Data Kebisingan

The document contains data on noise levels that were measured over two time periods: 7:35-7:45 and 8:35-8:45. For each time period, the noise level in decibels is recorded every second for 10 minutes. Formulas are provided for calculating the equivalent noise level over 1 minute and 10 minutes from this data. The results of these calculations are also shown for the first time period.

Uploaded by

alya pratiwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views62 pages

Data Kebisingan

The document contains data on noise levels that were measured over two time periods: 7:35-7:45 and 8:35-8:45. For each time period, the noise level in decibels is recorded every second for 10 minutes. Formulas are provided for calculating the equivalent noise level over 1 minute and 10 minutes from this data. The results of these calculations are also shown for the first time period.

Uploaded by

alya pratiwi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 62

TEKNIK DAN SURVEY LALU LINTAS

POLITEKNIK NEGERI UJUNG PANDANG

4.10 DATA KEBISINGAN

4.10.1 JAM 07.35 – 07.45

Detik
/ 1 2 3 4 5 6 7 8 9 10
Menit
5 77,7 80,3 90,5 75,1 78,9 76,5 77,2 76 84 81,1
10 76,6 76,2 83,7 73,9 73,2 76,7 76,9 80,2 84,8 87,7
15 80 77,8 82,7 78,2 76,8 79,6 80,3 84,2 82,7 78,2
20 81,4 84,5 80,9 80,9 78,6 77,7 79,5 75,8 86,5 83
25 84,5 82,3 76,3 78,5 80,3 78,2 77,5 76,9 89,4 82
30 87,1 85,5 83,8 83,6 99,2 77,3 77,6 81,4 83,7 84,2
35 79,7 78 86,4 87,6 81,8 77,8 81,8 79,4 78,2 87,2
40 78,8 84,9 80 80,9 79,2 79,3 86,9 76,9 81,3 76,3
45 78,3 86,1 83,1 84,1 99,6 79,9 82,6 79,1 76,5 88,7
50 75,2 89,7 82,4 77,9 80,5 76,5 85 78,1 78,7 84
55 77,3 91,3 73,6 81,7 75,2 78,1 79,8 85,1 85,2 81,8
60 78,4 91,9 75,8 76,9 72,8 83,8 78,5 80,8 78,1 85,7

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

UNTUK 1 MENIT

1
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,77 58884365,54 1530122162 25502036 127510180,2 81,05545
7,66 45708818,96
8 100000000
8,14 138038426,5
8,45 281838293,1
8,71 512861384
7,97 93325430,08
7,88 75857757,5
7,83 67608297,54
7,52 33113112,15
7,73 53703179,64
7,84 69183097,09
2
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,03 107151930,5 5626110233 93768503,9 468842519,4 86,71027
7,62 41686938,35
7,78 60255958,61
8,45 281838293,1
8,23 169824365,2
8,55 354813389,2
7,8 63095734,45
8,49 309029543,3

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,61 407380277,8
8,97 933254300,8
9,13 1348962883
9,19 1548816619
3
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
9,05 1122018454 2923615496 48726924,9 243634624,7 83,86739
8,37 234422881,5
8,27 186208713,7
8,09 123026877,1
7,63 42657951,88
8,38 239883291,9
8,64 436515832,2
8 100000000
8,31 204173794,5
8,24 173780082,9
7,36 22908676,53
7,58 38018939,63
4
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,51 32359365,69 1759938634 29332310,6 146661552,8 81,66316
7,39 24547089,16
7,82 66069344,8
8,09 123026877,1
7,85 70794578,44
8,36 229086765,3
8,76 575439937,3
8,09 123026877,1
8,41 257039578,3
7,79 61659500,19
8,17 147910838,8
7,69 48977881,94
5
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,89 77624711,66 18162624380 302710406 1513552032 91,79997
7,32 20892961,31
7,68 47863009,23
7,86 72443596,01
8,03 107151930,5
9,92 8317637711
8,18 151356124,8
7,92 83176377,11
9,96 9120108394
8,05 112201845,4
7,52 33113112,15
7,28 19054607,18

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,65 44668359,22 953510406 15891840 79459200 79,00144


7,67 46773514,13
7,96 91201083,94
7,77 58884365,54
7,82 66069344,8
7,73 53703179,64
7,78 60255958,61
7,93 85113803,82
7,99 97723722,1
7,65 44668359,22
7,81 64565422,9
8,38 239883291,9
7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,72 52480746,02 1717140412 28619007 143095034 81,55625
7,69 48977881,94
8,03 107151930,5
7,95 89125093,81
7,75 56234132,52
7,76 57543993,73
8,18 151356124,8
8,69 489778819,4
8,26 181970085,9
8,5 316227766
7,98 95499258,6
7,85 70794578,44
8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,6 39810717,06 1358328435 22638807 113194036 80,53824
8,02 104712854,8
8,42 263026799,2
7,58 38018939,63
7,69 48977881,94
8,14 138038426,5
7,94 87096359
7,69 48977881,94
7,91 81283051,62
7,81 64565422,9
8,51 323593656,9
8,08 120226443,5
9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,4 251188643,2 3006924153 50115403 250577013 83,98941
8,48 301995172
8,27 186208713,7
8,65 446683592,2
8,94 870963590
8,37 234422881,5
7,82 66069344,8
8,13 134896288,3
7,65 44668359,22
7,87 74131024,13

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,52 331131121,5
7,81 64565422,9

10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,11 128824955,2 3487635956 58127266 290636330 84,6335
8,77 588843655,4
7,82 66069344,8
8,3 199526231,5
8,2 158489319,2
8,42 263026799,2
8,72 524807460,2
7,63 42657951,88
8,87 741310241,3
8,4 251188643,2
8,18 151356124,8
8,57 371535229,1

UNTUK 10 MENIT

85,
Leq 10 menit : 29

Hasil Leq /
Menit Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
1 81,05544859 8,105544859 127510180 3,377E+09 337716252 85,29

2 86,71026991 8,671026991 468842519


3 83,86739009 8,386739009 243634625
4 81,66316279 8,166316279 146661553
5 91,79997355 9,179997355 1513552032
6 79,00144191 7,900144191 79459200,5
7 81,55624563 8,155624563 143095034
8 80,53823546 8,053823546 113194036
9 83,98941228 8,398941228 250577013
10 84,633499 8,4633499 290636330

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

 JAM 08.35 – 08.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 76,1 79,4 82,3 77,2 80,6 78,9 79,8 82,9 76,6 81,3
10 76,1 78,7 83,8 78,2 77,4 80,1 79,8 77 78 80,3
15 72,7 85,6 83,6 78,7 77,7 81,3 85,1 76,7 81,2 77,5
20 77,5 82,7 80,2 79,9 79,4 75,3 82,4 77,6 70,9 80,8
25 82,7 79,9 89,7 84,4 80 82,1 82,5 75,2 75,3 79,4
30 79,9 75 86,9 79,1 75,4 78 78,6 77 89,8 81,9
35 85,6 77,4 82,5 76,8 82,3 84,3 82,4 80,3 82,5 83,1
40 76,2 84 83,8 78 75,4 81,2 76,2 79,6 77,9 82,4
45 87,8 83,4 78,9 79,5 81,7 81,6 90,9 76,5 89,9 80
50 78,4 77,2 80,1 78,7 76,4 77,6 81,6 78,4 84,5 80,2
55 77,2 75 75,2 77,6 79,1 78,8 79,5 83,7 77,9 83,9
60 71,4 80,5 80,3 80,3 77,9 81 83,1 80,3 77,4 79,7

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

UNTUK 1 MENIT

1 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
40738027,7 26384262, 131921313, 81,2031
7,61 8 1583055760 7 3 5
40738027,7
7,61 8
18620871,3
7,27 7
56234132,5
7,75 2
186208713,
8,27 7
7,99 97723722,1
363078054,
8,56 8
41686938,3
7,62 5
602559586,
8,78 1
69183097,0
7,84 9
52480746,0
7,72 2
13803842,6
7,14 5
2 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

26018081, 130090409, 81,1424


7,94 87096359 1561084911 9 3 5
74131024,1
7,87 3
363078054,
8,56 8
186208713,
8,27 7
7,99 97723722,1
7,5 31622776,6
54954087,3
7,74 9
251188643,
8,4 2
218776162,
8,34 4
52480746,0
7,72 2
7,5 31622776,6
112201845,
8,05 4
3 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
169824365, 48407844, 242039223, 83,8388
8,23 2 2904470684 7 7 6
239883291,
8,38 9
229086765,
8,36 3
104712854,
8,02 8
933254300,
8,97 8
489778819,
8,69 4
8,25 177827941
239883291,
8,38 9
77624711,6
7,89 6
102329299,
8,01 2
33113112,1
7,52 5
107151930,
8,03 5
4 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
52480746,0 18100359, 90501795,4 79,5665
7,72 2 1086021545 1 1 7
7,82 66069344,8
7,87 74131024,1

