Aritmatik Volume: Deskripsi: Pekerjaan Pelat Lantai Dimensi Plat Panjang Lebar Luasan M M m2 Lantai 2

The document provides details on floor plates for a building project including: - Dimensions and areas of floor plates for levels 2-4 and the roof level. - Reinforcement details including bar diameter, spacing, number of layers and dimensions. - Calculations of concrete and formwork volumes and reinforcement weights by floor. The document contains technical specifications for construction elements and reinforcement requirements for multiple levels of a building.

Uploaded by

maria josephine
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
61 views18 pages

Aritmatik Volume: Deskripsi: Pekerjaan Pelat Lantai Dimensi Plat Panjang Lebar Luasan M M m2 Lantai 2

The document provides details on floor plates for a building project including: - Dimensions and areas of floor plates for levels 2-4 and the roof level. - Reinforcement details including bar diameter, spacing, number of layers and dimensions. - Calculations of concrete and formwork volumes and reinforcement weights by floor. The document contains technical specifications for construction elements and reinforcement requirements for multiple levels of a building.

Uploaded by

maria josephine
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 18

ARITMATIK VOLUME

Deskripsi : Pekerjaan Pelat Lantai

Dimensi Plat

No GRID TYPE ELEVASI


Panjang Lebar Luasan

m m m2

LANTAI 2
1 1 - 4 / A - B L2 + 4.00 2.00 5.00
2 2 - 4 / B - B1 L2 + 4.00 3.00 5.00
3 1 - 4 / B1 - C L2 + 4.00 3.00 5.00
4 1 - 2 / C - D L2 + 4.00 3.00 5.00
5 4 - 5 / A - B L2 + 4.00 4.00 1.80
6 3 - 4 / B - C L2 + 4.00 3.00 1.80
7 1 - 2 / D - D' L3 + 4.00 1.00 5.00

TOTAL VOLUME L2

LANTAI 3
1 1 - 4 / A - B L3 + 8.00 2.00 5.00
2 2 - 4 / B - B1 L3 + 8.00 3.00 5.00
3 1 - 4 / B1 - C L3 + 8.00 3.00 5.00
4 2 - 3 / C L3 + 8.00 3.00 5.00
5 4 - 5 / A - B L2 + 8.00 4.00 1.80

TOTAL VOLUME L3

LANTAI 4
1 1 - 4 / A - B L4 + 12.00 2.00 5.00
2 2 - 4 / B - B1 L4 + 12.00 3.00 5.00
3 1 - 4 / B1 - C L4 + 12.00 3.00 5.00
4 4 - 5 / B1 - C L4 + 12.00 3.00 1.80
5 4 - 5 / B - B1 L4 + 12.00 3.00 1.80
6 6 - 7 / C - C' L4 + 12.00 0.75 5.00
7 7 - 8 / B4 - C
TOTAL VOLUME L4

LANTAI ATAS
1 1 - 4 / A' - A LA + 12.00 1.80 5.00
2 4 - 5 / A' - A LA + 12.00 1.80 1.80
3 4 - 5 / A - B LA + 12.00 4.00 1.80
4 1 - 5 / B - C LA + 12.00 3.00 1.80
5 1 - 5 / C - C' LA + 12.00 1.80 1.80
6 1 - 5 / C - C' LA + 12.00 1.80 5.00

TOTAL VOLUME LA
Dimensi Plat PENULANGAN P
Vol Beton Vol Bekisting
Jumlah dimensi per m3
Tebal Kell dia Jarak TuL
Layer xy
m m m3 m2 mm m bh m2

0.12 14.00 1.20 11.68 ø 10.00 0.25 2.00 8.33


0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 11.60 0.86 8.59 ø 10.00 0.25 2.00 8.33
0.12 9.60 0.65 6.55 ø 10.00 0.25 2.00 8.33
0.12 12.00 0.60 6.44 ø 10.00 0.25 2.00 8.33

