Draft BQ
Draft BQ
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
3.3 EXCAVATE, LOAD, HAUL AND DISPOSE
Cut and Dispose
E F132 3.3.4 Excavate in natural hard material by ripper unit to disposal site m3
approved
by the P.D.
F F133.3 3.3.7 Excavate in rock material by hydraulic rock breaker to disposal m3
site
approved by the P.D.
G F135 3.3.9 Excavate in unsuitable material as per Specification to disposal site m3
embankment.
I F322 3.7.2.2 Imported material from Contactor's own source as per m3
Specification to
form embankment.
Page Total Carried To Summary of Bill No. 3
Miscellaneous
Items not mentioned above but are necessary for the completion of
the Works (Contractor to list out, if any)
b)
c)
Page Total Carried To Summary of Bill No. 3
AMOUNT (RM)
BILL NO. 3 - EARTHWORKS
3.3 EXCAVATE, LOAD, HAUL AND DISPOSE
Cut and Dispose
E F132 3.3.4 Excavate in natural hard material by ripper unit to disposal site m3
approved
by the P.D.
F F133.3 3.3.7 Excavate in rock material by hydraulic rock breaker to disposal m3
site
approved by the P.D.
G F135 3.3.9 Excavate in unsuitable material as per Specification to disposal site m3
embankment.
I F322 3.7.2.2 Imported material from Contactor's own source as per m3
Specification to
form embankment.
Page Total Carried To Summary of Bill No. 3
Miscellaneous
Items not mentioned above but are necessary for the completion of
the Works (Contractor to list out, if any)
b)
c)
Page Total Carried To Summary of Bill No. 3
AMOUNT (RM)
BILL NO. 3 - EARTHWORKS
3.3 EXCAVATE, LOAD, HAUL AND DISPOSE
Cut and Dispose
E F132 3.3.4 Excavate in natural hard material by ripper unit to disposal site m3
approved
by the P.D.
F F133.3 3.3.7 Excavate in rock material by hydraulic rock breaker to disposal m3
site
approved by the P.D.
G F135 3.3.9 Excavate in unsuitable material as per Specification to disposal site m3
embankment.
I F322 3.7.2.2 Imported material from Contactor's own source as per m3
Specification to
form embankment.
Page Total Carried To Summary of Bill No. 3
Miscellaneous
Items not mentioned above but are necessary for the completion of
the Works (Contractor to list out, if any)
b)
c)
Page Total Carried To Summary of Bill No. 3
AMOUNT (RM)
BILL NO. 3 - EARTHWORKS
3.3 EXCAVATE, LOAD, HAUL AND DISPOSE
Cut and Dispose
E F132 3.3.4 Excavate in natural hard material by ripper unit to disposal site m3
approved
by the P.D.
F F133.3 3.3.7 Excavate in rock material by hydraulic rock breaker to disposal m3
site
approved by the P.D.
G F135 3.3.9 Excavate in unsuitable material as per Specification to disposal site m3
embankment.
I F322 3.7.2.2 Imported material from Contactor's own source as per m3
Specification to
form embankment.
Page Total Carried To Summary of Bill No. 3
Miscellaneous
Items not mentioned above but are necessary for the completion of
the Works (Contractor to list out, if any)
b)
c)
Page Total Carried To Summary of Bill No. 3
AMOUNT (RM)
BILL NO: 4 - DRAINAGE WORKS
4.2 NEW PIPE CULVERT
G Q151.1 4.2.1 Excavation 3
m
Trench excavation for drainage works.
4.2.2 Type of Foundation
4.2.2.2 Type B - Normal Foundation
J F314.2 4.2.2.2.2 Filling; Other stated material; granular material 3
m
as per specification
4.2.2.7 Precast Concrete Pipe Culvert
K Q611 [1200mm] diameter single precast concrete pipe m
culvert, Class [Z] in standard length of 1 m.
4.2.2.8 Sumps
L Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load].
4.2.2.9 Inlet/ Outlet
Headwall/ Wingwall
M Q891.2 Cast In-Situ nr
4.2.2.10 Fill Material
N F312.3 General; Imported granular material to grading 3
m
limits as per
Specification Clause (2.2 (e) Section 2).
4.4 NEW PRECAST BOX CULVERT F0R SIZE <3.
0m WIDE
4.4.1 Excavation
P Q151.1 Trench excavation for drainage works. 3
m
4.4.2 Type of Foundation
Q I111 4.4.2.1 Reinforced Concrete Slab Foundation 2
m
4.4.2.1.1 Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
R I511.1 4.4.2.1.2 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
4.4.2.3 Precast Box Culvert
A Q621.1 [1200mm (W) x 1200mm (H)] single precast box m
culvert in standard
length of 1 m.
4.2.2.4 Sumps
C Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load]
4.4.2.5 Inlet/ Outlet
Headwall/ Wingwall
D Q891.2 Cast In-Situ nr
4.4.2.6 Fill Material
F F312.3 General; Imported granular fill material to 3
m
grading limits as per
Specification Clause (2.2 (e) Section 2).
NEW PRECAST BOX CULVERT F0R SIZE >3.
0m WIDE
G Q151.1 Drain Excavation 3
m
Trench excavation for drainage works.
Type of Foundation
H I111 Reinforced Concrete Slab Foundation 2
m
Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
J I511.1 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
Precast Box Culvert
N Q621.1 [3300mm (W) x 1500mm (H)] single precast box m
culvert in standard
length of 1 m.
Inlet/ Outlet
Headwall/ Wingwall
O Q891.2 Cast In-Situ nr
4.7 SURFACE DRAIN
4.7.1 Excavation
R Q111 Depth not exceeding 1.5m 3
m
4.7.2 Roadside Drains
D Q230.5 Roadside drain; precast concrete drain [900mm] m
wide with average
[900mm] high.
Type 5 (RSD5)
4.7.2 Shoulder Drain
Q290 Shoulder drain; cast in-situ concrete grade 20; m
[300mm] wide x [300mm] deep x [75mm] thick.
Type 1 (SD1)
4.8 SUB-SURFACE DRAIN
Q111 4.8.1 Excavation 3
m
Depth not exceeding 1.5m
4.8.2 Subsoil Drains
Q310.3 Subsoil drains; including aggregate (e.g. 20mm- m
40mm) wrapped with geotextile/ synthetic filter
cloth.
Type 1 (SSD1)
SUMP
Sump At Fill & Cut
Q790.1 Brick sump and insitu concrete sump including
excavation, lean concrete, plastering,
formworks, reinforcement, joints, backfilling and
disposal of surplus material.
Brick sumps; [600mm x 2000mm x 1.0m] deep nr
SUMMARY
Page BQ4 - 1/6 Pg
Page BQ4 - 2/6 Pg
Page BQ4 - 3/6 Pg
Page BQ4 - 4/6 Pg
Page BQ4 - 5/6 Pg
4.2 NEW PIPE CULVERT
G Q151.1 4.2.1 Excavation 3
m
Trench excavation for drainage works.
4.2.2 Type of Foundation
4.2.2.2 Type B - Normal Foundation
J F314.2 4.2.2.2.2 Filling; Other stated material; granular material 3
m
as per specification
4.2.2.7 Precast Concrete Pipe Culvert
K Q611 [1200mm] diameter single precast concrete pipe m
culvert, Class [Z] in standard length of 1 m.
4.2.2.8 Sumps
L Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load].
4.2.2.9 Inlet/ Outlet
Headwall/ Wingwall
M Q891.2 Cast In-Situ nr
4.2.2.10 Fill Material
N F312.3 General; Imported granular material to grading 3
m
limits as per
Specification Clause (2.2 (e) Section 2).
4.4 NEW PRECAST BOX CULVERT F0R SIZE <3.
0m WIDE
4.4.1 Excavation
P Q151.1 Trench excavation for drainage works. 3
m
4.4.2 Type of Foundation
Q I111 4.4.2.1 Reinforced Concrete Slab Foundation 2
m
4.4.2.1.1 Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
R I511.1 4.4.2.1.2 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
4.4.2.3 Precast Box Culvert
A Q621.1 [1200mm (W) x 1200mm (H)] single precast box m
culvert in standard
length of 1 m.
4.2.2.4 Sumps
C Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load]
4.4.2.5 Inlet/ Outlet
Headwall/ Wingwall
D Q891.2 Cast In-Situ nr
4.4.2.6 Fill Material
F F312.3 General; Imported granular fill material to 3
m
grading limits as per
Specification Clause (2.2 (e) Section 2).
NEW PRECAST BOX CULVERT F0R SIZE >3.
