steering system
1. Using an adequate sling and lifting device, position pressure. Refer to 'Testing Pre-charge Pressure', in
the accumulator on its mounting bracket with oil inlet this section.
port downward and install mounting straps (3).
SM 1205 2-98 5
Steering System - Accumulator
Section 220-0080
WARNING
This truck is equipped with pre-charged nitrogen gas cylinders of more than 2.8 bar (40 lbf/in2).
Special permits may be required when transporting the truck or cylinders by any method while
cylinders are charged. For shipment, contact the appropriate agency in the country involved.
Consult your dealer for further permit information.
* * * *
6 SM 1205 2-98
STEERING SYSTEM - Steering Valve
Section 220-0090
SM - 1560
Note: The steering valve can be identified as item 5 in There are four ports on valve housing (4) as follows:
Section 220-0000, STEERING SYSTEM
SCHEMATIC. Port 'P' - Supply from accumulator valve
Port 'T' - Return to tank
The steering valve, mounted to the cab firewall and Port 'R' - Cylinder supply for right hand turn
connected to the steering column, controls hydraulic Port 'L' - Cylinder supply for left hand turn
flow in the steering system. The steering valve is of a
closed centre design, which means that the valve does Turning action of the steering wheel is transmitted
not have any flow through it when it is in the neutral or through the steering column to sleeve (11) and
no steering position. driveshaft (9), which is fastened to the sleeve with
centring pin (13). Rotation of driveshaft (9) causes
The main components of the steering valve are valve gerotor gear (6) to rotate in gerotor housing (5). When
SM 2027 7-00 1
Steering System - Steering Valve
Section 220-0090
gerotor gear (6) rotates, oil in gerotor housing (5) SM - 282
pockets (see Fig. 2) is forced out and flows through GEROTOR GEAR GEROTOR
spool (12) and sleeve (11) to the steering cylinder port. HOUSING
OPERATION
Numbers in parentheses refer to Fig. 1.
2 SM 2027 7-00
Steering System - Steering Valve
Section 220-0090
SM - 2532 REMOVAL
Numbers in parentheses refer to Fig. 7.
SUPPLY TO RETURN FROM
CYLINDERS CYLINDERS
WARNINGS
L R
5 Dangerous pressure. To prevent personal injury
and property damage, turn steering wheel
several times in each direction to relieve
pressure in the system.
T P To prevent personal injury and property
RETURN
TO TANK
SUPPLY FROM
damage, be sure wheel blocks, blocking
ACCUMULATOR VALVE materials and lifting equipment are properly
secured and of adequate capacity to do the job
Fig. 4 - Oil Flow for Powered Left Turn
safely.
RETURN FROM SUPPLY TO 2. Turn steering wheel in both directions several times
CYLINDERS CYLINDERS to relieve pressure in accumulator and steering
system. Block all road wheels.
L R
5
3. Remove bolts (2) and washers (3) securing cover
(1). Remove cover (1) from the truck.
Fig. 6 - Steering Valve In 'Neutral' Position Note: Although all illustrations do not show the
steering valve in a vice, it is recommended that you
any time it is brought against a travel limit and
released. In this way the system is protected from
becoming overheated when the truck is parked
temporarily with the power steering circuit loaded.
SM 2027 7-00 3
Steering System - Steering Valve
Section 220-0090
SM - 2535
31
2
3 7 30
1 8 29
28
26
27 20
19
16 18
6 14
27
17
26
25
24
24
5
15
23
21
14
22
9
10
13
4
3
2
12 11
1 - Cover 9 - Steering Valve 17 - Bushing
2 - Bolt 10 - Gasket 18 - Hardened Washer 25 - Nut
3 - Washer 11 - Bolt 19 - Washer 26 - Bolt
4 - Nut 12 - Lockwasher 20 - Circlip 27 - Bearing
5 - Bracket Assembly 13 - Shaft Assembly 21 - Gas Strut 28 - Bolt
6 - Bracket 14 - Bearing 22 - Bolt 29 - Washer
7 - Bolt 15 - Pivot Fork Assembly 23 - Bolt 30 - Nut
8 - Lockwasher 16 - Fork Assembly 24 - Washer 31 - Steering Wheel & Cap
Fig. 7 - Exploded View of Steering Valve Installation
keep it in a vice during disassembly. Follow the 7. Remove valve housing (4) from the vice and place
clamping procedures explained throughout the text. on a clean cloth to protect the surface finish. Using
suitable pliers remove retaining ring (15) from valve
1. Place steering valve assembly in a soft jawed vice, housing (4).
end cap (2) up.
8. Position 2 flat blade screwdrivers 180° apart in groove
2. Remove cap screws (1) securing end cap (2), of retainer (16) and pry retainer (16) assembly out of
gerotor housing (5) and wear plate (7) to valve housing valve housing (4). Push spool (12) down when removing
(4). Remove end cap (2) from valve retainer (16) from valve housing (4). Be careful not to
housing (4) and discard 'O' ring (3). damage groove of retaining ring (15).
3. Remove gerotor housing (5) and gerotor gear (6) 9. Remove and discard 'O' ring (17) and seal (18) from
from valve housing (4). Remove and discard 'O' ring retainer (16).
(8) from gerotor housing (5).
10. Using a thin blade screwdriver, pry dust seal (14)
4. Remove wear plate (7) from valve housing (4). from retainer (16). Discard dust seal (14).
5. Remove and discard 'O' ring (8) from valve 11. Remove bearing races (19) and needle bearing
housing (4). (20) from spool (12) and sleeve (11) assembly.
4 SM 2027 7-00
Steering System - Steering Valve
Section 220-0090
SM - 1552
P
R
T
L
11
12
13
19
20
19 1
18 2
17
16 3
15 5
14 6
8
7
8
4
9
10
SM - 614 12. Remove spool (12) and sleeve (11) assembly from
14 hole end of valve housing (4), as shown in Fig. 9.
SM 2027 7-00 5
Steering System - Steering Valve
Section 220-0090
14. Remove spool (12) from sleeve (11) carefully. SM - 297
Remove centring springs (10) from spool (12) by
hand. See Fig. 10.
INSPECTION
1. Clean all metal parts in a suitable solvent and blow
dry with compressed air. Do not wipe dry with cloth or
paper towel as lint or other matter may get into the
hydraulic system and cause damage.
ASSEMBLY
Numbers in parentheses refer to Fig. 8, unless
otherwise specified.
spring (10) slots line up at the same end. See Fig. 11.
Rotate spool (12) while sliding parts together.
3. Position two sets (three each) of centring springs (10) 5. Centre centring springs (10) in the parts so that they
on the bench so that the extended edge is down and push down evenly and are flush with upper surface of
arched centre section is together. In this position, spool (12) and sleeve (11).
enter one end of entire spring set into spring
installation tool, as shown in Fig. 12. Note: If centring springs (10) are to be installed
without the aid of an installation tool, the following
4. Compress extended end of centring springs (10) and procedure should be carried out:
6 SM 2027 7-00
Steering System - Steering Valve
Section 220-0090
Fig. 13 - Installing Centring Pin c. Push one set of two centring springs (10) between
the two springs in spool (12).
10. Install new seal (18) and 'O' ring (17) in retainer
(16), as shown in Fig. 17.
Note: Do not use any seal that falls freely into the
pocket of retainer (16).
4 - Valve Housing
15 - Retaining Ring
16 - Retainer 11. Install retainer (16) assembly over spool (12) end
with a twisting motion, as shown in Fig. 16. Tap
Fig. 16 - Retainer and Retaining Ring Installation retainer (16) in valve housing (4) with a rubber hammer
SM 2027 7-00 7
Steering System - Steering Valve
Section 220-0090
SM - 1554 SM - 621
PORT FACE
PIN PARALLEL
WITH PORT FACE
14 - Dust Seal
15 - Retaining Ring 17 - 'O' Ring 9 - Driveshaft
16 - Retainer 18 - Seal 13 - Centring Pin
Fig. 17 - Seal and 'O' Ring Locations Fig. 19 - Aligning Driveshaft With Centring Pin
PORT FACE
4 - Valve Housing
8 - 'O' Ring 9 - Driveshaft
13 - Centring Pin
Fig. 18 - Valve housing Clamped in Vice Fig. 20 - Aligning Valve Housing and Gerotor Assembly
Note: Check to ensure spool (12) and sleeve (11) are housing (4).
flush with, or slightly below, the 14 hole surface of
valve housing (4). Clean the upper surface of valve 15. Rotate spool (12) and sleeve (11) assembly until
housing (4) by wiping with the palm of clean hand. centring pin (13) is parallel with port face, see Fig. 19.
Clean each of the flat surfaces of the meter section Install driveshaft (9) in valve housing (4) making sure it
parts in a similar way when ready for re-assembly. Do engages with centring pin (13). To assure proper
not use cloth or paper to clean surfaces. alignment, mark driveshaft (9) as shown in Fig. 20.
14. Install wear plate (7) on valve housing (4). Align 16. Install new 'O' ring (8) and gerotor gear (6), in
bolt holes in wear plate (7) with tapped holes in valve gerotor housing (5). See Fig. 21.
8 SM 2027 7-00
Steering System - Steering Valve
Section 220-0090
SM - 624
WARNING
To prevent personal injury and property
damage, be sure wheel blocks, blocking
materials and lifting equipment are properly
secured and of adequate capacity to do the job
safely.
17. With seal side of gerotor housing (5) toward wear 6. Remove wheel blocks from all road wheels and start
plate (7), align gerotor gear (6) valleys on driveshaft the engine. Operate the steering and check hydraulic
(9), as shown in Fig. 20. Note the parallel relationship lines for leaks. Tighten lines and fittings as required.
of reference lines A, B, C & D in Fig. 20. Align cap
screw (1) holes without disengaging gerotor gear (6) 7. Recheck oil level in the steering and brake control
from driveshaft (9). tank and add oil if necessary.
18. Install new 'O' ring (3) in end cap (2) and install 8. Secure cover (1) to the truck with bolts (2) and
end cap (2) on gerotor housing (5), as shown in Fig. 22. washers (3).
19. Align cap screw (1) holes and install seven dry cap
FILLING AND BLEEDING THE STEERING
screws (1) in end cap (2). Pre-tighten cap screws (1)
to 20 - 27 Nm (15 - 20 lbf ft) then tighten to a torque of SYSTEM
100 Nm (75 lbf ft), in the sequence shown in Fig. 23. 1. Fill steering and brake control tank to Maximum
level. Be ready to add oil when the engine is started.
Do not let oil drop below the pump suction line to
INSTALLATION prevent air entering the system.
Numbers in parentheses refer to Fig. 7.
2. Start engine and let it idle. Immediately add oil to the
Note: Tighten all fasteners to standard torques listed steering and brake control tank as required. When no
in Section 300-0080, STANDARD BOLT AND NUT more oil can be added and oil is clear, proceed as
TORQUE SPECIFICATIONS. follows:
Note: Tighten all hydraulic lines fitted with ORFS a. Turn the steering wheel from lock to lock to bleed
connections, as described in Section 220-0000, the air in the steering cylinders and lines.
STEERING SYSTEM SCHEMATIC. Renew all
'O' rings where used. Note: Immediately upon valve spool actuation oil must
SM 2027 7-00 9
Steering System - Steering Valve
Section 220-0090
10 SM 2027 7-00
Steering System - Steering Valve
Section 220-0090
* * * *
SM 2027 7-00 11
STEERING SYSTEM - Double Relief Valve
Section 220-0110
SM - 1326
DESCRIPTION SM - 561
SM 1208 2-98 1
Steering System - Double Relief Valve
Section 220-0110
When oil flowing through valve body (1) at port 'B', and SM - 560
out of the opposite side exceeds valve (2) setting,
valve (2) is moved off valve seat (3) against the 6
STEERING A A STEERING
pressure of spring (5). See Fig. 4. As valve (2) moves CYLINDER CYLINDER
BASE END ROD END
off valve seat (3), oil flows out of port 'A' to the
opposite end of steering cylinders. After the road STEERING STEERING
B B
shock has been dissipated, pressure is reduced and CYLINDER CYLINDER
ROD END BASE END
spring (5) seats valve (2) against valve seat (3). See
Fig. 3.
LEFT TURN RIGHT TURN
PORT ON PORT ON
STEERING VALVE STEERING VALVE
REMOVAL
Fig. 3 - Double Relief Valve In Neutral Position
WARNINGS SM - 559
Hydraulic fluid pressure will remain within the
system after engine shutdown. To prevent 6
STEERING A A STEERING
personal injury and property damage, turn CYLINDER CYLINDER
steering wheel several times in each direction BASE END ROD END
1. Position the vehicle in a level work area, raise the Fig. 4 - Double Relief Valve - Valve (2) Activated
body and secure in place with the body safety pins.
Apply the parking brake and switch off the engine. and carefully remove adjustment screw (7) from valve
body (1).
2. Turn steering wheel in both directions several times
to relieve any pressure in accumulator and steering
system. Block all road wheels. WARNING
Compressed springs. Use care when removing
3. Before removal of double relief valve from the truck, relief body (13). Springs (5 & 18) are under
clean exterior of the valve and hydraulic oil lines to compression and may spring out of valve body
prevent ingress of dirt. (1) bore, causing personal injury, if
compression is not released carefully.
4. Identify and tag all hydraulic oil lines to aid in
installation and disconnect from double relief valve. 3. Carefully remove relief body (13) assembly from
Cap all lines and plug all ports of the double relief valve body (1). Remove washer (4) and spring end
valve to prevent ingress of dirt. (6) assembly from relief body (13). Remove and
discard 'O' Ring (15) from spring end (6).
5. Remove mounting hardware securing double relief
valve to the truck and move to a clean area for 4. Remove spring (5) from valve body (1).
disassembly.
Note: To remove valve (2) assembly and valve
seat (3) assembly from valve body (1), it is necessary
DISASSEMBLY to turn valve body on its end and tap down on a work
Numbers in parentheses refer to Fig. 1. bench, or other suitable area, to release the parts.
1. If required, remove elbows and tees from double 5. Remove valve (2) assembly from valve body (1).
relief valve and identify to aid in assembly. Remove and discard 'O' Ring (10) and backup
ring (11) from valve (2).
2. Slacken jam nut (14) from adjustment screw (7)
6. Remove valve seat (3) assembly from valve
2 SM 1208 2-98
Steering System - Double Relief Valve
Section 220-0110
body (1). Remove and discard 'O' ring (8) and backup 6. Repeat steps 1 through 5 to assemble remaining
rings (9) from valve seat (3). valve (16) assembly.
7. Follow steps 1 through 6 to disassemble the 7. If removed, install plugs (12) in valve body (1).
remaining valve (16) assembly.
8. Adjust valve as described under 'Adjustment'.
8. If necessary, remove plugs (12) from valve body (1).
9. If removed, install elbows and tees on double relief
valve as tagged at disassembly.
INSPECTION
Numbers in parentheses refer to Fig. 1.
ADJUSTMENT
Note: There is a seal kit available to replace all of the Numbers and letters in parentheses refer to Fig. 1.
seals in the valve. However, if any of the other items
are damaged the valve assembly should be replaced. SM - 165
Refer to the trucks Parts Book for part number of the NEEDLE
seal kit. VALVE
2. Install valve seat (3) assembly in valve body (1) and 3. Install a needle valve in the third leg of the tee,
lightly tap home with a pin punch. Install valve (2) with a line returning from needle valve to oil
assembly in valve body (1). reservoir.
3. Install new 'O' ring (15) on spring end (6) and install 4. Install a plug in one side of port 'A' and a line
spring end (6) assembly in relief body (13). Install returning to oil reservoir in the opposite side of port 'A'.
spring (5) in relief body (13).
5. Open the needle valve and start the pump.
4. Install washer (4) on relief body (13) and thread Gradually close the needle valve. If oil is discharged
relief body (13) assembly into valve body (1). Tighten through port 'A' before relief pressure is reached, turn
relief body (13) to a torque of 60 - 65 Nm (44 - 48 lbf/in2). adjustment screw (7) in until discharge stops.
Continue closing the needle valve and turning
5. Thread adjustment screw (7) into valve body (1). Do adjustment screw (7) until discharge through port 'A'
not secure with jam nut (14) until after pressure setting occurs at relief pressure.
adjustment is complete.
SM 1208 2-98 3
Steering System - Double Relief Valve
Section 220-0110
If oil is discharged through port 'A' only when relief secure in place with mounting hardware.
pressure is exceeded, turn adjustment screw (7) out
and open needle valve slightly. Continue opening 2. Remove blanking caps from hydraulic lines and
needle valve and turning adjustment screw (7) out install lines to double relief valve as identified during
until discharge through port 'A' occurs at relief pressure. removal.
6. Repeat Steps 1 through 5 on opposite end of 3. Check oil level in the steering and brake control tank
double relief valve. Adjust adjustment screw (20) so and add oil if required. Refer to Section 220-0040,
discharge through port 'B' occurs at relief pressure. STEERING AND BRAKE CONTROL TANK for
correct fill level, and, Section 300-0020,
7. Re-check both relief settings before securing LUBRICATION SYSTEM for oil specification.
adjustment screws (7 & 20) with jam nuts (14).
4. Start the engine and bring hydraulic oil to operating
8. Re-check both relief settings before installing temperature.
double relief valve assembly on the truck.
5. Check double relief valve and hydraulic line
connections for leaks and tighten as required.
INSTALLATION
Note: Tighten all fasteners to standard torques listed 6. Remove body safety pins and lower the body to the
in Section 300-0080, STANDARD BOLT AND NUT frame. Remove wheel blocks.
TORQUE SPECIFICATIONS.
Note: Tighten all hydraulic lines fitted with ORFS SPECIAL TOOLS
connections, as described in Section 220-0000, There are no special tools required for procedures
STEERING SYSTEM SCHEMATIC. Renew all outlined in this section. Refer to Section 300-0070,
'O' rings where used. SERVICE TOOLS, for part numbers of general
service tools required. These tools are available from
1. Make certain, area of installation is clean and your dealer.
position double relief valve on mounting bracket and
* * * *
4 SM 1208 2-98
STEERING SYSTEM - Steering Cylinder and Linkage
Section 220-0120
SM - 2536
34
35 39
15
45
16 17 32
10 18 44
19 43
14
38 31
14 37
49
A
8 36
24 34
A
14 46
35
40 39
11 45
FRONT
26
10 33
25
14
11 41 27 38
42
13 37
47
30 28
9 12 36
15 48
40
A 22
47 29
23 7
5,6
1 - Spindle Assembly - LH
2 - Spacer 17 - Bolt 41 42
3 - Spindle Assembly - RH 18 - Lockwasher 1,3
4 - Spacer 19 - Plate
5 - Steering Arm - LH 20 - Cotter Pin 2,4 21 20
6 - Steering Arm - RH 21 - Castle Nut
7 - Bolt 22 - Seal
8 - Bellcrank 23 - Plug 32 - Rod End 41 - Castle Nut
9 - Pin 24 - Bolt 33 - Rod End 42 - Cotter Pin
10 - Bushing 25 - Retainer Ring 34 - Bolt 43 - Bolt
11 - Thrust Washer 26 - Plate 35 - Washer 44 - Nut
12 - Locking Pin 27 - Bushing 36 - Stud 45 - Plug
13 - Nut 28 - Ball Pin 37 - Bearing 46 - Lockwasher
14 - Lube Fitting 29 - Steering Cylinder 38 - Retainer Ring 47 - Spacer
15 - Expansion Plug 30 - Lube Fitting 39 - Plate 48 - Lube Fitting
16 - Anchor Pin 31 - Tie Rod 40 - Seal 49 - Mounting Bracket
SM 2028 R1 08-03 1
Steering System - Steering Cylinder and Linkage
Section 220-0120
1. Position the vehicle in a level work area, be sure the 5. Break tack welds around expansion plugs (15) and
body is completely lowered, apply the parking brake remove expansion plugs from bellcrank housing.
and switch off the engine.
6. Remove nut (13) from locking pin (12) and, using
2. Turn steering wheel in both directions several times a mild steel drift, tap locking pin (12) out from bellcrank
to relieve pressure in accumulator and steering (8).
system. Block all road wheels.
7. Using suitable lifting equipment, support bellcrank
(8) and, using a mild steel drift (slightly less than
Steering Cylinder 75 mm (3 in) in diameter), drive pin (9) from the
1. Support steering cylinder (29) with suitable blocks bellcrank housing and bellcrank (8).
or lifting device.
8. Remove bellcrank (8) and thrust washers (11) from
2. Ensure all hydraulic lines connected to steering the bellcrank housing.
cylinders (29) are identified for ease of installation and
with suitable containers available to catch spillage, 9. If bushings (10) are to be replaced, use a mild steel
disconnect hydraulic lines. Cap all lines and ports to drift (slightly more than 75 mm (3 in) in diameter) and
prevent entry of dirt. drive bushings out of the bellcrank housing.
3. Remove cotter pin (20) and castle nut (21) from ball Note: If removing welds using an air arc, follow the
pin (28) assembly at rod end of steering cylinder (29). procedures outlined for 'Welding' in Section 100-0010,
CHASSIS, HOOD AND FENDERS.
4. Remove bolts (17), lockwashers (18) and plate (19)
from anchor pin (16) at base end of steering cylinder 10. If one or both steering stops are damaged they
(29). Remove anchor pin (16) and carefully lift steering can be removed by using an air arc to break the
cylinder (29) from bellcrank (8) housing and steering welds.
arm (5). Spacers (47) will be removed with steering
cylinder (29). Remove seal (22) from steering arm (5)
ball joint bore. DISASSEMBLY
5. Drain hydraulic oil from steering cylinder (29) Tie Rod Assembly
assembly and place in a clean work area for disassembly. Numbers in parentheses refer to Fig. 1.
6. Repeat steps 3 through 5 to remove opposite Note: To aid in assembly and installation, record
steering cylinder (29) from bellcrank (8) and steering assembled length of tie rod (29) assembly for
arm (6). reference.
2 SM 2028 R1 08-03
Steering System - Steering Cylinder and Linkage
Section 220-0120
2. Place tie rod (31) assembly in a vice, or similar 6. Remove and discard backup ring (5) and 'O' ring (6)
holding device, and remove bolts (34) and from outer groove of end cap (4).
lockwashers (35) securing plate (39) to rod end (32).
Remove plate (39). 7. Press piston rod (1) out of end cap (4).
3. Pry retainer ring (38) out of rod end (32). 8. Remove and discard wiper (2) and seal (3) from
inside groove of end cap (4).
4. Turn tie rod (31) in vice so that the threaded end of stud
(36) points upwards. Using a soft faced hammer, tap stud 9. If necessary, remove snap rings (12) and press
(36) out of rod end (32) and remove bearing (37). bushing (13) out of tube (11) eye.
5. Repeat steps 2 through 4 to disassemble rod end 10. Remove lube fitting (16) from base end of tube (11).
(33) of tie rod (31).
6. Loosen nuts (44) and bolts (43) and unscrew rod INSPECTION
ends (32 & 33) from tie rod (31). 1. Clean all metal parts of the steering cylinder in a
suitable solvent and dry with clean, lint-free cloths.
Make certain all cylinder ports are free of dirt or
Steering Cylinder - Piston Rod End contamination.
Numbers in parentheses refer to Fig. 1.
2. Check cylinder tube and outer diameter of piston for
1. Remove lube fitting (48) and plug (23) from piston scratches, cracks, or other signs of damage. Use a
rod end of steering cylinder (29). fine stone to remove scratches or ridges. Replace
these components, if defects cannot be corrected.
2. Place steering cylinder (29) assembly in a vice, or
similar holding device, and remove bolts (24) and 3. Inspect piston rod for distortion, cracks or other
lockwashers (46) securing plate (26) to piston rod end. defects. Replace piston rod if defective area is
Remove plate (26). irreparable.
3. Pry retainer ring (25) out of the piston rod eye. 4. Check bushings for wear and replace if required.
SM 2028 R1 08-03 3
Steering System - Steering Cylinder and Linkage
Section 220-0120
SM - 2537
14
7
8
15
11
2
3 9
16
10 12
5
13
6
12
bottoms against the shoulder. Screw nut (9) onto Steering Cylinder - Piston Rod End
threaded end of piston rod (1) and tighten to a torque Numbers in parentheses refer to Fig. 1.
of 540 - 610 Nm (400 - 450 lbf ft).
1. Place steering cylinder (29) assembly in a vice, or
Note: Nut (9) should not be used more than three similar holding device, with tapped holes in piston rod
times. Check nut locking collar condition and replace eye facing up.
the nut if it does not produce a firm locking action on
piston rod threads. 2. Lubricate bushing (27) and ball pin (28) with grease
and tap bushing and ball pin as an assembly into
4. If removed, press bushing (13) into tube (11) eye piston rod eye end of steering cylinder (29).
and secure with snap rings (12).
3. Secure ball pin (28) in place with retainer ring (25).
5. Slide tube (11) onto piston rod (1) assembly and Make sure retainer ring seats properly in piston rod eye.
press tightly into position to end cap (4). Secure end
cap (4) to tube (11) with bolts (10). Tighten bolts (10) 4. Position plate (26) on piston rod end and secure
to a torque of 150 - 165 Nm (110 - 120 lbf ft). with bolts (24) and lockwashers (46).
6. Install lube fitting (16) at base end of tube (11). 5. If removed, install lube fitting (48) and plug (23) in
piston rod end of steering cylinder (29).
4 SM 2028 R1 08-03
Steering System - Steering Cylinder and Linkage
Section 220-0120
2. With tapped holes in rod end (32) facing up, 4. Drive locking pin (12) into bellcrank (8), making sure
lubricate bearing (37) and stud (36) with grease and it seats solidly in its bore. Secure locking pin (12) in
tap bearing and stud as an assembly into rod end (32). bellcrank (8) with nut (13). Tighten nut (13) to a torque
of 245 - 300 Nm (180 - 220 lbf ft).
3. Secure stud (36) in place with retainer ring (38). Make
sure retainer ring seats properly in rod end (32). Note: Prior to welding on the vehicle, follow the
procedures outlined for 'Welding' in Section 100-0010,
4. Position plate (39) on rod end (32) and secure with CHASSIS, HOOD AND FENDERS.
bolts (34) and lockwashers (35).
5. Place expansion plugs (15) into upper and lower
5. Repeat steps 1 through 4 to assemble rod end (33) bores of bellcrank (8) housing and tack weld each
assembly to opposite end of tie rod (31). expansion plug in three places.