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

3
7,99 97723722,1
275422870,
8,44 3
81283051,6
7,91 2
47863009,2
7,68 3
63095734,4
7,8 5
89125093,8
7,95 1
74131024,1
7,87 3
57543993,7
7,76 3
107151930,
8,03 5
5 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
114815362, 989426883, 16490448, 82452240,2 79,1620
8,06 1 2 1 7 2
54954087,3
7,74 9
58884365,5
7,77 4
7,94 87096359
8 100000000
34673685,0
7,54 5
169824365,
8,23 2
34673685,0
7,54 5
147910838,
8,17 8
43651583,2
7,64 2
81283051,6
7,91 2
61659500,1
7,79 9

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,89 77624711,66 1378828883 22980481 114902407 80,60329
8,01 102329299,2
8,13 134896288,3
7,53 33884415,61
8,21 162181009,7
7,8 63095734,45
8,43 269153480,4
8,12 131825673,9

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,16 144543977,1
7,76 57543993,73
7,88 75857757,5
8,1 125892541,2
7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,98 95499258,6 2822222451 47037041 235185204 83,7141
7,98 95499258,6
8,51 323593656,9
8,24 173780082,9
8,25 177827941
7,86 72443596,01
8,24 173780082,9
7,62 41686938,35
9,09 1230268771
8,16 144543977,1
7,95 89125093,81
8,31 204173794,5
8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,29 194984460 1086431810 18107197 90535984,1 79,56821
7,7 50118723,36
7,67 46773514,13
7,76 57543993,73
7,52 33113112,15
7,7 50118723,36
8,03 107151930,5
7,96 91201083,94
7,65 44668359,22
7,84 69183097,09
8,37 234422881,5
8,03 107151930,5
9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,66 45708818,96 2856986459 47616441 238082205 83,76727
7,8 63095734,45
8,12 131825673,9
7,09 12302687,71
7,53 33884415,61
8,98 954992586
8,25 177827941
7,79 61659500,19
8,99 977237221
8,45 281838293,1
7,79 61659500,19
7,74 54954087,39
10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,13 134896288,3 1581949869 26365831 131829156 81,20011
8,03 107151930,5
7,75 56234132,52
8,08 120226443,5
7,94 87096359
8,19 154881661,9

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,31 204173794,5
8,24 173780082,9
8 100000000
8,02 104712854,8
8,39 245470891,6
7,97 93325430,08

UNTUK 10 MENIT

8
Leq 10 menit : 1,72

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
1,488E+0 14875399 81
1 81,20314966 8,120314966 131921313 9 4 ,72
2 81,1424528 8,11424528 130090409
3 83,83885751 8,383885751 242039224
4 79,56657195 7,956657195 90501795,4
5 79,1620246 7,91620246 82452240,3
6 80,60329126 8,060329126 114902407
7 83,71409996 8,371409996 235185204
8 79,56821227 7,956821227 90535984,1
9 83,76726936 8,376726936 238082205
10 81,20011471 8,120011471 131829156

 JAM 09.35 – 09.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 81,9 79,6 74,8 86,8 77 76,7 79 76,4 84,2 78,1
10 78,2 77,3 79,4 77,8 82,8 80,8 75,5 78,5 82,3 87,6
15 80,7 75,3 80 76,6 80,1 82,5 90,2 80,9 88,6 76,9
20 86,6 79,3 77,5 82 75,8 81,3 75,3 79,1 75,5 80,3
25 78,6 87,9 77,3 80,1 82,6 86,8 78,2 80,3 80,4 80,5
30 83,6 77,4 75,2 78,3 82 85,2 78,4 73,2 83,3 82,6
35 80,8 76,8 76,6 86,3 83,6 80,8 79,4 81,4 86 82,2
40 76,4 76,4 82,8 81,4 77,3 71,7 81,4 80,3 80,5 85
45 83 83,6 77,3 79,3 74,2 79,1 83,3 80 79,2 79,7
50 79,9 80,5 85,5 75,3 85 76,6 84 78,1 80,7 81,4
55 77,4 80,2 77,6 73,4 80,3 79,9 83 80,2 87,6 85,2
60 79,1 77,9 77,8 79,1 79,2 80 79,1 82,8 76,7 78

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,19 154881661,9 1694424432 28240407,2 141202036 81,49841
7,82 66069344,8
8,07 117489755,5
8,66 457088189,6
7,86 72443596,01
8,36 229086765,3
8,08 120226443,5
7,64 43651583,22
8,3 199526231,5
7,99 97723722,1
7,74 54954087,39
7,91 81283051,62

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,96 91201083,94 1534627130 25577118,8 127885594,2 81,06822
7,73 53703179,64
7,53 33884415,61
7,93 85113803,82
8,79 616595001,9
7,74 54954087,39
7,68 47863009,23
7,64 43651583,22
8,36 229086765,3
8,05 112201845,4
8,02 104712854,8
7,79 61659500,19

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,48 30199517,2 1122917712 18715295,2 93576476,04 79,71167
7,94 87096359
8 100000000
7,75 56234132,52
7,73 53703179,64
7,52 33113112,15
7,66 45708818,96
8,28 190546071,8
7,73 53703179,64
8,55 354813389,2
7,76 57543993,73
7,78 60255958,61

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,68 478630092,3 1699798618 28329977 141649884,9 81,51216
7,78 60255958,61

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,66 45708818,96
8,2 158489319,2
8,01 102329299,2
7,83 67608297,54
8,63 426579518,8
8,14 138038426,5
7,93 85113803,82
7,53 33884415,61
7,34 21877616,24
7,91 81283051,62

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,7 50118723,36 1537121138 25618685,6 128093428,1 81,07527
8,28 190546071,8
8,01 102329299,2
7,58 38018939,63
8,26 181970085,9
8,2 158489319,2
8,36 229086765,3
7,73 53703179,64
7,42 26302679,92
8,5 316227766
8,03 107151930,5
7,92 83176377,11

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,67 46773514,13 1749218521 29153642 145768210 81,63663
8,08 120226443,5
8,25 177827941
8,13 134896288,3
8,68 478630092,3
8,52 331131121,5
8,08 120226443,5
7,17 14791083,88
7,91 81283051,62
7,66 45708818,96
7,99 97723722,1
8 100000000

7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,9 79432823,47 2302108489 38368475 191842374 82,82945
7,55 35481338,92
9,02 1047128548
7,53 33884415,61
7,82 66069344,8
7,84 69183097,09

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,94 87096359
8,14 138038426,5
8,33 213796209
8,4 251188643,2
8,3 199526231,5
7,91 81283051,62

8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,64 43651583,22 1151815689 19196928 95984641 79,82202
7,85 70794578,44
8,09 123026877,1
7,91 81283051,62
8,03 107151930,5
7,32 20892961,31
8,14 138038426,5
8,03 107151930,5
8 100000000
7,81 64565422,9
8,02 104712854,8
8,28 190546071,8

9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,42 263026799,2 2849401092 47490018 237450091 83,75572
8,23 169824365,2
8,86 724435960,1
7,55 35481338,92
8,04 109647819,6
8,33 213796209
8,6 398107170,6
8,05 112201845,4
7,92 83176377,11
8,07 117489755,5
8,76 575439937,3
7,67 46773514,13

10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,81 64565422,9 2198084273 36634738 183173689 82,62863
8,76 575439937,3
7,69 48977881,94
8,03 107151930,5
8,05 112201845,4
8,26 181970085,9
8,22 165958690,7

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,5 316227766
7,97 93325430,08
8,14 138038426,5
8,52 331131121,5
7,8 63095734,45

UNTUK 10 MENIT

Leq 10 menit : 81,72

Hasil Leq /
Menit Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
8,14984095 14120203 1,487E+0 14866264 8
1 81,49840959 9 6 9 2 1,72
8,10682162 12788559
2 81,06821626 6 4
7,97116668
3 79,71166686 6 93576476
8,15121622 14164988
4 81,51216226 6 5
8,10752684 12809342
5 81,07526849 9 8
8,16366282 14576821
6 81,63662821 1 0
19184237
7 82,8294454 8,28294454 4
7,98220174 95984640,
8 79,82201744 4 7
23745009
9 83,7557234 8,37557234 1
8,26286309 18317368
10 82,62863093 3 9

 JAM 10.35 – 10.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 79,4 73,4 74,5 94,6 78 78,3 82,6 84,2 72,4 80,9
10 78,4 80,7 78,8 72,6 78,3 74,5 79 79,5 70,3 90,4
15 81,5 74,9 72,3 68,2 77,9 79,3 72,7 82,7 87,8 78,1
20 76,3 94 81,8 75,4 82,5 83,6 76,3 78,3 73,4 77,7
25 87,3 81,8 83 86,6 78 81,3 78,2 75,5 75,3 80,2
30 83,1 75,4 76,7 83,5 79,1 75,2 74,2 78,6 77,9 76,6
35 81,9 82,4 73,6 77,1 76,6 85,2 84,7 77,2 93,8 80,4
40 78,6 77,8 71,1 80,2 78,2 78,5 82,2 79,7 80,3 88,8
45 81,8 75,5 75,4 77,5 69,5 76,2 77,7 89,9 84,9 80