0m WIDE
G Q151.1 Drain Excavation 3
m
Trench excavation for drainage works.
Type of Foundation
H I111 Reinforced Concrete Slab Foundation 2
m
Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
J I511.1 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
Precast Box Culvert
N Q621.1 [3300mm (W) x 1500mm (H)] single precast box m
culvert in standard
length of 1 m.
Inlet/ Outlet
Headwall/ Wingwall
O Q891.2 Cast In-Situ nr
4.7 SURFACE DRAIN
4.7.1 Excavation
R Q111 Depth not exceeding 1.5m 3
m
4.7.2 Roadside Drains
D Q230.5 Roadside drain; precast concrete drain [900mm] m
wide with average
[900mm] high.
Type 5 (RSD5)
4.7.2 Shoulder Drain
Q290 Shoulder drain; cast in-situ concrete grade 20; m
[300mm] wide x [300mm] deep x [75mm] thick.
Type 1 (SD1)
4.8 SUB-SURFACE DRAIN
Q111 4.8.1 Excavation 3
m
Depth not exceeding 1.5m
4.8.2 Subsoil Drains
Q310.3 Subsoil drains; including aggregate (e.g. 20mm- m
40mm) wrapped with geotextile/ synthetic filter
cloth.
Type 1 (SSD1)
SUMP
Sump At Fill & Cut
Q790.1 Brick sump and insitu concrete sump including
excavation, lean concrete, plastering,
formworks, reinforcement, joints, backfilling and
disposal of surplus material.
Brick sumps; [600mm x 2000mm x 1.0m] deep nr
SUMMARY
Page BQ4 - 1/6 Pg
Page BQ4 - 2/6 Pg
Page BQ4 - 3/6 Pg
Page BQ4 - 4/6 Pg
Page BQ4 - 5/6 Pg
4.2 NEW PIPE CULVERT
G Q151.1 4.2.1 Excavation 3
m
Trench excavation for drainage works.
4.2.2 Type of Foundation
4.2.2.2 Type B - Normal Foundation
J F314.2 4.2.2.2.2 Filling; Other stated material; granular material 3
m
as per specification
4.2.2.7 Precast Concrete Pipe Culvert
K Q611 [1200mm] diameter single precast concrete pipe m
culvert, Class [Z] in standard length of 1 m.
4.2.2.8 Sumps
L Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load].
4.2.2.9 Inlet/ Outlet
Headwall/ Wingwall
M Q891.2 Cast In-Situ nr
4.2.2.10 Fill Material
N F312.3 General; Imported granular material to grading 3
m
limits as per
Specification Clause (2.2 (e) Section 2).
4.4 NEW PRECAST BOX CULVERT F0R SIZE <3.
0m WIDE
4.4.1 Excavation
P Q151.1 Trench excavation for drainage works. 3
m
4.4.2 Type of Foundation
Q I111 4.4.2.1 Reinforced Concrete Slab Foundation 2
m
4.4.2.1.1 Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
R I511.1 4.4.2.1.2 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
4.4.2.3 Precast Box Culvert
A Q621.1 [1200mm (W) x 1200mm (H)] single precast box m
culvert in standard
length of 1 m.
4.2.2.4 Sumps
C Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load]
4.4.2.5 Inlet/ Outlet
Headwall/ Wingwall
D Q891.2 Cast In-Situ nr
4.4.2.6 Fill Material
F F312.3 General; Imported granular fill material to 3
m
grading limits as per
Specification Clause (2.2 (e) Section 2).
NEW PRECAST BOX CULVERT F0R SIZE >3.
0m WIDE
G Q151.1 Drain Excavation 3
m
Trench excavation for drainage works.
Type of Foundation
H I111 Reinforced Concrete Slab Foundation 2
m
Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
J I511.1 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
Precast Box Culvert
N Q621.1 [3300mm (W) x 1500mm (H)] single precast box m
culvert in standard
length of 1 m.
Inlet/ Outlet
Headwall/ Wingwall
O Q891.2 Cast In-Situ nr
4.7 SURFACE DRAIN
4.7.1 Excavation
R Q111 Depth not exceeding 1.5m 3
m
4.7.2 Roadside Drains
D Q230.5 Roadside drain; precast concrete drain [900mm] m
wide with average
[900mm] high.
Type 5 (RSD5)
4.7.2 Shoulder Drain
Q290 Shoulder drain; cast in-situ concrete grade 20; m
[300mm] wide x [300mm] deep x [75mm] thick.
Type 1 (SD1)
4.8 SUB-SURFACE DRAIN
Q111 4.8.1 Excavation 3
m
Depth not exceeding 1.5m
4.8.2 Subsoil Drains
Q310.3 Subsoil drains; including aggregate (e.g. 20mm- m
40mm) wrapped with geotextile/ synthetic filter
cloth.
Type 1 (SSD1)
SUMP
Sump At Fill & Cut
Q790.1 Brick sump and insitu concrete sump including
excavation, lean concrete, plastering,
formworks, reinforcement, joints, backfilling and
disposal of surplus material.
Brick sumps; [600mm x 2000mm x 1.0m] deep nr
SUMMARY
Page BQ4 - 1/6 Pg
Page BQ4 - 2/6 Pg
Page BQ4 - 3/6 Pg
Page BQ4 - 4/6 Pg
Page BQ4 - 5/6 Pg
4.2 NEW PIPE CULVERT
G Q151.1 4.2.1 Excavation 3
m
Trench excavation for drainage works.
4.2.2 Type of Foundation
4.2.2.2 Type B - Normal Foundation
J F314.2 4.2.2.2.2 Filling; Other stated material; granular material 3
m
as per specification
4.2.2.7 Precast Concrete Pipe Culvert
K Q611 [1200mm] diameter single precast concrete pipe m
culvert, Class [Z] in standard length of 1 m.
4.2.2.8 Sumps
L Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load].
4.2.2.9 Inlet/ Outlet
Headwall/ Wingwall
M Q891.2 Cast In-Situ nr
4.2.2.10 Fill Material
N F312.3 General; Imported granular material to grading 3
m
limits as per
Specification Clause (2.2 (e) Section 2).
4.4 NEW PRECAST BOX CULVERT F0R SIZE <3.
0m WIDE
4.4.1 Excavation
P Q151.1 Trench excavation for drainage works. 3
m
4.4.2 Type of Foundation
Q I111 4.4.2.1 Reinforced Concrete Slab Foundation 2
m
4.4.2.1.1 Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
R I511.1 4.4.2.1.2 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
4.4.2.3 Precast Box Culvert
A Q621.1 [1200mm (W) x 1200mm (H)] single precast box m
culvert in standard
length of 1 m.
4.2.2.4 Sumps
C Q790 Cast in-Situ; [1500mm x 1500mm x 2.0m deep]; nr
including mild steel
grating cover for [100 kN load]
4.4.2.5 Inlet/ Outlet
Headwall/ Wingwall
D Q891.2 Cast In-Situ nr
4.4.2.6 Fill Material
F F312.3 General; Imported granular fill material to 3
m
grading limits as per
Specification Clause (2.2 (e) Section 2).
NEW PRECAST BOX CULVERT F0R SIZE >3.
0m WIDE
G Q151.1 Drain Excavation 3
m
Trench excavation for drainage works.
Type of Foundation
H I111 Reinforced Concrete Slab Foundation 2
m
Grade C15 Concrete; Blinding mass
concrete, [100mm] thick to footing
J I511.1 Formwork; sides; Bases, footings, pile caps, and 2
m
ground slabs,
F1; rough finish to bases.
Precast Box Culvert
N Q621.1 [3300mm (W) x 1500mm (H)] single precast box m
culvert in standard
length of 1 m.
Inlet/ Outlet
Headwall/ Wingwall
O Q891.2 Cast In-Situ nr
4.7 SURFACE DRAIN
4.7.1 Excavation
R Q111 Depth not exceeding 1.5m 3
m
4.7.2 Roadside Drains
D Q230.5 Roadside drain; precast concrete drain [900mm] m
wide with average
[900mm] high.
Type 5 (RSD5)
4.7.2 Shoulder Drain
Q290 Shoulder drain; cast in-situ concrete grade 20; m
[300mm] wide x [300mm] deep x [75mm] thick.
Type 1 (SD1)
4.8 SUB-SURFACE DRAIN
Q111 4.8.1 Excavation 3
m
Depth not exceeding 1.5m
4.8.2 Subsoil Drains
Q310.3 Subsoil drains; including aggregate (e.g. 20mm- m
40mm) wrapped with geotextile/ synthetic filter
cloth.