6. Install lube fitting (14) and plug (45) in rod end (32). 6. Using suitable lifting equipment, position steering
arm (5) to spindle assembly (1) and secure with
bolts (7).
INSTALLATION
Numbers in parentheses refer to Fig. 1. 7. Install seals (40) on studs (36) and, using suitable
lifting equipment, install tie rod (31) assembly on
Note: Tighten all fasteners without special torques bellcrank (8) and steering arm (5) and secure with
specified to standard torques listed in Section castle nuts (41). Tighten castle nuts (41) to a torque of
300-0080, STANDARD BOLT AND NUT TORQUE 2 035 - 2 300 Nm (1 500 - 1 700 lbf ft).
SPECIFICATIONS.
8. Secure castle nuts (41) to studs (36) with new cotter
Note: Tighten all hydraulic lines fitted with ORFS pins (42).
connections, as described in Section 220-0000,
STEERING SYSTEM SCHEMATIC. Renew all 9. Repeat steps 6 through 8 to install steering arm (6)
'O' rings where used. and opposite tie rod (31) assembly.
SM 2028 R1 08-03 5
Steering System - Steering Cylinder and Linkage
Section 220-0120
3. Insert ball pin (28) in steering arm (5) bore and secure
ball pin (28) to steering arm (5) with castle nut (21).
Tighten castle nut (21) to a torque of 4 000 - 4 500 Nm
(3 000 - 3 300 lbf ft) and secure to ball pin (28) with
new cotter pin (20). OF VEHICLE
7. Check oil level in the steering and brake control Check for toe-in only when the truck is empty and
tank and add oil if necessary. Refer to Section bellcrank (8) is centred. Use a slide bar attached to the
220-0040, STEERING AND BRAKE CONTROL TANK wheel rim edge to make this check.
for correct oil level and, Section 300-0020,
LUBRICATION SYSTEM for oil specification. If adjustment is necessary, loosen nuts (44) and
bolts (43) at each end of tie rod (31) assemblies. Turn
8. Remove wheel blocks from all road wheels and start tie rods (31) with a pipe wrench until correct toe-in
the engine. Operate the steering and check hydraulic dimension is obtained. Refer to Fig. 3.
lines for leaks. Tighten lines and fittings as required.
When tie rod (31) lengths have been established,
9. Re-check oil level in the steering and brake control secure rod ends (32 & 33) to tie rods (31) with bolts
tank and add oil if necessary. (43) and nuts (44).
ALIGNMENT MAINTENANCE
Numbers in parentheses refer to Fig. 1. Every 50 Hours - Lubricate steering cylinders and
steering pivot pin with grease specified in Section
Correct front end alignment is dependent on three 300-0020, LUBRICATION SYSTEM.
basic fundamentals:
6 SM 2028 R1 08-03
Steering System - Steering Cylinder and Linkage
Section 220-0120
* * * *
SM 2028 R1 08-03 7
STEERING SYSTEM - Accumulator Valve
Section 220-0130
SM - 169
The Accumulator Valve can be identified as item 4 in Incorporated in this assembly are three valves; a
Section 220-0000, STEERING SYSTEM check valve, accumulator two-way valve and a
SCHEMATIC, in this manual. system pressure protection valve.
SM 1209 2-98 1
Steering System - Accumulator Valve
Section 220-0130
An accumulator two-way valve (13 thru 17) is located and oil flows to the steering valve through port 'B' and
in the centre portion of the assembly. In the operating to the accumulator through port 'E'. Pressure is
position, engine running and two-way valve energized supplied to pressure switch (8, Figs. 2, 3 & 4) and
(refer to Fig. 2), this valve allows the accumulator to remote diagnostic test point through a tee piece in
retain its pressure. In its non-operating position, port 'G2'. Refer to Fig. 2.
engine shutdown and two-way valve de-energized
(refer to Fig. 3), a controlled bleed-down of the During operation of the machine, transmission pilot
accumulator pressure to the steering and brake pressure through port 'D' keeps the two-way valve
control tank occurs. This bleed-down takes 3 to 5 (13 thru 17) energized (closed). This traps a supply
minutes. of oil in the accumulator.
Relief valve cartridge (8), at the lower portion of the Return oil from the steering valve enters port 'C' and
assembly, is preset to 207 bar (3 000 lbf/in²) and exits through port 'R' to tank.
seated. This valve acts as a backup in the event of a
malfunction of the steering pump compensator valve. Port 'G1' is plugged.
Should the compensator valve allow steering system
pressure to exceed the preset pressure of relief valve Should pressure in any of these circuit lines exceed
cartridge (8), valve will open and relieve excess oil the preset pressure setting on relief valve cartridge
pressure to the steering and brake control tank. Refer (8), the relief valve will open and oil will exit through
to Fig. 4. port 'R' to tank. Refer to Fig. 4.
SM - 1323
SUPPLY TO
RETURN FROM STEERING PRESSURE
STEERING VALVE VALVE TEST POINT
SUPPLY TO
ACCUMULATOR
BRAKE
CIRCUIT
RETURN SUPPLY
TO TANK FROM
PUMP
2 SM 1209 2-98
Steering System - Accumulator Valve
Section 220-0130
SM - 1324
PRESSURE
TEST POINT
RETURN FROM
ACCUMULATOR
RETURN
TO TANK
SM - 1325
SUPPLY TO
RETURN FROM STEERING PRESSURE
STEERING VALVE VALVE TEST POINT
SUPPLY TO
ACCUMULATOR
BRAKE
CIRCUIT
RETURN
SUPPLY
TO TANK
FROM
PUMP
SM 1209 2-98 3
Steering System - Accumulator Valve
Section 220-0130
SM - 170
9 - Filter
10 - Breather
11 - 'O' Ring
12 - Spring
13 - Pin
1 - Relief Valve Cartridge 14 - Quad Ring
2 - 'O' Ring 15 - Piston
3 - 'O' Ring 16 - 'O' Ring
4 - Backup Rings 17 - Plug
5 - Valve Body 18 - Plug
6 - Filter 19 - 'O' Ring
7 - Spring 20 - Spring
8 - Plug 21 - Poppet
4 SM 1209 2-98
Steering System - Accumulator Valve
Section 220-0130
(19) from plug (18). Discard spring (20). (13) assembly in valve body (5). Install new quad ring
(14) on piston (15) and install piston (15) assembly in
4. Clamp valve body (5) in a soft-jawed vice and valve body (5).
remove relief valve cartridge (1) from valve body (5).
Remove and discard backup rings (4), 'O' ring (3) and 5. Install new 'O' ring (16) on plug (17) and install
'O' ring (2) from relief valve cartridge (1). plug (17) in valve body (5).
Note: Do NOT disassemble relief valve cartridge (1) 6. Install new 'O' ring (19) on plug (18) and install
assembly; it is pressure set and sealed at assembly. poppet (21), new spring (20) and plug (18) in valve
If relief valve cartridge (1) is defective, it must be body (5).
replaced with a new one.
5. Remove plug (8), spring (7) and filter (6) from INSTALLATION
valve body (5). Remove breather (9) from valve body Note: Tighten all fasteners to standard torques listed
(5). Discard filter (6), breather (9) and spring (7). in Section 300-0080, STANDARD BOLT AND NUT
TORQUE SPECIFICATIONS.
3. Check poppet (21) and seats in valve body (5). 2. Connect all hydraulic lines securely to accumulator
Ensure they are not worn, nicked, cracked or scored. valve as tagged at 'Removal'.
4. Check condition of relief valve cartridge (1). Insert 3. Check the level of oil in the steering and brake
a blunt-nosed drift or punch into relief valve cartridge control tank. Refer to Section 220-0040, STEERING
(1) end and depress the piston. If piston does not AND BRAKE CONTROL TANK. Add oil if low. Use
move freely, or hangs up, replace relief valve oils meeting the specifications outlined in Section
cartridge (1) assembly. Relief valve cartridge (1) 300-0020, LUBRICATION SYSTEM.
assembly should also be replaced if lead seal has
been removed, as the relief valve cartridge (1) 4. Remove wheel chocks, start the engine and slowly
adjustment may not be accurate. operate steering system. Check for correct steering
operation and leaks. Tighten lines and fittings if
necessary and re-check oil level.
ASSEMBLY
Numbers in parentheses refer to Fig. 5.
MAINTENANCE
1. Install new filter (6), new spring (7) and plug (8) in valve Numbers in parentheses refer to Fig. 5.
body (5). Install new breather (9) in valve body (5).
1. Check breather (9) regularly for plugging, due to
2. Place valve body (5) in a soft-jawed vice. Install accumulation of dirt, painting over or plugged with
new 'O' rings (2 & 3) and backup rings (4) on relief tape or other material. Check filter (6) for plugging.
valve cartridge (1). Install relief valve cartridge (1)
assembly in valve body (5). 2. Clean filter (6) and breather (9) with a suitable
cleaning solvent, or if required, replace.
3. Install new 'O' ring (11) on piston (10). Press
piston (10) into its bore in valve body (5). 3. If painting in the area of the accumulator valve is
necessary, be sure to mask breather (9). Be sure to
4. Install new spring (12) on pin (13) and install pin remove all masking tape from breather (9) after painting.
* * * *
SM 1209 2-98 5
STEERING SYSTEM - Steering Filter
Section 220-0150
SM - 627
OPERATION
Numbers in parentheses refer to Fig. 1.
SM 1593 12-98 1
Steering System - Steering Filter
Section 220-0150
be changed immediately visual indicator registers in 2. Turn steering wheel in both directions several times
the yellow 'Needs Cleaning' area. to relieve any pressure in accumulator and steering
system. Block all road wheels.
Note: Bypass valve (6) is still not open at this point.
3. Remove hydraulic lines at inlet port 'A' and outlet
Bypass valve (6) starts to open when indicator link (7) port 'B' and drain oil into a suitable container.
passes from the yellow area into the red area on visual
indicator (8). If visual indicator (8) is in the red 'Bypass' 4. Drain hydraulic oil from filter assembly into a
area, bypass valve (6) is open and this allows a suitable container by unscrewing bowl (2) from
certain amount of hydraulic oil to bypass clogged housing (1). Lower bowl (2) vertically to clear element
element (3). (3), which will remain in housing (1), and discard 'O'
ring (4).
MAINTENANCE 5. Dislodge element (3) from its push fit in housing (1)
Numbers in parentheses refer to Fig. 1. and remove carefully.
The steering filter visual indicator (8) should be 6. Remove magnet (5) assembly from element (3) and
checked daily. Element (3) should be changed discard element (3). If necessary, remove hex nut
immediately visual indicator (8) registers in the yellow securing magnets (5) on the post. Clean magnets (5)
area, or every 1 000 hours, whichever comes first. and secure on post with hex nut.
10. Screw bowl (2) into housing (1) and torque tighten
WARNINGS to 20 Nm (15 lbf ft).
Dangerous pressure. Turn steering wheel
several times in each direction to relieve 11. Connect inlet and outlet lines to steering filter and
pressure in the system. Failure to release fill hydraulic tank with oil as specified in Section
pressure as stated can result in personal injury 300-0020, LUBRICATION SYSTEM. Refer to Section
and property damage. 220-0040, STEERING AND BRAKE CONTROL
TANK, for correct fill level.
To prevent personal injury and property
damage, be sure wheel blocks are properly 12. Remove wheel blocks and disconnect shipping bar
secured and of adequate capacity to do the job and place in the stowed position. Start engine, check
safely. for correct steering operation and check for leaks.
Tighten lines and fittings, as required.
1. Position the vehicle in a level work area, apply the
parking brake and switch off the engine. Note: If there is air in the steering system the system
must be bled, as described in Section 220-0000,
STEERING SYSTEM SCHEMATIC.
TORQUE
FIG. NO. ITEM NO. ITEM NAME Nm lbf ft
1 2 Bowl 20 15
* * * *
2 SM 1593 12-98
BODY SYSTEM - Body System Schematic
Section 230-0000
Body and Disc Brake Cooling Tank (1) Note: The control lever should be kept in the 'Float'
Refer to Section 230-0040, BODY AND DISC BRAKE position at all times, except when raising or lowering
COOLING TANK. the body.
The body and disc brake cooling tank is the common A pressure relief valve, installed in port 'H', opens
reservoir for the body hoist system and oil cooled disc when pressure in the hydraulic system exceeds 190 bar
brakes (OCDB) cooling oil. It is mounted on the left (2 750 lbf/in2). This allows oil to flow through an
hand frame rail rearwards of the steering and brake internal passage in the valve body and exit at port 'E'
control tank. to manifold block (4). The oil flow is directed through
the manifold block to supplement the OCDB cooling oil.
Tandem Pump (2) The pressure relief valve works in parallel with
Refer to Section 230-0050, TANDEM PUMP. pressure relief valve (11) mounted off the valve body
at port 'F'. Should oil pressure exceed 190 bar
The tandem gear pump, mounted off the engine power (2 750 lbf/in2), the relief cartridge will open and oil will
takeoff, supplies hydraulic oil for operating the body flow through the relief cartridge and exit the relief valve
and cooling the rear disc brake assemblies. body to the body and disc brake cooling tank.
The front section draws oil from the body and disc There are two body hoist cylinders mounted between
brake cooling tank, then pumps the oil to body control the frame rails. The cylinders are two-stage with power
valve (3) where, depending on spool position, oil flows down in the second stage.
to the body hoist circuit or, with spool in the float
position, flows through manifold block (4) to
supplement the disc brake cooling oil. Manifold Relief Valve (6)
Refer to Section 230-0110, MANIFOLD RELIEF
The rear section draws oil from the body and disc VALVE.
brake cooling tank, then pumps the oil through
manifold block (4) to supply the disc brake cooling The manifold relief valve, mounted off a bracket
circuit. attached to the torque tube, is installed in the body
hoist system to prevent the body from pulling a void in
the body hoist cylinders when dumping unbalanced
loads. The manifold relief valve also provides a means
for return oil from the body lower circuit to return to the
body and disc brake cooling tank. The manifold relief
valve is set at 90 bar (1 300 lbf/in2).
Spool in Lower position - Pressure should be e. Tighten the nut a further 1/4 to 1/2 a turn using the
22.6 - 25.6 bar (328 - 371 lbf/in2). correct size spanner (wrench).
Spool in Float position - Pressure should be f. Check that a satisfactory routing has been achieved.
13 ± 0.5 bar (188 ± 7 lbf/in2).
Section 230-0000
Body System - Body System Schematic
SM - 2460A
5 5
D
9
7
6
8 TEST E 14
COMPONENTS
1 - Body and Disc Brake TO OCDB
Cooling Tank COOLING CIRCUIT
2 - Tandem Pump 7
3 - Body Control Valve
4 - Manifold Block STEERING
5 - Body Cylinder CIRCUIT B
6 - Manifold Relief Valve
7 - Disc Brake Oil Filter 3
8 - Disc Brake Oil Cooler HPCO C
9 - Body Control Joystick
10 - Relief Valve 4
11 - Pressure Relief Valve
12 - Tank Breather
13 - Disc Brake Oil Temp Switch
14 - Pilot Supply Valve
COLOUR CODES
Red - Pressurized Oil
Blue - Exhaust or Return Oil
Green - Intake Oil 2
Orange - Pilot Pressure 13 A
Yellow - Static Oil 12
1
11
10
SM 1929 Rev 1 11-00
Fig. 2 - Body Hoist System Schematic - Body Control Valve in the 'Hold' Position
SM 1929 Rev 1 11-00
SM - 2460B
5 5
D
9
7
6
8 TEST E 14
COMPONENTS
1 - Body and Disc Brake
TO OCDB
Cooling Tank
COOLING CIRCUIT
2 - Tandem Pump
7
3 - Body Control Valve
4 - Manifold Block
5 - Body Cylinder STEERING
6 - Manifold Relief Valve CIRCUIT B
7 - Disc Brake Oil Filter
8 - Disc Brake Oil Cooler 3
COLOUR CODES
Red - Pressurized Oil
Blue - Exhaust or Return Oil
Green - Intake Oil
Orange - Pilot Pressure 2
Yellow - Static Oil 13 A
12
1
11
10
Section 230-0000
Fig. 3 - Body Hoist System Schematic - Body Control Valve in the 'Raise' Position
5
6
Section 230-0000
Body System - Body System Schematic
SM - 2460C
5 5
D
9
7
6
8 TEST E 14
COMPONENTS
1 - Body and Disc Brake TO OCDB
Cooling Tank COOLING CIRCUIT
2 - Tandem Pump 7
3 - Body Control Valve
4 - Manifold Block STEERING
5 - Body Cylinder CIRCUIT B
6 - Manifold Relief Valve
7 - Disc Brake Oil Filter 3
8 - Disc Brake Oil Cooler HPCO
C
9 - Body Control Joystick
10 - Relief Valve 4
11 - Pressure Relief Valve
12 - Tank Breather
13 - Disc Brake Oil Temp Switch
14 - Pilot Supply Valve
COLOUR CODES
Red - Pressurized Oil
Blue - Exhaust or Return Oil
Green - Intake Oil
2
Orange - Pilot Pressure 13 A
Yellow - Static Oil
12
1
11
10
SM 1929 Rev 1 11-00
Fig. 4 - Body Hoist System Schematic - Body Control Valve in the 'Float' Position
SM 1929 Rev 1 11-00
SM - 2460D
5 5
D
9
7
6
8 TEST E 14
COMPONENTS TO OCDB
1 - Body and Disc Brake COOLING CIRCUIT
Cooling Tank 7
2 - Tandem Pump
3 - Body Control Valve STEERING
4 - Manifold Block CIRCUIT B
5 - Body Cylinder
*
C
8 - Disc Brake Oil Cooler
9 - Body Control Joystick
*
4
10 - Relief Valve
11 - Pressure Relief Valve
*
12 - Tank Breather
13 - Disc Brake Oil Temp Switch
14 - Pilot Supply Valve
COLOUR CODES
Red - Pressurized Oil
Blue - Exhaust or Return Oil
2
Green - Intake Oil
13 A
Orange - Pilot Pressure
Yellow - Static Oil 12
1
11
10
Section 230-0000
Fig. 5 - Body Hoist System Schematic - Body Control Valve in the 'Lower' Position
7
BODY SYSTEM - Body and Disc Brake Cooling Tank
Section 230-0040
SM - 2438
24 26,27,28 28
5 1 26
6 27
28
16
11
10
15 30
12
78 9 29
14
13
14
13
26
14
28
4
25
17
2
21
23 19
22 28
31
20 27
32
33 8
7
34
18
3 15
The Body and Disc Brake Cooling Tank can be Integral with hydraulic tank (1) assembly are filter
identified as item 1 in Section 230-0000, BODY elements (13) with bypass valve (9), suction screens
SYSTEM SCHEMATIC, in this manual. (18) and window nuts (16). Access covers (2 & 3)
give easy access to replace filter elements (13) and
The hydraulic tank (1) is the common reservoir clean suction screens (18).
for the body hoist system and oil cooled disc brakes
SM 1928 R1 08-03 1
Body System - Body and Disc Brake Cooling Tank
Section 230-0040
SM - 2439 SM - 2440
J
13
2 G
12
J A B C D E F
1
10
1 - Hydraulic Tank A
2 - Tandem Pump 12 - Breather K B
10 - Relief Valve 13 - Oil Temperature Switch C E F
D
The disc brake cooling oil flow is drawn from port 'C', A breather installed in a tee at port 'J' is the common
through suction screen (18), by the rear section of the breather to both the body and disc brake cooling tank
tandem gear pump. Oil is then pumped through the and the steering and brake control tank. This allows
manifold block at the rear of the body control valve to any air entering the tanks to be released to
the disc brake cooling circuit. atmosphere, preventing a pressure build up in the
tank assemblies. See Fig. 4.
Excess disc brake cooling oil at the manifold block,
returns to tank at port 'A' and flows through pressure Port 'K' is plugged and provides a tank drain port.
relief valve (19) to the tank body.
An inter-connecting hose assembly (3, Fig. 5) links
Return oil from the body hoist circuit enters the tank at the body and disc brake cooling tank and the steering
port 'D' from the body control valve. The oil enters filter and brake control tank. Refer to Section 220-0040,
element (13) chamber and flows through a centre tube STEERING AND BRAKE CONTROL TANK.
and filter elements (13) to the tank body, thus ensuring
return oil is filtered before entering the tank.
2 SM 1928 R1 03-08
Body System - Body and Disc Brake Cooling Tank
Section 230-0040
SM - 1683
4
5
1
6
2
3
1 - Breather 4 - Bushing
2 - Nipple 5 - Elbow
3 - Tee 6 - Breather Line
MAINTENANCE fully lowered, the oil level should show in top window
nut (16). Under all conditions bottom window nut (16)
Numbers in parentheses refer to Fig. 1, unless
should show full.
otherwise specified.
If oil is required, remove filler cap (5) and fill
Note: Tighten all fasteners to torques listed in
hydraulic tank (1) with hydraulic oil specified in
Section 300-0080, STANDARD BOLT AND NUT
Section 300-0020, LUBRICATION SYSTEM, until oil
TORQUE SPECIFICATIONS.
shows in top window nut (16). Fit filler cap (5).
SM 1928 R1 08-03 3
Body System - Body and Disc Brake Cooling Tank
Section 230-0040
WARNING
To prevent personal injury and property
damage, be sure wheel blocks are properly
secured and of adequate capacity to do the job
safely.
7. Install bypass valve (9) in plate (10) and secure 3. With suitable containers in position, remove drain
plate (10) assembly on rods (11) with wing nuts (12). plug (17) from hydraulic tank (1) and drain the oil.
Reinstall drain plug (17) in hydraulic tank (1) and
8. Install new gasket (15) and cover (2) on hydraulic tighten securely. Remove drain plug from steering and
tank (1) and secure with bolts (7) and lockwashers (8).
SM - 464
9. Fill hydraulic tank (1) and steering and brake
control tank to correct level with hydraulic oil as
specified in Section 300-0020, LUBRICATION
SYSTEM. Install filler cap (5).
10. Start the engine and raise and lower the body to
charge the system. Switch off the engine and check
oil level as described under 'Checking Oil Level'.
Remove wheel blocks.
Fig. 6 - Suction Screen Removal/Installation Tool
4 SM 1928 R1 03-08
Body System - Body and Disc Brake Cooling Tank
Section 230-0040
brake control tank and drain the oil. Refer to Section 13. Fill hydraulic tank (1) and steering and brake control
220-0040, STEERING AND BRAKE CONTROL TANK. tank to correct level with hydraulic oil as specified in
Reinstall drain plug in hydraulic tank and tighten Section 300-0020, LUBRICATION SYSTEM. Install
securely. filler cap (5).
4. If required, remove inter-connecting hose 14. Start the engine and raise and lower the body to
assembly (3, Fig. 5) from access cover (3). Fit charge the system. Switch off the engine and check
blanking cap and plug to hydraulic line and tank port. oil level as described under 'Checking Oil Level'.
Remove bolts (7), lockwashers (8), access cover (3) Remove wheel blocks.
and gasket (15) from hydraulic tank (1). Discard
gasket (15).
Breather
5. Remove lockwire (31) securing suction screens Remove and clean breather (1, Fig. 4) at the interval
(18) in hydraulic tank (1). specified in Section 300-0020, LUBRICATION SYSTEM.
Replace breather if cleaning is not sufficient.
6. Using a suitable tool, as shown in Fig. 6, unscrew
suction screens (18) by turning hexagon head at
neck of each suction screen. TANK ASSEMBLY
WARNING WARNING
Splashing liquid. Wear a suitable face shield To prevent personal injury and property
when using compressed air to dry tank and damage, be sure wheel blocks are properly
components. secured and of adequate capacity to do the job
safely.
8. Clean suction screens (18) and hydraulic tank (1)
with paraffin and dry with compressed air. Inspect for 1. Position the vehicle in a level work area, be sure
damage and renew if necessary. the body is fully lowered, apply the parking brake and
switch off the engine.
9. Assemble relief valve (19) in reverse order to
disassembly. Thoroughly clean and dry threads on 2. Block all road wheels.
relief valve (19) and tank port and apply Loctite
Activator 'T' to threads. Apply Loctite 243 to threads 3. With suitable containers in position, remove drain
of relief valve (19) and install relief valve assembly in plug (17) from hydraulic tank (1) and drain the oil.
hydraulic tank (1). Reinstall drain plug (17) in hydraulic tank (1) and
tighten securely. Remove drain plug from steering and
10. Insert lockwire (31) in suction screens (18) and brake control tank and drain the oil. Refer to Section
install suction screens in hydraulic tank (1). Secure 220-0040, STEERING AND BRAKE CONTROL TANK.
suction screens (18) in hydraulic tank (1) using a Reinstall drain plug in hydraulic tank and tighten
suitable tool, as shown in Fig. 6. securely.
11. Join ends of lockwire (31) and secure suction 4. Ensure all hydraulic lines connected to hydraulic
screens (18) together with lockwire (31). tank (1) assembly are identified for ease of installation
and, with suitable containers available to catch
Note: Do not grip the body of suction screens (18). leakage, disconnect all hydraulic lines. Fit blanking
Use a suitable tool, as shown in Fig. 6, to grip the caps and plugs to all hydraulic lines and tank ports.
hexagon head at the neck of each suction screen.
5. Disconnect breather line (6, Fig. 4) from elbow
12. Install new gasket (15) and access cover (3) on (5, Fig. 4). Fit blanking caps to line.
hydraulic tank (1) and secure with bolts (7) and
lockwashers (8). Remove blanking cap and plug from 6. Disconnect inter-connecting hose assembly
hydraulic line and tank port and install inter-connecting (3, Fig. 5) from access cover (3). Fit blanking caps to
hose assembly (3, Fig. 5) to access cover (3). line.
SM 1928 R1 08-03 5
Body System - Body and Disc Brake Cooling Tank
Section 230-0040
5. Check bypass valve (9) for damage or wear and
WARNING replace if required.
Heavy Tank. Ensure lifting device is of adequate
capacity and properly secured to avoid 6. Check breather (1, Fig. 4) for damage and replace
personal injury or property damage. if required.
3. If required, remove breather (1), nipple (2), tee (3), Note: Tighten all hydraulic lines fitted with ORFS
bushing (4) and elbow (5) from hydraulic tank (1, Fig. 1). connections, as described in Section 230-0000,
BODY SYSTEM SCHEMATIC. Renew all 'O' rings
where used.
