0% found this document useful (0 votes)
69 views1 page

Exercise 1

Uploaded by

Nur Azlin Idayu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views1 page

Exercise 1

Uploaded by

Nur Azlin Idayu
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EXERCISE 1

1. You are required to analyse and calculate cost of an excavator. Provide cost of
operating the excavator in 1 hour.
– Cost of excavator RM 350,000
– Estimated plant maintenance cost RM 35,000/5yr
– Duration of use 5 yr
– Yearly interest rate 10%
– Usage rate in a year 275 days
– Operator cost RM 40/day
– Diesel (daily) RM 50
– Grease (daily) RM 5

2. You are required to do an excavation work as part of site clearing activity. The
excavation should not exceed 300mm depth (average depth is 150mm) for a 900 m2
field area. Type of soil is sand, and all excavation works to be done manually. If gross
profit required is 15%, how much cost for the site clearing is needed.

Given information:
Labour constant
– Excavation not more than 300mm (average 150mm) - 0.58hr/m2
– Levelling the excavated level 0.12hr/m2
– Discarding excavated materials 1.2hr/m3
– Daily labour rate 40.00