Type 1 (SSD1)
SUMP
Sump At Fill & Cut
Q790.1 Brick sump and insitu concrete sump including
excavation, lean concrete, plastering,
formworks, reinforcement, joints, backfilling and
disposal of surplus material.
Brick sumps; [600mm x 2000mm x 1.0m] deep nr
SUMMARY
Page BQ4 - 1/6 Pg
Page BQ4 - 2/6 Pg
Page BQ4 - 3/6 Pg
Page BQ4 - 4/6 Pg
Page BQ4 - 5/6 Pg
5.1A FLEXIBLE PAVEMENT
In accordance to latest Standard Specification for Road
Works Section 4: Flexible Pavement hereafter referred to
as the Specification (rate to include all the tests required).
5.1A.1 NEW PAVEMENT
5.1A.1.1 Subgrade Preparation
A R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
levelling, and compaction of the top 300 mm of the subgrade.
5.1A.1.2 Carriageway and Paved Shoulder
5.1A.1.2(i) Sub-Base
B R221 200 mm thick granular material with a CBR value of not less 2
m
Specification.
5.1A.1.2(iii) Surfacing
D R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
5.1A1.6 Fill Material on Unpaved Shoulder
The following items for filling shall Include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.
A F311 Using suitable excavated material as per Specification. 3
m
5.1A.2 TREATMENT TO EXISTING PAVEMENT
Remove Existing Pavement
C Demolition and removal of existing pavement. 2
m
5.1A.2.14 Reconstruction of Existing Pavement
D R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
E R221 200mm thick granular material with a CBR value of not less than 30%, 2
m
Specification.
5.1A.2.14(iii Surfacing
)
G R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
H R530.1 5.1A.2.14(iv Bituminous tack coat to be applied at a rate of 0.25 - 0.55 litre per
)
square metre as per Specification. 2
m
Asphaltic Concrete
J R541 100mm thick Binder Course using bitumen of penetration grade 60-70 2
m
as per Specification.
K R551.2 50 mm thick Wearing Course using bitumen of penetration 2
m
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 5
5.1A FLEXIBLE PAVEMENT
In accordance to latest Standard Specification for Road
Works Section 4: Flexible Pavement hereafter referred to
as the Specification (rate to include all the tests required).
5.1A.1 NEW PAVEMENT
5.1A.1.1 Subgrade Preparation
A R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
levelling, and compaction of the top 300 mm of the subgrade.
5.1A.1.2 Carriageway and Paved Shoulder
5.1A.1.2(i) Sub-Base
B R221 200 mm thick granular material with a CBR value of not less 2
m
Specification.
5.1A.1.2(iii) Surfacing
D R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
5.1A1.6 Fill Material on Unpaved Shoulder
The following items for filling shall Include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.
A F311 Using suitable excavated material as per Specification. 3
m
5.1A.2 TREATMENT TO EXISTING PAVEMENT
Remove Existing Pavement
C Demolition and removal of existing pavement. 2
m
5.1A.2.14 Reconstruction of Existing Pavement
D R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
E R221 200mm thick granular material with a CBR value of not less than 30%, 2
m
Specification.
5.1A.2.14(iii Surfacing
)
G R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
H R530.1 5.1A.2.14(iv Bituminous tack coat to be applied at a rate of 0.25 - 0.55 litre per
)
square metre as per Specification. 2
m
Asphaltic Concrete
J R541 100mm thick Binder Course using bitumen of penetration grade 60-70 2
m
as per Specification.
K R551.2 50 mm thick Wearing Course using bitumen of penetration 2
m
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 5
5.1A FLEXIBLE PAVEMENT
In accordance to latest Standard Specification for Road
Works Section 4: Flexible Pavement hereafter referred to
as the Specification (rate to include all the tests required).
5.1A.1 NEW PAVEMENT
5.1A.1.1 Subgrade Preparation
A R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
levelling, and compaction of the top 300 mm of the subgrade.
5.1A.1.2 Carriageway and Paved Shoulder
5.1A.1.2(i) Sub-Base
B R221 200 mm thick granular material with a CBR value of not less 2
m
Specification.
5.1A.1.2(iii) Surfacing
D R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
5.1A1.6 Fill Material on Unpaved Shoulder
The following items for filling shall Include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.
A F311 Using suitable excavated material as per Specification. 3
m
5.1A.2 TREATMENT TO EXISTING PAVEMENT
Remove Existing Pavement
C Demolition and removal of existing pavement. 2
m
5.1A.2.14 Reconstruction of Existing Pavement
D R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
E R221 200mm thick granular material with a CBR value of not less than 30%, 2
m
Specification.
5.1A.2.14(iii Surfacing
)
G R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
H R530.1 5.1A.2.14(iv Bituminous tack coat to be applied at a rate of 0.25 - 0.55 litre per
)
square metre as per Specification. 2
m
Asphaltic Concrete
J R541 100mm thick Binder Course using bitumen of penetration grade 60-70 2
m
as per Specification.
K R551.2 50 mm thick Wearing Course using bitumen of penetration 2
m
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 5
5.1A FLEXIBLE PAVEMENT
In accordance to latest Standard Specification for Road
Works Section 4: Flexible Pavement hereafter referred to
as the Specification (rate to include all the tests required).
5.1A.1 NEW PAVEMENT
5.1A.1.1 Subgrade Preparation
A R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
levelling, and compaction of the top 300 mm of the subgrade.
5.1A.1.2 Carriageway and Paved Shoulder
5.1A.1.2(i) Sub-Base
B R221 200 mm thick granular material with a CBR value of not less 2
m
Specification.
5.1A.1.2(iii) Surfacing
D R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
5.1A1.6 Fill Material on Unpaved Shoulder
The following items for filling shall Include compaction, and additional
filling necessitated by settlement or penetration into underlying material
as applicable.
A F311 Using suitable excavated material as per Specification. 3
m
5.1A.2 TREATMENT TO EXISTING PAVEMENT
Remove Existing Pavement
C Demolition and removal of existing pavement. 2
m
5.1A.2.14 Reconstruction of Existing Pavement
D R110 Earth material to receive road pavement. Rate to include scarifying, 2
m
E R221 200mm thick granular material with a CBR value of not less than 30%, 2
m
Specification.
5.1A.2.14(iii Surfacing
)
G R520 Bituminous prime coat to be applied at a rate of 0.5 - 1.0 litre per 2
m
H R530.1 5.1A.2.14(iv Bituminous tack coat to be applied at a rate of 0.25 - 0.55 litre per
)
square metre as per Specification. 2
m
Asphaltic Concrete
J R541 100mm thick Binder Course using bitumen of penetration grade 60-70 2
m
as per Specification.
K R551.2 50 mm thick Wearing Course using bitumen of penetration 2
m
Lorry Bay
*lean concrete m2
*BRC (TBA) m2
*Concrete g40 m3
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 5
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
R811.137 Non-illuminated high intensity prismatic retro-reflective
nr
H sheeting mounted
on aluminium composite sign plate for type WD 8 sign
[size 750mm x 750mm].
R811.138 Non-illuminated high intensity prismatic retro-reflective
nr
J sheeting mounted
on aluminium composite sign plate for type WD 9 sign
[size 750mm x 750mm].
R811.52 Non-illuminated high intensity prismatic retro-reflective
nr
K sheeting mounted
on aluminium composite sign plate for type WD 10a sign
[size 750mm x 750mm].
R811.53 Non-illuminated high intensity prismatic retro-reflective
nr
L sheeting mounted
on aluminium composite sign plate for type WD 10b sign
[size 750mm x 750mm].
R811.60 Non-illuminated high intensity prismatic retro-reflective
nr
M sheeting mounted
on aluminium composite sign plate for type WD 17 sign
[size 1000mm (W) x 500mm (H)].
R811.64 Non-illuminated high intensity prismatic retro-reflective
nr
N sheeting mounted
on aluminium composite sign plate for type WD 21 sign
[size 750mm x 750mm].
R811.67 Non-illuminated high intensity prismatic retro-reflective
nr
A sheeting mounted
on aluminium composite sign plate for type WD 24 sign
[size 900mm (H) x 300mm (W)].
R811.70 Non-illuminated high intensity prismatic retro-reflective
nr
B sheeting mounted
on aluminium composite sign plate for type WD 27a sign
[size 750mm x 750mm]
R811.71 Non-illuminated high intensity prismatic retro-reflective
nr
C sheeting mounted
on aluminium composite sign plate for type WD 27b sign
[size 750mm x 750mm].
R811.72 Non-illuminated high intensity prismatic retro-reflective
nr
D sheeting mounted
on aluminium composite sign plate for type WD 27c sign
[size 750mm x 750mm].