Inspection
Numbers in parentheses refer to Fig. 1, unless
otherwise specified. WARNING
To prevent personal injury and property
damage, be sure wheel blocks, blocking
WARNING materials and lifting equipment are properly
Splashing liquid. Wear a suitable face shield secured and of adequate capacity to do the job
when using compressed air to dry tank and safely.
components.
1. Using suitable lifting equipment, position hydraulic
1. Clean hydraulic tank (1) and components with tank (1) assembly on mounting brackets (24 & 25).
paraffin and dry with compressed air. Secure transmission filler tube to underside of front
right hand mounting bracket and hydraulic tank (1)
2. Inspect tank for weld cracks and security of with bolt (26), hardened washers (28) and nut (27).
internal pipes and weld fitments. Secure hydraulic tank (1) assembly on mounting
brackets (24 & 25) with bolts (26), hardened washers
3. Check suction screens (18) for damage and renew if (28) and nuts (27).
required.
2. Remove blanking cap from breather line (6, Fig. 4)
4. Check pressure relief valve (19) assembly is free of and connect breather line to elbow (5, Fig. 4). Tighten
contaminants and that poppet (20) is free. breather line securely.
6 SM 1928 R1 03-08
Body System - Body and Disc Brake Cooling Tank
Section 230-0040
3. Remove blanking cap from inter-connecting hose SPECIAL TOOLS
assembly (3, Fig. 5) and connect hose to access
There are no special tools required for procedures
cover (3). Tighten hose assembly securely.
outlined in this section. Refer to Section 300-0070,
SERVICE TOOLS, for part numbers of general
4. Remove blanking caps and plugs and install all
service tools and adhesives required. These tools
lines to hydraulic tank (1) , as tagged at removal.
and adhesives are available from your dealer.
5. Fill hydraulic tank (1) to correct level with
hydraulic oil as specified in Section 300-0020,
LUBRICATION SYSTEM. Install filler cap (5).
* * * *
SM 1928 R1 08-03 7
BODY SYSTEM - Tandem Pump
Section 230-0050
SM - 373
* Shown on Fig. 6.
Fig. 1 - Cutaway View of Tandem Pump
DESCRIPTION OPERATION
Numbers in parentheses refer to Figs. 1 & 6. Numbers in parentheses refer to Figs. 1 & 6. Refer to
Fig. 2 for the operation of a typical gear type
The Tandem Pump can be identified as item 2 in hydraulic pump. Refer to Fig. 3 for hydraulic
Section 230-0000, BODY SYSTEM SCHEMATIC, in schematic of the tandem pump operation.
this manual.
As the drive gear rotates, the driven gear rotates in
The tandem gear pump, mounted off the engine the opposite direction. The pockets between the gear
power takeoff, supplies hydraulic oil for operating the teeth carry oil from the inlet port around the gear
body and cooling the rear disc brake assemblies. housing ID to the pump outlet port. As the gear teeth
re-mesh, this oil is forced out of the outlet port of the
This is a multiple gear type pump consisting of two gear housing. The maximum oil delivery rate of each
separate sections connected together as one section of the tandem pump is fixed by the width of
assembly. The front section consists of driveshaft & its respective gear set and the speed at which
gear (12), driven gear (13) and gear housing (15). driveshaft (12) is turned.
Drive gear (20), driven gear (21) and gear housing
(22) make up the rear section. Connecting shaft (17) The front section of the tandem pump draws oil from
connects the rear section to driveshaft and gear (12). the body and disc brake cooling tank, then pumps the
SM 1213 2-98 1
Body System - Tandem Pump
Section 230-0050
SM - 338 SM - 575
DRIVE GEAR TO BODY
TO BRAKE CONTROL VALVE
COOLING
CIRCUIT
INLET OUTLET
Fig. 2 - Typical Pump Operation Fig. 3 - Hydraulic Schematic of Tandem Pump Operation
WARNING
To prevent personal injury and property
damage, make sure blocking or lifting
equipment is of adequate capacity and
properly secured to do the job safely.
2 SM 1213 2-98
Body System - Tandem Pump
Section 230-0050
SM - 374
21 - Driven Gear
22 - Gear Housing
23 - End Cover
13 - Driven Gear 24 - Name Plate
14 - Seals 25 - Drive Screws
1 - Snap Ring 7 - Plug 15 - Gear Housing 26 - Washers
2 - Spacer 8 - Ring Seals 16 - Seals 27 - Studs
3 - Seal Retainer 9 - Bearings 17 - Connecting Shaft 28 - Nuts
4 - ‘O’ Ring 10 - Pocket Seals 18 - Bearing Carrier 29 - Pins (if used)
5 - Seal 11 - Thrust Plates 19 - Plug 30 - Seals (if used)
6 - Shaft End Cover 12 - Driveshaft & Gear 20 - Drive Gear 31 - Anti-Vibration Rings
SM 1213 2-98 3
Body System - Tandem Pump
Section 230-0050
3. Tap end cover (23) with a soft hammer and SM - 344
separate from gear housing (22). If end cover (23)
must be pried off, use care to avoid damaging
machined surfaces of the cover and housing. See
Fig. 7. If thrust plate (11) stays with gear housing
(22), it can be tapped out later. Do not damage or
distort the thrust plate.
SM - 341 SM - 346
SM - 342 SM - 347
4 SM 1213 2-98
Body System - Tandem Pump
Section 230-0050
SM - 348 8. Separate and lift off gear housing (15) with care.
See Fig. 12. Remove thrust plate (11) as in Step 4.
10. Pry thrust plate (11) from shaft end cover (6)
carefully to avoid distortion. See Fig. 14.
11. Clamp shaft end cover (6) in vice, mounting face up.
Fig. 13 - Removing Driveshaft Remove snap ring (1) with snap ring pliers. See Fig. 15.
12. Pull spacer (2) from shaft end cover (6) with a
SM - 349
bearing puller. See Fig. 16.
13. Remove seal retainer (3) and seal (5) from shaft
end cover (6). See Fig. 17. The seal retainer removal
tool shown in Fig. 37 can be easily made for this
purpose. Remove and discard 'O' ring (4).
14. Tap seal (5) from seal retainer (3). See Fig. 18.
The tool shown in Fig. 37 can be fashioned to
separate these parts.
Fig. 14 - Removing Thrust Plate 15. If necessary, remove bearings (9) and ring seals
(8) from shaft end cover (6), bearing carrier (18) and
SM - 350 SM - 352
SM - 351 SM - 353
SM 1213 2-98 5
Body System - Tandem Pump
Section 230-0050
Fig. 20 - Removing and Installing Seals Thrust plate side wear permits oil to bypass gears
and allows internal oil slippage and reduced pump
efficiency. Check thrust plate surface wear against
end cover (23). See Figs. 19 & 20.
the size of new thrust plates. If worn more than 0.05
mm (0.002 in), replace the thrust plates.
16. Remove and discard all seals (30), if used, and
pocket seals (10) from thrust plates (11), and seals
8. Bearings (9) should fit into their bores with a light
(14 & 16) from gear housings (15 & 22).
press fit. A tight hand fit is allowable. If the bearings
can fall out of their bores, the bores might be distorted
17. Remove plug (7) only if damaged.
or oversize. When gears are replaced, their bearings
must also be replaced.
18. Remove anti-vibration rings (31) from bearing
carrier (18) only if damaged.
9. Check driveshaft and gear (12) for wear or damage
to splines, and seal areas. Replace the driveshaft and
INSPECTION driven gear matched set if wear is detectable by touch
or measures in excess of 0.05 mm (0.002 in) at the
Numbers in parentheses refer to Figs. 1 & 6.
seal or drive areas. Excessive spline wear requires
driveshaft and matching gear replacement.
1. Clean all parts in suitable solvent and dry all but
bearings with compressed air.
SM - 356
6 SM 1213 2-98
Body System - Tandem Pump
Section 230-0050
ASSEMBLY
Numbers in parentheses refer to Figs. 1 & 6.
SM 1213 2-98 7
Body System - Tandem Pump
Section 230-0050
7. With shaft end cover (6) clamped in a soft-jawed SM - 362
vice, insert driveshaft and gear (12) into the shaft end
cover bore and push down until the gear is snug
against thrust plate (11). Install matched driven gear
(13) hub into its bearing (9) so that the three teeth
marked at 'Disassembly' will mesh. See Fig. 26.
8. Coat new seals (14 & 16) with grease and insert
them into their grooves in both sides of gear housings
(15 & 22). See Fig. 27.
9. Slide gear housing (15) over gears (12 & 13) and,
with match marks made at 'Disassembly' aligned, tap Fig. 27 - Installing Seals
gear housing (15) with a soft hammer until it rests
snugly against shaft end cover (6). See Fig. 28. If a SM - 363
new gear housing is used, make sure the large oil
port will be toward the inlet, and the small port toward
the outlet side of the pump assembly. Be sure seal
(14) is not pinched or dislodged. Coat gears (12 & 13)
with hydraulic fluid for initial lubrication when the
pump is started.
13. Slide gear housing (22) over gears (20 & 21) and,
Fig. 29 - Installing Bearing Carrier
with match marks made at 'Disassembly' aligned, tap
SM - 361 SM - 365
8 SM 1213 2-98
Body System - Tandem Pump
Section 230-0050
SM - 367
15. Insert eight studs (27) through the pump assembly
and thread into shaft end cover (6). Install washers
(26) and nuts (28). Tighten opposite nuts alternately
until snug. See Fig. 33. Rotate driveshaft (12) with a
150 mm (6 in) wrench and check carefully for pump
binding. If the pump rotates freely, torque tighten
alternate nuts (28) to 271 Nm (200 lbf ft). If the pump
binds, the cause should be determined and corrected
before completing the assembly. Check for burrs on
shafts, housings, bearings, etc., or similar causes.
18. Coat a new 'O' ring (4) with grease and install on
seal retainer (3). Oil a seal installation sleeve and
twist into the seal ID carefully. Slide the sleeve and
seal over driveshaft (12) and seat seal (5) and seal
retainer (3) assembly firmly in shaft end cover (6)
bore. Remove seal installation sleeve. See Fig. 35.
Fig. 33 - Installing Stud Nuts
19. Insert spacer (2) over driveshaft (12) and install
SM - 369 SM - 370
SM 1213 2-98 9
Body System - Tandem Pump
Section 230-0050
SM - 371 4. Fill body and disc brake cooling tank to the proper
level. Refer to Section 230-0040, BODY AND DISC
BRAKE COOLING TANK. Refer to Section 300-0020,
LUBRICATION SYSTEM, for correct oil
specifications.
into shaft end cover (6) against seal retainer (3). See 6. Check pump mounting and line connections for leaks.
Fig. 36.
20. Install snap ring (1) in shaft end cover (6) snap LUBRICATION
ring groove. All pump parts are lubricated by the hydraulic oil. The
oil, therefore, must be kept clean to minimize pump
wear. Whenever there is a hydraulic system failure,
INSTALLATION AND RUN-IN the oil should be drained, the entire system flushed,
Note: Tighten all fasteners to standard torques listed oil filters replaced, oil screens thoroughly cleaned
in Section 300-0080, STANDARD BOLT AND NUT and fresh hydraulic oil installed to eliminate all metal
TORQUE SPECIFICATIONS. particles or foreign matter.
Note: Tighten all hydraulic lines fitted with ORFS Refer to Section 300-0020, LUBRICATION SYSTEM,
connections, as described in Section 230-0000, for recommended periodic oil drain periods and oil
BODY SYSTEM SCHEMATIC. Renew all 'O' rings specifications.
where used.
SPECIAL TOOLS
WARNING The special tools shown in use in Figs. 17 & 18 can
To prevent personal injury and property be fabricated as shown in Fig. 37.
damage, make sure blocking or lifting
equipment is of adequate capacity and SM - 372
properly secured to do the job safely.
TORQUE
FIG. NO. ITEM NO. NAME Nm lbf ft
1&6 33
28 Nut 271 200
* * * *
10 SM 1213 2-98
BODY SYSTEM - Body Control Valve
Section 230-0060
SM - 2072
14 13
7 6
11 10 9 8 15
12
17
19 16
20
18 27
C
21
28
H
22
F
25
G 23 24
B A
J
D
5 4 2 3
E
1 26
The body control valve can be identified as item 3, and Integral of body control valve body (1) is a four
the OCDB manifold block as item 4, in Section position spool (2). The four positions of control spool
230-0000, BODY SYSTEM SCHEMATIC. (2) are; 'Raise', 'Hold', 'Float' and 'Lower' (power
down). Spool (2) is detented in the 'Hold' position and
Mounted off the left hand frame rail to the rear of the contains an inner and outer spring (9 & 10) which
horse collar, the body control valve is used to direct returns spool (2) from the 'Raise' to 'Hold' position. The
hydraulic oil to the body hoist cylinders for raising or control lever should be kept in the 'Float' position at all
lowering the body, and, depending on spool (2) times, except when raising or lowering the body.
position, is directed through the OCDB manifold block
to supplement the OCDB cooling oil. Movement of spool (2) is by hydraulic pressure from
the pilot accumulator valve connected to the body
Hydraulic oil is pumped to the body control valve by control joystick at the left hand side of the drivers' seat.
the main hydraulic pump mounted on the engine Refer to Section 230-0081, BODY CONTROL
power takeoff. JOYSTICK.
Port 'A' - Body cylinder 'Lower' circuit RAISE CIRCUIT LOWER CIRCUIT
Port 'B' - Body cylinder 'Raise' circuit TO HPCO &
Port 'C' - Inlet supply from main hydraulic pump MAN. BLOCK
A E B
Port 'D' - Return to tank
Port 'E' - Supply to OCDB manifold block
Port 'F' - Pressure relief valve assembly (12, Fig. 6)
Port 'G' - Check valve assembly
Port 'H' - Pressure relief valve (18)
Port 'J' - Plugged
D C F
TANK
Pressure Relief Valves SUPPLY
Numbers and letters in parentheses refer to Fig. 1. FROM PUMP
D C F
TANK
Oil forced out of the hoist cylinders as the body lowers,
SUPPLY enters control valve body (1) at port 'B', flows through
FROM PUMP the passage opened by spool (2) and exits at port 'D'
to the body and disc brake cooling tank. Make-up oil
flows around spool (2) and exits at port 'A' to replenish
Fig. 5 - Body Control Valve - 'Raise' Position oil in the hoist cylinders as the body lowers.
the 'Raise' ports on the body hoist cylinders. Body 'Lower' (Power Down) Position
Return oil from the body hoist cylinders enters control Numbers and letters in parentheses refer to Fig. 1.
valve body (1) at port 'A', via the manifold relief valve, Refer to Fig. 5 for hydraulic schematic of the body
flows through the passage opened by spool (2) and control valve operating in the 'Lower' position.
exits at port 'D' to the body and disc brake cooling
tank. Refer to Section 230-0110, MANIFOLD RELIEF Moving the hydraulic control joystick to the 'LOWER'
VALVE. position moves spool (2) position within valve body (1).
Hydraulic oil enters control valve body (1) at port 'C'.
Oil pressure opens poppet (22) and oil flows through
Body 'Hold' Position the passage opened by spool (2) and exits at port 'A'
Numbers and letters in parentheses refer to Fig. 1. to the manifold relief valve.
Refer to Fig. 3 for hydraulic schematic of the body
control valve operating in the 'Hold' position. Oil travels through the manifold relief valve, to the
'Lower' ports on the body hoist cylinders. Refer to
With the hydraulic control joystick and spool (2) in the Section 230-0110, MANIFOLD RELIEF VALVE.
'Hold' position, oil enters control valve body (1) at port
'C', flows through the valve and exits at port 'E' to the Return oil from the body hoist cylinders enters control
OCDB manifold block. The oil flow is directed through valve body at port 'B', flows through the passage
the OCDB manifold block to supplement the OCDB opened by spool (2) and exits at port 'D' to the body
cooling oil. and disc brake cooling tank.
Spool (2) blocks the flow of oil to and from the body REMOVAL
hoist cylinders, holding the cylinder pistons in place.
Numbers in parentheses refer to Fig. 6, unless
otherwise specified.
Body 'Float' Position
Numbers and letters in parentheses refer to Fig. 1.
Refer to Fig. 4 for hydraulic schematic of the body WARNING
control valve operating in the 'Float' position. Hydraulic fluid pressure will remain within the
system after engine shut down. Operate the
Note: The control joystick should be kept in the 'Float' body control joystick in both directions
position at all times, except when raising or lowering approximately 15 times to ensure the pressure
the body. has dissipated from the pilot supply valve
accumulator before carrying out any work on
Moving the hydraulic control joystick to the 'Float' the body control system or serious injury
could result.
SM - 2067
13 11 14,15,16 12
20
19
17
1
18
E
A
B
7,8 9,10
F
6,4,5 C
3,4,5 2
2. Operate steering left and right several times to 6. Support body control valve (1), mounting bracket
discharge the steering accumulator. Block all road (2), pressure relief valve (12) and manifold block (17)
wheels. assembly with a suitable lifting device and remove
nuts (4), bolts (3) and lockwashers (5). Remove
3. Remove drain plug from body and disc brake assembly from mounting bracket and move clear of
cooling tank and drain oil into a suitable container. the vehicle.
Reinstall drain plug in the tank and secure.
7. Remove nuts (4), lockwashers (5) and bolts (6)
4. Remove mounting bolts and guard (13) to gain securing body control valve (1) to mounting bracket
access to body control valve (1). Clean body control (2). Remove mounting bracket (2).
2 Check Valve
1. Carefully remove plug (16) and 'O' ring (20) from
8
port 'G' in valve body (1). Discard 'O' ring (20).
6
4
2. Remove spring (21) and poppet (22) from port 'G' in
valve body (1).
3
7
1 - Relief Valve Body Valve Spool
2 - Relief Cartridge
3 - 'O' Ring 6 - 'O' Ring 1. Carefully remove bolts (14) and end cap (13) from
4 - 'O' Ring 7 - Adjusting Screw valve body (1). If required, remove elbow from end cap
5 - Backup Ring 8 - Locknut
(13).
Fig. 7 - Exploded View of Pressure Relief Valve
2. Unscrew spool extension (12) and remove retainer
8. Remove bolts (20) and lockwashers (19) securing (11), outer spring (10) and inner spring (9) from valve
manifold block (17) to body control valve (1). Remove spool (2).
manifold block (17) from body control valve (1).
Discard 'O' ring (18) from manifold block (17). 3. Carefully remove inner and outer spring retainers
(8 &7) from valve spool (2).
9. Slacken elbow (11) and remove pressure relief
valve (12) from elbow (11). Remove bolts (9), washers 4. Carefully remove 'O' ring (6), retainer (5) and
(10) elbow (11) and adaptor flange (7) from body 'O' ring (4) from valve spool (2). Discard 'O' rings (4 & 6).
control valve (1). Remove and discard 'O' ring (8) from
adaptor flange (7). 5. Remove spool (2) and seal (3) from valve body (1).
Discard 'O' rings (4 & 6).
DISASSEMBLY 6. Remove bolts (26), end cap (25), seal (23) and 'O'
Numbers and letters in parentheses refer to Fig. 1. ring (24) from valve body (1). Discard 'O' ring (24). If
required, remove elbow from end cap (25).
WARNING
Valve Body
Spring loaded parts. Use care when removing
end cap, retainers and plugs to prevent sudden 1. If required, identify and remove adaptor blocks and
release of spring tension behind these parts. 'O' rings from ports 'D' and 'E' in valve body (1).
Personal injury or property damage could Discard 'O' rings.
result if care is not taken.
SM - 3509
2. Position pressure relief valve (12) to adaptor (11) pressure relief valve (12) and manifold block (17) and
and tighten adaptor (11) securely. Be sure pressure hydraulic lines for leaks. Correct as required. Check
relief valve (12) is correctly orientated. body control valve for correct operation in all four
positions.
3. Install new 'O' ring (18) in OCDB manifold block (17).
Secure OCDB manifold block (17) to port 'E' of body 11. Raise the body and secure in place with the body
control valve (1) with bolts (20) and lockwashers (19). safety pins. Install guard (13) over body control valve
(1). Remove body safety pins and all wheel blocks.
4. Position body control valve (1) assembly on
mounting bracket (2) and secure with bolts (6),
lockwashers (5) and nuts (4). MAINTENANCE
Numbers in parentheses refer to Fig. 1.
5. Using suitable lifting equipment, position body
control valve (1) and mounting bracket (2) assembly to Inspect the body control valve, manifold block,
mounting bracket on the chassis. pressure relief valve and hydraulic lines regularly for
any signs of leakage or damage. Limited repair of the
6. Secure mounting bracket (2) assembly to frame body control valve and pressure relief valve (18) is by
mounting bracket with bolts (3), lockwashers (5) and replacement of parts only. The manifold block should
nuts (4). Leave off bolt (3) which secures guard (13) to be replaced if damaged.
mounting bracket (2).
e. If pressure is too-high, a shim(1, Fig 8) should be d. Screw relief valve (12, Fig. 6) out until the pressure
removed from pressure relief valve (18, Fig. 1). starts to drop. Continue screwing relief valve (12, Fig.
6) out slightly until the pressure observed equals that
Note: Retain any shim removed in step 'e' for future recorded in "Relief Valve Pressure Check - Step C."
use if required.
e. Secure locking nut (8, Fig. 7) in place and operate
Checking and Adjusting Relief Valve body. Re-check relief valve pressure and adjust if
Relief valve (12, Fig. 6) pressure should be checked at required.
the interval specified in Section 300-0020,
LUBRICATION SYSTEM, as follows: f. Remove pressure gauge from diagnostic point
* * * *
SM - 1795
2
3
1
5
6
8
7
9
10
8
9
7 - Mounting Bracket
1 - Body Control Joystick 4 - Connector 8 - Screw
2 - Bolt 5 - Elbow 9 - Lockwasher
3 - Lockwasher 6 - Elbow 10 - Cover Plate
DESCRIPTION SM - 1798
OPERATION
The body control joystick controls the hydraulic valve 1 2
which operates the body hoist cylinders. The four
Fig. 2 - Body Control Joystick Schematic Symbol
SM 1597 12-98 1
Body System - Body Control Joystick
Section 230-0081
operating positions of the joystick from front to rear are 2. Operate the body control joystick (1) continuously to
as follows: discharge the pilot valve accumulator. Block all road
wheels.
'LOWER' - This position provides hydraulic force to
power-down the body. It is needed when the body
3. Remove screws (8) and lockwashers (9) securing
cannot be started downward from the fully raised
cover plate (10) to mounting bracket (7) on the
position by gravity. When the body starts lowering by
operator's seat. Remove cover plate (10).
gravity, the joystick should be moved to the 'FLOAT'
position.
4. Ensure all hydraulic lines connected to body control
'FLOAT' - The joystick should be moved to this joystick (1) are identified for ease of installation and, with
position while the body is lowering by gravity and suitable containers available to catch leakage, disconnect
should remain in this position until the body must be hydraulic lines. Fit blanking caps to all open lines.
operated again. The control joystick should always be
kept in 'FLOAT' while the machine is in motion. 5. Remove bolts (2) and lockwashers (3) securing
'HOLD' - Moving the joystick to this position while the body control joystick (1) to mounting bracket (7).
body is being raised or lowered traps the oil in the Remove body control joystick (1).
body hoists to stop and hold the body at any desired
height. The joystick will remain in the detented 'HOLD' 6. Note location of elbows (5 & 6) and connector (4)
position when released. and remove from body control joystick (1) for use on
the new joystick.
'RAISE' - This position directs oil to extend the body
hoists and raise the body. When released, the joystick 7. Install elbows (5 & 6) and connector (4) in new body
will be spring-returned to the 'HOLD' position. control joystick (1) ports as removed from the old joystick.
REMOVAL AND INSTALLATION 8. Secure body control joystick (1) to mounting bracket
Numbers in parentheses refer to Fig. 1. (7) on the operator's seat with bolts (2) and
lockwashers (3).
Note: Tighten all fasteners to standard torques listed
in Section 300-0080, STANDARD BOLT AND NUT 9. Remove blanking caps from hydraulic lines and
TORQUE SPECIFICATIONS. install lines to body control joystick (1) as identified
during removal.
Note: Tighten all hydraulic lines fitted with ORFS
connections, as described in Section 230-0000, BODY 10. Check oil level in the body and disc brake cooling
SYSTEM SCHEMATIC. Renew all 'O' rings where used. tank and add oil if required. Refer to Section 230-0040,
BODY AND DISC BRAKE COOLING TANK for correct
fill level, and, Section 300-0020, LUBRICATION
WARNINGS SYSTEM for oil specification.
Hydraulic fluid pressure will remain within the
system after engine shut down. Operate the 11. Remove wheel blocks, start the engine and bring
body control joystick in both directions hydraulic oil to operating temperature. Operate body
approximately 15 times to ensure the pressure control joystick (1) and check hydraulic line
has dissipated from the pilot supply valve connections for leaks and tighten as required.
accumulator before carrying out any work on
the body control system or serious injury MAINTENANCE
could result. Limited repair of the body control joystick is by
replacement of parts only. Refer to vehicle Parts Book
To prevent personal injury and property for part numbers of kits.
damage, be sure wheel blocks are properly
secured and of adequate capacity to do the job SPECIAL TOOLS
safely.
There are no special tools required for procedures
1. Position the vehicle in a level work area, be sure the outlined in this section. Refer to Section 300-0020,
body is fully lowered, apply the parking brake and SERVICE TOOLS, for part numbers of general service
switch off the engine. tools required. These tools are available from your
dealer.
* * * *
2 SM 1597 12-98
BODY SYSTEM - Manifold Relief Valve
Section 230-0110
SM - 586
7 - Seals
1 - Manifold Body 3 - Relief Cartridge 5 - 'O' Ring 8 - Connector
2 - Check Cartridge 4 - Plug 6 - Seals 9 - Cap
DESCRIPTION SM 2781
SM 1645 R1 08-03 1
Body System - Manifold Relief Valve
Section 230-0110
Refer to Fig. 3. When the body control valve is used SM2782
to lower the body, oil enters the manifold relief valve
at port 'V'. Oil pressure opens check cartridge (2) to
port 'C' allowing oil to exit the manifold relief valve to 5 5
supply the lower ports on the body hoist cylinders.
Ports 'B' and 'G' are plugged with plugs (4) and
'O' rings (5). Connector (8) and cap (9) are installed
in port 'S' to provide a pressure check point.
6
TEST E
FROM BODY
REMOVAL CONTROL VALVE
Numbers in parentheses refer to Fig. 4.