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

50 86,7 73,5 83,4 75,9 73,7 75,7 81,9 74,9 84,4 73,7
55 83,4 84,5 80,9 81,3 68,7 68,9 75 70,5 80 82,5
60 76,4 78,6 76 80,1 79,4 73 77 72,9 73 75,4

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)
UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


182520085,
7,94 87096359 2190241023 36504017 2 82,61311
7,84 69183097,09
8,15 141253754,5
7,63 42657951,88
8,73 537031796,4
8,31 204173794,5
8,19 154881661,9
7,86 72443596,01
8,18 151356124,8
8,67 467735141,3
8,34 218776162,4
7,64 43651583,22
2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
58572884, 292864420,
7,34 21877616,24 3514373048 1 7 84,66667
8,07 117489755,5
7,49 30902954,33
9,4 2511886432
8,18 151356124,8
7,54 34673685,05
8,24 173780082,9
7,78 60255958,61
7,55 35481338,92
7,35 22387211,39
8,45 281838293,1
7,86 72443596,01
3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
16179308, 80896542,2
7,45 28183829,31 970758507,4 5 9 79,0793
7,88 75857757,5
7,23 16982436,52
8,18 151356124,8
8,3 199526231,5
7,67 46773514,13
7,36 22908676,53
7,11 12882495,52
7,54 34673685,05
8,34 218776162,4

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,09 123026877,1
7,6 39810717,06
4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
342736055,
9,46 2884031503 4112832662 68547211 2 85,3496
7,26 18197008,59
6,82 6606934,48
7,54 34673685,05
8,66 457088189,6
8,35 223872113,9
7,71 51286138,4
8,02 104712854,8
7,75 56234132,52
7,59 38904514,5
8,13 134896288,3
8,01 102329299,2
5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
12553544,
7,8 63095734,45 753212681,9 7 62767723,5 77,97736
7,83 67608297,54
7,79 61659500,19
8,25 177827941
7,8 63095734,45
7,91 81283051,62
7,66 45708818,96
7,82 66069344,8
6,95 8912509,381
7,37 23442288,15
6,87 7413102,413
7,94 87096359

6 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
67608297,5 108648335 1810805 79,5684
7,83 4 2 6 90540279 2
28183829,3
7,45 1
85113803,8
7,93 2
229086765,
8,36 3
134896288,
8,13 3
33113112,1
7,52 5
331131121,
8,52 5
7,85 70794578,4

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

4
41686938,3
7,62 5
37153522,9
7,57 1
7762471,16
6,89 6
19952623,1
7,3 5

7 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
181970085, 117164089 1952734 79,8961
8,26 9 8 8 97636742 3
79432823,4
7,9 7
18620871,3
7,27 7
42657951,8
7,63 8
7,82 66069344,8
26302679,9
7,42 2
295120922,
8,47 7
165958690,
8,22 7
58884365,5
7,77 4
154881661,
8,19 9
7,5 31622776,6
50118723,3
7,7 6

8 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
263026799, 189855882 3164264 15821323 81,9924
8,42 2 1 7 5 3
89125093,8
7,95 1
186208713,
8,27 7
67608297,5
7,83 4
35481338,9
7,55 2
72443596,0
7,86 1
7,72 52480746,0

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

2
93325430,0
7,97 8
8,99 977237221
30902954,3
7,49 3
11220184,5
7,05 4
7,29 19498446

9 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
17378008,2 395846420 6597440 32987201 85,1834
7,24 9 6 3 7 5
10715193,0
7,03 5
602559586,
8,78 1
21877616,2
7,34 4
33884415,6
7,53 1
61659500,1
7,79 9
239883291
9,38 9
107151930,
8,03 5
309029543,
8,49 3
275422870,
8,44 3
8 100000000
19952623,1
7,3 5

10 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
123026877, 269754584 4495909 22479548 83,5178
8,09 1 4 7 7 8
109647819
9,04 6
7,81 64565422,9
58884365,5
7,77 4
104712854,
8,02 8
45708818,9
7,66 6
8,04 109647819,

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

6
8,88 758577575
8 100000000
23442288,1
7,37 5
8,25 177827941
34673685,0
7,54 5

UNTUK 10 MENIT

8
Leq 10 menit : 2,70

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
1,863E+0 18628425 82
1 82,61310663 8,261310663 182520085 9 9 ,70
2 84,66666614 8,466666614 292864421
80896542,
3 79,07929959 7,907929959 3
4 85,34959794 8,534959794 342736055
62767723,
5 77,97736378 7,797736378 5
90540279,
6 79,5684183 7,95684183 3
97636741,
7 79,89613277 7,989613277 5
8 81,99242811 8,199242811 158213235
9 85,18345476 8,518345476 329872017
10 83,51787588 8,351787588 224795487

 JAM 11.35 – 11.45

Detik
/ 1 2 3 4 5 6 7 8 9 10
Menit
5 88,6 81,8 78,3 75,2 73,7 94,7 79,2 74,9 78,1 83,1
10 84,5 76,8 72 78,4 79,3 77,5 82,9 74,2 89,5 81,3
15 81,3 83,7 76,6 84,8 80,9 78,5 87,5 76,1 76,2 72,8
20 83 79,9 77,6 77,1 77,6 74,2 75,2 75,6 78,4 77,1
25 78,4 74,3 75,7 72,1 69,9 79,5 76,4 81,8 75 90,5
30 76,8 85,4 83,1 79,8 74,1 77,8 68,3 82,2 72,2 79,1
35 78,8 75,9 80,9 74,4 77,2 74,6 76,1 75,8 78 78,7
40 81 75,4 88,4 74,1 72,8 75,4 73 76,2 74 81
45 74,1 83 78,2 76,8 82,6 95,1 73,6 77,9 77,1 75,2

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

50 79 72,8 78 77,9 75,5 82,5 84,5 74,3 72,8 76,1


55 77,7 75,7 77,2 83,1 78,1 76,1 67,8 79,2 95,5 72,8
60 74,2 72,5 78,6 80 73,3 75,3 71,6 76,3 80 79,4

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,86 724435960,1 1849817005 30830283,4 154151417,1 81,87948
8,45 281838293,1
8,13 134896288,3
8,3 199526231,5
7,84 69183097,09
7,68 47863009,23
7,88 75857757,5
8,1 125892541,2
7,41 25703957,83
7,9 79432823,47
7,77 58884365,54
7,42 26302679,92

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,18 151356124,8 1252113291 20868554,9 104342774,3 80,18462
7,68 47863009,23
8,37 234422881,5
7,99 97723722,1
7,43 26915348,04
8,54 346736850,5
7,59 38904514,5
7,54 34673685,05
8,3 199526231,5
7,28 19054607,18
7,57 37153522,91
7,25 17782794,1

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,83 67608297,54 1496984629 24949743,8 124748719,1 80,96036
7,2 15848931,92
7,66 45708818,96
7,76 57543993,73
7,57 37153522,91
8,31 204173794,5
8,09 123026877,1
8,84 691830970,9
7,82 66069344,8
7,8 63095734,45
7,72 52480746,02
7,86 72443596,01

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,52 33113112,15 1034237428 17237290,5 86186452,33 79,35439
7,84 69183097,09
8,48 301995172
7,71 51286138,4
7,21 16218100,97

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,98 95499258,6
7,44 27542287,03
7,41 25703957,83
7,68 47863009,23
7,79 61659500,19
8,31 204173794,5
8 100000000

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,37 23442288,15 699535114,6 11658918,6 58294592,88 77,65628
7,93 85113803,82
8,09 123026877,1
7,76 57543993,73
6,99 9772372,21
7,41 25703957,83
7,72 52480746,02
7,28 19054607,18
8,26 181970085,9
7,55 35481338,92
7,81 64565422,9
7,33 21379620,9

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


9,47 2951209227 6805822624 113430377 567151885 87,53699
7,75 56234132,52
7,85 70794578,44
7,42 26302679,92
7,95 89125093,81
7,78 60255958,61
7,46 28840315,03
7,54 34673685,05
9,51 3235936569
8,25 177827941
7,61 40738027,78
7,53 33884415,61
7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,92 83176377,11 1309945302 21832422 109162108 80,38072
8,29 194984460
8,75 562341325,2
7,52 33113112,15
7,64 43651583,22
6,83 6760829,754
7,61 40738027,78
7,3 19952623,15
7,36 22908676,53
8,45 281838293,1
6,78 6025595,861
7,16 14454397,71

