Constant Head Permeability Test Results

This document summarizes the results of a constant head permeability test conducted according to BS-5930 (1981) standards. The test was performed in a borehole at a depth of 6.23 feet below the top of the casing in clayey silt soils. Over a period of 50 minutes, a total flow of 11 cubic centimeters was measured, yielding a permeability rate of 5.78 x 10-7 centimeters per second.

Uploaded by

Ignatius Pathula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
295 views1 page

Constant Head Permeability Test Results

This document summarizes the results of a constant head permeability test conducted according to BS-5930 (1981) standards. The test was performed in a borehole at a depth of 6.23 feet below the top of the casing in clayey silt soils. Over a period of 50 minutes, a total flow of 11 cubic centimeters was measured, yielding a permeability rate of 5.78 x 10-7 centimeters per second.

Uploaded by

Ignatius Pathula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

FIELD PERMEABILITY TEST(Vertical)

BS-5930 (1981)
Constant Head Permeability Test Site: Head Khanki Barrage Location:
Depth below top of casing: Job No. Borehole: BH - Bhabr
(a) Bottom of borehole: (1.90) 6.23 ft Date: 22-05-08 Test No: 01
(b) Bottom of casing: (1.90) 6.23 ft Groun level: Crew/Operator: Mohsin
(c) Top of filter material: - ft Weather: Cloudy Tested by: Adnan / Safdar
(d) Initial ground water level: - ft External diameter of casing: 0.2403 ft
Height of casing above surface:(1.19)m ft Length of filter: - ft
Elevation of casing: ft Type of soil: Clayey Silt

Clock Time Elasped Time Initial Reading Final Reading Flow (cm3)
2:47:00PM 1 (1) 1000 ml 1000 ml 0
2:48 1 (2) 1000 ml 1000 ml 0
2:49 1 (3) 1000 ml 1000 ml 0
2:50 1 (4) 1000 ml 1000 ml 0
2:51 1 (5) 1000 ml 1000 ml 0
2:53 2 (7) 1000 ml 1000 ml 0
2:55 2 (9) 1000 ml 998 2
2:57 2 (11) 998 998 0
2:59 2 (13) 998 998 0
3:01 2 (15) 998 998 0
3:06 5 (20) 998 992 6
3:11 5 (25) 992 992 0
3:16 5 (30) 992 991 1
3:26 10 (40) 991 990 1
3:36 10 (50) 990 989 1

Total Elapsed Time (Min) 50 (3000) Total Flow ( cm3 ) 11

q= (Total Flow) / (Elapsed Time) 0.00366 cm3/sec


F= 2.75 x 7.325 = 20.143 cm
Hc= ( Total Head in cm ) 309 cm
K= q/ F * Hc = 5.78 x 10 -7 cm/sec