2 SM 1645 R1 08-03
Body System - Manifold Relief Valve
Section 230-0110
4. Dry both cartridges with compressed air. 2. Align manifold relief valve (4) with bracket (5) and
secure with bolts (3), washers (2) and nuts (1).
5. Examine cartridge seals (6 & 7) for signs of wear
or damage and replace if necessary. 3. Remove blanking caps and plugs and connect all
hydraulic lines to manifold relief valve (4) ports, as
Note: If cartridges (2 & 3) are damaged in any form tagged at removal.
they must be replaced with a new cartridge.
4. Start the engine, remove body safety pins and
operate the body to check manifold relief valve (4)
ASSEMBLY and hydraulic lines for leaks. Switch off the engine.
Numbers in parentheses refer to Fig. 1.
5. Remove cap (9, Fig. 1) and install a 0 - 207 bar
Note: Tighten all fasteners without special torques (0 - 3 000 lbf/in²) pressure gauge on connector
specified to torques listed in Section 300-0080, (8, Fig. 1).
STANDARD BOLT AND NUT TORQUE
SPECIFICATIONS. 6. Start the engine and check manifold relief valve (4)
relief pressure is 90 bar (1 300 lbf/in²), at maximum
1. If removed, install connector (8) and cap (9) in rev/min and with body cylinder extending through
manifold body (1). second stage. If manifold relief valve (4) relief
pressure is not as above, it can be adjusted as
2. Install new 'O' rings (5) on plugs (4) and install follows:
plugs (4) in manifold body (1).
Note: Relief valve cartridge (3, Fig. 1) is factory
3. Install relief cartridge (3) in manifold body (1) and set at 90 bar (1 300 lbf/in²) and sealed.
torque tighten relief cartridge (3) to 60 - 65 Nm
(45 - 50 lbf ft). a. Break seal around relief cartridge (3, Fig. 1) and
unscrew the cap.
4. Install check cartridge (2) in manifold body (1) and
torque tighten check cartridge (2) to 60 - 65 Nm b. Slacken the lock nut on relief valve cartridge
(45 - 50 lbf ft). (3, Fig. 1) and adjust screw in, or out, until the
correct pressure reading is showing on the
SM 1645 R1 08-03 3
Body System - Manifold Relief Valve
Section 230-0110
pressure gauge. Tighten the lock nut and re-check of parts only.
the pressure setting. Install the cap on relief valve
cartridge (3, Fig. 1). When carrying out pressure checks on the machine,
follow the procedure described in 'Installation'. Refer
7. Switch off the engine, remove the pressure gauge to Section 300-0020, LUBRICATION SYSTEM, for
from connector (8, Fig. 1) and install cap (9, Fig. 1) recommended pressure check intervals.
on the connector.
* * * *
4 SM 1645 R1 08-03
BODY SYSTEM - Pilot Supply Valve
Section 230-0121
SM - 1799
13 2 4,5 3
12
11
PV
6,7,8
TO MANIFOLD
BRACKET IN
T P2
CAB FLOOR 9
10
1
TO STEERING TO MANIFOLD
TANK BRAKE VALVE
9 - Elbow - 90°
1 - Valve Body 5 - Seal 10 - Tee Piece
2 - Accumulator 6 - Bolt 11 - Diagnostic Fitting
3 - Mounting Bracket 7 - Lockwasher 12 - Cap
4 - Plug 8 - Washer 13 - Elbow - 45°
DESCRIPTION SM - 2779
SM 1599 R1 08-03 1
Body System - Pilot Supply Valve
Section 230-0121
The pilot supply valve is a non-serviceable item and 4. Remove bolts (6), lockwashers (7), washers (8) and
should be replaced completely, if damaged, as follows: pilot supply valve (1) from mounting bracket (3).
Note: Tighten all fasteners to standard torques listed in 5. Note location of elbows (9 & 13) and tee piece (10)
Section 300-0080, STANDARD BOLT AND NUT and remove from pilot supply valve (1) for use on the
TORQUE SPECIFICATIONS. new valve. If necessary, disconnect diagnostic fitting
(11) and cap (12) from elbow (13).
Note: Tighten all hydraulic lines fitted with ORFS
connections, as described in Section 230-0000, BODY 6. Install elbows (9 & 13) and tee piece (10) in new pilot
SYSTEM SCHEMATIC. Renew all 'O' rings where supply valve (1) ports as removed from the old valve. If
used. necessary, install diagnostic fitting (11) and cap (12) to
elbow (13).
* * * *
2 SM 1599 R1 08-03
BODY SYSTEM - Body Cylinder
Section 230-0130
SM - 2462
BODY 4
3
2
1
FRAME
TORQUE
TUBE
6 5
6
1 6
2 5
3 1 - Pins
4 2 - Washer
6
3 - Lockwasher
4 - Bolt
5 - Cylinder
6 - Lube Fitting
Fig. 1 - Exploded View of Body Cylinder Mounting
DESCRIPTION
Numbers in parentheses refer to Fig. 1, unless WARNING
otherwise specified. Hydraulic fluid pressure will remain within the
system after engine shut down. Operate the
The body cylinders can be identified as item 5 in body control joystick in both directions
Section 230-0000, BODY SYSTEM SCHEMATIC. approximately 15 times to ensure the pressure
has dissipated from the pilot supply valve
There are two body hoist cylinders mounted between accumulator before carrying out any work on
the frame rails. Cylinder base ends (3, Fig. 2) are the body control system or serious injury
connected to the body and retractable ends (26, Fig. 2) could result.
are connected to the frame. The cylinders are two-
stage with power down in the second stage. Cylinder 1. Position the vehicle in a level work area, raise the
mounting is by pins (1) secured by washers (2), body and install body prop pins at rear of unit. Apply
lockwashers (3) and bolts (4). the parking brake and switch off the engine.
SM 1930 7-00 1
Body System - Body Cylinder
Section 230-0130
SM - 2463
25
26
18 15
24
22 10 23
21
20 9
8
17
16
14
19
27
15
12
11 28
13
29
30
7
31
6 28
2 5 29
4 32
3 33 25
1 34
1 - Bolt 10 - Wiper
2 - Bushing 11 - Wear Ring 19 - Tube 27 - Elbow - 45°
3 - Base 12 - Piston Ring 20 - Seal 28 - Bolt
4 - Backup Ring 13 - Tube 21 - Wear Ring 29 - Lockwasher
5 - 'O' Ring 14 - Set Screw 22 - Wiper 30 - P-clip
6 - Wear Ring 15 - Seal 23 - 'O' Ring 31 - Hose Assembly
7 - Tube 16 - Tube 24 - Backup Ring 32 - P-clip
8 - Seal 17 - Bushing 25 - Fitting 33 - Coupling
9 - Wear Ring 18 - Nut 26 - End 34 - Lube Fitting
7. Remove cylinder to a clean area for 'Disassembly'. 1. Remove bolts (1) and nuts (18) securing base (3) to
cylinder tube (19). Remove base (3).
2 SM 1930 7-00
Body System - Body Cylinder
Section 230-0130
2. Remove and discard backup ring (4) and 'O' ring (5) 7. Replace all seals, 'O' rings and wipers.
from base (3).
8. Push tube (13) from outer tube (19) and remove. 2. Install seal (20), wear ring (21) and wiper (22) into
Remove wear ring (11) and piston rings (12) from tube tube (19).
(13). Discard piston rings (12).
3. Replace seals (15) on tube (16) and place tube in
9. Remove tube (16) from tube (13). Remove and tube (13).
discard seals (15) from tube (16).
4. Place wear ring (11) and new piston rings (12) on
10. Remove and discard seal (20), wear ring (21) and tube (13), and install in tube (19).
wiper (22) from tube (19).
5. Install seals (8), wear ring (9) and wiper (10) in tube (7).
11. Press bushings (2 & 17) from base (3) and end
(26), respectively, if bushings show signs of excessive 6. Install wear ring (6) on tube (7) and place inner tube
wear. (7) in outer tube (19).
12. Remove grease fitting (25) from end (26), if damaged. 7. Place backup ring (24) and 'O' ring (23) on end (26).
2. Blow out the passages in the tubes and piston rod 10. Replace 'O' ring (5) and backup ring (4) on base (3).
with compressed air to remove any foreign material.
11. Align base (3) and tube (19) as shown in Fig. 3.
3. Inspect the tubes, for broken welds or deep
grooves. Shine a light through components to inspect SM - 181
for damage.
SM 1930 7-00 3
Body System - Body Cylinder
Section 230-0130
12. Secure base (3) to tube (19) with bolts (1) and 4. Check oil level in the body and disc brake cooling
nuts (18). Tighten bolts (1) to a torque of 156 - 176 Nm tank and add oil if required. Refer to Section 230-0040,
(115 - 130 lbf ft) lubed. BODY AND DISC BRAKE COOLING TANK for correct
fill level, and, Section 300-0020, LUBRICATION
SYSTEM for oil specification.
INSTALLATION
Numbers in parentheses refer to Fig. 1. 5. Start the engine and bring hydraulic oil to operating
temperature. Extend cylinder until top mounting hole is
Note: Tighten all fasteners to torques listed in aligned. Coat pin (1) shaft with anti-seize compound
Section 300-0080, STANDARD BOLT AND NUT and install in top mounting bore. Secure pin (1) in
TORQUE SPECIFICATIONS. place with washer (2), lockwasher (3) and bolt (4).
Note: Tighten all hydraulic lines fitted with ORFS 6. Lubricate pins at lube fittings (6) with lubricant as
connections, as described in Section 230-0000, BODY specified in Section 300-0020, LUBRICATION
SYSTEM SCHEMATIC. Renew all 'O' rings where SYSTEM. Check hydraulic oil tank level. Refer to
used. Section 230-0040, BODY AND DISC BRAKE
COOLING TANK.
* * * *
4 SM 1930 7-00
BRAKING SYSTEM - Braking System Schematic
Section 250-0000
Monoblock Brake Valve (8) separate retarder selection switch on the dash panel.
Refer to Section 250-0100, MONOBLOCK BRAKE Pressing the switch at the top will select the OCDB
VALVE. retarder and pressing the bottom will select the
transmission retarder.
Mounted off the left hand frame rail, the monoblock
brake valve incorporates three valves; a pressure Note: The transmission retarder circuit is made up of
reducing valve, pressure relief valve and a shuttle valve. Directional Control Valve (11) and Transmission
Retarder Cylinder (12).
The pressure reducing valve reduces the available
hydraulic oil pressure from the rear brake accumulator
to a pressure of 83 bar (1 200 lbf/in2). Retarder Light Pressure Switch (18)
The retarder light pressure switch is a normally open
The pressure relief valve regulates pressure, after (NO) switch. As retarder pressure increases to 2.7 bar
pressure the reducing valve, to provide a residual (39 lbf/in²) and above, the circuit should close and
pressure of 3.1 ± 0.35 bar (45 ± 5 lbf/in2) in the rear send a signal to illuminate the retarder indicator light in
brake lines. A filter system, comprising of a disc filter the dash panel, and the retarder light at the rear of the
and a conical filter, helps protect an orifice plate at truck. As pressure drops below 2.7 bar (39 lbf/in²) the
the pressure relief valve. circuit should open and the retarder lights should go
out.
The shuttle valve, depending on spool position,
provides a residual pressure of 3.1 ± 0.35 bar
(45 ± 5 lbf/in2) in the rear brake lines, or, upon Pressure Reducing Valve (19)
actuation of the treadle or retarder valve, the brake Refer to Section 250-0110, PRESSURE REDUCING
actuation pressure overcomes the residual pressure VALVE.
to give a brake application at the rear brake packs.
Mounted on the inside of the left hand frame rail in
front of the body guide, the pressure reducing valve is
Directional Control Valve (9) located in the hydraulic brake circuit between the
Refer to Section 250-0090, DIRECTIONAL treadle valve and the front brake callipers.
CONTROL VALVE.
The pressure reducing valve, on application of the
The directional control valve is located in the 'Px' 50% brake reduction switch, mounted on the dash
hydraulic circuit between the brake manifold valve and panel in the cab, allows the operator to limit the
the treadle valve. The 'Px' circuit hydraulically actuates braking pressure to 50% at the front brakes.
the treadle valve when the park/emergency control
switch is activated. The directional control valve also
controls automatic service brake, applied pressure Pressure Test Points
bleed down, with engine shutdown. There are four diagnostic pressure test points in the
braking system, as shown in Figs. 2 through 7.
Retarder Control Valve (10) Note: When checking hydraulic pressures the vehicle
Refer to Section 250-0130, RETARDER CONTROL should be positioned on a level surface and all road
VALVE. wheels securely blocked.
Pressure should be 11.7 - 12.7 bar (170 - 180 lbf/in2) c. Where a hose is fitted, ensure that it is not twisted or
with the engine operating at 1 500 rev/min, output kinked when the nuts are tightened so that it is allowed
stalled, in all ranges and lockup. to adopt a natural position.
Pressure reading should be 110 bar (1 600 lbf/in2) with f. Check that a satisfactory hose or tube routing has
the engine running and the treadle valve applied. been achieved.
Test Point D
This test point is used to record the Rear Service RELIEVING PRESSURE
Brake Pressure, Residual Brake Pressure and the
Retarder Pressure - Taken from port 'TP2' on the
monoblock brake valve, these pressures can be WARNINGS
checked at diagnostic test point (front) mounted off The braking system is equipped with
rear mounting bracket for the body and disc brake accumulators which maintain pressure in the
cooling tank. Pressure readings should be as follows: system even after engine shutdown. Operate
the treadle valve continuously until the
Rear Service Brakes Pressure - 52 bar (750 lbf/in2), pressure has dissipated before carrying out
with the engine running and treadle valve applied. any work on the braking system or serious
injury could result.
Residual Brake Pressure - 3.1 ± 0.35 bar
(45 ± 5 lbf/in2), with the engine running and both the To prevent personal injury and property
service brakes and the parking brakes released. damage, be sure wheel blocks are properly
secured and of adequate capacity to do the job
Retarder Pressure - 33 bar (480 lbf/in2), with the safely.
engine running and the retarder control lever fully applied.
1. Position the vehicle in a level work area, apply the
parking brake and switch off the engine.
'O' RING FACE SEALS (ORFS)
Where hydraulic lines are fitted with ORFS 2. Operate the treadle valve continuously to discharge
connections, the following procedure should be carried the brake accumulators (pressure in accumulator
out during installation. Refer to Fig. 1. hydraulic lines should be 0 bar (0 lbf/in2)). Block all
road wheels.
SM - 1335
FITTING NUT 3. Carefully loosen brake pipes at base of both the
front and rear accumulators to check that all pressure
TUBE
has been released. Tighten brake pipes.
SERVICE TOOLS
It is recommended that the following tools are used Non-contact Infrared Thermometer
when carrying out pressure or temperature checks The infrared thermometer can be used to spot heat
during maintenance procedures. These tools, along problems early in electrical, mechanical and hydraulic
with other general service tools, are available from systems. Hand held and easy to use, you simply aim, pull
your dealer. Refer to Section 300-0070, SERVICE the trigger, and read the temperature. Since there
TOOLS, for part numbers of these tools. is no need to touch what you are measuring,
temperatures of hard-to-reach or moving components
can be taken without getting burned or shocked.
Section 250-0000
Braking System - Braking System Schematic
SM - 2296A
7 7 C OUTLET
COMPONENTS 19
1 - Steering Pump
TEST
2 - Accumulators
3 - Brake Manifold Valve
4 - Treadle Valve REF.
5 - Front Brake Callipers BODY
6 - Shuttle Valve HOIST
7 - Oil Cooled Disc Brakes CIRCUIT
RB2 RB1
8 - Monoblock Brake Valve TP2 INLET TANK
8
9 - Directional Control Valve D
10 - Retarder Control Valve
FB
11 - Directional Control Valve
9 B A
12 - Transmission Retarder Cylinder B
TP1 4
13 - Stop Light Pressure Switch 5
b
14 - Rear Brake Accumulator PX
A a
Pressure Switch
15 - Front Brake Accumulator T
Pressure Switch T P
16 - Parking Brake Pressure Switch
17 - Lockup Drop Out Pressure P1 P2
Switch 16 A
B1 B2 P1 P2
18 - Retarder Light Pressure Switch 1
2 2
*19 - Pressure Reducing Valve 3 6
13 17 12
* - Optional Components
7 7 C OUTLET
19
COMPONENTS
1 - Steering Pump TEST
2 - Accumulators
3 - Brake Manifold Valve REF.
4 - Treadle Valve BODY
5 - Front Brake Callipers HOIST
6 - Shuttle Valve CIRCUIT
7 - Oil Cooled Disc Brakes RB2 RB1
8 TP2 INLET TANK
8 - Monoblock Brake Valve D
9 - Directional Control Valve
10 - Retarder Control Valve FB
11 - Directional Control Valve 9 B A
B
12 - Transmission Retarder Cylinder TP1 4 5
13 - Stop Light Pressure Switch b
PX
14 - Rear Brake Accumulator A a
* - Optional Components
A P1
PRESSURE TEST POINTS
A - Park Brake Pressure B T
B - Transmission Pressure 18
C - Front Service Brake Pressure 10 11 A B
D - Rear Service Brake Pressure,
Residual Brake Pressure and
T REG
Retarder Pressure. P
PY P T
COLOUR CODES P
ACC1
Red - Pressurized Oil
Blue - Exhaust or Return Oil ACC2
Green - Intake Oil PS1 PS2
Section 250-0000
Orange - Pilot Pressure
Yellow - Static Oil 15 14
Section 250-0000
Braking System - Braking System Schematic
SM - 2296C
COMPONENTS 7 7 C OUTLET
19
1 - Steering Pump
2 - Accumulators TEST
3 - Brake Manifold Valve
4 - Treadle Valve
REF.
5 - Front Brake Callipers
BODY
6 - Shuttle Valve HOIST
7 - Oil Cooled Disc Brakes CIRCUIT
8 - Monoblock Brake Valve RB2 RB1
TP2 INLET TANK
9 - Directional Control Valve 8
D
10 - Retarder Control Valve
11 - Directional Control Valve FB
12 - Transmission Retarder Cylinder 9 B A
B
13 - Stop Light Pressure Switch TP1 4 5
14 - Rear Brake Accumulator b
PX
Pressure Switch A a
15 - Front Brake Accumulator
Pressure Switch T
16 - Parking Brake Pressure Switch T P
17 - Lockup Drop Out Pressure P1 P2
Switch
16 A
18 - Retarder Light Pressure Switch B1 B2 P1 P2
1
*19 - Pressure Reducing Valve 2 2
3 13 17 6
12
* - Optional Components
15 14
7 7 C OUTLET
COMPONENTS 19
1 - Steering Pump
2 - Accumulators TEST
3 - Brake Manifold Valve
4 - Treadle Valve
REF.
5 - Front Brake Callipers BODY
6 - Shuttle Valve HOIST
7 - Oil Cooled Disc Brakes CIRCUIT
8 - Monoblock Brake Valve RB2 RB1
8 TP2 INLET TANK
9 - Directional Control Valve D
10 - Retarder Control Valve
11 - Directional Control Valve FB
12 - Transmission Retarder Cylinder 9 B A
B
13 - Stop Light Pressure Switch TP1 4 5
14 - Rear Brake Accumulator b
PX
Pressure Switch A a
15 - Front Brake Accumulator
Section 250-0000
15 14
Section 250-0000
Braking System - Braking System Schematic
SM - 2296E
7 7 C OUTLET
COMPONENTS 19
1 - Steering Pump
2 - Accumulators TEST
3 - Brake Manifold Valve
4 - Treadle Valve REF.
5 - Front Brake Callipers BODY
6 - Shuttle Valve HOIST
7 - Oil Cooled Disc Brakes CIRCUIT
8 - Monoblock Brake Valve RB2 RB1
8 TP2 INLET TANK
9 - Directional Control Valve D
10 - Retarder Control Valve
11 - Directional Control Valve FB
12 - Transmission Retarder Cylinder 9 B A
B
13 - Stop Light Pressure Switch TP1 4 5
14 - Rear Brake Accumulator b
PX
Pressure Switch A a
15 - Front Brake Accumulator
T
Pressure Switch
T P
16 - Parking Brake Pressure Switch
17 - Lockup Drop Out Pressure P1 P2
Switch 16 A
18 - Retarder Light Pressure Switch B1 B2 P1 P2
1
*19 - Pressure Reducing Valve 2 2
3 13 17 6
12
* - Optional Components
15 14
COMPONENTS 7 7 C OUTLET
1 - Steering Pump 19
2 - Accumulators
TEST
3 - Brake Manifold Valve
4 - Treadle Valve
5 - Front Brake Callipers REF.
6 - Shuttle Valve BODY
HOIST
7 - Oil Cooled Disc Brakes
CIRCUIT
8 - Monoblock Brake Valve RB2 RB1
9 - Directional Control Valve 8 TP2 INLET TANK
D
10 - Retarder Control Valve
11 - Directional Control Valve FB
12 - Transmission Retarder Cylinder 9 B A
13 - Stop Light Pressure Switch B
TP1 4 5
14 - Rear Brake Accumulator b
PX
Pressure Switch A a
16 A
18 - Retarder Light Pressure Switch B1 B2 P1 P2
1
*19 - Pressure Reducing Valve 2 2
*
3 13 17 6
12
*
* - Optional Components
Section 250-0000
Yellow - Static Oil
15 14
6 PY ACC1
P ACC2
7 5,18
PS1 P2
P1
8 1
PS2
9 T PS3
A 20
P
10
B
16
14
12
11
2
17
15 3
19
13
DESCRIPTION Hydraulic oil from the steering pump enters the brake
The brake manifold valve can be identified as item 3 in manifold valve at port 'P'. Oil pressure moves check
Section 250-0000, BRAKING SYSTEM SCHEMATIC. balls (9) from their seats (10) and allows oil to flow
through port 'ACC1' to the front brake accumulator
Mounted off the cab mounting crossmember, the and through port 'ACC2' to the rear brake accumulator.
brake manifold valve distributes hydraulic oil flow from
the steering pump, to the treadle valve, front and rear Pressurised oil exits the brake manifold valve through
brake circuit accumulators and parking brake at the port 'PY' and flows to port 'P1' on the treadle valve,
rear wheels. The valve also provides appropriate and, through port 'P1' on the brake manifold valve to
returns to the steering and brake control tank for the port 'P2' on the treadle valve.
hydraulic oil.
Solenoid Cartridge - De-energized
When the park/emergency brake switch is activated
OPERATION (pushed in), the electrical signal between the switch
Numbers in parentheses refer to Fig. 1. Refer to Figs. and solenoid coil (3) is opened, de-energizing solenoid
2 and 3 for hydraulic schematics. cartridge (2). Oil flows through solenoid cartridge (2)
and exits the brake manifold valve through port 'A' to
SM 2040 R1 07-03 1
Braking System - Brake Manifold Valve
Section 250-0050
SM - 1660
16
PS3 3
TO DIRECTIONAL
A P1 TO PORT 'P2'
CONTROL VALVE
TREADLE VALVE
FROM MONOBLOCK
BRAKE VALVE B T
FROM
STEERING PUMP P
PY
TO PORT 'P1' TREADLE VALVE
ACC1
TO FRONT ACCUMULATOR
TO REAR ACCUMULATOR
ACC2
PS1 PS2
15 14
the directional control valve. The oil travels through the Pressure Switches
directional control valve and into the 'Px' port in the The normally closed (NC) pressure switch (19), located
treadle valve for an emergency brake application. in port 'PS1', senses the pressure in the front brake
accumulator, and sends a signal to a warning light on
Return oil from the parking brake circuit flows through the dash panel when pressure drops below 125 bar
the monoblock brake valve and enters the brake (1 812 lbf/in²). The normally closed (NC) pressure
manifold valve at port 'B'. The oil flows through switch (19), located in port 'PS2', senses the pressure
solenoid cartridge (2) and exits the brake manifold in the rear brake accumulator. The pressure switch
valve at port 'T' to the steering and brake control tank. sends a signal to a warning light on the dash panel
With no pressure in the parking brake circuit to hold when pressure drops below 82 bar (1 205 lbf/in²).
the parking brake off, the parking brake is applied.
The normally closed (NC) pressure switch (20), located
Solenoid Cartridge - Energized in port 'PS3', senses pressure in the parking brake line,
When the park/emergency brake switch is deactivated and sends a signal to a warning light on the dash panel
(pulled out), the electrical signal between the switch when pressure drops below 65 bar (940 lbf/in²).
and solenoid coil (3) is closed, energizing solenoid
cartridge (2). Oil flows through solenoid cartridge (2)
and exits the brake manifold valve at port 'B' to the REMOVAL
monoblock brake valve. The oil flows through the Numbers in parentheses refer to Fig. 1.
pressure reducing valve in the monoblock brake valve
and exits the valve to release the parking brakes.
Refer to Section 250-0100, MONOBLOCK BRAKE WARNING
VALVE. Hydraulic fluid pressure will remain within the
system after engine shut down. Operate the
Return oil from the 'Px' port on the treadle valve flows treadle valve continuously until the pressure
through the directional control valve and into the brake has dissipated before carrying out any work on
manifold valve at port 'A'. The oil travels through the braking system or serious injury could
solenoid cartridge (2) and exits the brake manifold result.
valve at port 'T' to the steering and brake control tank.
2 SM 2040 R1 07-03
Braking System - Brake Manifold Valve
Section 250-0050
SM - 1661
16
PS3 3
FROM DIRECTIONAL A P1
CONTROL VALVE TO PORT 'P2'
TREADLE VALVE
TO MONOBLOCK
B T
BRAKE VALVE
FROM
P
STEERING PUMP
PY
TO PORT 'P1' TREADLE VALVE
ACC1
TO FRONT ACCUMULATOR
TO REAR ACCUMULATOR
ACC2
PS1 PS2
15 14
DISASSEMBLY
WARNING Numbers in parentheses refer to Fig. 1.
To prevent personal injury and property
damage, be sure wheel blocks are properly 1. Clamp valve body (1) lightly in a soft jawed vice,
secured and of adequate capacity to do the job retainers (6) face up. Do not overtighten jaws. Remove
safely. retainers (6) from valve body (1) and discard 'O' rings (7).
1. Position the vehicle in a level work area, apply the 2. Remove plug (5) from valve body (1) and discard 'O'
parking brake and switch off the engine. ring (18).
2. Operate the treadle valve continuously to discharge 3. Carefully remove valve body (1) assembly from the
the brake accumulators. Block all road wheels. vice and remove springs (8) and check balls (9) from
valve body (1).