R811.185 Non-illuminated high intensity prismatic retro-reflective
nr
sheeting mounted
on aluminium composite sign plate for type GI 1 sign [size
300mm x
230mm].
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
6.2 TRAFFIC BARRIER
R843 6.2.1 Guardrails
J R844.1 Guardrail end Type 1. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
K R844.1 Guardrail end Type 2. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
L R844.1 Bridge End. Rate to include bolts, nuts, posts, and other
nr
ancillary work.
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.3 PAVEMENT MARKINGS
6.3.1 All Weather Thermo Plastic Road Marking (AWT)
Pavement markings shall generally be All Wheater
Thermo Plastic
Road Marking (AWT) and in accordance with the latest
version of
Standard Specification for Road Works: Section 6: Road
Furniture
(Road Markings)
M R823.2 Type 1 [continuity line]: 200mm wide intermittent continuity
m
line with
1000mm line and 1000mm gap.
N R823.3 Type 2 [give way line]: 200mm wide intermittent line with
m
300mm line
and 300mm gap.
P R823.4 Type 5 [centre/lane line (rural area)]: 100mm wide
m
intermittent line with
2700mm line and 4500mm gap.
Q R822.1 Type 6 [edge line]: 150mm wide continous line. m
R R822.2 Type 7 [stop line]: 300mm wide continous line. m
A R822.4 Type 10 [double line]: 100mm wide continous double line. m
R823.7 Type 11 [climbing lane line]: 100mm wide intermittent double
m
line with
2700mm line and 4500mm gap.
R823.8 Type 12 [bus stop line]: 100mm wide intermittent line with
m
900mm line
and 900mm gap.
B R824.1 Chevron marking for cross hatching. 2
m
6.3.3 Direction arrow and pavement marking for roads
C R821.1 Single straight directional arrow. nr
D R821.2 Single turning directional arrow. nr
E R821.3 Double headed directional arrow. nr
6.7 DELINEATORS
6.7.1 Chevron Delineator
F R832 6.7.2 Delineator posts as shown in Drawing. nr
G R833 6.7.3 Retroreflective roadstud as per Drawing. nr
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.8 MISCELLANEOUS
H R857 6.8.1 Right of way (ROW) marker as shown in Drawing. nr
6.8.6 Kilometre post
J R853.1 Kilometre post, [Type A]. nr
K R853.2 Kilometre post, [Type B]. nr
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works
(Contractor to list out, if any)
a) Precast concrete kerb overall size 600mm long x 150mm
wide x 305mm high, complete with laying on concrete m
bedding
b) Precast concrete kerb with opening overall size 600mm
long x 150mm wide x 305mm high, complete with laying on nr
concrete bedding
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
R811.137 Non-illuminated high intensity prismatic retro-reflective
nr
H sheeting mounted
on aluminium composite sign plate for type WD 8 sign
[size 750mm x 750mm].
R811.138 Non-illuminated high intensity prismatic retro-reflective
nr
J sheeting mounted
on aluminium composite sign plate for type WD 9 sign
[size 750mm x 750mm].
R811.52 Non-illuminated high intensity prismatic retro-reflective
nr
K sheeting mounted
on aluminium composite sign plate for type WD 10a sign
[size 750mm x 750mm].
R811.53 Non-illuminated high intensity prismatic retro-reflective
nr
L sheeting mounted
on aluminium composite sign plate for type WD 10b sign
[size 750mm x 750mm].
R811.60 Non-illuminated high intensity prismatic retro-reflective
nr
M sheeting mounted
on aluminium composite sign plate for type WD 17 sign
[size 1000mm (W) x 500mm (H)].
R811.64 Non-illuminated high intensity prismatic retro-reflective
nr
N sheeting mounted
on aluminium composite sign plate for type WD 21 sign
[size 750mm x 750mm].
R811.67 Non-illuminated high intensity prismatic retro-reflective
nr
A sheeting mounted
on aluminium composite sign plate for type WD 24 sign
[size 900mm (H) x 300mm (W)].
R811.70 Non-illuminated high intensity prismatic retro-reflective
nr
B sheeting mounted
on aluminium composite sign plate for type WD 27a sign
[size 750mm x 750mm]
R811.71 Non-illuminated high intensity prismatic retro-reflective
nr
C sheeting mounted
on aluminium composite sign plate for type WD 27b sign
[size 750mm x 750mm].
R811.72 Non-illuminated high intensity prismatic retro-reflective
nr
D sheeting mounted
on aluminium composite sign plate for type WD 27c sign
[size 750mm x 750mm].
R811.185 Non-illuminated high intensity prismatic retro-reflective
nr
sheeting mounted
on aluminium composite sign plate for type GI 1 sign [size
300mm x
230mm].
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
6.2 TRAFFIC BARRIER
R843 6.2.1 Guardrails
J R844.1 Guardrail end Type 1. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
K R844.1 Guardrail end Type 2. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
L R844.1 Bridge End. Rate to include bolts, nuts, posts, and other
nr
ancillary work.
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.3 PAVEMENT MARKINGS
6.3.1 All Weather Thermo Plastic Road Marking (AWT)
Pavement markings shall generally be All Wheater
Thermo Plastic
Road Marking (AWT) and in accordance with the latest
version of
Standard Specification for Road Works: Section 6: Road
Furniture
(Road Markings)
M R823.2 Type 1 [continuity line]: 200mm wide intermittent continuity
m
line with
1000mm line and 1000mm gap.
N R823.3 Type 2 [give way line]: 200mm wide intermittent line with
m
300mm line
and 300mm gap.
P R823.4 Type 5 [centre/lane line (rural area)]: 100mm wide
m
intermittent line with
2700mm line and 4500mm gap.
Q R822.1 Type 6 [edge line]: 150mm wide continous line. m
R R822.2 Type 7 [stop line]: 300mm wide continous line. m
A R822.4 Type 10 [double line]: 100mm wide continous double line. m
R823.7 Type 11 [climbing lane line]: 100mm wide intermittent double
m
line with
2700mm line and 4500mm gap.
R823.8 Type 12 [bus stop line]: 100mm wide intermittent line with
m
900mm line
and 900mm gap.
B R824.1 Chevron marking for cross hatching. 2
m
6.3.3 Direction arrow and pavement marking for roads
C R821.1 Single straight directional arrow. nr
D R821.2 Single turning directional arrow. nr
E R821.3 Double headed directional arrow. nr
6.7 DELINEATORS
6.7.1 Chevron Delineator
F R832 6.7.2 Delineator posts as shown in Drawing. nr
G R833 6.7.3 Retroreflective roadstud as per Drawing. nr
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.8 MISCELLANEOUS
H R857 6.8.1 Right of way (ROW) marker as shown in Drawing. nr
6.8.6 Kilometre post
J R853.1 Kilometre post, [Type A]. nr
K R853.2 Kilometre post, [Type B]. nr
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works
(Contractor to list out, if any)
a) Precast concrete kerb overall size 600mm long x 150mm
wide x 305mm high, complete with laying on concrete m
bedding
b) Precast concrete kerb with opening overall size 600mm
long x 150mm wide x 305mm high, complete with laying on nr
concrete bedding
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
R811.137 Non-illuminated high intensity prismatic retro-reflective
nr
H sheeting mounted
on aluminium composite sign plate for type WD 8 sign
[size 750mm x 750mm].
R811.138 Non-illuminated high intensity prismatic retro-reflective
nr
J sheeting mounted
on aluminium composite sign plate for type WD 9 sign
[size 750mm x 750mm].
R811.52 Non-illuminated high intensity prismatic retro-reflective
nr
K sheeting mounted
on aluminium composite sign plate for type WD 10a sign
[size 750mm x 750mm].
R811.53 Non-illuminated high intensity prismatic retro-reflective
nr
L sheeting mounted
on aluminium composite sign plate for type WD 10b sign
[size 750mm x 750mm].
R811.60 Non-illuminated high intensity prismatic retro-reflective
nr
M sheeting mounted
on aluminium composite sign plate for type WD 17 sign
[size 1000mm (W) x 500mm (H)].
R811.64 Non-illuminated high intensity prismatic retro-reflective
nr
N sheeting mounted
on aluminium composite sign plate for type WD 21 sign
[size 750mm x 750mm].
R811.67 Non-illuminated high intensity prismatic retro-reflective
nr
A sheeting mounted
on aluminium composite sign plate for type WD 24 sign
[size 900mm (H) x 300mm (W)].
