Standard Inspection and Test Plan ITP No: 904 Emergency Diesel Generator

The document provides standard inspection and test plans for an emergency diesel generator. It lists 4 main activities: 1) a visual and dimensional check to verify specifications; 2) operation tests as outlined in an SDMO test procedure; 3) load tests as per the SDMO procedure; and 4) impacts of load as per the SDMO procedure. It notes that the tests will be carried out by the manufacturer and provides requirements for inspection, acceptance, and reporting.

Uploaded by

Zaid R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
697 views5 pages

Standard Inspection and Test Plan ITP No: 904 Emergency Diesel Generator

The document provides standard inspection and test plans for an emergency diesel generator. It lists 4 main activities: 1) a visual and dimensional check to verify specifications; 2) operation tests as outlined in an SDMO test procedure; 3) load tests as per the SDMO procedure; and 4) impacts of load as per the SDMO procedure. It notes that the tests will be carried out by the manufacturer and provides requirements for inspection, acceptance, and reporting.

Uploaded by

Zaid R
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

0 FOR APPROVAL Z.Y. M.C M.C E.C. 16.03.

2009
REVISION DESCRIPTION BY CHECK APPROVED APPROVED DATE
OWNER :

GENERAL ELECTRIC COMPANY OF LIBYA


ZWITINA 2X285 MW GAS TURBINE PROJECT

CONSULTANT :

Arabian Consulting & Engineering Services Co.

TITLE :

STANDARD INSPECTION AND TEST PLAN


ITP No: 904
EMERGENCY DIESEL GENERATOR
SUB-CONTRACTOR : MAIN CONTRACTOR :

PROJECT DOC. NO:

SIZE JOB NO. AREA DEPT. CODE DESIGN REV


SCALE
This Drawing/Document is the property of
ENKA TEKNIK and it cannot be used,
reproduced or loaned to third parties without
the written permission of ENKA TEKNIK 4 7 4 0 0 3 2 0 T - 9 7 5 09 0 NTS
FORMS INDEX

LIST OF ATTACHED FORMS

No. Form No. Rev. Description


1. ITP - 904 0 STANDART ITP:904-EMERGENCY DIESEL GENERATOR
2. 0 SDMO EDG FAT PROCEDURE

LIST OF REFERENCED FORMS

No. Form No. Doc. Ref. Description


STANDARD INSPECTION AND TEST PLAN Document No:
47400320T97509
ITP No: 904 Date:16.03.2009
EMERGENCY DIESEL GENERATOR Rev.No:0
Page: 2
PROJECT NAME: ZWITINA POWER PLANT PROJECT NO:740032 DRAWING NO/ISO NO: OTHER REFERENCES:

MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:

Activity Activity Inspection/Test Reference Document Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements ENKA TEKNİK QC. Client GESCO/GECOL/ACESCo. Rep. Reference No.:
904-1 Visual and Dimensional Check - Painting, finishing, 740032 2E 054 24 – Emergency * W W
welding, fixing control Diesel Generator Technical
- Verify compliance to Specification
specification
- Dimensional Control
- Accessories and Quantities
- Name Plate Data Check
904-2 Operation Tests Refer to SDMO Test * W W
Procedure

904-3 Load Tests Refer to SDMO Test * W W


Procedure

904- 4 Impacts of Load Refer to SDMO Test * W W


Procedure

Note : Above mentioned tests shall be carried out by manufacturer.


Legend : S - Surveillance Inspection W - Witness Inspection Point H - Mandatory Hold Point For Inspection R - Record Review
* Report or Certificate to be provided.

Sub -contractor QC Date & Signature /Stamp No. Enka Teknik QC Date & Signature /Stamp No. Client GESCO/GECOL/ACES Co. Rep. Date & Signature / Stamp No.
Factory Acceptance Tests JGD/JGD/I.16.04 …...00-PR

Type of generating set: T1540


SERVICE INGENIERIE

OM : Project : Zwitina Power Plant PR N°1

I.VISUAL CONTROL OF THE PLANT BEFORE STARTING

Static examination to check the compliance of the assembled components:

- General aspect (painting, finishing, welding, fixings)

- Size (measurements)

- Manufacturer’s name plates

- Protection against direct contact (bus bar, heat elements...)

- Connecting points (bus bar, input/output Diesel oil...)

- Circuit breaker control (pole number, trigger, threshold)

II.TESTS OF OPERATION

- Safeties test

- Checking of the indicators control panel

- Visual checking of the circuits for no leak

9 Cooling system.

9 Oil system.

9 Diesel oil system

9 Checking of the start and stop cycle

PR N° 1 OM:. Rédacteur : PJ : Date : Page : 1 / 2


Factory Acceptance Tests JGD/JGD/I.16.04 …...00-PR

Type of generating set: T1540


SERVICE INGENIERIE

OM : Project : Zwitina Power Plant PR N°1

III.TESTS ON LOAD

Because of the test bench design, all the power measurements are made on liquid resistors with power
factor = 1.The tests on load take place about 30 min.

Reading at different levels of assigned power (power in kVA)

For generating set prime power PPR defined : …..kW


% of power 0 25 50 75 100 110

At each of these levels, at the end of the time given will be recorded.
The electrical parameters: voltage, frequency, intensity and power.

For 100% load the mechanical indications: oil pressure, engine temperature engine and other if
possible, will be recorded.

IV.IMPACTS OF LOAD

The load impacts measurements are made at several stages of the nominal power with a flat deck
plotter.
The voltage and frequency transitory are recorded for each impact.

Î 0 – 25% / 25 – 0%
Î 0 – 50% / 50 – 0%

-A maximum load impact test in correct standard values

-A maximum load impact test possible for the generating set out of the standard values

V.TESTS REPORT

A report of factory tests for the customer will be signed at the end of the day

PR N° 1 OM:. Rédacteur : PJ : Date : Page : 2 / 2