This visual examination report summarizes the inspection of welds on an LPG spherical tank under construction in Karbala, Iraq. It lists 42 welds that were examined and found to meet acceptance criteria. All welds were made using procedure SM-P.1(1.1)-P200 and materials complied with standards ASME VIII-DIV 2, 2010. The inspector was Hatem Ragab and the report was issued on 10/10/2016.

Uploaded by

Armnn Rasmo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views8 pages

VT Report Outside 1 10-10

This visual examination report summarizes the inspection of welds on an LPG spherical tank under construction in Karbala, Iraq. It lists 42 welds that were examined and found to meet acceptance criteria. All welds were made using procedure SM-P.1(1.1)-P200 and materials complied with standards ASME VIII-DIV 2, 2010. The inspector was Hatem Ragab and the report was issued on 10/10/2016.

Uploaded by

Armnn Rasmo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

A Visual Examination Report pages : 08

Aali Alneel For Report Date : 10/10/2016


Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

1 1 TO 2A 8345.8 603, 604

2 1 TO 2B 8345.8 602, 608

3 1 TO 3B 2509.5 604, 608

4 1 TO 3D 2509.5 608

5 2A TO 3B 2509.5 604  ---------

6 2A TO 3D 2509.5 605  ---------

7 2A TO 3A 7628.4 604, 605  ---------

8 2B TO 3B 2509.5 603  ---------

9 2B TO 3D 2509.5 603  ---------

10 2B TO 3C 7628.4 603  ---------

11 3A TO 3B 1440.9 603  ---------

12 3B TO 3C 1440.9 603  ---------

13 3C TO 3D 1440.9 603  ---------

14 3D TO 3A 1440.9 603, 605  ---------

15 3A TO 4F 1656.9 601, 605  ---------

16 3A TO 4A 6627.2 601, 602, 605  ---------

17 3A TO 4B 1656.9 611  ---------

18 3B TO 4B 4970.3 609, 611  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|1
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

19 3B TO 4C 4970.3 605  ---------

20 3C TO 4C 1656.9 605  ---------

21 3C TO 4D 6627.2 604, 611  ---------

22 3C TO 4E 1656.9 602, 611  ---------

23 3D TO 4E 4970.3 601, 602, 611  ---------

24 3D TO 4F 4970.3 601, 602, 605  ---------

25 4A TO 4B 2343.1 611  ---------

26 4B TO 4C 2343.1 605  ---------

27 4C TO 4D 2343.1 604, 605  ---------

28 4D TO 4E 2343.1 601, 605  ---------

29 4E TO 4F 2343.1 611  ---------

30 4F TO 4A 2343.1 611  ---------

31 4A TO 5S 608.75 611  ---------

32 4A TO 5T 2435.0 611  ---------

33 4A TO 5A 2435.0 609, 611  ---------

34 4A TO 5B 2435.0 609, 611  ---------

35 4A TO 5C 608.75 609, 611  ---------

36 4B TO 5C 1826.25 609, 611  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|2
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

37 4B TO 5D 2435.0 609, 611  ---------

38 4B TO 5E 2435.0 609, 611  ---------

39 4B TO 5F 1217.5 609, 611  ---------

40 4C TO 5F 1217.5 605  ---------

41 4C TO 5G 2435.0 605  ---------

42 4C TO 5H 2435.0 605  ---------

43 4C TO 5I 1826.25 605  ---------

44 4D TO 5I 608.75 604, 605  ---------

45 4D TO 5J 2435.0 604, 605  ---------

46 4D TO 5K 2435.0 604, 605  ---------

47 4D TO 5L 2435.0 604, 605  ---------

48 4D TO 5M 608.75 604, 605  ---------

49 4E TO 5M 1826.25 601, 605  ---------

50 4E TO 5N 2435.0 602, 605  ---------

51 4E TO 5O 2435.0 602, 605  ---------

52 4E TO 5P 1217.5 602, 605  ---------

53 4F TO 5P 1217.5 611  ---------

54 4F TO 5Q 2435.0 601, 611  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|3
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

55 4F TO 5R 2435.0 601, 611  ---------

56 4F TO 5S 1826.25 611  ---------

57 5A TO 5B 9372.4 608, 611  ---------

58 5B TO 5C 9372.4 611  ---------

59 5C TO 5D 9372.4 604, 610  ---------

60 5D TO 5E 9372.4 610

61 5E TO 5F 9372.4 607  ---------

62 5F TO 5G 9372.4 607  ---------

63 5G TO 5H 9372.4 611, 612  ---------

64 5H TO 5I 9372.4 602  ---------

65 5I TO 5J 9372.4 602, 605  ---------

66 5J TO 5K 9372.4 605, 609  ---------

67 5K TO 5L 9372.4 604  ---------

68 5L TO 5M 9372.4 604  ---------

69 5M TO 5N 9372.4 605  ---------

70 5N TO 5O 9372.4 608  ---------

71 5O TO 5P 9372.4 608, 611  ---------

72 5P TO 5Q 9372.4 605  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|4
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

