1. Works which add capital value to existing assets but do not create new assets are called
(a) Original Works (b) Repair Works
(c) Minor Works (d) Contingent Works
▾ Answer
Answer: C
2. New constructions, site preparation, additions and alterations to existing works, special repairs to newly purchased or previously
abandoned buildings or structures, including re-modelling or replacement are called
(a) Original Works (b) Repair Works
(c) Minor Works (d) Contingent Works
▾ Answer
Answer: A
3. Subject to certain conditions a Ministry or Department at its discretion may directly execute repair works estimated to cost up to
Rupees
(a) 10 lakhs (b) 15 lakhs
(c) 20 lakhs (d) 30 lakhs
▾ Answer
Answer: D
4. A Ministry or Department may, at its discretion, assign to any Public Works Organisation (PWO) repair works estimated to cost above
Rupees 30 Lakhs and original/minor works of
(a) above 50 lakh (b) above 1 crore
(c) above 2 crore (d) any value
▾ Answer
Answer: D
1 of 3 13-10-2021, 21:09
General Financial Rules 2017 : WORKS | NCERT BOOKS PDF https://ncertbookspdf.com/gfr-2017-works-mcq/
5. Pick the incorrect one
No works shall be commenced or liability incurred in connection with it until
(a) administrative approval has been obtained from the appropriate authority in each case.
(b) sanction to incur expenditure has been obtained from the competent authority.
(c) a properly detailed design has been sanctioned; while designing the projects etc, principles of Life Cycle cost may also be
considered.
(d) funds to cover the charge during the year and beyond till completion of the work have been provided by competent authority.
▾ Answer
Answer: D
6. State whether true or false
For purpose of approval and sanctions, a group of works which forms one project, shall be considered as one work. Therefore,
approval or sanction of higher authority is not required as cost of each particular work in the project is within the powers of such
approval or sanction of a lower authority.
(a) True (b) False
▾ Answer
Answer: B
7. Open tenders will be called for works costing Rupees
(a) 1 lakh to 10 lakh (b) 2 lakh to 15 lakh
(c) 3 lakh to 20 lakh (d) 5 lakh to 30 lakh
▾ Answer
Answer: D
8. Limited tenders will be called for works costing less than Rupees
(a) 1 lakh (b) 2 lakh
(c) 5 lakh (d) 10 lakh
▾ Answer
Answer: C
9. To review the progress of the work, the Administrative Ministry or Department will set up a Review Committee consisting of a
representative each from the Administrative Ministry, Finance (Internal Finance Wing) and the Executing Agency when the estimate cost
of approved project is Rupees
(a) 50 crore and above (b) 100 crore and above
(c) 200 crore and above (d) 500 crore and above
▾ Answer
Answer: B
10. The Review Committee shall have the powers to accept variation within
(a) 5% of the approved estimates. (b) 10% of the approved estimates
(c) 10% of the approved estimates (a) 15% of the approved estimates
2 of 3 13-10-2021, 21:09
General Financial Rules 2017 : WORKS | NCERT BOOKS PDF https://ncertbookspdf.com/gfr-2017-works-mcq/
▾ Answer
Answer: C
Leave a Comment
You must be logged in to post a comment.
CAG SAS Exam Syllabus for AAO
PC 1
PC 2
PC4
PC 5
PC8
PC 14
PC16
PC22
SAS Question Bank/SAS MCQ QUESTIONS AAO EXAM PREPARATION
SAS Exam Notes and Materials for Civil Audit | SAS CAG EXAM 2021
Reference Books for SAS CAG Exam 2021
Copyright © 2021 NCERT BOOKS PDF
3 of 3 13-10-2021, 21:09