8.62 84.02

0.12 14.00 1.20 11.68 ø 10.00 0.25 2.00 8.33


0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 16.00 1.80 16.92 ø 10.00 0.12 2.00 8.33
0.12 11.60 0.86 8.59 ø 10.00 1.12 2.00 8.33

7.38 71.03

0.12 14.00 1.20 11.68 ø 10.00 0.25 2.00 8.33


0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 16.00 1.80 16.92 ø 10.00 0.25 2.00 8.33
0.12 9.60 0.65 6.55 ø 10.00 0.25 2.00 8.33
0.12 9.60 0.65 6.55 ø 10.00 0.25 2.00 8.33
0.12 11.50 0.45 5.13 ø 10.00 0.25 2.00 8.33
6.47 63.75

0.12 13.60 1.08 10.63 ø 8.00 0.15 2.00 8.33


0.12 7.20 0.39 4.10 ø 8.00 0.15 2.00 8.33
0.12 11.60 0.86 8.59 ø 8.00 0.15 2.00 8.33
0.12 9.60 0.65 6.55 ø 8.00 0.15 2.00 8.33
0.12 7.20 0.39 4.10 ø 8.00 0.15 2.00 8.33
0.12 13.60 1.08 10.63 ø 8.00 0.15 2.00 8.33

4.39 44.62
PENULANGAN PLAT UTAMA PER M3

dimensi per m3 Panjang Panjang Berat


Berat Utama KOEF dia
x y Arah X Arah Y Tulangan
m m m m kg/m kg kg/m3 mm

4.00 2.08 20.54 20.54 0.62 49.30 41.08 ø 8.00


4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 35.49 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 26.62 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 24.65 41.08 ø 8.00

357.90

4.00 2.08 20.54 20.54 0.62 49.30 41.08 ø 8.00


4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 42.79 42.79 0.62 154.06 85.59 ø 8.00
4.00 2.08 4.59 4.59 0.62 7.92 9.17 ø 8.00

359.17

4.00 2.08 20.54 20.54 0.62 49.30 41.08 ø 8.00


4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 73.95 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 26.62 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 26.62 41.08 ø 8.00
4.00 2.08 20.54 20.54 0.62 18.49 41.08 ø 8.00
268.92

4.00 2.08 21.91 21.91 0.39 47.33 43.82 ø 10.00


4.00 2.08 21.91 21.91 0.39 17.04 43.82 ø 10.00
4.00 2.08 21.91 21.91 0.39 37.86 43.82 ø 10.00
4.00 2.08 21.91 21.91 0.39 28.40 43.82 ø 10.00
4.00 2.08 21.91 21.91 0.39 17.04 43.82 ø 10.00
4.00 2.08 21.91 21.91 0.39 47.33 43.82 ø 10.00

194.98
PENULANGAN PLAT SUSUT PER M3

Jumlah dimensi per m3 Panjang Panjang Berat


Jarak TuL
Layer xy x y Arah X Arah Y Tulangan
m bh m2 m m m m kg/m

0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39


0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 5.00 1.67 21.91 21.91 0.39
0.15 2.00 8.33 6.00 1.39 21.91 21.91 0.39
0.15 2.00 8.33 7.00 1.19 21.91 21.91 0.39

0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39


0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 5.00 1.67 21.91 21.91 0.39

0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39


0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 21.91 21.91 0.39
0.15 2.00 8.33 5.00 1.67 21.91 21.91 0.39
0.15 2.00 8.33 6.00 1.39 21.91 21.91 0.39
0.15 2.00 8.33 4.00 2.08 34.23 34.23 0.62
0.15 2.00 8.33 4.00 2.08 34.23 34.23 0.62
0.15 2.00 8.33 4.00 2.08 34.23 34.23 0.62
0.15 2.00 8.33 4.00 2.08 34.23 34.23 0.62
0.15 2.00 8.33 4.00 2.08 34.23 34.23 0.62
0.15 2.00 8.33 4.00 2.08 34.23 34.23 0.62
Berat Tul KOEF
Utama + Susut TOTAL KETERANGAN TOTAL VOLUME
Berat Susut KOEF

kg kg/m3 Kg kg/m3

52.58 43.82 101.88 84.90 LANTAI 2


78.88 43.82 152.82 84.90 ELV = + 4.00
78.88 43.82 152.82 84.90 Tebal = 0.12 cm
78.88 43.82 152.82 84.90
37.86 43.82 73.36 84.90 1) Beton Plat
28.40 43.82 55.02 84.90 2) Berat Besi Tulangan Plat
26.29 43.82 50.94 84.90 3) Kebutuhan Bekisting Plat