3. Remove and tag electrical connections to solenoid
coil (3) and pressure switches (19 & 20). 4. If required, clamp valve body (1) lightly in soft jawed
vice and remove check ball seats (10).
4. Clean brake manifold valve assembly and
surrounding area with a suitable solvent. Ensure all 5. Rotate valve body (1) in vice until solenoid coil (3) is
hydraulic lines connected to the brake manifold valve facing up. Lightly clamp valve body (1) in vice and
are identified for ease of installation and, with suitable remove locknut (4) and solenoid coil (3) from solenoid
containers available to catch leakage, disconnect cartridge (2).
hydraulic lines. Fit blanking caps to all open lines.
6. Remove solenoid cartridge (2) assembly from valve
5. Release and remove mounting hardware securing body (1) and discard 'O' rings (11, 12, 14 & 16) and
brake manifold valve to the cab mounting backup rings (13, 15 & 17).
crossmember and remove assembly from the truck.
7. Mark valve body (1) port identification on each of
SM 2040 R1 07-03 3
Braking System - Brake Manifold Valve
Section 250-0050
the pressure switches (19 & 20) and remove from valve SM - 1508
body (1).
6
Note: It is important that the pressure switches are
clearly identified as the pressure settings between
pressure switches (19) and pressure switch (20) are 7
9
different.
8 10
8. If required, note orientation and remove hydraulic
line connectors from ports in valve body (1).
ASSEMBLY
6 - Retainer
Numbers in parentheses refer to Fig. 1. 7 - 'O' Ring 9 - Check Ball
8 - Spring 10 - Seat
1. Install new 'O' rings (11, 12, 14 & 16) and backup
Fig. 4 - Section Through Check Ball Assembly
rings (13, 15 & 17) on solenoid cartridge (2) as shown
in Fig. 1.
where used.
2. Install solenoid cartridge (2) assembly in valve body
(1) and tighten securely. Install solenoid coil (3) on 1. Position brake manifold valve assembly to the cab
solenoid cartridge (2) and secure with locknut (4). mounting crossmember and secure with mounting
hardware.
3. Rotate valve body (1) in vice until retainer (6) face is
up. Install new 'O' ring (18) on plug (5) and install plug 2. Remove blanking caps from hydraulic lines and
(5) assembly in valve body (1). connect to brake manifold valve as noted during
removal.
4. If removed, apply Loctite 603 to threads of seats
(10) and install seats (10) in valve body (1). Tighten 3. Connect electrical connections to solenoid coil (3)
seats (10) to a torque of 20 Nm (15 lbf ft). See Fig. 4. and pressure switches (19 & 20) as noted during
removal.
5. Install one check ball (9) on seat (10) and spring (8)
on check ball (9). Install new 'O' ring (7) on retainer (6) 4. Check oil level in the steering and brake control
and carefully place retainer (6) assembly over spring tank and add oil if required. Refer to Section
(8) in valve body (1). Tighten retainer (6) securely in 220-0040, STEERING AND BRAKE CONTROL TANK
valve body (1). See Fig. 4. for correct fill level, and, Section 300-0020,
LUBRICATION SYSTEM for oil specification.
6. Repeat step 5 for second check ball, spring and
retainer assembly. 5. Remove wheel blocks, start the engine and bring
hydraulic oil to operating temperature.
7. Install pressure switches (19 & 20) in valve body (1)
as noted during disassembly. 6. Check brake manifold valve and hydraulic line
connections for leaks and tighten as required.
8. If removed, install hydraulic line connectors in valve
body (1) as noted during disassembly. 7. Shut off engine and make sure a full service brake
application is made followed by a parking brake
application.
INSTALLATION
Note: Tighten all fasteners to torques listed in 8. Repeat all braking and engine shut down cycles
Section 300-0080, STANDARD BOLT AND NUT several times and check for appropriate application/
TORQUE SPECIFICATIONS. release cycle several times.
Note: Tighten all hydraulic lines fitted with ORFS 9. Check all connections again for leaks and tighten as
connections, as described in Section 250-0000, required.
BRAKING SYSTEM SCHEMATIC. Renew all 'O' rings
4 SM 2040 R1 07-03
Braking System - Brake Manifold Valve
Section 250-0050
10. Remove body safety pins and lower the body to the replacement of parts only.
frame.
SPECIAL TOOLS
MAINTENANCE There are no special tools required for procedures
Inspect the brake manifold valve regularly for any signs outlined in this section. Refer to Section 300-0070,
of leakage or damage and repair/replace as required. SERVICE TOOLS, for part numbers of general service
tools and adhesives required. These tools, and
Note: Limited repair of the brake manifold valve is by adhesives are available from your dealer.
* * * *
SM 2040 R1 07-03 5
BRAKING SYSTEM - Accumulator
Section 250-0060
SM - 277
Piston (5) acts as a separator dividing cylinder (12) 2. Remove valve cap (1A) from charging valve (1)
into two sections. The section nearest charging valve (1) and loosen locknut (1D). Coat open end of charging
contains the nitrogen pre-charge. Hydraulic oil from valve with soapy water. Bubbles indicate leaky valve
SM 1600 12-98 1
Braking System - Accumulator
Section 250-0060
core (1B). Attempt to reseat the valve core by SM - 1273
depressing and releasing it quickly once or twice.
Recheck for leakage, if leakage continues then
discharge the accumulator as described under
'Discharging Nitrogen' in this section, then replace
the valve core. Torque tighten locknut (1D) to 11 Nm
(100 lbf in) and replace valve cap (1A) finger tight.
1. Position the vehicle in a level work area, apply the Nitrogen pressures at ambient temperatures of other
parking brake and switch off the engine. than 21o C (70o F).
2. Operate the treadle valve continuously to 7. Close accumulator valve (4) and open bleeder
discharge the brake accumulators. Block all road valve (10) to dissipate gauge pressure. Close bleeder
wheels. valve (10) after pressure is relieved. If accumulator
needs charged, leave line and chuck attached to
3. Check accumulator mountings to be sure the charging valve and charge the accumulator as
accumulator is held tightly in position. described under 'Charging The Accumulator'.
4. Remove cap (1A, Fig. 1) from accumulator 8. If precharge is 55 bar (800 lbf/in2) at 21o C (70o F),
charging valve (1, Fig. 1). Attach charging line (1) to rotate 'T' handle anticlockwise until it stops, then
charging valve by rotating 'T' handle of valve chuck torque tighten locknut (1D, Fig. 1) on charging valve
(2) anticlockwise until it stops. Screw the swivel nut (1, Fig. 1) to 11 Nm (100 lbf in). Loosen the swivel
down on the valve until it seats. Loosen charging nut and remove the gauging head.
valve locknut (1D, Fig. 1) by turning anticlockwise
one to two turns. 9. Install valve cap (1A, Fig. 1) on charging valve
(1, Fig. 1) and tighten finger tight.
5. Turn 'T' handle clockwise until charging valve core
is depressed. Be sure bleeder valve (10) is tight and
does not leak, and valves (4 & 6) are closed. CHARGING THE ACCUMULATOR
Numbers in parentheses refer to Fig. 2, unless
6. To read accumulator precharge pressure, slowly otherwise specified.
open accumulator valve (4). Pressure gauge (5) will
register pre-charge pressure, it should be 55 bar Either oil or water pumped nitrogen can be used to
(800 lbf/in2) at 21o C (70o F) ambient temperature. charge the accumulator. Both types are readily
Refer to the table at the end of this section for available from a local compressed gas dealer.
2 SM 1600 12-98
Braking System - Accumulator
Section 250-0060
DISCHARGING NITROGEN
WARNINGS Numbers in parentheses refer to Fig. 1, unless
Do not use Oxygen or any gas other than otherwise specified.
Nitrogen to charge an accumulator. Oxygen
under pressure coming into contact with oil or Make sure charging valve (1) is closed internally by
grease will cause a violent explosion. Always turning locknut (1D) clockwise. Remove valve cap
double check to make sure you are using (1A) and valve core (1B) from charging valve
Nitrogen to prevent personal injury and assembly (1). Slowly turn the locknut (1D)
property damage. anticlockwise to open the charging valve assembly (1).
A high pressure nitrogen pressure DO NOT remove charging valve (1) until all the gas
regulator must be used with the charging has been completely evacuated.
assembly. Failure to use pressure regulator
could cause property damage, personal injury
or death. WARNING
Do not try to discharge the accumulator by
1. Attach line (1) and the swivel nut to charging valve depressing the charging valve core (1B, Fig. 1).
(1, Fig. 1) as described in Steps 1 through 4 under
the heading 'Testing Pre-charge Pressure'. Be sure
valves (4 & 6) are closed. REMOVAL
Numbers in parentheses refer to Fig. 3.
2. Attach gauging head to nitrogen bottle by screwing
down on gland nut (8).
WARNINGS
3. Open tank valve (6) slowly; pressure shown on Make sure that lifting equipment, blocking
gauge (5) is tank pressure. materials and wheel blocks are properly
secured and of adequate capacity to prevent
4. Open accumulator valve (4) slowly and charge personal injury and property damage.
accumulator to 55 bar (800 lbf/in2) at 21o C (70o F)
ambient temperature, closing valve occasionally. Accumulators are charged with Nitrogen.
Refer to the table at the end of this section for the The service pressure is 55 bar (800 lbf/in²) at
Nitrogen pressures at ambient temperatures of other 21o C (70o F). Be sure all Nitrogen pressure has
than 21o C (70o F). been relieved before removing accumulator
from the truck. Sudden release of pressure
5. To check accumulator charge, close tank valve may cause personal injury.
(6), relieve pressure between tank and gauge by
opening bleeder valve (10) momentarily. This will 1. Position the vehicle in a level work area, apply the
allow gauge needle to settle, thus giving correct parking brake and switch off the engine.
pressure reading of accumulator charge.
2. Operate the treadle valve continuously to discharge
6. When the correct pressure for the ambient the brake accumulators. Block all road wheels.
temperature has been reached, close valves (4 & 6)
tightly. Bleed pressure off pressure gauge (5) by 3. Remove screws (2, Fig. 1), lockwashers (3, Fig. 1)
opening bleeder valve (10). Close bleeder valve when and protector (4, Fig. 1).
all pressure is bled off the gauge.
4. Discharge nitrogen from accumulators. Refer to
7. Unscrew gland nut (8) from nitrogen bottle. previous section on 'Discharging Nitrogen' for correct
procedure.
8. Rotate 'T' handle of valve chuck (2) anticlockwise
until it stops, torque tighten charging valve locknut 5. Disconnect hydraulic lines from bottom of
(1D, Fig. 1) to 11 Nm (100 lbf in), loosen the swivel accumulators. Drain oil and cap the lines and
nut and remove gauging head. accumulator ports to prevent ingress of dirt.
9. Check accumulator charging valve (1, Fig. 1) for 6. Support the accumulators using an adequate sling
leakage using soapy water. Reinstall valve cap (1A, and lifting device. Remove bolts (1 & 2), washers (3)
Fig. 1) and tighten finger tight. and clamps (4). Remove accumulators.
SM 1600 12-98 3
Braking System - Accumulator
Section 250-0060
DISASSEMBLY SM - 278
WARNING
Accumulators are charged with Nitrogen. The
service pressure is 55 bar (800 lbf/in2) at
21o C (70o F). Do not attempt to remove any
valves or fittings until all nitrogen pressure is
completely relieved to prevent personal injury
and property damage.
4 SM 1600 12-98
Braking System - Accumulator
Section 250-0060
6. Test accumulator hydraulically for leakage or 5. Charge the accumulator with Nitrogen gas as
failure at 255 - 276 bar (3 700 - 4 000 lbf/in2). described under the heading 'Charging the
Discharge after testing. Accumulator' in this section.
MAINTENANCE
WARNING Inspect the accumulators regularly for any signs of
Make sure that lifting equipment, blocking leakage or damage.
materials and wheel chocks are properly
secured and of adequate capacity to prevent Every 500 hours
personal injury and property damage. Check the Nitrogen precharge pressure at the
accumulators, prior to checking braking system
1. Position accumulators on mounting bracket with pressure. Refer to 'Testing Pre-charge Pressure', in
the oil inlet ports downward. this section.
SM 1600 12-98 5
Braking System - Accumulator
Section 250-0060
WARNING
This truck is equipped with precharged nitrogen gas cylinders of more than 2.8 bar (40 lbf/in2).
Special permits may be required when transporting the truck or cylinders by any method while
cylinders are charged. For shipment, contact the appropriate agency in the country involved.
Consult your dealer for further permit information.
* * * *
6 SM 1600 12-98
BRAKING SYSTEM - Treadle Valve
Section 250-0070
SM - 1267
1 - Adjustment Collar
2 - Actuator Plunger 16 - Reaction Plunger
3 - Glyde Ring Assembly 17 - Wiper Seal 30 - Nut 43 - Screw
4 - Plunger Return Spring 18 - Backup Ring 31 - Washer 44 - Retainer Plate
5 - Regulator Spring 19 - Seal 32 - U Bolt 45 - Capscrew
6 - Regulator Spring 20 - Valve Body 33 - Screw 46 - Actuator Base
7 - Spring Seat 21 - Plate 34 - Nut 47 - Insert
8 - Regulator Spool 22 - 'O' Ring 35 - Adjustment Screw 48 - Nut
9 - Backup Ring 23 - Face Seal 36 - Actuator Cam 49 - Washer
10 - 'O' Ring 24 - Screw 37 - Insert 50 - Pedal
11 - Backup Ring 25 - 'O' Ring 38 - Pivot Pin 51 - Capscrew
12 - 'O' Ring 26 - Retaining Plug 39 - Return Spring 52 - Insert
13 - 'O' Ring 27 - Base Plate 40 - Return Spring 53 - Capscrew
14 - Regulator Sleeve 28 - Washer 41 - Cap 54 - Lockup Drop Out Pressure Switch
15 - Spool Return Spring 29 - Capscrew 42 - Boot 55 - Stop Light Pressure Switch
SM - 1656 SM - 1657
FROM
TO FRONT FRONT
BRAKES BRAKES
4 4
Px FROM
TO REAR Px REAR
BRAKES BRAKES
T T
SUPPLY SUPPLY
FROM P1 P2 FROM P1 P2
BRAKE BRAKE
MANIFOLD B1 B2 MANIFOLD B1 B2
13 17 13 17
SUPPLY SUPPLY
FROM FROM
BRAKE BRAKE
MANIFOLD MANIFOLD
Fig. 2 - Normal Service Brake Application Fig. 3 - Normal Service Brake Release
SM - 1658 SM - 1659
FROM
TO FRONT FRONT
BRAKES BRAKES
4 4
SUPPLY FROM
Px TO TANK Px
FROM TO REAR REAR
VIA
BRAKE BRAKES BRAKES
BRAKE
MANIFOLD T MANIFOLD T
SOLENOID SOLENOID
P1 P2 P1 P2
SUPPLY SUPPLY
FROM FROM
BRAKE B1 B2 BRAKE B1 B2
MANIFOLD MANIFOLD
13 17 13 17
SUPPLY SUPPLY
FROM FROM
BRAKE BRAKE
MANIFOLD MANIFOLD
operators force on pedal (50). Regulator spools (8) oil in the 'B1' and 'B2' lines to return to tank, releasing
have closed off the inlet ports, outlet ports and the tank the brakes.
port and will remain in this position as long as pedal
(50) is not moved. If the operator further depresses Note: Outlet ports 'B1' and 'B2' will give output
pedal (50), regulator spools (8) will move down and pressure 5% higher when activated by an emergency
build more pressure in the brake until it balances the stop ('Px' circuit) than a brake pedal actuation.
pedal force.
REBUILD CRITERIA
Normal Service Brake Release Inspect the valve regularly for any signs of leakage or
Refer to Fig. 3. When the operator releases pedal (50), damage. Check the actuator for excessive cam rock
regulator spool (8) will become unbalanced and move and replace components if necessary.
upwards, opening outlet ports 'B1' and 'B2' to tank. At
this point, oil in the 'B1' and 'B2' lines is released to The controller should be rebuilt if one or more of the
tank through tank port 'T', releasing the brakes. following conditions exist:
Hydraulic oil pressure will remain 7. Remove retainer plate (44), boot (42) and cap (41)
within the system after engine shut down. as an assembly by grasping boot (42) and gently lifting
Operate the treadle pedal continuously until from actuator base (46).
the pressure has dissipated before carrying
out any work on the braking system or serious 8. Loosen the socket head capscrews from adjustment
injury could result. collars (1) and unscrew adjustment collars (1).
1. Position the vehicle in a level work area, apply the 9. Remove capscrews (45) securing actuator base
parking brake and switch off the engine. (46) to valve body (20). Remove actuator base (46)
from valve body (20).
2. Operate the treadle valve continuously to discharge
the braking accumulators. Block all road wheels. 10. Remove stop light pressure switch (55) and lockup
drop out pressure switch (54) from plate (21).
3. Clean treadle valve assembly and surrounding area
with a suitable solvent. Ensure all hydraulic lines 11. Remove capscrews (53) securing plate (21) on
connected to the treadle valve are identified for ease valve body (20). Remove plate (21) and discard
of installation and, with suitable containers available to 'O' ring (22) and face seals (23).
catch leakage, disconnect hydraulic lines. Fit blanking
caps to all open lines and treadle valve ports. 12. Remove controller from the vice.
4. Remove and tag electrical connections to stop light 13. Remove capscrews (29) and washers (28) from
pressure switch (55) and lockup drop out pressure the base of valve body (20). Remove base plate (27).
switch (54).
14. With valve body (20) upright, retaining plug (26)
5. Release and remove mounting hardware securing should fall out. If retaining plug (26) does not fall out,
the treadle valve to the cab floor. Remove treadle lightly tap the plug to dislodge.
valve assembly to a clean area for 'Disassembly'.
15. Remove and discard 'O' ring (25) from counterbore
in the base of valve body (20).
DISASSEMBLY
Numbers in parentheses refer to Fig. 1. Note: Throughout the following steps it is important to
keep the circuits and circuit components identified as
1. Remove blanking caps from treadle valve ports and to which side of the unit they came from. For a given
drain oil from valve body (20) ports by rotating the circuit, all the components have a tolerance stack
valve over a suitable container. which could vary. Keep the 'B1' and 'B2' components
separate.
2. Secure the controller upright in a table vice.
16. With the controller upright on the work bench, hold
3. Remove pedal (50) from actuator cam (36) by valve body (20) with one hand and push the 'B1'
loosening two capscrews (51) at the pedal heel. Note actuator plunger (2) down with the other hand until
that capscrews (51) need not be removed. regulator sleeve (14) pops loose.
4. Loosen but do not remove nuts (30) from 'U' bolts 17. Repeat the above procedure to loosen the 'B2'
regulator sleeve (14).
18. Turn valve body (20) on its side on the work bench SUB-ASSEMBLY
and remove regulator sleeves (14) from valve body (20). Numbers in parentheses refer to Fig. 1.
19. Remove regulator spools (8), reaction plungers Note: All metal parts should be thoroughly cleaned
(16) and spool return springs (15) from regulator with a suitable solvent, dried, and lubricated with a
sleeves (14). light weight oil before assembly. This valve is built to
extremely close manufacturing tolerances. Great care
20. Remove plunger return springs (4), regulator should be taken to keep components protected from
springs (5 & 6) and spring seats (7) from valve body (20). contamination prior to and during assembly.
2. Inspect actuator plunger (2) for wear on the sides 5. Position boot (42) such that it conforms to the
where it moves through the seals. If axial grooves are contour of cap (41), then set aside. Loctite Prism 410
seen or if any wear is evident, replace actuator requires about 30 minutes to cure.
plunger (2). Actuator plungers (2) with diameter worn
below 18.97 mm (0.747 in) must be replaced.
Threaded Inserts
3. Place regulator spool (8) into regulator sleeve (14) 1. Position actuator base (46) upside down on the
and push the spool lightly through the sleeve. work bench and support directly under each of the four
Regulator spool (8) must be able to move freely and floor mounting holes. Install threaded inserts (47) into
smoothly the entire length of regulator sleeve (14). If it actuator base (46) by tapping lightly with a small
cannot, regulator spool (8) and regulator sleeve (14) hammer until insert (47) flanges become flush with
must be replaced as a matched set. actuator base (46). Be sure actuator base (46) is
supported to prevent braking. Thoroughly clean
Note: Never replace just the spool or sleeve. They actuator base (46) assembly and set aside.
must be replaced as a matched set.
2. Position actuator cam (36) upside down on the work
4. Inspect each spring carefully for cracks or breaks. bench and support it at the centre hole. Insert
Any spring with a crack or break must be replaced. threaded insert (37) by tapping lightly with a small
Also, if the treadle valve was not reaching proper hammer until its flange becomes flush with actuator
regulated pressure, replace all regulator springs. cam (36) surface. Be sure actuator cam (36) is
supported to prevent breaking. Thoroughly clean
5. Inspect threaded inserts (37, 47 & 52) in actuator actuator cam (36) assembly and set aside.
cam (36), actuator base (46) and pedal (50). If any of
the threads are damaged, the inserts must be replaced. 3. Position pedal (50) upside down on the work bench
and support it directly above the two holes near its
Regulator Sleeve
1. Install 'O' ring (10) onto the smallest groove (on the
top) of regulator sleeve (14). Install 'O' ring (12) onto
the middle groove of regulator sleeve (14). Install
'O' ring (13) onto the largest groove (on the bottom) of Fig. 7 - Regulator Sleeve Seal Installation
regulator sleeve (14). See Fig. 7.
Actuator Plunger
2. Install backup ring (11) onto each side of 'O' ring
(12) located in the middle of regulator sleeve (14). See Note: Glyde ring (3) assembly consists of an 'O' ring
Fig. 7. and a split glyde ring.
3. Install backup ring (9) behind 'O' ring (10) located at 1. Install 'O' ring into the 'O' ring groove located at the
the top end of regulator sleeve (14). 'O' ring (10) is the large diameter end of actuator plunger (2).
smallest of the three 'O' rings. Position backup ring (9)
so that it is next to the top of regulator sleeve (14). The 2. Install split glyde ring over the 'O' ring. Twist and
top of regulator sleeve (14) is the end with the smallest squeeze the split glyde ring into a small circle before
OD. See Fig. 7. installing to ensure a tight fit over the 'O' ring.
4. Repeat steps 1 through 3 for the second circuit. 3. Repeat steps 1 and 2 for the second circuit.
ASSEMBLY SM - 1237
4. Lightly lubricate regulator spool (8) assembly and 12. Install base plate (27) on top of retaining plug (26)
install into regulator sleeve (14). The spherical end of and secure with capscrews (29) and washers (28).
regulator spool (8) should be at the top of regulator Tighten capscrews (29) evenly to a torque of
sleeve (14). The top of regulator sleeve (14) is the end 16 - 17 Nm (140 - 150 lbf in), alternating diagonally to
with the smallest OD. evenly seat regulator sleeve (14) assembly.
Note: Check to ensure that regulator spool (8) will 13. Install actuator base (46) on top of valve body (20)
slide smoothly and freely in regulator sleeve (14). and secure with capscrews (45). Make sure to position
Replace the entire spool and sleeve assembly if the properly for correct port direction. Tighten capscrews
spool does not slide smoothly and freely. (45) to a torque of 20 - 21 Nm (180 - 190 lbf in).
5. Remove regulator spool (8) from regulator sleeve 14. Screw adjustment collars (1) onto the top of
(14) before installing sleeve into valve body (20). actuator plungers (2). Screw all the way down until
they bottom on the threads.
6. Lightly lubricate 'O' rings (10, 12 & 13) on regulator
sleeve (14). Note: It is extremely important to bottom-out
adjustment collars (1) to prevent over-stressing and
7. Install regulator sleeve (14) assembly into the breaking the springs during the adjustment process.
correct circuit of valve body (20). Make sure spring
seat (7) is correctly seated in regulator spring (6) 15. Lightly lubricate and install new 'O' ring (22) and
before installing regulator sleeve (14). Push regulator face seals (23) in grooves of plate (21).
sleeve (14) into bore until retaining flange at the base
contacts valve body (20). 16. Install valve body (20) in a vice with tank port 'T'
facing down. Carefully place plate (21) assembly on
8. Install spool return spring (15) into regulator spool (8). valve body (20) and secure with capscrews (53).
Install reaction plunger (16) into regulator spool (8). Tighten capscrews (53) to a torque of 16 - 17 Nm
Reinstall regulator spool (8) into regulator sleeve (14). (140 - 150 lbf in).
SM - 499
PILOT
159 bar
(2 300 lbf/in²) RETURN
SUPPLY
SUPPLY
FRONT REAR
BRAKE BRAKE
PRESSURE PRESSURE
SIMULATED
BRAKE VOLUME
17. Install stop light pressure switch (55) and lockup SM - 1238
drop out pressure switch (54) in plate (21) and tighten SCREWDRIVER
OR PRY BAR
securely.
4. Attach tank return line to 'T' port of valve body (20). FINAL ASSEMBLY
Numbers in parentheses refer to Fig. 1.
5. Attach output ports 'B1' and 'B2' to test lines. Check
that all ports are used. Note: Tighten all fasteners without special torques
specified to standard torques listed in Section
6. Set supply line pressure to 159 bar (2 300 lbf/in²). 300-0080, STANDARD BOLT AND NUT TORQUE
SPECIFICATIONS.
7. Set pilot supply pressure to 159 bar (2 300 lbf/in²).
1. Remove pivot pin (38) from actuator base (46).
8. Return line pressure during this test is not to exceed
0.34 bar (5 lbf/in²). 2. Assemble actuator cap (41), boot (42) and retainer
plate (44) to actuator base (46) and secure with
9. Test valve with 10W hydraulic oil at 50° + 6° C screws (43).
(120° + 10° F).
3. Insert pivot pin (38) through the hole in actuator
base (46), through the holes in 'U' bolts (32), and
Setting Manual and Pilot Pressure through the pivot pin hole in the other side of actuator
1. Install pivot pin (38) in actuator base (46) by itself base (46). As pivot pin (38) is being inserted, install
without installing pedal (50) assembly. pedal return springs (39 & 40).
2. By taking a screw driver or pry bar and placing it 4. Centre pivot pin (38) and secure with nuts (30) and
under pivot pin (38) and on top of actuator plunger (2) washers (31) on 'U' bolts (32). Tighten nuts (30) to a
assembly, you will be able to actuate each circuit torque of 16 - 17 Nm (140 - 150 lbf in).
individually. See Fig. 10.