R811.70 Non-illuminated high intensity prismatic retro-reflective
nr
B sheeting mounted
on aluminium composite sign plate for type WD 27a sign
[size 750mm x 750mm]
R811.71 Non-illuminated high intensity prismatic retro-reflective
nr
C sheeting mounted
on aluminium composite sign plate for type WD 27b sign
[size 750mm x 750mm].
R811.72 Non-illuminated high intensity prismatic retro-reflective
nr
D sheeting mounted
on aluminium composite sign plate for type WD 27c sign
[size 750mm x 750mm].
R811.185 Non-illuminated high intensity prismatic retro-reflective
nr
sheeting mounted
on aluminium composite sign plate for type GI 1 sign [size
300mm x
230mm].
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
6.2 TRAFFIC BARRIER
R843 6.2.1 Guardrails
J R844.1 Guardrail end Type 1. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
K R844.1 Guardrail end Type 2. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
L R844.1 Bridge End. Rate to include bolts, nuts, posts, and other
nr
ancillary work.
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.3 PAVEMENT MARKINGS
6.3.1 All Weather Thermo Plastic Road Marking (AWT)
Pavement markings shall generally be All Wheater
Thermo Plastic
Road Marking (AWT) and in accordance with the latest
version of
Standard Specification for Road Works: Section 6: Road
Furniture
(Road Markings)
M R823.2 Type 1 [continuity line]: 200mm wide intermittent continuity
m
line with
1000mm line and 1000mm gap.
N R823.3 Type 2 [give way line]: 200mm wide intermittent line with
m
300mm line
and 300mm gap.
P R823.4 Type 5 [centre/lane line (rural area)]: 100mm wide
m
intermittent line with
2700mm line and 4500mm gap.
Q R822.1 Type 6 [edge line]: 150mm wide continous line. m
R R822.2 Type 7 [stop line]: 300mm wide continous line. m
A R822.4 Type 10 [double line]: 100mm wide continous double line. m
R823.7 Type 11 [climbing lane line]: 100mm wide intermittent double
m
line with
2700mm line and 4500mm gap.
R823.8 Type 12 [bus stop line]: 100mm wide intermittent line with
m
900mm line
and 900mm gap.
B R824.1 Chevron marking for cross hatching. 2
m
6.3.3 Direction arrow and pavement marking for roads
C R821.1 Single straight directional arrow. nr
D R821.2 Single turning directional arrow. nr
E R821.3 Double headed directional arrow. nr
6.7 DELINEATORS
6.7.1 Chevron Delineator
F R832 6.7.2 Delineator posts as shown in Drawing. nr
G R833 6.7.3 Retroreflective roadstud as per Drawing. nr
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.8 MISCELLANEOUS
H R857 6.8.1 Right of way (ROW) marker as shown in Drawing. nr
6.8.6 Kilometre post
J R853.1 Kilometre post, [Type A]. nr
K R853.2 Kilometre post, [Type B]. nr
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works
(Contractor to list out, if any)
a) Precast concrete kerb overall size 600mm long x 150mm
wide x 305mm high, complete with laying on concrete m
bedding
b) Precast concrete kerb with opening overall size 600mm
long x 150mm wide x 305mm high, complete with laying on nr
concrete bedding
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
R811.137 Non-illuminated high intensity prismatic retro-reflective
nr
H sheeting mounted
on aluminium composite sign plate for type WD 8 sign
[size 750mm x 750mm].
R811.138 Non-illuminated high intensity prismatic retro-reflective
nr
J sheeting mounted
on aluminium composite sign plate for type WD 9 sign
[size 750mm x 750mm].
R811.52 Non-illuminated high intensity prismatic retro-reflective
nr
K sheeting mounted
on aluminium composite sign plate for type WD 10a sign
[size 750mm x 750mm].
R811.53 Non-illuminated high intensity prismatic retro-reflective
nr
L sheeting mounted
on aluminium composite sign plate for type WD 10b sign
[size 750mm x 750mm].
R811.60 Non-illuminated high intensity prismatic retro-reflective
nr
M sheeting mounted
on aluminium composite sign plate for type WD 17 sign
[size 1000mm (W) x 500mm (H)].
R811.64 Non-illuminated high intensity prismatic retro-reflective
nr
N sheeting mounted
on aluminium composite sign plate for type WD 21 sign
[size 750mm x 750mm].
R811.67 Non-illuminated high intensity prismatic retro-reflective
nr
A sheeting mounted
on aluminium composite sign plate for type WD 24 sign
[size 900mm (H) x 300mm (W)].
R811.70 Non-illuminated high intensity prismatic retro-reflective
nr
B sheeting mounted
on aluminium composite sign plate for type WD 27a sign
[size 750mm x 750mm]
R811.71 Non-illuminated high intensity prismatic retro-reflective
nr
C sheeting mounted
on aluminium composite sign plate for type WD 27b sign
[size 750mm x 750mm].
R811.72 Non-illuminated high intensity prismatic retro-reflective
nr
D sheeting mounted
on aluminium composite sign plate for type WD 27c sign
[size 750mm x 750mm].
R811.185 Non-illuminated high intensity prismatic retro-reflective
nr
sheeting mounted
on aluminium composite sign plate for type GI 1 sign [size
300mm x
230mm].
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.1.5 Warning and Regulatory Traffic Signs (Cont'd)
6.2 TRAFFIC BARRIER
R843 6.2.1 Guardrails
J R844.1 Guardrail end Type 1. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
K R844.1 Guardrail end Type 2. Rate to include bolts, nuts, posts, and
nr
other ancillary work.
L R844.1 Bridge End. Rate to include bolts, nuts, posts, and other
nr
ancillary work.
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.3 PAVEMENT MARKINGS
6.3.1 All Weather Thermo Plastic Road Marking (AWT)
Pavement markings shall generally be All Wheater
Thermo Plastic
Road Marking (AWT) and in accordance with the latest
version of
Standard Specification for Road Works: Section 6: Road
Furniture
(Road Markings)
M R823.2 Type 1 [continuity line]: 200mm wide intermittent continuity
m
line with
1000mm line and 1000mm gap.
N R823.3 Type 2 [give way line]: 200mm wide intermittent line with
m
300mm line
and 300mm gap.
P R823.4 Type 5 [centre/lane line (rural area)]: 100mm wide
m
intermittent line with
2700mm line and 4500mm gap.
Q R822.1 Type 6 [edge line]: 150mm wide continous line. m
R R822.2 Type 7 [stop line]: 300mm wide continous line. m
A R822.4 Type 10 [double line]: 100mm wide continous double line. m
R823.7 Type 11 [climbing lane line]: 100mm wide intermittent double
m
line with
2700mm line and 4500mm gap.
R823.8 Type 12 [bus stop line]: 100mm wide intermittent line with
m
900mm line
and 900mm gap.
B R824.1 Chevron marking for cross hatching. 2
m
6.3.3 Direction arrow and pavement marking for roads
C R821.1 Single straight directional arrow. nr
D R821.2 Single turning directional arrow. nr
E R821.3 Double headed directional arrow. nr
6.7 DELINEATORS
6.7.1 Chevron Delineator
F R832 6.7.2 Delineator posts as shown in Drawing. nr
G R833 6.7.3 Retroreflective roadstud as per Drawing. nr
Page Total Carried To Summary of Bill No. 6
NO. CODE MOM DESCRIPTION
NO. UNIT
6.8 MISCELLANEOUS
H R857 6.8.1 Right of way (ROW) marker as shown in Drawing. nr
6.8.6 Kilometre post
J R853.1 Kilometre post, [Type A]. nr
K R853.2 Kilometre post, [Type B]. nr
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works
(Contractor to list out, if any)
a) Precast concrete kerb overall size 600mm long x 150mm
wide x 305mm high, complete with laying on concrete m
bedding
b) Precast concrete kerb with opening overall size 600mm
long x 150mm wide x 305mm high, complete with laying on nr
concrete bedding
B G570.2 High Strength Woven Geotextile. 2
m
Item for high strength woven geotextile shall be
deemed to include cost of storage at site with
neccessary protection against exposure to direct
sun.
C F334.1 3
m
Replacement of Unsuitable Material.
Items for filling shall include filling earth in
layers, compaction, and additional filling
necessitated by settlement or penetration into
underlying material as applicable.
Other stated material - [granular material] as per
Specification to replace unsuitable material.
Settlement Marker.
D G830 Settlement marker as per Specification. nr
Settlement Plate.
E G841 Settlement plate as per Specification and as nr
shown in the Drawing no.
(KPKR/J/R/11 /PG/5.1).
Inclinometer.