381.76 739.67

52.58 43.82 101.88 84.90 LANTAI 3


78.88 43.82 152.82 84.90 ELV = + 8.00
78.88 43.82 152.82 84.90 Tebal = 0.12 cm
78.88 43.82 232.93 129.41
37.86 43.82 45.78 52.99 1) Beton Plat
2) Berat Besi Tulangan Plat
3) Kebutuhan Bekisting Plat

327.08 686.25

52.58 43.82 101.88 84.90 LANTAI 4


78.88 43.82 152.82 84.90 ELV = + 12.00
78.88 43.82 152.82 84.90 Tebal = 0.12 cm
28.40 43.82 55.02 84.90
28.40 43.82 55.02 84.90 1) Beton Plat
19.72 43.82 38.21 84.90 2) Berat Besi Tulangan Plat
3) Kebutuhan Bekisting Plat
286.85 555.77

73.95 68.47 121.27 112.29 LANTAI ATAS


26.62 68.47 43.66 112.29 1
59.16 68.47 97.02 112.29 4
44.37 68.47 72.76 112.29 4
26.62 68.47 43.66 112.29 1
73.95 68.47 121.27 112.29 1
3) Kebutuhan Bekisting Plat

304.66 499.65
N TOTAL VOLUME

8.62 m3
739.67 kg
84.02 m2

7.38 m3
686.25 kg
71.03 m2

6.47 m3
555.77 kg
63.75 m2
44.62 m2
arah jarak baris jml plat batang arah
2000 5 250 8 6 15 2000 5
5000 2 250 20 6 18 5000 2
3000 5 250 12 6 25 3000 5
5000 3 250 20 6 27 5000 3
1000 5 250 4 1 1 1000 5
5000 1 250 20 1 2 5000 1
4000 1.8 250 16 2 5 4000 1.8
1800 4 250 7 3 5 1800 4
3000 1.8 250 12 2 3 3000 1.8
1800 3 250 7 2 3 1800 3
104

arah jarak baris jml plat batang arah


2000 5 250 8 6 15 2000 5
5000 2 250 20 6 18 5000 2
3000 5 250 12 5 21 3000 5
5000 3 250 20 5 23 5000 3
1000 5 120 8 1 3 4000 1.8
5000 1 120 41 1 4 1800 4
4000 1.8 250 16 2 5 3000 1.8
1800 4 250 7 3 5 1800 3
3000 1.8 250 12 2 3
1800 3 250 7 2 3
100

arah jarak baris jml plat batang arah


2000 5 250 8 6 15 2000 5
5000 2 250 20 6 18 5000 2
3000 5 250 12 5 21 3000 5
5000 3 250 20 5 23 5000 3
750 5 250 3 1 1 4000 1.8
5000 7.5 250 20 1 12 1800 4
4000 1.8 150 26 2 8 3000 1.8
1800 4 150 12 3 10 1800 3
208

arah jarak baris jml plat batang


5000 1.8 150 33 6 28
1800 4 150 12 3 10
3000 3 150 20 4 18
1800 1.8 150 12 4 6
288
jarak baris jml plat batang
150 13 6 28
150 33 6 31
150 20 6 45
150 33 6 47
150 6 1 2
150 33 1 3
150 26 2 8
150 12 3 10
150 20 2 6
150 12 2 5
185

jarak baris jml plat batang


150 13 6 28
150 33 6 31
150 20 5 38
150 33 5 39
150 26 2 8
150 12 3 10
150 20 2 6
150 12 2 5
165

jarak baris jml plat batang


150 13 6 28
150 33 6 31
150 20 5 38
150 33 5 39
150 26 2 8
150 12 3 10
150 20 2 6
150 12 2 5
165
PEMBESIAN

VOLUME Durasi Produktifitas Koefisien ( O.H)