5. Install pedal (50) assembly on actuator cam (36)
3. Gradually apply pressure on each circuit to check and secure with capscrews (51), washers (49) and
for leaks. Make sure adjustment collar (1) is screwed nuts (48).
all the way down on the threads.
6. Cycle each circuit 50 times using pilot apply. 3. Set the deadband by placing a 0.64 mm (0.025 in)
shim between the pedal return stop and the boss on
7. Recheck pressures after cycling. If they have the actuator base return stop. See Fig. 11.
changed, readjust.
4. Turn adjustment screw (35) down (clockwise) until it
8. Tighten the capscrews in adjustment collars (1) to is touching actuator cap (41).
3 - 3.5 Nm (25 - 30 lbf in). You may have to rotate
entire actuator plunger (2) to get to the capscrews. 5. Continue turning adjustment screw (35) clockwise
until you start to see a pressure reading on the
9. Check pressures again after tightening the pressure gauge then back-off adjustment screw (35)
capscrews. If the pressures have altered, loosen the 1/8 turn (anticlockwise).
appropriate capscrew and readjust.
Actuator Base 5. Remove wheel blocks, start the engine and bring
Return Stop
hydraulic oil to operating temperature.
1. Position treadle valve assembly on cab floor and Note: If the pressures to the brake circuits have been
secure with mounting hardware. Remove blanking determined as low or high, the pressures can be
caps from ports. raised or lowered by an in service (in situ) adjustment.
11. Install pivot pin (38) in actuator base (46) and by As brake pressure increases to 2.7 bar (39 lbf/in²) and
taking a screw driver or pry bar and placing it under above, the circuit should close and send a signal to
pivot pin (38) and on top of actuator plunger (2), you illuminate the brake lights. As pressure drops below
will be able to actuate each circuit individually. 2.7 bar (39 lbf/in²) the circuit should open and brake
lights go out.
12. Start engine to ensure full hydraulic pressure.
13. Test front 'B1' and rear 'B2' brake circuit actuating Lockup Drop Out Pressure Switch
pressures at diagnostic test points and adjust if Lockup drop out pressure switch (54) is a normally
necessary. Pressures should be 159 bar (2 300 lbf/in²) open switch. Attach a continuity tester to terminals on
for front 'B1' circuit and, 52 bar (750 lbf/in²) for rear 'B2' lockup drop out pressure switch (54). The circuit
circuit. should be open.
Note: Turning adjustment collar (1) up (anticlockwise) As brake pressure increases to 20 bar (290 lbf/in²) and
will increase the pressure while turning it down above, the circuit should close and send a signal to
(clockwise) will decrease the pressure. Fine the lockup drop out solenoid, which in turn drops the
adjustment will require only turning the collar in 1/8 transmission out of lockup. As pressure drops below
turn increments. 20 bar (290 lbf/in²) the circuit should open and lockup
can be engaged.
14. When pressure is set correctly, tighten the
capscrews in adjustment collars (1) to 3 - 3.5 Nm
(25 - 30 lbf in).
MAINTENANCE
SPECIAL TOOLS
There are no special tools required for procedures tools, sealants and adhesives required. These tools,
outlined in this section. Refer to Section 300-0070, sealants and adhesives are available from your dealer.
SERVICE TOOLS, for part numbers of general service
* * * *
SM - 1509
15
P
A
B
15
b
15 a
14
T
7 4 9 8 1 5 7 10
b a
6
6
3 11 12 11 3
2
13
B A
SM 1226 2-98 1
Braking System - Directional Control Valve
Section 250-0090
SM - 1510 SM - 1511
T P T P
BRAKE BRAKE
MANIFOLD MANIFOLD
VALVE VALVE
Fig. 2 - Directional Control Valve - Energized Fig. 3 - Directional Control Valve - De-energized
2 SM 1226 2-98
Braking System - Directional Control Valve
Section 250-0090
3. Clean directional control valve assembly and a. Install hydraulic supply capable of 0 - 159 bar
surrounding area with a suitable solvent. Ensure all (0 - 2 300 lbf/in²) to port 'P'.
hydraulic lines connected to the directional control
valve are identified for ease of installation and, with b. Install hydraulic supply capable of 0 - 21 bar
suitable containers available to catch leakage, (0 - 300 lbf/in²) to port 'a'.
disconnect hydraulic lines. Fit blanking caps to all
open lines. c. Install a suitable return line to port 'T'.
4. Release and remove mounting hardware securing d. Install a pressure gauge suitable for 0 - 207 bar
directional control valve to the mounting plate on the (0 - 3 000 lbf/in²) to port 'B'.
underside of the cab floor and remove assembly from
the truck. 2. Make sure all control valves to supply lines are
closed.
DISASSEMBLY/ASSEMBLY 3. Turn on hydraulic power supplies and make sure
Numbers in parentheses refer to Fig. 1. hydraulic oil is at normal operating temperature.
Note: Tighten all fasteners to standard torques listed 4. Open control valve for port 'P' supply and adjust to
in Section 300-0080, STANDARD BOLT AND NUT give a supply reading of 159 bar (2 300 lbf/in²).
TORQUE SPECIFICATIONS. Reading on pressure gauge at port 'B' should be zero.
Note: With the exception of replacing 'O' rings (11 & 12), Note: The directional control valve starts to de-energise
the directional control valve is a non serviceable item (close) when transmission pilot pressure falls below
and should be replaced as a complete assembly. The 7 bar (100 lbf/in²) and is fully de-energised when
'O' rings can be replaced as follows: transmission pilot pressure falls to 5.5 bar (80 lbf/in²).
1. Note orientation of valve body (1) to sub plate (13) 5. Open control valve for port 'a' supply and slowly
to facilitate assembly. increase this supply pressure from 0 to 21 bar
(0 to 300 lbf/in²) thus energising (opening) the
2. Clamp sub plate (13) lightly in a soft jawed vice directional control valve. Pressure reading at port 'B'
and remove allen bolts (9) and spacers (8). should now read 159 ± 7 bar (2 300 ± 100 lbf/in²).
Reading on pressure gauge at port 'D' should begin to
3. Separate valve body (1) from sub plate (13) and fall when supply pressure at port 'a' drops to 7 bar
discard 'O' rings (12). (100 lbf/in²). This rate of fall should reach a maximum
rate when supply pressure at port 'a' drops to 5.5 bar
4. Install new 'O' rings (12) in valve body (1) and fit (80 lbf/in²) or below. With supply pressure at port 'a' at
valve body (1) to sub plate (13) as noted prior to 5.5 bar (80 lbf/in²) or less, pressure on gauge at port
disassembly. Install spacers (8) in valve body (1) 'B' should quickly drop to almost zero, by exhausting
and secure valve body (1) to sub plate (13) with allen to tank via port 'T'.
bolts (9).
6. Slowly energise (open) control valve for port 'a'
5. Remove allen bolts (10) and end covers (2) from supply. Pressure reading at port 'B' should start to rise
valve body (1) and discard 'O' rings (11). when pressure at port 'a' reaches 5.5 bar (80 lbf/in²).
Rate of pressure increase at port 'B', should reach a
6. Install new 'O' rings (11) in end covers (2) and maximum level, when supply pressure at port 'a'
secure to valve body (1) with allen bolts (10). reaches 7 bar (100 lbf/in²) or above.
SM 1226 2-98 3
Braking System - Directional Control Valve
Section 250-0090
* * * *
4 SM 1226 2-98
BRAKING SYSTEM - Monoblock Brake Valve
Section 250-0100
SM - 1363
Pressure reducing valve (9) reduces the available Refer to Fig. 2. With the engine running and the brake
hydraulic oil pressure from the rear brake accumulator manifold valve energized, (park/emergency brake
to a pressure of 83 bar (1 200 lbf/in2). switch deactivated - pulled out) hydraulic oil from the
rear brake accumulator flows through the brake
Pressure relief valve (11) regulates pressure, after manifold valve and enters valve body (1) at port 'P'. Oil
pressure reducing valve (9), to provide a residual flows through pressure reducing valve (9) and exits
pressure of 3.1 ± 0.35 bar (45 ± 5 lbf/in2) in the rear valve body (1) at port 'RB2' to release the parking
brake lines. A filter system, comprising of disc filter (5) brake. Oil pressure is reduced to 83 bar (1 200 lbf/in2)
and conical filter (3), helps protect orifice plate (2) at before leaving valve body (1) at port 'RB2'. Excess oil
pressure relief valve (11). at pressure reducing valve (9) is diverted back to tank
through port 'T' in valve body (1).
REMOVAL SM - 1353
WARNINGS
Hydraulic fluid pressure will remain within the
system after engine shut down. Operate the
treadle valve continuously until the pressure
has dissipated before carrying out any work on
the braking system or serious injury could
result.
1 - 'O' Ring
To prevent personal injury and property 2 - 'O' Ring 4 - Backup Ring
damage, be sure wheel blocks are properly 3 - 'O' Ring 5 - Backup Ring
secured and of adequate capacity to do the job Fig. 4 - Pressure Reducing Cartridge Seals
safely.
SM - 1354
1. Position the vehicle in a level work area, raise the
body and secure in place with the body safety pins.
Apply the parking brake and switch off the engine.
DISASSEMBLY
Numbers in parentheses refer to Fig. 1, unless
otherwise specified.
2. Remove shuttle valve (10) assembly from valve (1). Remove and discard 'O' rings (8 & 9, Fig. 6) and
body (1). Remove and discard 'O' rings (3, 4 & 6, Fig. 5) backup ring (11, Fig. 6) from relief valve (11).
and backup rings (5 & 7, Fig. 5) from shuttle valve (10).
4. If required, remove blanking plug (8) from valve
3. Remove relief valve (11) assembly from valve body body (1). Remove and discard 'O' ring (7) from
blanking plug (8).
* * * *
DESCRIPTION SM - 2558
OPERATION
Numbers in parenthesis refer to Fig. 1. 6
Refer to Fig. 2. Pressing the 50% brake reduction 1 - Pressure Reducing Valve 6 - Elbow - 90°
switch to the 'On' position sends a signal to energize 2 - Solenoid 7 - Adapter
3 - Diagnostic Nipple 8 - Bolt
the solenoid in pressure reducing valve (1). Oil cannot 4 - Dust Cap 9 - Washer
pass through the check valve and is directed through 5 - Cartridge 10 - Pad
the relief valve. The relief valve limits the maximum
Fig. 1 - Pressure Reducing Valve Installation
braking pressure to the front brake callipers to 55 bar
(800 lbf/in²).
SM - 2298
Refer to Fig. 3. Pressing the 50% brake reduction TO FRONT BRAKE CALLIPERS
switch to the 'Off' position sends a signal to
OUTLET
de-energize the solenoid in pressure reducing valve 19
(1). In this condition full braking pressure 110 bar TEST
(1 600 lbf/in²) is applied to the front brake callipers
when the treadle valve is operated.
REMOVAL/INSTALLATION
INLET TANK
Numbers in parentheses refer to Fig. 1.
FROM BRAKE TREADLE VALVE
Note: Tighten all fasteners to standard torques listed
Fig. 2 - Pressure Reducing Valve - Solenoid Energized
in Section 300-0080, STANDARD BOLT AND NUT
TORQUE SPECIFICATIONS.
SM - 2299
TO FRONT BRAKE CALLIPERS
Note: Tighten all hydraulic lines fitted with ORFS
connections, as described in Section 250-0000, OUTLET
BRAKING SYSTEM SCHEMATIC. Renew all 'O' rings 19
WARNING
Hydraulic fluid pressure will remain within the
system after engine shut down. Operate the INLET TANK
treadle valve continuously until the pressure
has dissipated before carrying out any work on FROM BRAKE TREADLE VALVE
the braking system or serious injury could
Fig. 3 - Pressure Reducing Valve - Solenoid De-Energized
result.
SM 2041 7-00 1
Braking System - Pressure Reducing Valve
Section 250-0110
1. Position the vehicle in a level work area, raise the 9. Check oil level in the steering and brake control
body and secure in place with the body safety pins. tank and add oil if required. Refer to Section 220-0040,
Apply the parking brake and switch off the engine. STEERING AND BRAKE CONTROL TANK for correct
fill level, and, Section 300-0020, LUBRICATION
2. Operate the treadle valve continuously to discharge SYSTEM for oil specification.
the brake accumulators. Block all road wheels.
10. Remove wheel blocks, start the engine and bring
3. Clean pressure reducing valve (1) and surrounding hydraulic oil to operating temperature.
area with a suitable solvent. Ensure all hydraulic lines
connected to pressure reducing valve (1) are identified 11. Check pressure reducing valve (1) and hydraulic
for ease of installation and, with suitable containers line connections for leaks and tighten as required.
available to catch leakage, disconnect hydraulic lines.
Fit blanking caps to all open lines. 12. Remove body safety pins and lower the body to
the frame.
4. Support valve body and remove bolts (8) and
washers (9) securing pressure reducing valve (1) to its
mounting. Remove pressure reducing valve (1) from MAINTENANCE
vehicle. Limited repair of the pressure reducing valve is with
replacement of parts only. Refer to vehicle parts book
5. Note location and orientation of elbows (6) and for lists of kits available.
adaptor (7) and remove from pressure reducing valve
(1).
SPECIAL TOOLS
6. Replace all 'O' rings and install elbows (6) and There are no special tools required for procedures
adaptor (7) in pressure reducing brake valve (1) ports outlined in this section. Refer to Section 300-0070,
as identified. SERVICE TOOLS, for part numbers of general service
tools required. These tools are available from your
dealer.
* * * *
2 SM 2041 7-00
BRAKING SYSTEM - Retarder Control Valve
Section 250-0130
SM - 1272
1 - Adjustment Collar
2 - Actuator Plunger 11 - 'O' Ring 20 - Washer 29 - Jam Nut
3 - Plunger Return Spring 12 - 'O' Ring 21 - Capscrew 30 - Set Screw
4 - Regulator Spring 13 - Regulator Sleeve 22 - Housing 31 - Spring
5 - Regulator Spring 14 - Spool Return Spring 23 - Cap 32 - Friction Puck
6 - Spring Seat 15 - Wiper Seal 24 - Cam 33 - Capscrew
7 - Regulator Spool 16 - Backup Ring 25 - Spring Pin 34 - Shaft
8 - Backup Ring 17 - Seal 26 - Plug 35 - Ring
9 - 'O' Ring 18 - Valve Body 27 - Set Screw 36 - Lever
10 - Backup Ring 19 - Retainer 28 - Jam Nut 37 - Knob
SM - 1662
REAR
SERVICE
BRAKES
'P2' PORT
TREADLE
VALVE
FROM
BRAKE
MANIFOLD
VALVE
In the normal position, lever (36) is in the forward OCDB Retarder Application
position and regulator spool (7) is in the up position. Refer to Fig. 2. In this condition the directional control
In this condition the notched area near the top of valve (if fitted) is de-energized.
regulator spool (7) is exposed to the tank cavity in
valve body (18), the lower portion of the notched area When the operator activates lever (36), actuator
is exposed to the regulated pressure outlet port of the plunger (2) is moved down and pushes on regulator
valve. This effects a direct link between tank port 'T' springs (4 & 5) which in turn, push regulator spool (7)
and regulated outlet port 'R'. While regulator spool (7) down. As regulator spool (7) moves down, the
is in this position the retarder is released. metering notches move out of the tank cavity and
close outlet port 'R' off to tank port 'T'. Regulator spool
(7) continues to move downward until the lower edge
OPERATION of the metering notches become exposed to the inlet
Numbers in parentheses refer to Fig. 1, unless pressure port 'P'. This movement opens inlet port 'P'
otherwise specified. to outlet port 'R'.
SM - 1663
REAR
SERVICE
BRAKES
'P2' PORT
TREADLE
VALVE
FROM
BRAKE
MANIFOLD
VALVE
of this operation is a reduced pressure application of Note: Should the operator depress the treadle valve
the rear service brakes. to obtain a full service brake application, when the
retarder is applied, treadle valve pressure takes
As hydraulic pressure builds in the brake, oil flows priority at the shuttle valve in the brake lines when it
through the small orifice in the side of regulator spool exceeds retarder applied pressure. A full service
(7) and into the cavity below the spool. As pressure brake application occurs.
rises in the brake it also rises in the cavity below the
spool forcing regulator spool (7) upwards closing A retarder applied pressure switch (18, Fig. 2)
outlet port 'R'. Regulator spool (7) is now balanced (installed in a tee at port 'R') will close, sending a
between the brake pressure and the pressure of signal to illuminate an indicator light in the dash
regulator springs (4 & 5) generated by lever (36) panel, and a retarder light at the rear of the truck, to
position. Regulator spool (7) has closed off inlet port 'P', indicate that the retarder is applied.
outlet port 'R' and tank port 'T' and will remain in this
position until lever (36) is moved. This maintains the
applied pressure within the brake circuit and provides Transmission Retarder Application
infinitely variable application of the braking force. If Refer to Fig. 3. In this condition the directional control
the operator further actuates lever (36), regulator valve is energized.
spool (7) will move down and build more pressure in
the brake until it balances the lever force.
WARNING
The maximum pressure applied by the retarder Great care should be used if applying the
control valve is governed by the stroke of regulator retarder when road surfaces are slippery. The
spool (7) within the valve. This stroke can be retarder braking effect will occur only at the
adjusted during maintenance operations. driving axle and could make the truck difficult
to control.
SM - 1664
REAR
SERVICE
BRAKES
'P2' PORT
TREADLE
VALVE
FROM
BRAKE
MANIFOLD
VALVE
When the operator activates lever (36), actuator outlet port 'R' and tank port 'T' and will remain in this
plunger (2) is moved down and pushes on regulator position until lever (36) is moved. This maintains the
springs (4 & 5) which in turn, push regulator spool (7) applied pressure within the transmission retarder
down. As regulator spool (7) moves down, the circuit and provides infinitely variable application of
metering notches move out of the tank cavity and the retarder. If the operator further actuates lever
close outlet port 'R' off to tank port 'T'. Regulator (36), regulator spool (7) will move down and build
spool (7) continues to move downward until the lower more pressure in the retarder until it balances the
edge of the metering notches become exposed to the lever force.
inlet pressure port 'P'. This movement opens inlet
port 'P' to outlet port 'R'. The maximum pressure applied by the retarder
control valve is governed by the stroke of regulator
This permits reduced pressure to travel through spool (7) within the valve. This stroke can be
directional control valve (11, Fig. 3) to transmission adjusted during maintenance operations.
retarder cylinder (12, Fig. 3) on the transmission. Oil
fills the cavity around the rotor within the retarder and Note: Should the operator depress the treadle valve
creates drag, which in turn, slows the truck down. to obtain a full service brake application, when the
When the cavity is emptied, the rotor is free of drag. retarder is applied, treadle valve pressure takes
priority at the shuttle valve in the brake lines when it
As hydraulic pressure builds in the retarder, oil flows exceeds retarder applied pressure. A full service
through the small orifice in the side of regulator spool brake application occurs.
(7) and into the cavity below the spool. As pressure
rises in the retarder it also rises in the cavity below A retarder applied pressure switch (18, Fig. 3)
the spool forcing regulator spool (7) upwards closing (installed in a tee at port 'R') will close, sending a
outlet port 'R'. Regulator spool (7) is now balanced signal to illuminate an indicator light in the dash
between the retarder pressure and the pressure of panel, and a retarder light at the rear of the truck, to
regulator springs (4 & 5) generated by lever (36) indicate that the retarder is applied.
position. Regulator spool (7) has closed off inlet port 'P',
SM - 1665
REAR
SERVICE
BRAKES
'P2' PORT
TREADLE
VALVE
FROM
BRAKE
MANIFOLD
VALVE
OCDB Retarder Release (18, Fig. 5) will open, switching off the retarder
Refer to Fig. 4. In this condition the directional control indicator light on the dash panel and retarder light at
valve (if fitted) is de-energized. rear of the truck.
Transmission Retarder Release 2. Retarder valve holds pressure when in the neutral
Refer to Fig. 5. In this condition the directional control position.
valve is in energized.
3. Varying output pressure with the lever fully
When the operator releases lever (36), regulator actuated.
spool (7) will become unbalanced and move upwards
under the influence of the transmission retarder 4. Spring pin securing shaft to actuator cam has
circuit pressure and spool return spring (14). As a failed.
result, regulator spool (7) moves to open outlet port
'R' to tank port 'T', closing inlet pressure port 'P'. The 5. Excessively worn friction pucks. This will be evident
pressure will fall and retarder applied pressure switch through mechanical interference of actuator cam (24),
1. Position the vehicle in a level work area, apply the 7. Remove regulator spool (7) and spool return
parking brake and switch off the engine. spring (14) from regulator sleeve (13).
2. Operate the treadle valve continuously to 8. Remove plunger return spring (3), regulator springs
discharge the braking accumulators. Block all road (4 & 5) and spring seat (6) from valve body (18).
wheels.
9. Remove actuator plunger (2) by pushing down
3. Remove and tag electrical connections to retarder (toward the bottom of valve body (18)) on actuator
pressure switch. plunger (2) by hand, until the plunger slides out.
4. Ensure all hydraulic lines connected to the retarder 10. Remove and discard 'O' rings (9, 11 & 12) and
valve are identified for ease of installation and, with teflon backup rings (8 & 10) from regulator sleeve (13).
suitable containers available to catch leakage,
disconnect hydraulic lines. Fit blanking caps to all 11. Remove and discard wiper seal (15), seal (17)
open lines and retarder valve ports. and backup ring (16) from the actuator section of
valve body (18).
5. Release and remove mounting hardware securing
the retarder control valve in the centre console.
Remove retarder control valve assembly to a clean Actuator
area for 'Disassembly'. 1. Loosen jam nut (29) and remove set screw (30)
from housing (22).
DISASSEMBLY 2. Remove spring (31) from housing (22). Inspect
Numbers in parentheses refer to Fig. 1. spring (31) carefully for cracks or breaks and replace
if required.
1. Remove blanking caps from valve body (18) ports
and drain oil by rotating the valve over a suitable 3. Remove plug (26) from housing (22). Spring pin
container. (25) may have already sheared off. If not, use a
2.3 mm (0.09 in) pin punch to press spring pin (25)
2. Secure the valve upright in a table vice. past shaft (34).
3. Remove capscrews (33) securing housing (22) 4. Rotate lever (36) and shaft (34) sub-assembly to
assembly to valve body (18). Remove housing assembly. release it from cam (24). Pull lever (36) and shaft
(34) sub-assembly from housing (22).
2. Inspect actuator plunger (2) for wear on the sides 3. Measure the distance friction puck (32) protrudes
where it moves through the seals. If axial grooves from housing (22). This distance should be
are seen or if any wear is evident, replace actuator approximately 2.3 mm (0.09 in). If this distance
plunger (2). Actuator plunger (2) must be replaced if varies more than 0.5 mm (0.02 in), replace the
the diameter is worn below 18.97 mm (0.747 in). actuator assembly.
3. Place regulator spool (7) into regulator sleeve (13) 4. Insert cam (24) in housing (22).
and push the spool lightly through the sleeve.
Regulator spool (7) must be able to move freely and 5. Align shaft (34) and lever (36) assembly with
smoothly the entire length of regulator sleeve (13). If housing (22) and cam (24) bore. Insert shaft (34) into
it cannot, regulator spool (7) and regulator sleeve housing (22) and cam (24) bore.
(13) must be replaced as a matched set.
6. Align 3 mm (0.12 in) diameter holes in shaft (34)
Note: Never replace just the spool or sleeve. They and cam (24). Install spring pin (25) until pin is
must be replaced as a matched set. recessed approximately 2.3 mm (0.09 in) below
cam (24) surface.
4. Inspect each spring carefully for cracks or breaks.
Any spring with a crack or break must be replaced. 7. Place second friction puck (32) in housing (22) and
Also, if the retarder valve was not reaching proper place spring (31) behind friction puck (32).
regulated pressure, replace all regulator springs.
8. Install set screw (30) in housing (22).
SUB-ASSEMBLY Note: Set screw (30) will be adjusted later to provide
Numbers in parentheses refer to Fig. 1. the proper spring compression.
Note: All metal parts should be thoroughly cleaned 9. Install jam nut (29) on set screw (30) and tighten
with a suitable solvent, dried, and lubricated with a finger tight.
light weight oil before assembly. This valve is built to
extremely close manufacturing tolerances. Great 10. Install set screw (27) in housing (22) and jam nut
care should be taken to keep components protected (28) on set screw (27). Finger tighten jam nut (28).
from contamination prior to and during assembly.
11. Turn sub-assembly with the bottom side up and
fill the actuation cavity with EP, NLGI grease until
Actuator cam (24) is covered. Refer to Section 300-0020,
1. If new lever (36) and shaft (34) are being fitted LUBRICATION SYSTEM for grease specification.
4. Install wiper seal (15) in the top counterbore. Fig. 6 - Valve Body Seal Installation
Position wiper seal (15) in the groove so that the
register lip is facing up toward the actuator. SM - 1348
Regulator Sleeve
1. Install 'O' ring (9) onto the smallest groove (on the
top) of regulator sleeve (13). Install 'O' ring (11) onto
the middle groove of regulator sleeve (13). Install
'O' ring (12) onto the largest groove (on the bottom)
of regulator sleeve (13). See Fig. 7.
SM - 1349
BRAKE
PRESSURE
8. Lightly lubricate 'O' ring (9) and install into counter 2. Attach main supply input pressure line to port 'P'.
bore in the bottom end of valve body (18).
3. Attach tank return line to port 'T'.
9. Install retainer (19) to valve body (18) and secure
with capscrews (21) and washers (20). Tighten 4. Attach regulated output test line to port 'R'. Check
capscrews (21) evenly to a torque of 20 - 21 Nm that all ports are used.
(180 - 190 lbf in), alternating diagonally to evenly seat
regulator sleeve (13) assembly. 5. Set supply line pressure to 159 bar (2 300 lbf/in2).
10. Screw adjustment collars (1) onto the top of 6. Return line pressure during this test is not to
actuator plunger (2). Screw all the way down until it exceed 0.34 bar (5 lbf/in2).
bottoms on the thread.
7. Test valve with 10W hydraulic oil at 50° + 6° C
Note: It is extremely important to bottom-out (120° + 10° F).
adjustment collar (1) to prevent over-stressing and
breaking the springs during the adjustment process.