F G820.3 Inclinometer as per Specification and as shown in nr
the Drawing no. (KPKR/J/R/11 /PG/5.1)
with depth of installation exceeding 20.0m but not
exceeding 30.0m. Rate to include pre-boring and
installation.
G G880 Monitoring of instrument for the above instrument nr
at the project site by [Qualified Personnel] as per
Specification. Rate to include preparation of
monitoring report inclusive of analyse, findings
and recommendation to be submitted on a
[monthly] basis. (4 Teams)
Team/mth
SLOPE STABILISATION : HORIZONTAL DRAIN
S
Rate for horizontal drain shall be deemed to
include drilling, perforated pipe and all
associated works.
A G351.2 [75mm] diameter UPVC horizontal drain as shown m
in the Drawing No. (KPKR/J/R/11 /PG/3.5) in
earth - 12.0m long
SLOPE STABILISATION : SOIL NAILING
Plant and Equipment.
B G110 Provision of all necessary plant and equipment, tran sum
Soil Nailing.
Pull-out Test.
Pull out test on soil nail, rate to include all
necessary equipment and submission of
procedure, records, and report.
G G312.5 Pull-out teston the 12.0m long soil nail to (….) tim No
H G312.6 Pull-out teston the 12.0m long nut not exceeding 18. No
Horizontal Drain.
Surface Protection.
SLOPE STABILISATION : ROCK BOLT
Provision of all necessary plant and equipment, transum
Moving and handling all necessary plant and sum
equipment within the Site and from location to
location as often as is, and whenever necessary
for execution of whole operation.
Temporary staging on slope. sum
Rock Bolt
Items for rock bolt shall be deemed to include
drilling of borehole, reinforced bar, reinforced
concrete pad, sleeve grouting, sealant
compound, and all associated works.
Type 1 with [T32] bolt
a) Exceeding 6.0m long but not exceeding 9.0m lonr
Testing
Pull out test / Proof test on rock bolt as specified nr
Surface Protection - Rockfall Netting
Rockfall netting with [PVC-coated heavily galvanizem2
RETAINING STRUCTURES : REINFORCED SOI
L SLOPES
Items for Reinforced Soil Slopes shall be deemed
to include preparation of surfaces, multiple
handling, disposal of surplus excavated material,
upholding of sides excavation, additional
excavation to provide working space, backfilling,
removal of dead services and reinstatement of
original surface; unless covered by separate
items.
Non-woven Geotextile.
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
A G570.1 Non-woven geotextile [Type B with minimum m2
design strength of 9 kN/m] as separator as per
Specification.
B G570.3 Geogrid.
Item for geogrid shall be deemed to include
cost of storage at site with neccessary
protection against exposure to direct sun.
Geogrid with minimum design strength of [130/30 m2
kN/m] as soil reinforcement as per Specification.
C G580.2 Drainage Blanket
[500mm] thick [granular material] as drainage 3
m
blanket as per Specification.
Miscellaneous
Items not mentioned above but are necessary
for the completion of the Works (Contractor to
list out, if any)
a)
b)
c)
To Grand Summary
RATE (RM) AMOUNT (RM)
BILL NO. 7 - GEOTECHNICAL WORKS
EDGENTA ENVIRONMENTAL & MATERIIAL TESTING LABORATORTY SDN BHD
BILL OF QUANTITY
NO. CODE NO. MOM DESCRIPTION UNIT QTY
A G570.1 GROUND TREATMENT : m2
SOFT GROUND REPLACEMENT / STABILITY
The following items shall include of supply
and lay geotextile filling and compact suitable
material/sand layer.
*** Embankment fill refer to BQ3 - Earthwork
*** Non-
woven Geotextile
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
Non-woven geotextile [Type B with minimum
design strength of 9 kN/m] as separator as per
Specification.
B G570.2 High Strength Woven Geotextile. 2
m
Item for high strength woven geotextile shall be
deemed to include cost of storage at site with
neccessary protection against exposure to direct
sun.
C F334.1 3
m
Replacement of Unsuitable Material.
Items for filling shall include filling earth in
layers, compaction, and additional filling
necessitated by settlement or penetration into
underlying material as applicable.
Other stated material - [granular material] as per
Specification to replace unsuitable material.
Settlement Marker.
D G830 Settlement marker as per Specification. nr
Settlement Plate.
E G841 Settlement plate as per Specification and as nr
shown in the Drawing no.
(KPKR/J/R/11 /PG/5.1).
Inclinometer.
F G820.3 Inclinometer as per Specification and as shown in nr
the Drawing no. (KPKR/J/R/11 /PG/5.1)
with depth of installation exceeding 20.0m but not
exceeding 30.0m. Rate to include pre-boring and
installation.
G G880 Monitoring of instrument for the above instrument nr
at the project site by [Qualified Personnel] as per
Specification. Rate to include preparation of
monitoring report inclusive of analyse, findings
and recommendation to be submitted on a
[monthly] basis. (4 Teams)
Team/mth
SLOPE STABILISATION : HORIZONTAL DRAIN
S
Rate for horizontal drain shall be deemed to
include drilling, perforated pipe and all
associated works.
A G351.2 [75mm] diameter UPVC horizontal drain as shown m
in the Drawing No. (KPKR/J/R/11 /PG/3.5) in
earth - 12.0m long
SLOPE STABILISATION : SOIL NAILING
Plant and Equipment.
B G110 Provision of all necessary plant and equipment, tran sum
Soil Nailing.
Pull-out Test.
Pull out test on soil nail, rate to include all
necessary equipment and submission of
procedure, records, and report.
G G312.5 Pull-out teston the 12.0m long soil nail to (….) tim No
H G312.6 Pull-out teston the 12.0m long nut not exceeding 18. No
Horizontal Drain.
Surface Protection.
SLOPE STABILISATION : ROCK BOLT
Provision of all necessary plant and equipment, transum
Moving and handling all necessary plant and sum
equipment within the Site and from location to
location as often as is, and whenever necessary
for execution of whole operation.
Temporary staging on slope. sum
Rock Bolt
Items for rock bolt shall be deemed to include
drilling of borehole, reinforced bar, reinforced
concrete pad, sleeve grouting, sealant
compound, and all associated works.
Type 1 with [T32] bolt
a) Exceeding 6.0m long but not exceeding 9.0m lonr
Testing
Pull out test / Proof test on rock bolt as specified nr
Surface Protection - Rockfall Netting
Rockfall netting with [PVC-coated heavily galvanizem2
RETAINING STRUCTURES : REINFORCED SOI
L SLOPES
Items for Reinforced Soil Slopes shall be deemed
to include preparation of surfaces, multiple
handling, disposal of surplus excavated material,
upholding of sides excavation, additional
excavation to provide working space, backfilling,
removal of dead services and reinstatement of
original surface; unless covered by separate
items.
Non-woven Geotextile.
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
A G570.1 Non-woven geotextile [Type B with minimum m2
design strength of 9 kN/m] as separator as per
Specification.
B G570.3 Geogrid.
Item for geogrid shall be deemed to include
cost of storage at site with neccessary
protection against exposure to direct sun.
Geogrid with minimum design strength of [130/30 m2
kN/m] as soil reinforcement as per Specification.
C G580.2 Drainage Blanket
[500mm] thick [granular material] as drainage 3
m
blanket as per Specification.
Miscellaneous
Items not mentioned above but are necessary
for the completion of the Works (Contractor to
list out, if any)
a)
b)
c)
To Grand Summary
RATE (RM) AMOUNT (RM)
BILL NO. 7 - GEOTECHNICAL WORKS
EDGENTA ENVIRONMENTAL & MATERIIAL TESTING LABORATORTY SDN BHD
BILL OF QUANTITY
NO. CODE NO. MOM DESCRIPTION UNIT QTY
A G570.1 GROUND TREATMENT : m2
SOFT GROUND REPLACEMENT / STABILITY
The following items shall include of supply
and lay geotextile filling and compact suitable
material/sand layer.
*** Embankment fill refer to BQ3 - Earthwork
*** Non-
woven Geotextile
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
Non-woven geotextile [Type B with minimum
design strength of 9 kN/m] as separator as per
Specification.
B G570.2 High Strength Woven Geotextile. 2
m
Item for high strength woven geotextile shall be
deemed to include cost of storage at site with
neccessary protection against exposure to direct
sun.
C F334.1 3
m
Replacement of Unsuitable Material.
Items for filling shall include filling earth in
layers, compaction, and additional filling
necessitated by settlement or penetration into
underlying material as applicable.
Other stated material - [granular material] as per
Specification to replace unsuitable material.
Settlement Marker.