Jumlah
TYPE Batang Jumlah Grup
Tulangan Memasang Memotong Meluruskan
kg Batang Batang Tulangan Batang Tulangan Total Durasi kg/hari Tukang Besi Pembantu Tukang Mandor
Tulangan
L2 560.35 289 3 0.71 0.03 0.34 2 93.39 0.0107 0.0107 0.0027
L3 686.25 265 1 1.96 0.00 7.76 10 68.62 0.0146 0.0146 0.0036
L4 555.77 373 1 2.76 0.00 15.37 19 29.25 0.0342 0.0342 0.0085
LATAP 499.65 288 1 2.13 0.00 9.16 12 41.64 0.0240 0.0240 0.0060

BEKISTING
VOLUME Durasi Produktifitas Koefisien ( O.H)

TYPE Jumlah
Grup Menyetel Memasang Membuka dan
m2 Bekisting Bekisting Membersihkan Total Durasi kg/hari Tukang Besi Pembantu Tukang Mandor

L2 84.02 4 1.44 0.10 0.52 3 7.00 0.1428 0.1250 0.0179


L3 71.03 4 1.22 0.12 0.37 2 8.88 0.1126 0.0985 0.0141
L4 63.75 4 1.10 0.14 0.30 2 7.97 0.1255 0.1098 0.0157
LATAP 44.62 4 0.77 0.20 0.15 2 5.58 0.1793 0.1569 0.0224

PENGECORAN
VOLUME Kapasitas Durasi Produktifitas Koefisien ( O.H)
TYPE Produksi Jumlah Grup
m3 (Qt) hari kg/hari Mandor Tukang Beton Buruh
L2 8.62 212.76 1 1 8.62 0.1160 0.1160 0.2321
L3 7.38 212.76 1 1 7.38 0.1356 0.1356 0.2711
L4 6.47 212.76 1 1 6.47 0.1544 0.1544 0.3089
LATAP 4.39 212.76 1 1 4.39 0.2280 0.2280 0.4560
Pembesian

Bahan :
10.500 kg Besi beton polos @ Rp. 8,500.00
0.150 kg Kawat beton @ Rp. 16,500.00
Upah :
0.070 Oh Pekerja @ Rp. 90,000.00
0.070 Oh Tukang besi @ Rp. 90,000.00
0.007 Oh Kepala Tukang Besi @ Rp. 110,000.00
0.004 Oh Mandor @ Rp. 120,000.00

Jadi, Pembesian 1 Kg dengan besi polos

Pabrikasi 100 batang tulangan Pasang 100 batang tulangan

(0.85+1.5)/2=1.15 (3.5+6)/2=4.75

(1.2+2.5)/2=1.85 (5+7)/2=6

3 jam (6+8)/2=7

5.92
Pabrikasi = 3 x 100% = 34%
8.92
Pasang = 5.92 x 100% = 66%
8.92

Lantai 2
Jumlah Jumlah 1 Grup Biaya
Pekerja
Pekerja 18 10 900,000.00
Tukang besi 18 5 450,000.00
Kepala Tukang Besi 2 1 110,000.00
Mandor 1 1 120,000.00
Total 17 1,580,000.00
Berat kg 149.66 kg
Volume 560.35 kg
Durasi 3.74 hari
= Rp. 89,250.00
= Rp. 2,475.00

= Rp. 6,300.00
= Rp. 6,300.00
= Rp. 770.00
= Rp. 480.00
Rp. 91,725.00 + Rp. 13,850.00
Jumlah Rp. 105,575.00
ngan besi polos Rp. 10,557.50