Setting Apply Pressure 4. Adjust set screw (27) on top of housing (22) inward
Note: Before actuating the valve, be sure adjustment until the pressure begins to rise. Measure lever (36)
collar (1) is bottomed to prevent excessive pressure angle and back set screw (27) out until a lever angle
from damaging regulator springs (4 & 5). of 6° is achieved.
1. Gradually increase pressure in order to check for Note: Failure to comply with this specification may
leaks. Make sure adjustment collar (1) is screwed all result in the regulated pressure not being released to
the way down on the threads and cap (23) is installed tank.
on valve body (18).
5. Secure jam nut (28) on set screw (27) to lock the
2. Actuate plunger (2) until cap (23) contacts valve initial lever angle.
body (18). The pressure reading should be below
regulated pressure of 33 ± 1.7 bar (480 ± 25 lbf/in2). 6. Fully apply lever (36) to check the maximum
regulated output pressure and readjust if required.
3. To raise the regulated pressure, back adjustment
collar (1) up (anticlockwise) in small increments until Note: The approximate total lever (36) travel is 60°
the output pressure is 33 ± 1.7 bar (480 ± 25 lbf/in2) at and this value may be used for reference purposes
port 'R'. Fine adjustment will require only turning the only.
collar in 1/8 turn increments.
7. Apply and hold lever (36) to maintain maximum
Note: Adjust adjustment collar (1) in small increments regulated output pressure. Adjust set screw (30) until
to prevent the valve from being over pressurised sufficient spring (31) force is generated to hold lever
during the adjustment procedure. Excessive pressure (36) in the full apply position.
could cause premature regulator spring failure.
8. Turn set screw inward until friction pucks (32) hold
4. Once regulated pressure has been set, tighten the lever (36) while generating the maximum regulated
capscrew on adjustment collar (1). Check the pressure (approximately 1.5 turns).
pressure again after tightening the capscrew. If the
pressure has moved out of the specified range, loosen 9. Secure set screw (30) in position with jam nut (29)
the capscrew and readjust. to lock spring (31) compression.
6. Check for oil leaks and tighten connections as If the pressure is outwith the specified pressure
necessary. range, inspect the valve and take relevant action
(adjust pressures, strip down and repair or replace
7. Engage retarder. Make sure of a full service brake valve).
application and that retarder light illuminates. Release
retarder.
Retarder Light Pressure Switch
8. Check all connections again for leaks and tighten The retarder light pressure switch is a normally open
as necessary. switch. Attach a continuity tester to terminals on the
pressure switch. The circuit should be open.
* * * *
DESCRIPTION SM - 1350
TO MONOBLOCK
Letters in parentheses refer to Fig. 1. BRAKE VALVE
TESTING WARNINGS
Letters in parentheses refer to Fig. 1. To prevent personal injury and property
damage, ensure wheel blocks are of sufficient
Remove shuttle valve from the truck (as described capacity and properly secured to do the job
under 'Maintenance') and plug outlet port 'A'. Apply safely.
hydraulic oil pressure of 110 bar (1 600 lbf/in²)
through inlet port 'P1' and visually inspect inlet port To prevent personal injury, relieve the
'P2' for leaks. Repeat this test for inlet port 'P2'. If pressure in the braking system. The exact
any leakage of hydraulic oil occurs, replace shuttle procedure must be followed as described in
valve. Section 250-0000, BRAKING SYSTEM
SCHEMATIC.
SM 1229 2-98 1
Braking System - Shuttle Valve
Section 250-0140
1. Position the vehicle in a level work area, apply the install lines to shuttle valve as identified during removal.
parking brake and switch off the engine.
7. Check oil level in steering and brake control tank
2. Operate the treadle valve continuously to discharge and add oil if required. Refer to Section 220-0040,
the brake accumulators. Block all road wheels. STEERING AND BRAKE CONTROL TANK for
correct fill level, and, use only oil as specified in
3. Clean shuttle valve assembly and surrounding Section 300-0020, LUBRICATION SYSTEM.
area with a suitable solvent. Ensure all hydraulic
lines connected to the shuttle valve are identified for 8. Remove wheel blocks, start the engine and bring
ease of installation and, with suitable containers hydraulic oil to operating temperature.
available to catch leakage, disconnect hydraulic
lines. Fit blanking caps to all open lines. 9. Apply the brakes and check for oil leaks and
correct operation of the shuttle valve. Tighten line
4. Remove mounting hardware securing the shuttle connections and fittings as necessary.
valve to mounting bracket on the underside of the
cab. Remove shuttle valve and disconnect all fittings
for use on the new valve. SPECIAL TOOLS
There are no special tools required for procedures
5. Install all fittings on the new shuttle valve and outlined in this section. Refer to Section 300-0070,
secure shuttle valve assembly to mounting bracket SERVICE TOOLS, for part numbers of general
with mounting hardware. service tools required. These tools are available from
your dealer.
6. Remove blanking caps from hydraulic lines and
* * * *
2 SM 1229 2-98
OPERATORS COMPARTMENT - Cab and Mounting
Section 260-0010
SM - 2391
9
2 1
16
5
7 17
18 19
15
20
10
13 11
4 6
11 12
8
12
11
14 *21
3
DESCRIPTION
Numbers in parentheses refer to Fig. 1. WARNING
The protection offered by the FOPS protective
Cab assembly (1) is mounted through rubber mounts structure may be impaired if it has been
(12) which damp structure borne noise and vibration. subjected to any modification or damage.
The cab conforms with ISO/SAE, FOPS (Falling Unauthorized modification will void
Object Protective Structure) safety legislation, with certification.
ROPS (Roll Over Protective Structure provided by
the cab guard. Access to cab assembly (1) is from either side and
visibility is unrestricted through tinted glass. A
FOPS - ISO 3449, SAE J231 heater/filter/pressurizer and demisting unit in front of
High electrical current. Turn the ignition 9. Ensure heater lines are identified for ease of
key switch 'Off' before disconnecting any installation, and with suitable containers available to
electrical components. Disconnect electrical catch leakage, disconnect heater lines. Fit blanking
connections in the correct order given to caps to open lines and fittings.
prevent damage to the electrical components.
10. Ensure body control joystick lines are identified
1. Position the vehicle in a level work area, raise the for ease of installation, and with suitable containers
body and install the body safety pins. Refer to available to catch leakage, disconnect hoses at
Section 270-0010, BODY AND MOUNTING. manifold plate in cab floor. Fit blanking caps to open
lines and fittings.
2. Apply the parking brake and switch off the engine.
11. Ensure all connections to cab assembly (1) have
3. Turn the steering wheel in both directions several been removed, prior to removal.
times to relieve any pressure in the steering system.
Operate the treadle valve continuously to discharge 12. Attach suitable lifting equipment to cab assembly
the braking accumulators. Operate the body control (1) and take up the slack. Remove cap (20) from bolt
joystick continuously to discharge the pilot valve head. Remove locknut (14) securing bolt (13) to front
accumulator. Block all road wheels. cab support. Remove locknut (21), if fitted and
slacken off bolts (10) from rear cab supports.
4. Disconnect the electrical cables in the following
4. Remove blanking caps from all body control 13. Check all instruments and controls for proper
joystick lines and connect lines as identified at operation. Remove body safety pins and lower the
removal. Tighten all lines securely. body to the frame.
SM - 2394
3
2
33
32
8
9
13
14
7 21
17
12
6 18
5
10 19 20
11
28
23 26
24 25 27
23 22 1 15 16
31
30
29
28
25 - Hinge
1 - Gasket 9 - Screw 17 - Fixing Plate 26 - Pin
2 - RH Door Frame 10 - Screw 18 - Lock Cover 27 - Split Pin
3 - Sliding Frame 11 - Grommet 19 - Washer 28 - Clip
4 - Seal 12 - Lock 20 - Screw 29 - Washer
5 - Gasket 13 - Locking Plate 21 - Cover 30 - Nut
6 - Spacer 14 - Screw 22 - Nut 31 - Cap
7 - Door Handle 15 - Screw 23 - Retainer 32 - Catch - LH
8 - Screw 16 - Nut 24 - Screw 33 - Catch - RH
Fig. 2 - Exploded View of Right Hand Door Assembly
SM - 1994
64
65
63
3 58 59 60
61
62
34 7 8
33 55
56
32 11
57
48 2
19 18
15
6
46
31 9
4
10
54
30 14
12 13 20 45
27 49
24 66 67 21 68 43
69
29 28 35 44
16 17
47 21 1
50
39
45 40 41
26 22 42
36
23 37 38
25 37
52 53
51
2. If required, fit new inserts (15, Fig. 1) to hinges. 8. Position glass onto panel opening, pressing firmly
so that adhesive bonds sufficiently to allow the glass
3. Attach a suitable lifting device to LH door to be moved or straightened up as required.
assembly (3, Fig. 1) and align the door assembly to
hinges on cab. Install pin (43), aligning holes and 9. Ensuring the glass is adequately supported, allow
secure using split pin (44). Replace caps (45). the sealing adhesive to set properly.
4. Check LH door assembly (3, Fig. 1) for correct 10. Clean off any excess adhesive using a suitable
operation and also that the locks are operating correctly. solvent.
To replace a glass assembly, proceed as follows: This should stop the leak immediately, but since
some sealing compounds should be allowed to set
Note: Ensure the glass is supported adequately before getting wet, wait a few minutes before testing.
before starting to cut the adhesive seal.
SM - 3267
21
31
4 2
1 21
10
3
5
16 11
9
10
8
7
14 12
23 15
22
13
32
17 20
24 30
C 19
A
D 18
B
25
F 26
27 28
29
E
DESCRIPTION The driver seat is secured to the cab floor with bolts
Numbers in parentheses refer to Fig. 1. (28) and lockwashers (29). The seat assembly (1)
consists of a seat cushion (7) and back cushion (5)
mounted to seat frame (2). Seat frame (2) is attached
WARNING to seat base (30) by means of a suspension
By Law, seat belts must be provided. Always assembly. The air seat only reacts when the driver
wear seat belts when travelling in the vehicle. sits on the seat. When unoccupied, the seat sinks to
The following is the list of controls to adjust the seat: 8. If required, remove pop-out button and pull back
A. Height and slope adjustment, front. suspension cover (16) to allow access to suspension
B. Height and slope adjustment, rear. assembly (13).
C. Backrest angle adjustment.
D. Weight adjustment. 9. If required, remove mounting hardware securing
E. Horizontal adjustment (sliderails). dampers (12) to suspension assembly (13). Remove
F. Lumber support adjustment. dampers (12).
WARNING INSPECTION
Do not attempt to adjust the seat or seat belt Numbers in parentheses refer to Fig. 1.
while the machine is moving. Loss of control
may result. Stop the machine; apply the 1. Inspect air lines, control valve (D), dampers (12)
brakes; then adjust. and air spring (15) for leaks and damage and replace if
required.
REMOVAL AND DISASSEMBLY 2. Check all brackets and frame for cracks and/or
Numbers in parentheses refer to Fig. 1. damage. Repair or replace as necessary.
5. Using suitable lifting equipment, position seat The care of the upholstery on seat cover (8) and
assembly on the cab floor and secure with bolts (28) back cover (6) is a relatively simple, but important
and lockwashers (29). matter. Accumulation of dirt on the surface eventually
turns into a hard gritty substance which cuts into the
6. Reconnect compressor connector at the rear of the surface of the upholstery.
seat.
To clean seat cover (8) and back cover (6), use warm
7. Start the engine and charge the air system. Pull water and a mild soap, such as Castile. Work up thin
out control valve button (D) to allow air into seat soap suds on a piece of soft cloth and rub the
suspension system and check seat for proper upholstery briskly. Remove the suds with a damp
operation. cloth, using no soap, and finish by wiping the
upholstery dry with a soft, dry cloth.
8. Remove wheel chocks from road wheels.
Seat belt (21) assembly should be inspected by the
user on a regular basis. Replace Seat belt (21)
immediately if hardware is worn or damage, straps are
nicked or frayed, buckle is not functioning correctly,
loose stitching is found, or if the strap material has lost
strength due to the effects of ultraviolet rays.
* * * *
SM - 2392
A
27 A 31 32
28 B 24
29 30 5
A
4 23
A
22
30 24
29 B A 7
6
B 26 17
25 12 18
28 14
27
18 33 12
9 17 18 19
A 3318 11
A 10
8
13
16
B
15
6
26
20 20
21
21
1 - Seat Cushion
2 - Seat Frame 10 - Spring 18 - Lockwasher 26 - Bolt
3 - Back Cushion 11 - Latch 19 - Washer 27 - Bolt
4 - Bolt 12 - Pad 20 - Bolt 28 - Washer
5 - Lockwasher 13 - Pivot Pin 21 - Lockwasher 29 - Lockwasher
6 - Bracket 14 - Latch Pin 22 - Spacer 30 - Nut
7 - Bolt 15 - Locknut 23 - Bracket 31 - Bolt
8 - Seat Base 16 - Hardened Washer 24 - Washer 32 - Spacer
9 - Hinge 17 - Nut 25 - Lap Belt 33 - Nut
SM 1902 1-00 1
Operator's Compartment - Passenger Seat and Mounting
Section 260-0110
arrangement. Located within seat base (8) are the 8. Remove bolts (27), washers (28), lockwashers (29)
major CEC components; battery equalizer box, and nuts (30) securing lap belt (25) to seat base (8)
electronic control unit (ECU) and CEC interface box. and remove lap belt (25). Remove bolts (26),
lockwashers (18), nuts (33) and brackets (6) from seat
A retractable lap belt (25) is secured to seat base (8) base (8).
using bolts (27), washers (28), lockwashers (29) and
nuts (30). A release button allows quick release of lap 9. If seat base (8) requires to be removed, disconnect
belt (25). the electrical cables in the following order to prevent
damage to the electrical components.
4. Remove mounting hardware, back and seat 3. Connect the electrical cables in the following order
cushions (1 & 3) from seat frame (2). to prevent damage to the electrical components.
5. Remove bolts (7 & 31), washers (24) and spacers a. Connect electrical connections at the ECU.
(22 & 32) securing bracket (23) to seat frame (2). b. Connect battery equalizer positive connections.
Remove bracket (23). c. Connect battery cables to terminal posts (positive
cables first).
6. Remove nut (17), lockwasher (18) and latch pin (14) d. Connect battery equalizer ground cables.
from bracket (23).
4. Position brackets (6) on seat base (8) and secure
7. Remove spring (10) from latch (11) and seat with bolts (26), lockwashers (18) and nuts (33).
base (8). Remove locknut (15), hardened washer (16) Position lap belt (25) on mounting brackets (6) and
and latch (11) from pivot pin (13). Remove nut (17), secure with bolts (27), washers (28), lockwashers (29)
lockwasher (18), washer (19) and pivot pin (13) from and nuts (30).
seat base (8).
2 SM 1902 1-00
Operator's Compartment - Passenger Seat and Mounting
Section 260-0110
7. Install latch pin (14) in bracket (23) and secure with To clean seat cushion (1) and back cushion (3), use
lockwasher (18) and nut (17). warm water and a mild soap, such as Castile. Work up
thin soap suds on a piece of soft cloth and rub the
8. Position bracket (23) on seat frame (2) and secure with upholstery briskly. Remove the suds with a damp
bolts (7 & 31), washers (24) and spacers (22 & 32). cloth, using no soap, and finish by wiping the
upholstery dry with a soft, dry cloth.
9. Position back and seat cushions (1 & 3) on seat
frame (2) and secure with mounting hardware. Lap belt (25) assembly should be inspected by the
user on a regular basis. Replace lap belt (25)
10. Position the seat assembly to hinge (9) of seat immediately if hardware is worn or damage, straps are
base (8) and secure with bolts (4) and lockwashers nicked or frayed, release mechanism is not functioning
(5). Tighten bolts (4) to a torque of 18 Nm (13 lbf ft) correctly, loose stitching is found, or if the strap
lubed. Lower seat assembly on seat base (8) and material has lost strength due to the effects of
ensure latch arrangement is operating correctly. ultraviolet rays.
11. Remove wheel chocks from road wheels. Note: Regardless of appearance, lap belt (25) must be
removed and replaced at least once every three years.
* * * *
SM 1902 1-00 3
OPERATORS COMPARTMENT - Air Conditioning
Section 260-0130
SM - 2430
1 3 IN
D
S OUT
4
5
SM 2043 R1 08-03 1
Operators Compartment - Air Conditioning
Section 260-0130
slow down this radiation of heat. Cooling fins are Blockage of the filter will result in a drop in pressure
located on the condenser tubes and fans are used to that will be indicated by a drop in system performance.
circulate cool air around the condenser tubes. Keep all Connections of the new receiver drier should be
leaves, paper, dirt, etc. clear from the condenser and securely capped before installation to prevent the
condenser filter. The cooling fins should be straight to entrance of moisture (air) while in storage.
permit free flow of air. The condenser is sometimes
located ahead of the engine radiator and blockage of
air flow through the radiator also affects the Thermostatic Expansion Valve
condenser. Bent fan blades, slipping fan drive, An expansion valve is installed in the system to lower
inoperable condenser fan motors, or any other fault the pressure before the R-134a enters the evaporator.
that lessens the amount of cool air circulated through The reduction in pressure is done by passing the
the condenser, should be corrected. The oil, dirt, or R-134a through a small hole (orifice). The size of the
antifreeze will act as an insulator that will inhibit the orifice must be controlled to compensate for changes
radiation of heat. in pressure and temperature. The temperature of
R-134a leaving the evaporator is sensed by a
Since the purpose of the condenser is to radiate heat thermostatic sensor that moves the valve seat via a
energy, anything that prevents or inhibits this action diaphragm and actuating pin.
may affect cooling, but the temperature and pressure
of the R-134a raise and lower together. Heat energy
that has not been radiated will remain in the R-134a Evaporator - Heat/Cool
and the result will be pressure that is too high. The The evaporator is the low pressure, low temperature
condenser, hoses, connections and seals can be component where liquid R-134a absorbs heat from
damaged by the high pressure. Pressure sensing surrounding air. The expansion valve bleeds high
safety switches may be activated by the high pressure pressure R-134a into the low pressure evaporator.
caused by the condenser not radiating enough heat. The R-134a expands rapidly in the evaporator and its
temperature is quickly reduced. The R-134a absorbs
heat from the air when the blower fan circulates air
Receiver Drier over the evaporator coil fins. The exchange of heat
The high pressure liquid R-134a moves from the from the air to the R-134a depends upon the
condenser to the receiver drier, where the R-134a is difference in temperature. During high heat load, such
stored and filtered. Moisture is the major enemy of the air as usually encountered when the system is first turned
conditioning system and the desiccant inside the receiver on, the temperature difference is great and the R-134a
drier will absorb only a small amount. The container of will absorb heat quickly. The blower fan can be set at
desiccant inside the receiver drier may break open and its highest setting to circulate large quantities of warm
contaminate the system if any attempt is made to dry the air around the evaporator. After the cab has cooled,
desiccant, or, if more moisture is inside the system than the fan speed should be reduced so that the already
the desiccant can absorb. cool air will have a longer time to yield heat to the
R-134a as it passes the evaporator coils. The heater
Every effort should be made to remove all moisture circuits utilize engine coolant at approximately 82° C
from the system and install a new receiver drier if its (180° F).
condition is questionable. Installation of a new receiver
drier is recommended each time any part of the
R-134a system is open to the atmosphere. Bubbles High Pressure and Low Pressure Switches
are observed in the sight glass on top of the receiver The pressure switches are electric switches that
drier during the charging procedure. monitor air conditioner operation. The high pressure
and low pressure switches are activated at preset
A filter screen is located in the receiver drier to stop pressures and engage and disengage the compressor
solid contaminates circulating round the system. clutch.
2 SM 2043 R1 08-03
Operators Compartment - Air Conditioning
Section 260-0130
3. If required, remove mounting hardware securing 15. Slacken nuts (26) and washers (27 & 28) on
hoodsides to vehicle. Remove hoodsides. adjuster rod (21) to release tension on drive belt (11).
4. Discharge the air conditioning system as described 16. Slacken bolts (14 & 17), lockwashers (15 & 18),
under 'Discharging The System'. washers (16 & 19), spacer (20) and fixing block (22).
SM 2043 R1 08-03 3
Operators Compartment - Air Conditioning
Section 260-0130
SM - 2560A
11
4 7
2
8
9
8 1
14
17
12 16 15
3
2
32
31
1
30 19 18 10
20 23
26 27 24 13
21
22
25 24
28
29 27
26
4 SM 2043 R1 08-03
Operators Compartment - Air Conditioning
Section 260-0130
SM - 2560B
42
33
41
37
40
39
38
35
35
36
34
SM 2043 R1 08-03 5
Operators Compartment - Air Conditioning
Section 260-0130
Drive belt (11) should now be free to slide off of groove 4. Install receiver/drier (6) to mounting bracket (9) and
in compressor (10). secure with clamps (8). If removed, secure mounting
bracket (9) assembly to vehicle with mounting
17. Support compressor (10) and remove bolts (14, 17 hardware removed during Removal.
& 23), lockwashers (15 & 18), washers (16, 19, 24, 27
& 28), nuts (25 & 26), spacer (20), adjuster rod (21), 5. Remove caps from end of refrigerant hoses (2 & 4)
fixing block (22) and mounting bracket (29) securing and ports on receiver/drier (6), renew 'O' rings and
compressor (10) to mounting bracket (12). Remove connect hoses to ports as tagged at Removal. Renew
compressor (10) from the vehicle. 'O' ring and connect switch (7) to receiver/drier (6).
Note: If drive belt (11) does not require replacement 6. If removed, install condenser unit (5) to vehicle and
do not remove from engine fan pulley. If drive belt (11) secure with mounting hardware removed during
requires replacement, proceed with step 18. Removal.
18. Release tension on Poly 'V' fan belt and remove 7. Remove caps from end of refrigerant hoses (3 & 4)
from fan pulley. Remove compressor drive belt (11) and ports on condenser unit (5), renew 'O' rings and
from the rear groove of the fan pulley. Refer to Section connect refrigerant hoses (3 & 4) to condenser unit (5)
110-0030, ENGINE AND MOUNTING. ports as tagged at Removal.
19. If required, remove bolts (30), washers (31), 8. If removed, install mounting bracket (12) to vehicle
lockwashers (32) and mounting bracket (12) from and secure with bolts (30), washers (31) and
vehicle. lockwashers (32).
20. If required, disconnect all clamps and clips 9. Fit compressor (10) to mounting bracket (12) and
securing refrigerant hoses and harnesses to the secure with bolts (14, 17 & 23), lockwashers (15 & 18),
vehicle. Remove hoses and harnesses from the washers (16, 19, 24, 27 & 28), nuts (25 & 26), spacer
vehicle. (20), adjuster rod (21), fixing block (22) and mounting
bracket (29). Do not fully tighten at this stage.
INSTALLATION Note: If Poly 'V' fan belt and compressor drive belt
Numbers in parentheses refer to Fig. 2, unless (11) were removed, proceed with steps 10 & 11.
otherwise stated.
10. Install new drive belt (11) onto rear groove on
Note: Tighten all fasteners to standard torques engine fan pulley and fit to rear groove on compressor
specified in Section 300-0080, STANDARD BOLT (10).
AND NUT TORQUE SPECIFICATIONS.
11. Refit Poly 'V' fan belt and adjust tension. Refer to
Section 110-0030, ENGINE AND MOUNTING.
WARNING
To prevent personal injury and property 12. Adjust tension of compressor drive belt (11) with
damage, be sure wheel blocks, blocking nuts (26) on adjuster rod (21) until there is
materials and lifting equipment are properly approximately an inward deflection of 10 mm (0.4 in)
secured and of adequate capacity to do the job at the centre of drive belt (11). Fully tighten all
safely. mounting hardware.
1. If removed, position front cover (34, Fig. 3) and filter 13. Install drive belt guard (13) and secure using
assembly (36, Fig. 3) on air conditioner unit mounting hardware as removed at Removal.
(33, Fig. 3) and secure using quarter-turn screws.
14. Remove caps from end of refrigerant hoses (1 & 3)
2. Remove caps from end of refrigerant hoses (1 & 2) and ports on compressor (10), renew 'O' rings and
and adaptors on cab firewall, renew 'O' rings and connect hoses to ports as tagged at Removal.
connect hoses to ports as tagged at Removal.
15. Connect electrical connection to compressor (10)
3. Route refrigerant hoses (1 & 2) and secure with clutch.
clamps removed during Removal.
6 SM 2043 R1 08-03
Operators Compartment - Air Conditioning
Section 260-0130
16. Secure all lines with clips and clamps as removed 3. To check the refrigerant level, run the engine at
during removal. Ensure no lines are chaffing on sharp 1 200 rev/min with fans on high speed and thermostat
edges or resting against areas where heat will be fully open for a minimum of five minutes. If the clutch is
evident. engaged in this situation, there should be very few
bubbles visible in the receiver-drier sight glass.
17. Charge the air conditioning system as described
under 'Charging Procedure'. Note: Unit can operate with occasional bubbles
visible, but not milky looking.
18. Start up the engine and check for correct operation
of the air conditioning system. 4. Ensure all hoses and hose clamps are free from
contact with sharp metal, moving parts or near to
19. Secure hood sides to vehicle and remove wheel manifolds.
blocks.
5. Inspect condensation drain lines for debris, sharp
bends or breaks.
MAINTENANCE
6. Inspect the clutch wire from the thermostat for bare
spots.
WARNING
Always wear goggles or glasses to protect 7. Inspect bolts and nuts on the compressor and
your eyes when working around R-134a. mounting bracket for proper tightness.
R-134a boils at sea level temperatures of
-29.8° C (-21.6° F), which means that direct 8. Inspect and clean outside and inside cab air filters
contact with your skin will produce frostbite. periodically, depending on dust conditions. Replace
Exercise extreme care when handling R-134a. the outside filter when it becomes saturated to the
point it won't come clean.
If you get the slightest trace of R-134a in
your eye, flood the eye immediately with cool
water; then treat with mineral oil or clear Maintenance of 'V' belt Drives
petroleum jelly followed by boric acid rinse. 1. Listen for 'ticking' sound - they mean interference
Report to a hospital or doctor as soon as with the belts. Visually inspect for bent or damaged
possible. belt guards.
The chemicals of R-134a change when 2. Replace all belts in a mismatched set at one time to
burned and become a poison phosgene gas ensure even load distribution.
that will damage the respiratory system if
inhaled. NEVER SMOKE in an area where 3. Periodically check tension and keep belts tight.