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,49 30902954,33 745681338 12428022 62140112 77,93372
7,42 26302679,92
7,61 40738027,78
7,56 36307805,48
8,18 151356124,8
8,22 165958690,7
7,58 38018939,63
7,62 41686938,35
7,79 61659500,19
7,43 26915348,04
7,92 83176377,11
7,63 42657951,88
9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,81 64565422,9 4921594279 82026571 410132857 86,12925
8,95 891250938,1
7,62 41686938,35
7,84 69183097,09
7,5 31622776,6
7,22 16595869,07
7,8 63095734,45
7,4 25118864,32
7,71 51286138,4
7,28 19054607,18
9,55 3548133892
8 100000000
10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,31 204173794,5 1992738006 33212300 166061500 82,20269
8,13 134896288,3
7,28 19054607,18
7,71 51286138,4
9,05 1122018454
7,91 81283051,62
7,87 74131024,13
8,1 125892541,2
7,52 33113112,15
7,61 40738027,78
7,28 19054607,18
7,94 87096359

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 10 MENIT

8
Leq 10 menit : 2,65

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
1,842E+0 18423724 82
1 81,87947521 8,187947521 154151417 9 2 ,65
2 80,1846238 8,01846238 104342774
3 80,96036095 8,096036095 124748719
86186452,
4 79,35439004 7,935439004 3
58294592,
5 77,65628274 7,765628274 9
6 87,5369938 8,75369938 567151885
7 80,38071915 8,038071915 109162108
62140111,
8 77,93372028 7,793372028 5
9 86,12924563 8,612924563 410132857
10 82,20268958 8,220268958 166061500

 JAM 12.35 – 12.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 85,9 75,2 83,4 77,8 71,8 75,6 80,6 75,3 80,2 89,7
10 75 76,5 76,8 82,6 70,7 71,5 84,4 79,6 84,2 79,4
15 90,2 78,6 76,3 84,8 79,5 78,5 73,9 75,1 97,7 80,7
20 81,9 82,2 73,9 76,8 75,1 82,4 65,4 80,2 94,1 81,1
25 81,6 77,1 81,5 76,8 72,9 79,1 77,4 85,1 84,3 78,3
30 74,3 75,4 82 76,6 70,3 75,8 76,1 81,4 80,8 82,8
35 82 79,3 71,8 75,8 87,3 81,1 79,9 78,3 76 87,2
40 76,9 78,7 79,4 81,3 92,4 80,9 80,8 78,6 84,3 84,4
45 75,4 72 78,2 79,7 83,8 80,7 75,4 83,6 78,6 78,5
50 76,9 79,1 75,3 75,1 78,1 82 77,1 81,1 73,4 72
55 84,9 75,6 80,1 77,4 79,7 87,5 74,7 78,1 77,3 81,5
60 78,5 74,4 85,3 75,8 75,1 90,7 79 79,5 76,8 77,3

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


205423362,
8,59 389045145 2465080347 41084672,4 2 83,1265
7,5 31622776,6
9,02 1047128548
8,19 154881661,9
8,16 144543977,1
7,43 26915348,04
8,2 158489319,2
7,69 48977881,94
7,54 34673685,05
7,69 48977881,94
8,49 309029543,3
7,85 70794578,44

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


60197540,4
7,52 33113112,15 722370485,6 12039508,1 6 77,79579
7,65 44668359,22
7,86 72443596,01
8,22 165958690,7
7,71 51286138,4
7,54 34673685,05
7,93 85113803,82
7,87 74131024,13
7,2 15848931,92
7,91 81283051,62
7,56 36307805,48
7,44 27542287,03

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


106412206,
8,34 218776162,4 1276946474 21282441,2 1 80,26991
7,68 47863009,23
7,63 42657951,88
7,39 24547089,16
8,15 141253754,5
8,2 158489319,2
7,18 15135612,48
7,94 87096359
7,82 66069344,8
7,53 33884415,61
8,01 102329299,2
8,53 338844156,1

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


89769092,0
7,78 60255958,61 1077229105 17953818,4 5 79,53127
8,26 181970085,9

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,48 301995172
7,68 47863009,23
7,68 47863009,23
7,66 45708818,96
7,58 38018939,63
8,13 134896288,3
7,97 93325430,08
7,51 32359365,69
7,74 54954087,39
7,58 38018939,63

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


240295735,
7,18 15135612,48 2883548822 48059147 2 83,80746
7,07 11748975,55
7,95 89125093,81
7,51 32359365,69
7,29 19498446
7,03 10715193,05
8,73 537031796,4
9,24 1737800829
8,38 239883291,9
7,81 64565422,9
7,97 93325430,08
7,51 32359365,69

0.1*L1
6 Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
36307805,4 267937962 83,4885
7,56 8 1 44656327 223281635 3
14125375,4
7,15 5
70794578,4
7,85 4
173780082,
8,24 9
81283051,6
7,91 2
38018939,6
7,58 3
128824955,
8,11 2
123026877,
8,09 1
117489755,
8,07 5
158489319,
8,2 2
562341325,
8,75 2

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

9,07 1174897555

0.1*L1
7 Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
114815362, 926799710, 15446661, 77233309, 78,8780
8,06 1 1 8 2 5
275422870,
8,44 3
24547089,1
7,39 6
3467368,50
6,54 5
54954087,3
7,74 9
40738027,7
7,61 8
7,99 97723722,1
120226443,
8,08 5
34673685,0
7,54 5
7,71 51286138,4
29512092,2
7,47 7
79432823,4
7,9 7

0.1*L1
8 Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
33884415,6 137544393 22924065, 80,5926
7,53 1 4 6 114620328 2
91201083,9
7,96 4
32359365,6
7,51 9
104712854,
8,02 8
323593656,
8,51 9
138038426,
8,14 5
67608297,5
7,83 4
72443596,0
7,86 1
229086765,
8,36 3
128824955,
8,11 2
7,81 64565422,9

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

89125093,8
7,95 1

0.1*L1
9 Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
104712854, 972080351 89,0852
8,02 8 3 162013392 810066959 1
263026799,
8,42 2
9,77 5888436554
9,41 2570395783
269153480,
8,43 4
120226443,
8,08 5
39810717,0
7,6 6
269153480,
8,43 4
72443596,0
7,86 1
21877616,2
7,34 4
53703179,6
7,73 4
47863009,2
7,68 3

10 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
933254300, 260665051 43444175, 83,3690
8,97 8 5 2 217220876 2
7,94 87096359
117489755,
8,07 5
128824955,
8,11 2
67608297,5
7,83 4
190546071,
8,28 8
524807460,
8,72 2
275422870,
8,44 3
70794578,4
7,85 4
15848931,9
7,2 2
8,15 141253754,

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

5
53703179,6
7,73 4
UNTUK 10 MENIT

8
Leq 10 menit : 3,31

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
8,31264983 2,145E+0 21445210 83
1 83,12649833 3 205423362 9 4 ,31
7,77957874 60197540,
2 77,79578747 7 5
8,02699144
3 80,26991447 7 106412206
7,95312683 89769092,
4 79,53126833 3 1
8,38074606
5 83,80746063 3 240295735
8,34885300
6 83,48853004 4 223281635
7,88780464 77233309,
7 78,87804643 3 2
8,05926164
8 80,59261646 6 114620328
8,90852091
9 89,08520919 9 810066959
8,33690156
10 83,36901561 1 217220876

 JAM 13.35 – 13.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 76,2 76,2 74,5 73,9 80,8 80,5 82,3 80,5 75,7 75,8
10 74,9 81,3 73,5 76,6 82,1 78 81,2 73,4 78,6 84,8
15 75,4 78,1 74,9 78,3 81,5 77,1 76,8 77,9 83,5 79,6
20 72,3 80 77,2 84,3 85,4 73,4 75,9 82,7 78,9 82,6
25 72,9 77,5 91,9 78,2 73,8 87,1 78,5 81,8 83,5 78,8
30 75,4 78,6 76,3 79,4 80,8 71,8 89,7 93,5 79,2 74,4
35 71,8 79 76,7 79,2 75,7 73,1 81,6 83,7 76,6 80,1
40 71,9 86 74,9 81,3 75,8 78,7 80 86 85 76,2
45 84,5 82,7 69,2 78,7 71 99,6 84,2 86,3 79,4 81,8
50 81,9 80,7 76,3 78,5 88,2 82,6 88,4 75,6 77,4 76
55 80,4 97,5 81,7 85,3 84,4 87 89,9 77,8 82,4 72,3
60 73,1 77,1 81,2 81,2 83 82,8 76,2 79,9 80,9 76,9

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,62 41686938,35 775827078 12930451,3 64652256,5 78,10584
7,49 30902954,33
7,54 34673685,05
7,23 16982436,52
7,29 19498446
7,54 34673685,05
7,18 15135612,48
7,19 15488166,19
8,45 281838293,1
8,19 154881661,9
8,04 109647819,6
7,31 20417379,45

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


577147019,
7,62 41686938,35 6925764232 115429404 3 87,61286
8,13 134896288,3
7,81 64565422,9
8 100000000
7,75 56234132,52
7,86 72443596,01
7,9 79432823,47
8,6 398107170,6
8,27 186208713,7
8,07 117489755,5
9,75 5623413252
7,71 51286138,4