D G830 Settlement marker as per Specification. nr
Settlement Plate.
E G841 Settlement plate as per Specification and as nr
shown in the Drawing no.
(KPKR/J/R/11 /PG/5.1).
Inclinometer.
F G820.3 Inclinometer as per Specification and as shown in nr
the Drawing no. (KPKR/J/R/11 /PG/5.1)
with depth of installation exceeding 20.0m but not
exceeding 30.0m. Rate to include pre-boring and
installation.
G G880 Monitoring of instrument for the above instrument nr
at the project site by [Qualified Personnel] as per
Specification. Rate to include preparation of
monitoring report inclusive of analyse, findings
and recommendation to be submitted on a
[monthly] basis. (4 Teams)
Team/mth
SLOPE STABILISATION : HORIZONTAL DRAIN
S
Rate for horizontal drain shall be deemed to
include drilling, perforated pipe and all
associated works.
A G351.2 [75mm] diameter UPVC horizontal drain as shown m
in the Drawing No. (KPKR/J/R/11 /PG/3.5) in
earth - 12.0m long
SLOPE STABILISATION : SOIL NAILING
Plant and Equipment.
B G110 Provision of all necessary plant and equipment, tran sum
Soil Nailing.
Pull-out Test.
Pull out test on soil nail, rate to include all
necessary equipment and submission of
procedure, records, and report.
G G312.5 Pull-out teston the 12.0m long soil nail to (….) tim No
H G312.6 Pull-out teston the 12.0m long nut not exceeding 18. No
Horizontal Drain.
Surface Protection.
SLOPE STABILISATION : ROCK BOLT
Provision of all necessary plant and equipment, transum
Moving and handling all necessary plant and sum
equipment within the Site and from location to
location as often as is, and whenever necessary
for execution of whole operation.
Temporary staging on slope. sum
Rock Bolt
Items for rock bolt shall be deemed to include
drilling of borehole, reinforced bar, reinforced
concrete pad, sleeve grouting, sealant
compound, and all associated works.
Type 1 with [T32] bolt
a) Exceeding 6.0m long but not exceeding 9.0m lonr
Testing
Pull out test / Proof test on rock bolt as specified nr
Surface Protection - Rockfall Netting
Rockfall netting with [PVC-coated heavily galvanizem2
RETAINING STRUCTURES : REINFORCED SOI
L SLOPES
Items for Reinforced Soil Slopes shall be deemed
to include preparation of surfaces, multiple
handling, disposal of surplus excavated material,
upholding of sides excavation, additional
excavation to provide working space, backfilling,
removal of dead services and reinstatement of
original surface; unless covered by separate
items.
Non-woven Geotextile.
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
A G570.1 Non-woven geotextile [Type B with minimum m2
design strength of 9 kN/m] as separator as per
Specification.
B G570.3 Geogrid.
Item for geogrid shall be deemed to include
cost of storage at site with neccessary
protection against exposure to direct sun.
Geogrid with minimum design strength of [130/30 m2
kN/m] as soil reinforcement as per Specification.
C G580.2 Drainage Blanket
[500mm] thick [granular material] as drainage 3
m
blanket as per Specification.
Miscellaneous
Items not mentioned above but are necessary
for the completion of the Works (Contractor to
list out, if any)
a)
b)
c)
To Grand Summary
RATE (RM) AMOUNT (RM)
BILL NO. 7 - GEOTECHNICAL WORKS
EDGENTA ENVIRONMENTAL & MATERIIAL TESTING LABORATORTY SDN BHD
BILL OF QUANTITY
NO. CODE NO. MOM DESCRIPTION UNIT QTY
A G570.1 GROUND TREATMENT : m2
SOFT GROUND REPLACEMENT / STABILITY
The following items shall include of supply
and lay geotextile filling and compact suitable
material/sand layer.
*** Embankment fill refer to BQ3 - Earthwork
*** Non-
woven Geotextile
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
Non-woven geotextile [Type B with minimum
design strength of 9 kN/m] as separator as per
Specification.
B G570.2 High Strength Woven Geotextile. 2
m
Item for high strength woven geotextile shall be
deemed to include cost of storage at site with
neccessary protection against exposure to direct
sun.
C F334.1 3
m
Replacement of Unsuitable Material.
Items for filling shall include filling earth in
layers, compaction, and additional filling
necessitated by settlement or penetration into
underlying material as applicable.
Other stated material - [granular material] as per
Specification to replace unsuitable material.
Settlement Marker.
D G830 Settlement marker as per Specification. nr
Settlement Plate.
E G841 Settlement plate as per Specification and as nr
shown in the Drawing no.
(KPKR/J/R/11 /PG/5.1).
Inclinometer.
F G820.3 Inclinometer as per Specification and as shown in nr
the Drawing no. (KPKR/J/R/11 /PG/5.1)
with depth of installation exceeding 20.0m but not
exceeding 30.0m. Rate to include pre-boring and
installation.
G G880 Monitoring of instrument for the above instrument nr
at the project site by [Qualified Personnel] as per
Specification. Rate to include preparation of
monitoring report inclusive of analyse, findings
and recommendation to be submitted on a
[monthly] basis. (4 Teams)
Team/mth
SLOPE STABILISATION : HORIZONTAL DRAIN
S
Rate for horizontal drain shall be deemed to
include drilling, perforated pipe and all
associated works.
A G351.2 [75mm] diameter UPVC horizontal drain as shown m
in the Drawing No. (KPKR/J/R/11 /PG/3.5) in
earth - 12.0m long
SLOPE STABILISATION : SOIL NAILING
Plant and Equipment.
B G110 Provision of all necessary plant and equipment, tran sum
Soil Nailing.
Pull-out Test.
Pull out test on soil nail, rate to include all
necessary equipment and submission of
procedure, records, and report.
G G312.5 Pull-out teston the 12.0m long soil nail to (….) tim No
H G312.6 Pull-out teston the 12.0m long nut not exceeding 18. No
Horizontal Drain.
Surface Protection.
SLOPE STABILISATION : ROCK BOLT
Provision of all necessary plant and equipment, transum
Moving and handling all necessary plant and sum
equipment within the Site and from location to
location as often as is, and whenever necessary
for execution of whole operation.
Temporary staging on slope. sum
Rock Bolt
Items for rock bolt shall be deemed to include
drilling of borehole, reinforced bar, reinforced
concrete pad, sleeve grouting, sealant
compound, and all associated works.
Type 1 with [T32] bolt
a) Exceeding 6.0m long but not exceeding 9.0m lonr
Testing
Pull out test / Proof test on rock bolt as specified nr
Surface Protection - Rockfall Netting
Rockfall netting with [PVC-coated heavily galvanizem2
RETAINING STRUCTURES : REINFORCED SOI
L SLOPES
Items for Reinforced Soil Slopes shall be deemed
to include preparation of surfaces, multiple
handling, disposal of surplus excavated material,
upholding of sides excavation, additional
excavation to provide working space, backfilling,
removal of dead services and reinstatement of
original surface; unless covered by separate
items.
Non-woven Geotextile.
Item for non-woven geotextile shall be deemed
to include cost of storage at site with
neccessary protection against exposure to
direct sun.
A G570.1 Non-woven geotextile [Type B with minimum m2
design strength of 9 kN/m] as separator as per
Specification.
B G570.3 Geogrid.
Item for geogrid shall be deemed to include
cost of storage at site with neccessary
protection against exposure to direct sun.
Geogrid with minimum design strength of [130/30 m2
kN/m] as soil reinforcement as per Specification.
C G580.2 Drainage Blanket
[500mm] thick [granular material] as drainage 3
m
blanket as per Specification.
Miscellaneous
Items not mentioned above but are necessary
for the completion of the Works (Contractor to
list out, if any)
a)
b)
c)
To Grand Summary
RATE (RM) AMOUNT (RM)
NO. CODE NO. MOM DESCRIPTION UNIT QTY RATE (RM)
C100 9.1 TRAFFIC MANAGEMENT PLAN
Traffic Management Plan and the associated work
shall be in
accordance with the latest version of Specification
for Road Works :
Section 19
C110 9.1.1 To conduct conprehensive traffic to asessed the
impact of a construction sum
proposal and the existing traffic. To prepare and
submit traffic report,
hardcopy and softcopy. Report must be endorsed by
qualified traffic
consultant with P.E.
C120 9.1.2 Preparation of traffic management plan including
emergency response sum
plan. Rate to include the cost of any survey required,
literature,
references, consultations, and the production of the
document. It shall
also include the cost for the engagement of
profesional civil engineers
with experience in road construction required for
carrying out the
respective study and the preparationof the site plan.
