0% found this document useful (0 votes)
422 views1 page

Billing Notice

This document is a notice from Astana Cold Chain Inc. to Lawrence Sy, the owner of a proposed cold storage warehouse project. It requests the collection of the second billing of 18 million pesos by the end of the week in order to continue supplying manpower and materials like rafters and C-purlins to the project. If payment is not received, work at the site will be temporarily postponed. The notice is signed by Leo Lei as President of Astana Cold Chain Inc.

Uploaded by

Nikolai Gongora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
422 views1 page

Billing Notice

This document is a notice from Astana Cold Chain Inc. to Lawrence Sy, the owner of a proposed cold storage warehouse project. It requests the collection of the second billing of 18 million pesos by the end of the week in order to continue supplying manpower and materials like rafters and C-purlins to the project. If payment is not received, work at the site will be temporarily postponed. The notice is signed by Leo Lei as President of Astana Cold Chain Inc.

Uploaded by

Nikolai Gongora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

#11 Victoria Ave. Barangay San Isidro Brookside Suvd.

Cainta Rizal

Tel No. 02-656-7102 Fax No. 02-570-0197 Cell No. 0917-859-3333

Date: October 5, 2017

ASTANA COLD CHAIN INC.


Lot 22 KM 23 B West Service Road,
Brgy. Cupang, Alabang, Muntilupa City

ATTENTION : LAWRENCE SY
Owner

THRU : ENGR. DOUGLAS LOPEZ

PROJECT : PROPOSED COLD STORAGE WAREHOUSE

Subject : NOTICE TO COLLECT 2ND BILLING

Sir,
We will request to collect the 2nd billing as stated in the previous billing request
amount of EIGHTEEN MILLION PESOS ONLY (18,000,000.00) as per contract.
Due to this, we are able continue the supply of manpower and materials such as rafters,
C-purlins and other necessary material in the said project. I wish that my request will be
granted possibly this week.
Otherwise, if we cannot receive payment in full by this week, it will be caused for temporary
postponed of work at site.
Thank you for the consideration of this request.

Very Truly Yours,

LEO LEI
President