R-134a is used or stored. Use hot water or an
approved heated charge cylinder as a heat - The ideal tension is the lowest tension at which the
source if required to force R-134a into the belt will not slip under peak load conditions.
system. If using water, do not exceed 52° C - Check belt tension frequently during the first 24 - 48
(125° F). Never use direct flame or electric hours of run-in operation.
heaters in direct contact with the R-134a - Initial belt tension should be 445 N (100 lbf)
container. High temperatures may result in dropping to 334 N (75 lbf) after the first 48 hours.
raising the pressure to a dangerous level. - There should be a freeplay of 10 mm in the 'V' belt.
- Do not over tension belts.
1. Periodically clean the condenser coil of debris and - Keep belts free from foreign material that may
dirt using water or air pressure. A partially blocked cause slippage.
condenser coil can reduce the life of the compressor - Inspect the V-drive periodically. Re-tension belts if
belt and/or clutch. they are slipping.
- Maintain sheave alignment with a strong straight
2. If the system has a heater in the same location as edge tool while tensioning belts.
the air conditioning evaporator core, heater valves
should be closed. 4. Never attempt to correct belt slippage by using a
SM 2043 R1 08-03 7
Operators Compartment - Air Conditioning
Section 260-0130
belt dressing. The dressing may cause softening and or by using an oil injector when the system is being
deterioration. charged, observing the following good practises:
5. If belt slips, even when properly tensioned, check a. Only pour the amount required from the container
for overload, worn sheave grooves or oil or grease on straight into a CLEAN measuring jug and
the belts. immediately pour the oil into the compressor.
b. Re-cap container tightly as soon as the required
6. Never pry a 'V' belt or force it into the sheave amount has been taken (never leave an oil container
groove. Loosen the 'V' belt tightener prior to open).
installation. c. Do not mix different oils.
7. A belt that has operated while rolled over in the Only new oil should be used, because oil that has
sheave groove may be damaged - replace it. been exposed to the air will have absorbed water
(hygroscopic).
8. Store belts in a cool, dry place. If stored on a
machine, relieve all belt tension by loosening the Use only refrigerant oil as specified in Section
'V' belt tightener. 300-0020, LUBRICATION SYSTEM.
8 SM 2043 R1 08-03
Operators Compartment - Air Conditioning
Section 260-0130
Fig. 4 - Standard Service Manifold 8. Open the low side hand valve on the manifold and
vacuum pressure valve (1) and watch that the gauges
from the system components. If any of the major start to register that a vacuum is being drawn. If the
system components are to be repaired or replaced, gauges do not register the vacuum then a blockage or
the system must also be completely discharged. leak is present. Open the high side and pump down
until a vacuum of 10 mb is achieved.
SM 2043 R1 08-03 9
Operators Compartment - Air Conditioning
Section 260-0130
pressure. Watch the high side manifold gauge (C) rise 5. Connect the high pressure gauge hose (red hose
to ensure that no blockage is present. Close the and gauge) to discharge or high side fitting on
manifold valve and cylinder, then disconnect the hose compressor.
from the cylinder.
6. Connect yellow supply hose to suction port on
13. Connect the service hose (yellow) to the Nitrogen vacuum pump.
cylinder. Open the neck valve on the cylinder and set
the regulator pressure such that it is higher than the 7. Open both sides of gauges, low and high, completely.
system pressure then purge the hose. Open the low
side hand valve on the manifold, as the pressure rises 8. Start vacuum pump to evacuate the complete air
open the high side hand valve on the manifold and conditioning system.
allow a system pressure of 10 bar (150 psig) to be
reached. Close all the valves. Using a suitable 9. Run vacuum pump for approximately 30 minutes.
electronic leak detector, check all joints in the air Ideal gauge readings should be 29.92 inches of
conditioning system for leaks. Tighten any loose joints mercury. The pressure will vary with altitude; it will be
and re-test if necessary. approximately 0.03 bar (0.5 lbf/in²) less for each 305 m
(1 000 ft) of elevation.
14. If removed, secure hood sides to vehicle and
remove wheel blocks. 10. Before disconnecting power supply from vacuum
pump, close both high and low side gauges. Remove
yellow hose from vacuum pump and connect to
CHARGING THE SYSTEM R-134a source.
Note: Refer to all WARNINGS listed under
'Maintenance' prior to charging the system. 11. Open R-134a source. Loosen, but do not remove,
yellow supply hose at manifold on gauges to remove
Recommended Equipment Required: all air in the yellow supply hose, replacing the air with
Portable High Vacuum Charging Station R-134a. This is done in a few seconds. Tighten yellow
Electronic Leak Detector supply hose.
or Standard Service Manifold (Refer to Fig. 4)
12. Open low side of R-134a gauges slowly. When
gauge reads zero open both sides completely.
For New Or Completely Empty System Vacuum in the system will draw R-134a gas into the
Note: The charging procedure must be done in system. Hold until both gauge readings equalize.
ambient temperatures above 15.5° C (60° F) with the
R-134a canister temperature equal to the outside Note: Never charge with liquid R-134a. Charge on the
ambient temperature. low pressure side only.
4. Connect low pressure gauge hose (blue hose and 3. At this point a visual inspection must be made of the
gauge) to suction side or low side fitting on sight glass on top of the receiver-drier. As charging
compressor. The suction side can be identified by the continues, the sight glass will appear milky coloured
size of the hose connected to the fitting. This will be as the bubbles in the system circulate. As the system
the largest diameter hose of the system. continues the charging process, the regularity of the
10 SM 2043 R1 08-03
Operators Compartment - Air Conditioning
Section 260-0130
bubbles in the sight glass will gradually diminish. The system is completely charged when;
When no bubbles are seen in the sight glass, close the
low pressure valve (blue side) completely. a. the sight glass is free from bubbles.
b. the suction pressure on the gauge is approx.
4. Increase the engine idle speed while observing the 20 - 30 psig at 25° C ambient.
sight glass. If many bubbles are seen resulting from c. the correct weight of refrigerant has been added
the increased engine speed, open the low pressure (typically 1.4 kg (3 lb)).
side valve. Allow the system to continue the charging d. the correct superheat can be measured at the
procedure until the sight glass is clear. If the sight evaporator, approx. 3 - 6° C.
glass remains clear, with the increased engine speed, e. the correct sub-cooling can be measured at the
do not add any more R-134a. condenser, approx. 5 - 7° C.
Note: Occasionally bubbles are noticed during clutch 6. Replace protective caps on hoses and valve fittings.
cycling or system start-up. This is a normal condition.
7. Secure hood sides to vehicle and remove wheel
5. With the system completely charged, shut off the blocks.
engine. Close the valve on the R-134a canister and
remove the yellow supply hose. Remove both the low
pressure (blue) hose and high pressure (red) hose SPECIAL TOOLS
from the filling ports on the compressor. Refer to Section 300-0070, SERVICE TOOLS, for part
numbers of special tools referenced in this section and
Note: Some R-134a will escape as the hoses are general service tools and sealants required. These
being removed. Replace protective caps on hoses. tools and sealants are available from your dealer.
SM 2043 R1 08-03 11
Operators Compartment - Air Conditioning
Section 260-0130
12 SM 2043 R1 08-03
Operators Compartment - Air Conditioning
Section 260-0130
SM 2043 R1 08-03 13
Operators Compartment - Air Conditioning
Section 260-0130
* * * *
14 SM 2043 R1 08-03
BODY - Body and Mounting
Section 270-0010
SM - 2423
1 5
6
2
38
37 37
36
35 39
34
3,4
40 25 27 22 24
41
43 17
42
44
18
19 16
14,15 23
11 21
BODY
12
20
FRAME 9,28,29 7
26
30,31 9
8 10 13
32,33
SM 1917 7-00 1
Body - Body and Mounting
Section 270-0010
OPERATION
The body control joystick, mounted at the left hand WARNING
side of the drivers' seat, controls the body control To prevent personal injury and property
valve which supplies hydraulic oil to operate the body damage, be sure wheel chocks and lifting
hoist cylinders. equipment are properly secured and of
adequate capacity to do the job safely.
The four operating positions of the body control
joystick from front to rear are; Lower, Float, Hold and 1. Position the vehicle in a level work area, apply the
Raise. Refer to Section 230-0060, BODY CONTROL parking brake and block all road wheels.
VALVE and, Section 230-0081, BODY CONTROL
JOYSTICK. 2. Raise body assembly (1) and install body safety
pins (24).
Move the body control joystick all the way back to the 5. Support body hoist cylinders from the rear of the
'Raise' position and accelerate the engine. The body vehicle to prevent them swinging back on removal of
can be stopped at any point by moving the joystick to cylinder mounting pins. Remove cylinder mounting
'Hold'. Decelerate the engine as the last stages of the pins and allow body hoist cylinders to rest against the
body hoists begin to extend to slow the raising speed chassis.
as the hoists approach their maximum extensions.
6. Remove bolts (22) and hardened washers (23)
When the body has been raised to the desired height, securing body hinge pins (21) through body
move the control joystick to the 'Hold' position until the assembly (1) and pin mounting bores.
body is to be lowered.
7. Remove body hinge pins (21) and shims (20) from
body assembly (1) and pin mounting bores. Using
Lowering the Body suitable lifting equipment, sling body assembly (1) and
To lower the body, move the control joystick to the remove from the vehicle.
'Float' position to allow the body's weight to lower it to
the frame. Body descent can be stopped at any Note: Do not remove body pads (10) and shims (14 & 15)
position by moving the joystick back to the 'Hold' unless body pads (10) are being replaced.
position. If the body does not begin to lower by its own
weight, such as after dumping downgrade, move the 8. If required, remove locknuts (13), hardened
control joystick all the way forward to the 'Lower' washers (26), washers (12) and bolts (11) securing
position and power the body downward until it begins body pads (10) and shims (14 & 15) to body
lowering by gravity. Then move the joystick to 'Float' to assembly (1). Remove and discard body pads (10)
allow the body to lower the rest of the way to the and shims (14 & 15).
chassis.
Make sure that the body is completely lowered and the INSTALLATION
control lever is in 'Float' before releasing the brakes Numbers in parentheses refer to Fig. 1.
and moving the vehicle.
Note: Tighten all fasteners to standard torques listed
in Section 300-0080, STANDARD BOLT AND NUT
REMOVAL TORQUE SPECIFICATIONS.
Numbers in parentheses refer to Fig. 1.
Note: Approximate weight of body assembly (1) is
Note: Approximate weight of body assembly (1) is 11 500 kg (25 350 lb).
11 500 kg (25 350 lb).
2 SM 1917 7-00
Body - Body and Mounting
Section 270-0010
1. Ensure body hinge pins (21) and bores in body Note: When it becomes necessary, body pads (10)
assembly (1) are thoroughly cleaned with a suitable should be replaced as a set to maintain load
solvent. Coat body hinge pins (21) and bores in body distribution along the chassis. Existing body pads will
assembly (1) with a suitable anti-seize compound. have taken a compression 'set' and a new pad
shimmed to match existing pads will not carry its share
2. Using suitable lifting equipment, sling body of the load, resulting in uneven load distribution along
assembly (1) and centralise over the frame. the chassis.
3. Align body hinge pin (21) bores in body assembly Note: The body guides should also be inspected and
(1) with mounting bores in the frame. Install body hinge rebuilt with shims (29, 30, 31 or 32) as necessary at
pins (21) and secure with bolts (22) and hardened this time.
washers (23).
1. Raise body assembly (1) clear of the frame and
4. Remove lifting equipment from rear lifting points on position body pads (10) roughly in position on the
body assembly (1) and raise the front end of body frame rails. Lower body assembly (1) onto body
assembly (1) to provide access to install body hoist pads (10).
cylinders. Position wooden blocks (or suitable stands)
on the frame rails and lower body assembly (1) to rest 2. Shim the two rear body pads (10) with shims
on the blocks. Remove lifting equipment from body (14 & 15) until body hinge pins (21) are just touching at
assembly (1). the top of body assembly (1) bores.
5. Start the engine and using the body control lever, 3. Shim remaining body pads (10) with shims (14 & 15)
extend the body hoist cylinders until mounting holes to ensure body assembly (1) is resting parallel on the
are aligned with mounting bores on body assembly (1). frame.
Secure both body hoist cylinders to body assembly (1).
Refer to Section 230-0130, BODY CYLINDER. 4. Secure body pads (10) and shims (14 & 15) to body
assembly (1) with bolts (11), washers (12), hardened
6. Raise body assembly (1), remove blocks and lower washers (26) and locknuts (13).
body assembly (1).
5. Centralise body assembly (1) on the frame rails,
7. If removed, install body pads (10) and shims (14 & 15) remove body hinge pins (21) and reinstall with shims
as described under 'Body Shimming Procedure'. (20) to obtain a maximum gap of 1.5 mm (0.060 in)
between inner leg and body pivot. Secure body hinge
8. Centralise body assembly (1) on the frame rails, pins (21) with bolts (22) and hardened washers (23).
remove body hinge pins (21) and shim body hinge pins
(21) with shims (20) as described under 'Body 6. Ensure body assembly (1) is centralised on the
Shimming Procedure'. frame rails and measure gap between body guides on
the frame and the body guides. Secure shims (30, 31,
9. If removed, shim the body guides with shims (30, 32 or 33) to body guides on body assembly (1) using
31, 32 or 33) as described under 'Body Shimming bolts (28), washers (9) and nuts (29) as shown in
Procedure'. Figure 1. Leave a gap of 3.3 mm (0.13 in) between
body and frame guides.
10. Raise and lower body assembly (1) and check for
correct clearance at body hinge pins (21) and body Note: Only one shim (30, 31, 32 or 33) to be used on
guides. each side.
SM 1917 7-00 3
Body - Body and Mounting
Section 270-0010
7. Raise and lower body assembly (1) and check for gases. The resulting fire in the heating passages is
correct clearance at body hinge pins (21) and body helpful in that it burns away some of the carbon and
guides. helps keep the body passages open. However, the fire
should be allowed to burn itself out and should not be
encouraged by pouring fuel into the passages.
CLEANING HEATED BODY
Note: Optional exhaust heating of the body is If excessive exhaust back pressure develops, another
available for dumping of sticky or frozen materials. method of cleaning out the body passages is to
remove the heat channel plates and scrape the carbon
from the heating passages.
WARNINGS
To prevent personal injury and property To remove the heat channel plates, burn out the weld
damage, be sure lifting equipment is properly around them and lift out from the body assembly with
secured and of adequate capacity to do the job suitable lifting equipment.
safely.
Note: Prior to welding on the vehicle, follow the
Oxygen and oil should never be blown procedures outlined for 'Welding' in Section 100-0010,
into the body passages in an attempt to burn CHASSIS, HOOD AND FENDERS.
out the carbon deposits, as the combination of
oxygen and oil forms a highly explosive After the heating passages are thoroughly cleaned,
mixture. replace the heat channel plates and weld to sides and
bottom of the body assembly.
It is necessary to periodically clean out the carbon
deposits in the body heating passages which restrict
the flow of exhaust gases. This reduces the engine MAINTENANCE
efficiency and prevents the body from being heated. Lubricate body hinge pins and body hoist cylinder pins
at the intervals stated and with lubricant specified in
Occasionally the carbon deposits are ignited by Section 300-0020, LUBRICATION SYSTEM.
spontaneous combustion or by heat from the exhaust
* * * *
4 SM 1917 7-00
MISCELLANEOUS - Lubrication System
Section 300-0020
SM - 2543
7 1 16 21 5 8 26 10 20 24 21 22 19 12 21 25 13 18 9 14
27 6 23 22 26 8 10 24 11 24 4 20 2 3 15 25 18 17 9 14
SERVICE CAPACITIES
Ref. Service Capacities
Points Identification Lubricant litres US gal
1 Engine Crankcase and Filters EO 94 25
2 Transmission and Filters HTF 85 22.5
3 Main Hydraulic Tank HO 258 68
- Main Hydraulic System HO 432 114
4 Steering Hydraulic Tank HO 61 16
- Steering Hydraulic System HO 92 24.3
27 Cooling System Coolant 236 62.3
19 Fuel Tank Diesel 938 248
8 Front Ride Cylinders (Each) HO 25 6.6
9 Rear Ride Cylinders (Each) HO 21 5.5
16 Engine Power Takeoff EPL 2 0.53
17 Differential EPL 52 13.7
18 Wheel Planetaries (Total) EPL 43 11.4
- Air Conditioning Compressor PAG Oil 0.135 0.036
Note: Capacities given are approximate. Work to dipstick, sight gauges or level plugs. Use table in
conjunction with 'Recommended Lubricants' table.
RECOMMENDED LUBRICANTS
COMPONENT LUBRICANT VISCOSITY (See Note 1)
Transmission Allison C-4 Type Specification; Refer to Ambient Temp Recommendation
www.allisontransmission.com for a complete -35° C SAE 0W-30 or Transynd RD
list of C-4 approved oils. See note 3* -30° C SAE 0W-20 (Arctic)
-28° C DEXRON-III
-20° C SAE 10W
-15° C SAE 15W-40
0° C SAE 30
10° C SAE 40
Engine Engine oil with 1.00 % sulphated ash is SAE 15W-40
recommended. Sulphated ash must not exceed
1.85 % limit. Meeting MIL-2104F specifications.
API code CG-4. See Note 2.
Hydraulic System Hydraulic Transmission Oil meeting SAE 10W
Specification EMS19058. See Note 4. at ambient temperatures of -18° to 32° C
SAE 30W
at ambient temps of 32° C and above
Cooling System Heavy Duty Coolant. Refer to Section
210-0000, COOLING SYSTEM.
Fuel Tank Diesel Fuel Oil with maximum Sulphur 0.5%. DIN EN590
Differential Multipurpose Extreme Pressure type gear oil SAE 80W-90
Planetary Gears meeting MIL-L-2105C Specifications (No Zinc at ambient temperatures of -18° to 32° C
Power Takeoff Additive). See Note 5.
Grease Fittings Multipurpose Extreme Pressure Lithium No. 2 Consistency
Grease (which may, or may not contain
'Molybdenum'), with a typical melting point of
190° C.
Drivelines Multipurpose Extreme Pressure Lithium No. 2 Consistency
Steering Column Grease (without 'Molybdenum'), with a typical
Wheel Bearings melting point of 190° C.
Ride Cylinders Hydraulic oil meeting MIL-L-2104C SAE 10W
(Nitrogen/Oil) Specifications or API Service code CC or at ambient temperatures of -18° to 32° C
CD/SC.
Air Conditioning Polyalklene Glycol (PAG) ISO46
Compressor Compressor Lubricating Oil - Low Viscosity SP 10
Temperature Conversions
° Celsius -32 -30 -27 -25 -20 -18 -15 -10 0 10 15 25 32 35 38 45 93 190
° Fahrenheit -26 -22 -17 -13 -4 0 5 14 32 50 59 77 90 95 100 113 200 375
* * * *
Cab
15271016 - Glass Removal Tool
15271017 - Bonding Kit (Quick Dry)
Lubrication
09122784 - Grease Gun Assembly
09175662 - High Pressure Bucket Pump Lube Kit
SM - 112
in mm
1/8 3.2
ONE-4340 STL. OR EQUIV.-HDN.-GRIND
1/4 6.4
3/8 9.5
7/16 11.1
1/2 12.7
5/8 15.9
3/4 19.1
29/32 23.0
1 25.4
1 1/8 28.6
ACME THD.
1 1/4 31.8
1 3/8 34.9
1 1/2 38.1
APPROX ONE-4340
STL.-HDN.-GRIND 1 7/8 47.6
2 50.8
2 1/32 51.6
2 1/8 54.0
2 15/32 62.7
2 3/4 69.9
4 3/4 120.7
4 7/8 123.8
5 1/2 139.7
5 3/4 146.0
5 31/32 151.6
6 7/8 174.6
7 1/2 190.5
9 1/2 241.3
SM - 126
0.56 - 3 HOLES
in mm
EQUALLY SPACED
0.12 3.0
0.50 12.7
0.56 14.22
0.62 15.7
1.00 25.4
1.62 41.1
2.00 50.8
2.50 63.5
MATERIAL: 3.25 82.5
PLAIN CARBON STEEL 3.31 84.0
9.38 238
15.88 403
26.25 668
SM - 1487 SM - 1488
117 16 108 16
77.8 4.45 77.8 4.45
+- 0.13 +- 0.13
R51.6 R51.6
14 7.1 14 7.1
+- 0.13 +- 0.13
66.7 +- 0.25
66.7 +- 0.25
28.4
42.9
42.9
57
42.9
R0.50 R0.50
/0.76 /0.76
½in NPT R15
R15 R0.13/0.25
R0.13/0.25
Fig. 3 - Fabrication of Blanking Plate for Port 'B' Fig. 4 - Fabrication of Blanking Plate for Port 'C'
(Section 165-0030, BRAKE PARTS) (Section 165-0030, BRAKE PARTS)
0.177
0.139
0.130
INCHES
9.6
6.6
6.3
5.6
4.8
4.6
4.5
3.5
3.3
3.0
mm
15.7
12.7
11.9
1.52
0.76
Section 300-0070
6.00
5.50
4.00
3.00
2.56
2.50
2.00
1.68
1.12
1.00
0.81
0.75
0.72
20.00
INCHES
508
152
140
101
76.2
65.0
63.5
50.8
42.7
28.4
25.4
20.5
19.0
18.2
100 SQ.
STOCK
ITEM #1 -
HANDLE
Miscellaneous - Service Tools
.250 DIA.
HOLE THRU.
KNURL
DIA. HOLE
ITEM #5 - 'T' HANDLE
(WELDMENT)
.19 SQ.
8-32 UNC 2B X .38 MIN. FULL STOCK
THD. MINOR DIA. .130/.139 X .72 ITEM #3 - PIVOT BLOCK
DEEP
SM - 403
ALUMINIUM RING
SM - 404
Fig. 7 - Bearing Inner Race Installation Tool (Section 220-0050, STEERING PUMP)
SM - 625
* * * *
SM 1238 2-98 1
Miscellaneous - Standard Bolt and Nut Torque Specifications
Section 300-0080
Note: Where materials other than GM Standards are used, refer to the conversion table below.
Types of Steel Rockwell Hardness Range Applicable Torque Values SAE Bolt Head Symbols
2 SM 1238 2-98
Miscellaneous - Standard Bolt and Nut Torque Specifications
Section 300-0080
SM 1238 2-98 3
Miscellaneous - Standard Bolt and Nut Torque Specifications
Section 300-0080
Lockscrews Locknuts
SAE Grade 5 & 8
and ASTM A-574 SAE Grade 5 SAE Grade 8
Size Nm lbf in Nm lbf in Nm lbf in
0.25 - 20 0.3 3 0.4 3.5 0.5 4.5
0.25 - 28 0.3 3 0.4 3.5 0.5 4.5
0.31 - 18 0.6 5 0.6 5.5 0.9 7.5
0.31 - 24 0.6 5 0.6 5.5 0.9 7.5
0.38 - 16 1.0 9 1.0 8.5 1.3 11.5
0.38 - 24 1.0 9 1.0 8.5 1.3 11.5
0.44 - 14 1.4 12 1.4 12 1.8 16
0.44 - 20 1.4 12 1.4 12 1.8 16
0.50 - 13 1.8 16 1.7 15 2.3 20
0.50 - 20 1.8 16 1.7 15 2.3 20
0.56 - 12 2.5 22 2.4 21 3.2 28
0.56 - 18 2.5 22 2.4 21 3.2 28
0.62 - 11 3.4 30 3.1 27 4.1 36
0.62 - 18 3.4 30 3.1 27 4.1 36
0.75 - 10 5.1 45 4.6 41 6.1 54
0.75 - 16 5.1 45 4.6 41 6.1 54
0.88 - 9 7.3 65 7.0 62 9.3 82
0.88 - 14 7.3 65 7.0 62 9.3 82
1.00 - 8 9.6 85 9.5 84 12.7 112
1.00 - 12 9.6 85 9.5 84 12.7 112
1.00 - 14 - - 9.5 84 12.7 112
* * * *
4 SM 1238 2-98
MISCELLANEOUS - Unit Storage
Section 300-0090
5. RUST PREVENTION - Remove all evidence of rust 8. TRANSMISSION - Consult the relevant
from the machine and repaint. In addition, cover all Transmission Maintenance Manual for storage data
exposed machine surfaces with a good rust involving periods longer than 30 days.
preventive.
9. ENGINE - Consult the relevant Engine Maintenance
6. SUPPLY TANKS - Fill fuel and hydraulic tanks to Manual for storage data involving periods longer than
prevent moisture condensation within the tanks. 30 days.
7. TYRES - Inflate all tyres to correct pressure. During 10. VENTS AND BREATHERS - Remove all vents
storage, check inflation pressure approximately once and breathers and plug openings with pipe plugs. If it
every two weeks. is not possible to do this, seal vents and breathers with
waterproof tape.
SM 1239 2-98 1
Miscellaneous - Unit Storage
Section 300-0090
EXTENDED STORAGE - Over Six Months 2. BATTERIES - Install batteries and check for a full
When a machine is to be stored for a period over SIX charge. Charge batteries as required.
MONTHS, the following procedure must be followed:
3. TYRES - Inflate tyres to the proper pressures. Refer
Note: These steps are in addition to those given to Section 140-0040, WHEEL RIM AND TYRE, of this
previously under 'Extended Storage - Under Six manual.
Months'.
4. FUEL AND HYDRAULIC TANKS - Drain off
1. LUBRICATION - Completely lubricate the machine condensation and fill tanks to proper level, remove
according to the instructions contained in Section breather covers and install air breathers. Be sure
300-0020, LUBRICATION SYSTEM of this manual. breathers are clean before installation.
2. WHEEL BEARING - Remove, clean, inspect and 5. VENTS AND BREATHERS - Remove seals and
repack all wheel bearings. plugs from all breather openings, then install all
breathers and vents.
Note: The above steps must be repeated for every Six
Month period the machine is in storage. 6. ENGINES - Consult the relevant Engine
Maintenance Manual for instructions on removing an
engine from storage.
REMOVAL FROM EXTENDED STORAGE
7. PAINT - Check machine for rust. Remove all rust
General spots and repaint rusted areas.
1. LUBRICATION - Completely lubricate the machine
according to the instructions in Section 300-0020, 8. TRANSMISSION - Consult the relevant
LUBRICATION SYSTEM of this manual. Transmission Maintenance Manual for instructions on
removing from storage.
* * * *
2 SM 1239 2-98