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


177818156,
7,45 28183829,31 2133817883 35563631,4 9 82,49976
7,35 22387211,39
7,49 30902954,33
7,72 52480746,02
9,19 1548816619
7,63 42657951,88
7,67 46773514,13
7,49 30902954,33
6,92 8317637,711
7,63 42657951,88
8,17 147910838,8
8,12 131825673,9

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


116154290,
7,39 24547089,16 1393851488 23230858,1 6 80,65035
7,66 45708818,96
7,83 67608297,54

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,43 269153480,4
7,82 66069344,8
7,94 87096359
7,92 83176377,11
8,13 134896288,3
7,87 74131024,13
7,85 70794578,44
8,53 338844156,1
8,12 131825673,9

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


178168091,
8,08 120226443,5 2138017097 35633618,3 4 82,5083
8,21 162181009,7
8,15 141253754,5
8,54 346736850,5
7,38 23988329,19
8,08 120226443,5
7,57 37153522,91
7,58 38018939,63
7,1 12589254,12
8,82 660693448
8,44 275422870,3
8,3 199526231,5

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,05 112201845,4 10864818519 181080309 905401543 89,56841
7,8 63095734,45
7,71 51286138,4
7,34 21877616,24
8,71 512861384
7,18 15135612,48
7,31 20417379,45
7,87 74131024,13
9,96 9120108394
8,26 181970085,9
8,7 501187233,6
8,28 190546071,8

7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,23 169824365,2 3610792349 60179872 300899362 84,78421
8,12 131825673,9
7,68 47863009,23
7,59 38904514,5
7,85 70794578,44
8,97 933254300,8

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,16 144543977,1
8 100000000
8,42 263026799,2
8,84 691830970,9
8,99 977237221
7,62 41686938,35

8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,05 112201845,4 4025421996 67090367 335451833 85,2563
7,34 21877616,24
7,79 61659500,19
8,27 186208713,7
8,18 151356124,8
9,35 2238721139
8,37 234422881,5
8,6 398107170,6
8,63 426579518,8
7,56 36307805,48
7,78 60255958,61
7,99 97723722,1

9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,57 37153522,91 1518936427 25315607 126578036 81,02358
7,86 72443596,01
8,35 223872113,9
7,89 77624711,66
8,35 223872113,9
7,92 83176377,11
7,66 45708818,96
8,5 316227766
7,94 87096359
7,74 54954087,39
8,24 173780082,9
8,09 123026877,1

10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,58 38018939,63 1117728724 18628812 93144060 79,69155
8,48 301995172
7,96 91201083,94
8,26 181970085,9
7,88 75857757,5
7,44 27542287,03

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,01 102329299,2
7,62 41686938,35
8,18 151356124,8
7,6 39810717,06
7,23 16982436,52
7,69 48977881,94

UNTUK 10 MENIT

Leq 10 menit : 84,59

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
7,81058368 64652256, 2,875E+0 28754146 8
1 78,10583687 7 5 9 5 4,59
8,76128645
2 87,61286457 7 577147019
8,24997610
3 82,49976104 4 177818157
8,06503525
4 80,65035257 7 116154291
8,25082992
5 82,50829928 8 178168091
6 89,5684123 8,95684123 905401543
8,47842126
7 84,78421267 7 300899362
8,52563016
8 85,25630169 9 335451833
8,10235835
9 81,02358351 1 126578036
7,96915516 93144060,
10 79,69155166 6 3

 JAM 14.35 – 14.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 82,8 81,3 77,4 74,4 75,9 78,9 80,8 77,1 77,5 71
10 77,7 68,8 74,9 83,3 75,5 77,4 75,5 76,4 73,3 82
15 75,8 79 83,7 75,4 75,1 79,3 81,7 72,7 71,8 72,9
20 72,4 76,6 79,3 70,1 77,8 76,2 94,1 71,1 77,7 73,1
25 79,3 73,3 87,9 84,2 79,9 72,3 74,3 78,6 86,9 74,4
30 79,9 76,6 74,2 72,7 92,3 74,1 73,4 78 76,1 75,9
35 80,4 81,4 81,3 75,3 66,9 75,3 70,3 72,3 77,8 77,3
40 74,5 87,9 80,9 83,5 67,4 83,3 69,7 75 77,3 77,9
45 83 84,3 83,8 82 70,8 78,5 71,2 77,6 80,2 76,4
50 73,7 77,7 82,8 77,8 79,4 75,5 76,6 78,4 71,5 89,1
55 86,9 77,9 78,2 75 72,8 73,6 76,6 69,7 86,1 72,9

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

60 78,4 84,3 84,4 87,9 85,4 91,7 76,1 77,1 74,3 77,8

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,28 190546071,8 1407426996 23457116,6 117285583 80,69245
7,77 58884365,54
7,58 38018939,63
7,24 17378008,29
7,93 85113803,82
7,99 97723722,1
8,04 109647819,6
7,45 28183829,31
8,3 199526231,5
7,37 23442288,15
8,69 489778819,4
7,84 69183097,09

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,13 134896288,3 1748196401 29136606,7 145683033,4 81,63409
6,88 7585775,75
7,9 79432823,47
7,66 45708818,96
7,33 21379620,9
7,66 45708818,96
8,14 138038426,5
8,79 616595001,9
8,43 269153480,4
7,77 58884365,54
7,79 61659500,19
8,43 269153480,4

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,74 54954087,39 2078136153 34635602,6 173178012,8 82,38493
7,49 30902954,33
8,37 234422881,5
7,93 85113803,82
8,79 616595001,9
7,42 26302679,92
8,13 134896288,3
8,09 123026877,1
8,38 239883291,9
8,28 190546071,8
7,82 66069344,8
8,44 275422870,3

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,44 27542287,03 1692612367 28210206,1 141051030,6 81,49376
8,33 213796209
7,54 34673685,05
7,01 10232929,92
8,42 263026799,2

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,27 18620871,37
7,53 33884415,61
8,35 223872113,9
8,2 158489319,2
7,78 60255958,61
7,5 31622776,6
8,79 616595001,9

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,59 38904514,5 2438272210 40637870,2 203189350,8 83,07901
7,55 35481338,92
7,51 32359365,69
7,78 60255958,61
7,99 97723722,1
9,23 1698243652
6,69 4897788,194
6,74 5495408,739
7,08 12022644,35
7,94 87096359
7,28 19054607,18
8,54 346736850,5

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,89 77624711,66 2158039542 35967326 179836629 82,54878
7,74 54954087,39
7,93 85113803,82
7,62 41686938,35
7,23 16982436,52
7,41 25703957,83
7,53 33884415,61
8,33 213796209
7,85 70794578,44
7,55 35481338,92
7,36 22908676,53
9,17 1479108388
7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
8,08 120226443,5 3088193337 51469889 257349445 84,10523
7,55 35481338,92
8,17 147910838,8
9,41 2570395783
7,43 26915348,04
7,34 21877616,24
7,03 10715193,05
6,97 9332543,008
7,12 13182567,39
7,66 45708818,96
7,66 45708818,96
7,61 40738027,78

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,71 51286138,4 497931404 8298857 41494284 76,17988
7,64 43651583,22
7,27 18620871,37
7,11 12882495,52
7,86 72443596,01
7,8 63095734,45
7,23 16982436,52
7,5 31622776,6
7,76 57543993,73
7,84 69183097,09
6,97 9332543,008
7,71 51286138,4
9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,75 56234132,52 1349243573 22487393 112436964 80,50909
7,33 21379620,9
7,18 15135612,48
7,77 58884365,54
8,69 489778819,4
7,61 40738027,78
7,78 60255958,61
7,73 53703179,64
8,02 104712854,8
7,15 14125375,45
8,61 407380277,8
7,43 26915348,04
10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,1 12589254,12 1329040384 22150673 110753365 80,44357
8,2 158489319,2
7,29 19498446
7,31 20417379,45
7,44 27542287,03
7,59 38904514,5
7,73 53703179,64
7,79 61659500,19
7,64 43651583,22
8,91 812830516,2
7,29 19498446
7,78 60255958,61

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 10 MENIT

Leq 10 menit : 81,71

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
8,06924463 1,482E+0 14822577 8
1 80,69244631 1 117285583 9 0 1,71
8,16340897
2 81,63408976 6 145683033
8,23849275
3 82,38492752 2 173178013
8,14937626
4 81,49376264 4 141051031
8,30790094
5 83,07900943 3 203189351
8,25487815
6 82,54878152 2 179836629
8,41052323
7 84,10523236 6 257349445
7,61798827 41494283,
8 76,17988272 2 7
8,05090911
9 80,50909112 2 112436964
8,04435693
10 80,44356932 2 110753365