73 5Q TO 5R 9372.4 606, 611  ---------

74 5R TO 5S 9372.4 601, 611  ---------

75 5S TO 5T 9372.4 603  ---------

76 5T TO 5A 9372.4 603  ---------

77 6A TO 5A 1217.5 604  ---------

78 6A TO 5B 2435.0 604  ---------

79 6A TO 5C 2435.0 604  ---------

80 6A TO 5D 1826.25 604  ---------

81 6B TO 5D 608.75 604  ---------

82 6B TO 5E 2435.0 604  ---------

83 6B TO 5F 2435.0 602  ---------

84 6B TO 5G 2435.0 602  ---------

85 6B TO 5H 608.75 601, 602  ---------

86 6C TO 5H 1826.25 601, 602  ---------

87 6C TO 5I 2435.0 602  ---------

88 6C TO 5J 2435.0 602  ---------

89 6C TO 5K 1217.5 606, 609  ---------

90 6D TO 5K 1217.5 606, 609  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|5
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

91 6D TO 5L 2435.0 606  ---------

92 6D TO 5M 2435.0 606  ---------

93 6D TO 5N 1826.25 606  ---------

94 6E TO 5N 608.75 606  ---------

95 6E TO 5O 2435.0 606, 609  ---------

96 6E TO 5P 2435.0 602, 609  ---------

97 6E TO 5Q 2435.0 602, 609  ---------

98 6E TO 5R 608.75 602, 612  ---------

99 6F TO 5R 1826.25 602, 612  ---------

100 6F TO 5S 2435.0 604, 612  ---------

101 6F TO 5T 2435.0 604, 612  ---------

102 6F TO 5A 1217.5 604  ---------

103 6A TO 6B 2343.1 611  ---------

104 6B TO 6C 2343.1 602, 611  ---------

105 6C TO 6D 2343.1 606  ---------

106 6D TO 6E 2343.1 601, 604  ---------

107 6E TO 6F 2343.1 606  ---------

108 6F TO 6A 2343.1 602, 611  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|6
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

109 7A TO 6F 4970.3 601, 602, 607  ---------

110 7A TO 6A 4970.3 602  ---------

111 7B TO 6A 1656.9 602  ---------

112 7B TO 6B 6627.2 606, 608  ---------

113 7B TO 6C 1656.9 606, 608  ---------

114 7C TO 6C 4970.3 606, 608  ---------

115 7C TO 6D 4970.3 606, 608  ---------

116 7D TO 6D 1656.9 606, 608  ---------

117 7D TO 6E 6627.2 602  ---------

118 7D TO 6F 1656.9 602  ---------

119 7A TO 7B 1440.9 603  ---------

120 7B TO 7C 1440.9 603  ---------

121 7C TO 7D 1440.9 603  ---------

122 7D TO 7A 1440.9 603  ---------

123 8A TO 7D 2509.5 601  ---------

124 8A TO 7A 7628.4 601, 603  ---------

125 8A TO 7B 2509.5 601, 603  ---------

126 8B TO 7B 2509.5 603  ---------

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature

Date
Page|7
A Visual Examination Report pages : 08
Aali Alneel For Report Date : 10/10/2016
Construction L.T.D Report Report No. : M047-KA-VT-01

:Aali Alneel For


CLIENT : Heavy Engineering Equipment (HEESCO) Contractor
Construction L.T.D
MATERIAL / : A537 C-1 / 44.0 –
Project Name : LPG Spherical Tank (T-101B) – Karbala
THICKNESS (mm) 46.0 mm
Reference
: VT Procedure # AN-NDE-PR-001 DRAWING NO. : T-101-M005-C
Procedure
Acceptance Criteria : ASME VIII – DIV 2, 2010 ATTACHMENTS : WELD MAP
: Outside – Shell to
WPS No. : SM – P.1(1.1) – P200 Examined Part
Shell Joints
Evaluation
Sr. Joint No. Length, mm Welder Stamp Remarks
ACC. REJ.

127 8B TO 7C 7628.4 603  ---------

128 8B TO 7D 2509.5 603  ---------

129 9 TO 7B 2509.5

130 9 TO 7D 2509.5

131 9 TO 8A 8345.8

132 9 TO 8B 8345.8

Aali Al-Neel
HEESCO QC MTI TPI
Inspector
Name Hatem Ragab AHMED OMER
Signature