JOB HAZARD ANALYSIS [JHA] WORKSHEET
JHA NO.                                                PTW NO                                                                    WORK PERMIT TYPE                                                         □HOT /□COLD
FACILITY                                               LOCATION                                                                  SPECIFIC WORKSTATION
EQUIPMENT NO.                                          WORK                    backfilling for cable trench
                                                       DESCRIPTION
NOTE
1. JHA shall be applicable for all work activities which requires PTW.
2. The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA.
3. Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified
   work.
4. Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by all involved
   personnel.
JOB                                                   POTENTIAL
              DESCRIPTION OF JOB STEP                                     POTENTIAL CONSEQUENCES                          CONTROL BARRIERS                          ACTION PARTY                  RECOVERY BARRIERS                 ACTION PARTY
STEP                                                   HAZARD
1         Entry of workers &              mobilize Inexperienced      Plant or equipment shut down.            Attend Induction Safety briefing.                Supervisor/Safety Dept.       Inform Control Room.                     Supervisor
          excavator/equipment to site              workers disturbing
                                                   the equipment      Damage to the equipment/plant            Work leader to lead and supervise                                              Retraining if required.
                                                    Moving vehicle      Physical Injury.                       Drivers must have a valid driving license.               All Workers           Inform Control Room.               Supervisor / 1st Aider
                                                                        Equipment/property damage              Adhere to the speed limit in the plant.                                        First aid treatment.
                                                                                                               Walk face the incoming vehicles.
2         Manual excavation & pilot digging         Strike the          Injury                                 To get the latest drawing on the location of           Supervisor / Site       First aid                          Supervisor / 1st Aider
                                                    underground                                                the underground utilities                                 Engineer
                                                    utilities           Damage the property                                                                                                   Inform CSR on duty
                                                                                                               Pilot digging and shoveling
                                                                                                               Proper supervision on site
3         Start up the JCB                          Spark – Source of   Fire                                   To carry out gas test & certified free from            AGT/Supervisor          Inform CCR                               Supervisor
                                                    ignition                                                   combustible gas
                                                                                                                                                                                              Training/Prepare for evacuation
                                                                                                               Fire watcher and extinguisher to be on stand
                                                                                                               by
                                                                                                               Watch out if the equipment is overheated
                                                    Rotating parts      Physical injury                        PPE- Safety helmet, shoes, spec & coverall              All Workers/           First aid                            Supervisor/JCB
                                                                                                                                                                      Supervisor/ JCB                                             Operator/ 1st Aider
                                                                                                               Equipment to be inspected & certified safe for            Operator             Safety awareness
                                                                                                               use
                                                                                                                                                                                              Operator to check equipment
                                                                                                               The protective guards are in place                                             before using
                                                                                                               Stand by person must be on the look out
Page 1
4        Mechanical excavation on the work site   Hit or strike by    Physical injury                  Put up proper signage at strategic point                    Supervisor      First aid                          Supervisor / 1st Aider
                                                  moving excavator
                                                                      Damage to equipment or plant     Barricade the work area properly                                            Inform CCR
                                                                                                       Stand by person must stay vigilant at all time
                                                  Strike the          Injury                           Do get the latest drawing on the location of           Supervisor / Site    First aid                          Supervisor / 1st Aider
                                                  underground                                          the underground utilities                                 Engineer
                                                  utilities           Damage the property                                                                                          Inform CCR
                                                                                                       Pilot digging and shoveling
                                                                                                       Proper supervision on site
                                                  Noise               Hearing loss                     PPE-Ear plug                                                All Workers     Medical treatment                          Medic
                                                                                                       Do not expose too long to high noise level
                                                                                                       from the engine
5        Shoring work for the excavated pit       Cave in (Collapse   Trapped                          Proper shoring must be put in place and the                 Supervisor      Inform CCR                            Supervisor / ERT
                                                  of soil/sand)                                        material must be rigid.
                                                                                                                                                                                   Search & rescue team to be
                                                                                                       Access and egress shall be adequate                                         notified immediately
                                                                                                       Stand by person to monitor the work & to
                                                                                                       report & seek immediate assistant
                                                  Slippery or             Slip and trip                Clean/dry up wet surface where possible                     All Workers     First Aider on site.               Supervisor / 1st Aider
                                                  uneven surface
                                                                                                       Ensure the safety boot is in good condition                                 Monitor & make work site safe to
                                                                                                                                                                                   work on
                                                                                                       Proper housekeeping & remove all
                                                                                                       obstruction
                                                                      Bury workers or some             Make sure everyone keep far away from                                       Retaining if required
6        Backfilling the trench                   collapse                                                                                              Operator                                                      Supervisor
                                                                      equipment                        the trench
                                                                                                                                                                                       Retaining if required
                                                   The excavator/ Person injury , cover the workers    Make sure the ground is level and avoid
                                                                                                                                                                Operator            stop the vehicle and secure            Supervisor
                                                  shovel turn over  or turn over into the trench                 danger operation
                                                                                                                                                                                              the load
                                                  Hit person who
                                                                                                         Keep all personnel far away from the
                                                  near the shovel               Body ,head injury
                                                                                                                    backfilling area                            Operator                 First Aid treatment               Supervisor
                                                   or excavator
7                                                 Moving                                               Keep all personnel far away from the
         Compaction                                                   Bump the people ,body injury                                                      All Worker/Supervisor      First Aid treatment                1st Aider
                                                  machinery                                            backfilling area
                                                                                                       Make sure the earth is enough hard for
                                                      Collapse         The machinery sink into earth                                                      All Worker/Supervisor                 First aid
                                                                                                                  the machinery                                                                                            Supervisor
                                                  Sharp edges         Hand and finger injury           Wear appropriate hand glove.                        All Worker/Supervisor   First aid Kit                      Supervisor/Medic
                                                                                                       All sharp edges shall be protected or                                       Supervisor / work leader
                                                                                                       remove by bending
Page 2
                              Slip, trip and fall   Injury to workers               Ensure all materials / equipment been    All Worker/Supervisor/ First aid                    Supervisor/Medic
                                                                                    kept at appropriate area and away from       Vehicle Operator   sent to medic
                                                                                    work area or access. Removed any                                Supervisor / work leader
                                                                                    tripping hazards.                                               Full Supervision
8        House keeping work   Moving weight         Back strain from    repetitive Identify high risk activities                  All Workers       First aid                    Supervisor / 1st Aider
                              when loading          manual lifting
                                                                                    Use trolley or manual handling aids                             Training on manual lifting
                                                                                                                                                    techniques
                                                                                    Two person or team lifting
                                                                                    Reduce/split the loads into manageable
                                                                                    weight
                              Slippery work         Slip                            Clean up slippery surface                     All Workers       First aid                    Supervisor / 1st Aider
                              area
                                                                                    Dry off the wet area immediately
                                                                                    Use hand rail provided
Page 3
                                                            JHA APPROVAL DURING PTW APPLICATION
         ACCEPTED BY RECEIVING AUTHORITY                                         APPROVED BY APPROVING AUTHORITY
         NAME                                                                    NAME
         DESIGNATION                                                             DESIGNATION
         SIGNATURE                                                               SIGNATURE
         DATE                                                                    DATE
                                                                      AFTER PTW HAS BEEN APPROVED
     WORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING - AFTER PTW HAS BEEN APPROVED)
         Name(s)                           Designation   Signature            Name(s)               Designation     Signature
Page 4