 JAM 15.35 – 15.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 79,6 76,6 79,9 78,5 80 76,3 80,6 81,7 77 74,5
10 74,2 75,1 76,1 78,9 79,6 82,5 80,5 87,7 75,1 76,6
15 68,1 74,9 78,1 75,9 82,1 85,8 85,9 78,8 73,6 76,4
20 76 82,7 83,7 76,5 81,3 80,1 89,5 73,9 81,9 79,8
25 72,9 70,2 76,9 80,8 75,9 76,6 80,4 80,6 77,3 75
30 81,2 85,6 95,4 82,2 77,4 81 75,9 88,5 73,6 72,6
35 75,2 77 78,3 84,5 82,1 79,5 79,7 79,8 72 78,1
40 74,1 73,8 77,7 77,8 75,2 76,9 78 79,1 74,9 80,2
45 72,4 75,1 80,7 78,3 77,1 78,2 73 75,9 77,3 77,3
50 80,7 76,2 77,2 74,4 76,5 82,1 74,6 73,1 80,4 82
55 81,8 78,2 77,8 89,8 76,2 87,5 81,2 74,5 85,9 76
60 83,6 77,9 77,7 84,2 78,3 78,8 81,7 72 75,8 72,8

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


14820381, 74101905,5 78,6982
7,96 91201083,94 889222866,9 1 8 9
7,42 26302679,92
6,81 6456542,29
7,6 39810717,06
7,29 19498446
8,12 131825673,9
7,52 33113112,15
7,41 25703957,83
7,24 17378008,29
8,07 117489755,5
8,18 151356124,8
8,36 229086765,3

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


15743523, 78717616,2 78,9607
7,66 45708818,96 944611394,5 2 1 2
7,51 32359365,69
7,49 30902954,33
8,27 186208713,7
7,02 10471285,48
8,56 363078054,8
7,7 50118723,36
7,38 23988329,19
7,51 32359365,69
7,62 41686938,35
7,82 66069344,8
7,79 61659500,19

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


72823332, 364116660, 85,6124
7,99 97723722,1 4369399930 2 8 1
7,61 40738027,78
7,81 64565422,9
8,37 234422881,5
7,69 48977881,94
9,54 3467368505
7,83 67608297,54
7,77 58884365,54
8,07 117489755,5
7,72 52480746,02
7,78 60255958,61
7,77 58884365,54

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


36224025, 181120126, 82,5796
7,85 70794578,44 2173441520 3 6 7
7,89 77624711,66

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,59 38904514,5
7,65 44668359,22
8,08 120226443,5
8,22 165958690,7
8,45 281838293,1
7,78 60255958,61
7,83 67608297,54
7,44 27542287,03
8,98 954992586
8,42 263026799,2

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


81890069,9 79,1323
8 100000000 982680839,2 16378014 3 1
7,96 91201083,94
8,21 162181009,7
8,13 134896288,3
7,59 38904514,5
7,74 54954087,39
8,21 162181009,7
7,52 33113112,15
7,71 51286138,4
7,65 44668359,22
7,62 41686938,35
7,83 67608297,54

6 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
42657951,8 187915836 3131930 15659653 81,9478
7,63 8 2 6 0 2
8,25 177827941
380189396,
8,58 3
102329299,
8,01 2
45708818,9
7,66 6
125892541,
8,1 2
89125093,8
7,95 1
48977881,9
7,69 4
7,82 66069344,8
162181009,
8,21 7
562341325,
8,75 2
7,88 75857757,5

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
114815362, 214081624 3568027 17840135 82,5139
8,06 1 0 1 3 8
112201845,
8,05 4
8,59 389045145
891250938,
8,95 1
109647819,
8,04 6
7,59 38904514,5
93325430,0
7,97 8
63095734,4
7,8 5
19952623,1
7,3 5
28840315,0
7,46 3
131825673,
8,12 9
147910838,
8,17 8

8 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
147910838, 194005745 3233429 16167145 82,0863
8,17 8 3 1 4 3
588843655,
8,77 4
7,88 75857757,5
24547089,1
7,39 6
114815362,
8,06 1
707945784,
8,85 4
7,98 95499258,6
81283051,6
7,91 2
7,59 38904514,5
20417379,4
7,31 5
28183829,3
7,45 1
15848931,9
7,2 2

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

9 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
50118723,3 1623412 79,0939
7,7 6 974047254 1 81170604 9
32359365,6
7,51 9
22908676,5
7,36 3
154881661,
8,19 9
53703179,6
7,73 4
22908676,5
7,36 3
15848931,9
7,2 2
30902954,3
7,49 3
53703179,6
7,73 4
109647819,
8,04 6
8,59 389045145
38018939,6
7,58 3

10 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
28183829,3 1171999 77,6789
7,45 1 703199376 0 58599948 7
45708818,9
7,66 6
43651583,2
7,64 2
7,98 95499258,6
7,5 31622776,6
18197008,5
7,26 9
7,81 64565422,9
104712854,
8,02 8
53703179,6
7,73 4
158489319,
8,2 2
39810717,0
7,6 6
19054607,1
7,28 8
UNTUK 10 MENIT

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8
Leq 10 menit : 1,51

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
74101905, 1,416E+0 14163862 81
1 78,69829376 7,869829376 6 9 7 ,51
78717616,
2 78,96071934 7,896071934 2
3 85,61240551 8,561240551 364116661
4 82,57966713 8,257966713 181120127
81890069,
5 79,13231242 7,913231242 9
6 81,94782135 8,194782135 156596530
7 82,51398145 8,251398145 178401353
8 82,08633345 8,208633345 161671454
81170604,
9 79,0939878 7,90939878 5
10 77,67897231 7,767897231 58599948

 JAM 16.35 – 16.45

Detik
/ 1 2 3 4 5 6 7 8 9 10
Menit
5 82,2 71,5 68,4 73,9 77,4 76,2 80,3 83,7 67,1 73,2
10 73,8 73,8 72,3 71,1 83,1 75 77,8 74,2 74,2 76,1
15 72,8 76 79,1 83,8 83,6 73,2 74,2 73,2 71,1 67
20 75,2 73,1 75 76,3 80,2 68,2 74,4 73,6 78,2 73,6
25 73,5 78,4 70,7 72,5 78,6 71,3 75,6 76,8 74,9 71,2
30 70,3 74,7 75,5 78,3 74,9 74,9 77,2 73 75,8 67,9
35 72,3 73,9 76,2 76,5 74,9 70,3 73,5 75,5 76,2 71,7
40 71,1 76,2 78,1 82,6 79,6 77,5 80,3 76 73,3 69,9
45 74,9 72,9 79,8 78,8 74,8 75,4 80 75,3 71,8 77,2
50 79,9 68,7 73,9 87,6 79,7 71 83,2 64,5 77,8 72,3
55 71,8 70,4 78,4 79 73,2 72,8 82,1 72,5 74,7 73,2
60 72 75,3 71,4 75,2 76 72,5 81,1 74,7 76,5 65,8

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7744888,2 38724441,3
8,22 165958690,7 464693296,6 8 8 75,87985
7,38 23988329,19
7,28 19054607,18
7,52 33113112,15
7,35 22387211,39
7,03 10715193,05
7,23 16982436,52
7,11 12882495,52
7,49 30902954,33
7,99 97723722,1
7,18 15135612,48
7,2 15848931,92

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


5583862,7 27919313,6
7,15 14125375,45 335031764 3 7 74,45905
7,38 23988329,19
7,6 39810717,06
7,31 20417379,45
7,84 69183097,09
7,47 29512092,27
7,39 24547089,16
7,62 41686938,35
7,29 19498446
6,87 7413102,413
7,04 10964781,96
7,53 33884415,61

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8222042,2 41110211,4
6,84 6918309,709 493322537,7 9 7 76,1395
7,23 16982436,52
7,91 81283051,62
7,5 31622776,6
7,07 11748975,55
7,55 35481338,92
7,62 41686938,35
7,81 64565422,9
7,98 95499258,6
7,39 24547089,16
7,84 69183097,09
7,14 13803842,65

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


23264066,
7,39 24547089,16 1395843996 6 116320333 80,65656
7,11 12882495,52

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,38 239883291,9
7,63 42657951,88
7,25 17782794,1
7,83 67608297,54
7,65 44668359,22
8,26 181970085,9
7,88 75857757,5
8,76 575439937,3
7,9 79432823,47
7,52 33113112,15

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


16710111, 83550559,6
7,74 54954087,39 1002606716 9 8 79,21949
8,31 204173794,5
8,36 229086765,3
8,02 104712854,8
7,86 72443596,01
7,49 30902954,33
7,49 30902954,33
7,96 91201083,94
7,48 30199517,2
7,97 93325430,08
7,32 20892961,31
7,6 39810717,06

6 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
41686938,3 2468765
7,62 5 296251860 4937531 5 73,9248
7,5 31622776,6
20892961,3
7,32 1
6,82 6606934,48
13489628,8
7,13 3
30902954,3
7,49 3
10715193,0
7,03 5
56234132,5
7,75 2
34673685,0
7,54 5
12589254,1
7,1 2
19054607,1
7,28 8
7,25 17782794,1

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
107151930, 103951612 1732526 8662634
8,03 5 7 9 4 79,3765
60255958,6
7,78 1
26302679,9
7,42 2
27542287,0
7,44 3
36307805,4
7,56 8
52480746,0
7,72 2
22387211,3
7,35 9
107151930,
8,03 5
8 100000000
208929613,
8,32 1
162181009,
8,21 7
128824955,
8,11 2

8 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
234422881, 4430271
8,37 5 531632573 8860543 4 76,4643
26302679,9
7,42 2
20892961,3
7,32 1
22908676,5
7,36 3
47863009,2
7,68 3
19952623,1
7,3 5
35481338,9
7,55 2
39810717,0
7,6 6
33884415,6
7,53 1
2818382,93
6,45 1
7,25 17782794,1

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

29512092,2
7,47 7

9 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
3266196 75,1404
6,71 5128613,84 391943610 6532393 7 2
26302679,9
7,42 2
12882495,5
7,11 2
7,82 66069344,8
30902954,3
7,49 3
38018939,6
7,58 3
41686938,3
7,62 5
7,33 21379620,9
15135612,4
7,18 8
60255958,6
7,78 1
29512092,2
7,47 7
44668359,2
7,65 2

10 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
20892961,3 1896846 72,7803
7,32 1 227621549 3793692 2 2
40738027,7
7,61 8
5011872,33
6,7 6
22908676,5
7,36 3
13182567,3
7,12 9
6165950,01
6,79 9
14791083,8
7,17 8
6,99 9772372,21
52480746,0
7,72 2
16982436,5
7,23 2
7,32 20892961,3

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

1
3801893,96
6,58 3
UNTUK 10 MENIT

7
Leq 10 menit : 7,12

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
38724441, 51487200 5148720 77
1 75,87985162 7,587985162 4 2 0 ,12
27919313,
2 74,45904738 7,445904738 7
41110211,
3 76,13949711 7,613949711 5
4 80,65655637 8,065655637 116320333
83550559,
5 79,21949363 7,921949363 7
6 73,9247984 7,39247984 24687655
7 79,37649985 7,937649985 86626344
44302714,
8 76,46430336 7,646430336 4
32661967,
9 75,14042342 7,514042342 5
18968462,
10 72,78032129 7,278032129 4

 JAM 17.35 – 17.45

Detik
/ 1 2 3 4 5 6 7 8 9 10
Menit
5 76,7 75,5 75,4 86 75 86,3 84,6 77,5 74 78,4
10 78,4 80,6 76,5 82,9 78,9 78,1 79,6 80,9 74,9 76,4
15 81 80,6 77,6 80,4 72,7 80,9 77 77,3 76,6 78,1
20 78,5 88,7 76,6 83,4 79,9 76,8 76,8 77,1 77,9 74,9
25 76,7 79,8 82,4 75 79,5 75,6 82,6 81,8 90,1 70,7
30 78,3 80,2 76,9 83 78,9 70,6 74,2 78,1 75,4 75,6
35 79,6 71,7 77,9 80,9 83,1 79,6 82,6 72,1 84,1 72,4
40 85,1 72 78,5 76,7 75,7 73,2 79,9 82,1 78,9 79,3
45 80,3 80,4 86,5 72,2 82,9 73,6 76,6 77,5 72,8 78,6
50 74,1 79,5 80,3 82,1 69,6 76,4 77,2 73,4 77,3 74,1
55 81,2 72,4 85,8 71,6 76,9 79,5 80 85,7 91,9 76,8
60 72,6 70,1 83,4 85,4 76,2 76,5 79,3 82,8 84,2 77,1

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

UNTUK 1 MENIT

1 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,67 46773514,13 1124698854 18744980,9 93724904,51 79,71855
7,84 69183097,09
8,1 125892541,2
7,85 70794578,44
7,67 46773514,13
7,83 67608297,54
7,96 91201083,94
8,51 323593656,9
8,03 107151930,5
7,41 25703957,83
8,12 131825673,9
7,26 18197008,59

2 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,55 35481338,92 1463658285 24394304,8 121971523,8 80,86258
8,06 114815362,1
8,06 114815362,1
8,87 741310241,3
7,98 95499258,6
8,02 104712854,8
7,17 14791083,88
7,2 15848931,92
8,04 109647819,6
7,95 89125093,81
7,24 17378008,29
7,01 10232929,92

3 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,54 34673685,05 1690607982 28176799,7 140883998,5 81,48862
7,65 44668359,22
7,76 57543993,73
7,66 45708818,96
8,24 173780082,9
7,69 48977881,94
7,79 61659500,19
7,85 70794578,44
8,65 446683592,2
8,03 107151930,5
8,58 380189396,3
8,34 218776162,4

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

4 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,6 398107170,6 1862433139 31040552,3 155202761,6 81,90899
8,29 194984460
8,04 109647819,6
8,34 218776162,4
7,5 31622776,6
8,3 199526231,5
8,09 123026877,1
7,67 46773514,13
7,22 16595869,07
8,21 162181009,7
7,16 14454397,71
8,54 346736850,5

5 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,5 31622776,6 928438593,2 15473976,6 77369882,77 78,88572
7,89 77624711,66
7,27 18620871,37
7,99 97723722,1
7,95 89125093,81
7,89 77624711,66
8,31 204173794,5
7,57 37153522,91
8,29 194984460
6,96 9120108,394
7,69 48977881,94
7,62 41686938,35

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,63 426579518,8 1022271928 17037865 85189327 79,30385
7,81 64565422,9
8,09 123026877,1
7,68 47863009,23
7,56 36307805,48
7,06 11481536,21
7,96 91201083,94
7,32 20892961,31
7,36 22908676,53
7,64 43651583,22
7,95 89125093,81
7,65 44668359,22

7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

8,46 288403150,3 1248855909 20814265 104071326 80,17331


7,96 91201083,94
7,7 50118723,36
7,68 47863009,23
8,26 181970085,9
7,42 26302679,92
8,26 181970085,9
7,99 97723722,1
7,66 45708818,96
7,72 52480746,02
8 100000000
7,93 85113803,82

8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,75 56234132,52 1318764036 21979401 109897003 80,40986
8,09 123026877,1
7,73 53703179,64
7,71 51286138,4
8,18 151356124,8
7,81 64565422,9
7,21 16218100,97
8,21 162181009,7
7,75 56234132,52
7,34 21877616,24
8,57 371535229,1
8,28 190546071,8

9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,4 25118864,32 3440622310 57343705 286718526 84,57456
7,49 30902954,33
7,66 45708818,96
7,79 61659500,19
9,01 1023292992
7,54 34673685,05
8,41 257039578,3
7,89 77624711,66
7,28 19054607,18
7,73 53703179,64
9,19 1548816619
8,42 263026799,2

10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

7,84 69183097,09 556148352 9269139 46345696 76,66009


7,64 43651583,22
7,81 64565422,9
7,49 30902954,33
7,07 11748975,55
7,56 36307805,48
7,24 17378008,29
7,93 85113803,82
7,86 72443596,01
7,41 25703957,83
7,68 47863009,23
7,71 51286138,4

UNTUK 10 MENIT

8
Leq 10 menit : 0,87

Menit Hasil Leq / Menit 0.1*L1… 10^ (L1 - L12) 1/10 LOG
80
1 79,71855007 7,971855007 93724904,5 1,221E+09 122137495 ,87
2 80,86258449 8,086258449 121971524
3 81,48861669 8,148861669 140883998
4 81,90899445 8,190899445 155202762
5 78,88571939 7,888571939 77369882,8
6 79,30385189 7,930385189 85189327,3
7 80,17331087 8,017331087 104071326
8 80,40985849 8,040985849 109897003
9 84,57455755 8,457455755 286718526
10 76,66009409 7,666009409 46345696

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

 JAM 18.35 – 18.45

Detik /
1 2 3 4 5 6 7 8 9 10
Menit
5 80,6 78,9 90,2 83,7 74,1 77,3 80,2 79 77,8 72,8
10 76,7 78,1 84 74,6 78,7 70,9 80 83,7 80,7 79,7
15 79,2 75,8 81,8 77,9 72 81,8 78,4 79,4 76,1 77
20 74,5 78,5 77,5 73,5 74,3 75 76,2 76,3 76 77,7
25 76,9 78,8 76,1 79,8 74,6 76 80,1 82 78 76,9
30 82,5 80,6 83 80,4 76,4 76,2 87,2 82,3 76,9 72,9
35 77,6 80,3 82,2 77,5 77,6 73,2 79,4 76,7 85,8 80,6
40 80,2 81,9 76 76,9 73,2 82,8 69,9 73,8 82,6 86,2
45 77,4 76,4 76,1 72 78,7 76,6 71,5 69,1 85,5 77,5
50 77,9 82,5 78,1 84,1 80,1 84,8 76,2 82,6 77,8 80,4
55 72,8 79,3 76,1 68,7 75,7 84,5 79,3 78,1 76,9 81,3
60 75,6 81,1 80 79,2 72 77,8 77,2 74,2 79,3 88,4

Rumus Leq 10 menit = 10 Log 1/10 [(10^0.1*L1+…..+L10)]dB(A)


Rumus Leq 1 menit : 10Log1/60 [(10^0.1*L+…..+10^0.1*L12)]dB(A)

UNTUK 1 MENIT

1 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
114815362 833987754 13899795, 69498979, 78,4197
8,06 ,1 ,4 9 53 8
46773514,
7,67 13
83176377,
7,92 11
28183829,
7,45 31
48977881,
7,69 94
8,25 177827941
57543993,
7,76 73
104712854
8,02 ,8
54954087,
7,74 39
61659500,
7,79 19
19054607,
7,28 18

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

36307805,
7,56 48

2 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
77624711, 113912864 18985477, 94927387, 79,7739
7,89 66 8 5 33 2
64565422,
7,81 9
38018939,
7,58 63
70794578,
7,85 44
75857757,
7,88 5
114815362
8,06 ,1
107151930
8,03 ,5
154881661
8,19 ,9
43651583,
7,64 22
8,25 177827941
85113803,
7,93 82
128824955
8,11 ,2

3 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
104712854 219798259 36633043, 183165216 82,6284
9,02 8 4 2 ,2 3
251188643
8,4 ,2
151356124
8,18 ,8
56234132,
7,75 52
40738027,
7,61 78
199526231
8,3 ,5
165958690
8,22 ,7
39810717,
7,6 06
40738027,
7,61 78
7,81 64565422,

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

9
40738027,
7,61 78
8 100000000

4 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
234422881 102114699 17019116, 85095582, 79,2990
8,37 ,5 1 5 54 7
28840315,
7,46 03
61659500,
7,79 19
22387211,
7,35 39
95499258,
7,98 6
109647819
8,04 ,6
56234132,
7,75 52
48977881,
7,69 94
15848931,
7,2 92
257039578
8,41 ,3
7413102,4
6,87 13
83176377,
7,92 11

5 0.1*L1
Menit … 10^ (L1 - L12) 1/60 DBA (5) LOG
25703957, 522990893 8716514,8 43582574, 76,3931
7,41 83 ,4 9 45 3
74131024,
7,87 13
15848931,
7,2 92
26915348,
7,43 04
28840315,
7,46 03
43651583,
7,64 22
57543993,
7,76 73
20892961,
7,32 31

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

74131024,
7,87 13
102329299
8,01 ,2
37153522,
7,57 91
15848931,
7,2 92

6 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,73 53703179,64 1231719700 20528662 102643308 80,11331
7,09 12302687,71
8,18 151356124,8
7,5 31622776,6
7,6 39810717,06
7,62 41686938,35
7,32 20892961,31
8,28 190546071,8
7,66 45708818,96
8,48 301995172
8,45 281838293,1
7,78 60255958,61

7 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


8,02 104712854,8 1232995245 20549921 102749604 80,1178
8 100000000
7,84 69183097,09
7,62 41686938,35
8,01 102329299,2
8,72 524807460,2
7,94 87096359
6,99 9772372,21
7,15 14125375,45
7,62 41686938,35
7,93 85113803,82
7,72 52480746,02

8 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,9 79432823,47 1123652038 18727534 93637670 79,71451
8,37 234422881,5
7,94 87096359
7,63 42657951,88
8,2 158489319,2
8,23 169824365,2
7,67 46773514,13
7,38 23988329,19
6,91 8128305,162
8,26 181970085,9
7,81 64565422,9
7,42 26302679,92

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

9 Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG


7,78 60255958,61 1481688591 24694810 123474049 80,91576
8,07 117489755,5
7,61 40738027,78
7,6 39810717,06
7,8 63095734,45
7,69 48977881,94
8,58 380189396,3
8,26 181970085,9
8,55 354813389,2
7,78 60255958,61
7,69 48977881,94
7,93 85113803,82

10
Menit 0.1*L1… 10^ (L1 - L12) 1/60 DBA (5) LOG
7,28 19054607,18 1814153411 30235890 151179451 81,79493
7,97 93325430,08
7,7 50118723,36
7,77 58884365,54
7,69 48977881,94
7,29 19498446
8,06 114815362,1
8,62 416869383,5
7,75 56234132,52
8,04 109647819,6
8,13 134896288,3
8,84 691830970,9

UNTUK 10 MENIT

8
Leq 10 menit : 0,21

(L1 -
Menit Hasil Leq / Menit 0.1*L1… 10^ L12) 1/10 LOG
69498979, 1,05E+0 10499538 80
1 78,41978428 7,841978428 5 9 2 ,21
94927387,
2 79,77391528 7,977391528 3
3 82,62843003 8,262843003 183165216
85095582,
4 79,29907016 7,929907016 5
43582574,
5 76,39312881 7,639312881 5
6 80,11330642 8,011330642 102643308
7 80,11780156 8,011780156 102749604
93637669,
8 79,71450598 7,971450598 8

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

9 80,91575691 8,091575691 123474049


10 81,79492764 8,179492764 151179451
LEQ SIANG HARI

Rumus LS        
LS = 10 Log 1/12 (T1.100.1.L1 + …….. + T4.100.1.L4) dB (A)
 
T1 = Interval (Jam/det/men)

LS/L1…. = Leq Siang Hari

L1 - 0.1 10
INTERVAL L4 .L1… 10^ T . 10^ T1 +…. + T4 1/2 LOG
8 337 337.
1
5,29 8,53 .716.252 716.252 2.076.132.432 173.011.036 82,38
8 148 148.
1
1,72 8,17 .753.994 753.994
1 8 148 148.
1,72 8,17 .662.642 662.642
8 186 186.
1
2,70 8,27 .284.259 284.259
8 184 184.
1
2,65 8,27 .237.242 237.242
8 214 214.
1
3,31 8,33 .452.104 452.104
8 287 287.
1
4,59 8,46 .541.465 541.465
8 148 148.
1
1,71 8,17 .225.770 225.770
8 141 141.
1
1,51 8,15 .638.627 638.627
7 51 51.
1
7,12 7,71 .487.200 487.200
8 122 122.
1
0,87 8,09 .137.495 137.495
8 104 104.
1 0,21 8,02 .995.382 995.382

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

4.11 HUBUNGAN KECEPATAN – KEBISINGAN, VOLUME-KEBISINGAN,

VOLUME -KECEPATAN

a. Volume – Kebisingan

Volume/Q
JAM dBA
Gabungan

07.35 - 07.45 85,29 1390


08.35 - 08.45 81,72 1254
09.35 - 09.45 81,72 1054
10.35 - 10.45 82,70 968
11.35 - 11.45 82,65 917
12.35 - 12.45 83,31 901
13.35 - 13.45 84,59 887
14.35 - 14.45 81,71 926
15.35 - 15.45 81,51 827
16.35 - 16.45 77,12 1063
17.35 - 17.45 80,87 1093
18.35 - 18.45 80,21 760

Grafik Volume - Kebisingan

dBA - Q
1500

1200

f(x) = 16.8 x − 373.6


900 R² = 0.04
VOLUME

600

300

0
76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00

dBA

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

b. Kecepatan – Kebisingan

JAM dBA Kecepatan Rata-rata


(Gabungan)
07.35 - 07.45 85,29 29,98
08.35 - 08.45 81,72 26,82
09.35 - 09.45 81,72 26,08
10.35 - 10.45 82,70 28,2
11.35 - 11.45 82,65 29,37
12.35 - 12.45 83,31 27,73
13.35 - 13.45 84,59 24,53
14.35 - 14.45 81,71 25,53
15.35 - 15.45 81,51 26,17
16.35 - 16.45 77,12 29,38
17.35 - 17.45 80,87 27,98
18.35 - 18.45 80,21 28,43

Grafik Kecepatan – Kebisingan

dBA - V
40

30
f(x) = − 0.15 x + 39.4
R² = 0.03
KECEPATAN

20

10

0
76.00 77.00 78.00 79.00 80.00 81.00 82.00 83.00 84.00 85.00 86.00

dBA

JURUSAN TEKNIK SIPIL


PRODI D3 TEKNIK KONSTRUKSI SIPIL
TEKNIK DAN SURVEY LALU LINTAS
POLITEKNIK NEGERI UJUNG PANDANG

c. Volume – Kecepatan

Volume/Q/Gabungan
JAM Kecepatan Rata-rata
(Kend/Jam)
(Gabungan)
07.35 - 07.45 1390 29,98
08.35 - 08.45 1254 26,82
09.35 - 09.45 1054 26,08
10.35 - 10.45 968 28,2
11.35 - 11.45 917 29,37
12.35 - 12.45 901 27,73
13.35 - 13.45 887 24,53
14.35 - 14.45 926 25,53
15.35 - 15.45 827 26,17
16.35 - 16.45 1063 29,38
17.35 - 17.45 1093 27,98
18.35 - 18.45 760 28,43

Grafik Volume – Kecepatan

Q-V
1500

1200
f(x) = 36.77 x − 8.52
900 R² = 0.12
VOLUME

600

300

0
20 25 30 35

KECEPATAN RATA-RATA

JURUSAN TEKNIK SIPIL