Temporary Traffic Signs
Temporary traffic signs shall be in accordance with
Specification for
Road Works : Section 19.
K C211.1 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting not nr
exceeding 1.0 m2.
L C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 1.0 not exceeding 2.0 m2.
M C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 2.0 not exceeding 3.0 m2.
Q C212 9.3.1 nr
Barriers and Barricades
R C221 9.3.2 Portable Plastic Barrier water or sand-filled
(1000mm (L) x 800mm (H) x nr
500mm (W).
S C222 9.3.2 Portable Concrete Barrier 1.0m segment (1000mm
(L) x 800mm (H) x nr
500mm (W).
Delineators
A C231.1 9.3.3 Traffic Guidance cones with reflective bands. nr
B C231.2 9.3.3 Traffic Guidance super cones with reflective bands.
nr
C C232 9.3.3 Double sided reflective string delineators mounted
on a post at every m
Y
A nr
B Flood Lightings deem to include with electrical
C290 9.3.6.6 power supply.
C300 9.4 TRAFFIC MANAGEMENT REPORT
C310 9.4.1 Submission 6 sets of Traffic Management Safety
report once in every 3 months. (quaterly). Rate to
include the cost of any survey required, literatures,
references, consultations, and the production of the sum
document.
Miscellaneous
Items not mentioned above but are necessary for
the completion of the Works (Contractor to list out,
if any)
Temporary Traffic Signs
Temporary traffic signs shall be in accordance with
Specification for
Road Works : Section 19.
K C211.1 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting not nr
exceeding 1.0 m2.
L C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 1.0 not exceeding 2.0 m2.
M C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 2.0 not exceeding 3.0 m2.
Q C212 9.3.1 nr
Barriers and Barricades
R C221 9.3.2 Portable Plastic Barrier water or sand-filled
(1000mm (L) x 800mm (H) x nr
500mm (W).
S C222 9.3.2 Portable Concrete Barrier 1.0m segment (1000mm
(L) x 800mm (H) x nr
500mm (W).
Delineators
A C231.1 9.3.3 Traffic Guidance cones with reflective bands. nr
B C231.2 9.3.3 Traffic Guidance super cones with reflective bands.
nr
C C232 9.3.3 Double sided reflective string delineators mounted
on a post at every m
Y
A nr
B Flood Lightings deem to include with electrical
C290 9.3.6.6 power supply.
C300 9.4 TRAFFIC MANAGEMENT REPORT
C310 9.4.1 Submission 6 sets of Traffic Management Safety
report once in every 3 months. (quaterly). Rate to
include the cost of any survey required, literatures,
references, consultations, and the production of the sum
document.
Miscellaneous
Items not mentioned above but are necessary for
the completion of the Works (Contractor to list out,
if any)
Temporary Traffic Signs
Temporary traffic signs shall be in accordance with
Specification for
Road Works : Section 19.
K C211.1 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting not nr
exceeding 1.0 m2.
L C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 1.0 not exceeding 2.0 m2.
M C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 2.0 not exceeding 3.0 m2.
Q C212 9.3.1 nr
Barriers and Barricades
R C221 9.3.2 Portable Plastic Barrier water or sand-filled
(1000mm (L) x 800mm (H) x nr
500mm (W).
S C222 9.3.2 Portable Concrete Barrier 1.0m segment (1000mm
(L) x 800mm (H) x nr
500mm (W).
Delineators
A C231.1 9.3.3 Traffic Guidance cones with reflective bands. nr
B C231.2 9.3.3 Traffic Guidance super cones with reflective bands.
nr
C C232 9.3.3 Double sided reflective string delineators mounted
on a post at every m
Y
A nr
B Flood Lightings deem to include with electrical
C290 9.3.6.6 power supply.
C300 9.4 TRAFFIC MANAGEMENT REPORT
C310 9.4.1 Submission 6 sets of Traffic Management Safety
report once in every 3 months. (quaterly). Rate to
include the cost of any survey required, literatures,
references, consultations, and the production of the sum
document.
Miscellaneous
Items not mentioned above but are necessary for
the completion of the Works (Contractor to list out,
if any)
Temporary Traffic Signs
Temporary traffic signs shall be in accordance with
Specification for
Road Works : Section 19.
K C211.1 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting not nr
exceeding 1.0 m2.
L C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 1.0 not exceeding 2.0 m2.
M C211.2 9.3.1 Portable fluorescent orange prismatic retro-
reflective sheeting nr
exceeding 2.0 not exceeding 3.0 m2.
Q C212 9.3.1 nr
Barriers and Barricades
R C221 9.3.2 Portable Plastic Barrier water or sand-filled
(1000mm (L) x 800mm (H) x nr
500mm (W).
S C222 9.3.2 Portable Concrete Barrier 1.0m segment (1000mm
(L) x 800mm (H) x nr
500mm (W).
Delineators
A C231.1 9.3.3 Traffic Guidance cones with reflective bands. nr
B C231.2 9.3.3 Traffic Guidance super cones with reflective bands.
nr
C C232 9.3.3 Double sided reflective string delineators mounted
on a post at every m
Y
A nr
B Flood Lightings deem to include with electrical
C290 9.3.6.6 power supply.
C300 9.4 TRAFFIC MANAGEMENT REPORT
C310 9.4.1 Submission 6 sets of Traffic Management Safety
report once in every 3 months. (quaterly). Rate to
include the cost of any survey required, literatures,
references, consultations, and the production of the sum
document.
Miscellaneous
Items not mentioned above but are necessary for
the completion of the Works (Contractor to list out,
if any)
ENVIRONMENTAL OFFICER (E.O.)
Provision of 3 full time environmental officer (E.O.) for
environmental management works only, throughout the
contract period for the implementation of EIA and/or JKR
B B120 10.1.1.2 Sistem Pengurusan Alam Sekitar (SPAS) or project more than man-mth
RM 20 million including earthwork.
For EIA Project*
E.O. shall have a degree in Civil Engineering or Environmental
Science with minimum three (3) years of related experience in
environmental management works and must be certified as
CESSWI/CISEC/CePSWaM or equivalent.
i) . Turbidity meter no
ii) . Rain Gauge no
A Page Total Carried To Summary of Bill No. 10
B
C B350 10.1.2.2 Water Quality Sampling and Laboratory Testing
Water quality testing shall be deemed to include testing by
accredited laboratory:
Conduct monthly river/stream/other water body quality
monitoring
as specified and as shown in the drawing for the following
parameters or as directed by the S.O. throughout the contract
period :-
i. Total suspended solid (TSS).
ii. Biochemical oxygen demand (BOD).
B359.1 10.1.2.2.1 iii. Chemical oxygen demand (COD). sum
iv. Escherichia coli (E.coli).
v. Ammoniacal nitrogen.
vi. Oil and grease.
contract period.
Vibration measurement shall be deemed to include
monitoring by accredited sum
laboratory
a)Conduct vibration monitoring as specified or as directed by
the S.O. /P.D.
throughout the contract period.
B800 10.1.6 ENVIRONMENTAL MONITORING REPORT
Preparation of five (5) copies (per month) of the following
report
throughout the contract period :-
B819 10.1.6.1 Monthly environmental monitoring report. sum
10.1.7 ENVIRONMENTAL AUDIT
This audit where applicable shall be in accordance with DOE
requirements:
Conduct quarterly 3rd party audit as specified including
B820 10.1.7.1 preparation sum
of five (5) copies of Environmental Audit Report (per audit)
throughout
the contract period.
Page Total Carried To Summary of Bill No. 10
Conduct an environmental closure audit prior to issuance of
C B830 10.1.7.2 certificate of practical completion including preparation of five sum
(5) copies of the report.
Page Total Carried To Summary of Bill No. 10
10.2.1 DUST AND MUD CONTROL
10.2.1.1 Water Bowser Truck
Item for water bowser truck shall be deemed to include
provision and maintenance of vehicle, water supply and driver:
10.2.1.2 Tyre Washing Facilities
Item for tyre washing facilities shall be deemed to include
construction of tyre washing concrete platform, and provision
and maintenance of water supply and portable water jets:
10.2.1.3 Wash Trough
Provision, operation, maintenance and removal upon project
completion of wash trough including operators, water tank,
water supply and other necessary equipments as specified and
B420 10.2.1.3.1 as per drawing to clean vehicle tyres at various exits of the nr
worksites or as directed by the S.O.
10.2.4 Water Sprinkler
Item for water sprinkler shall be deemed to include provision
and maintenance of water sprinkler:
Water sprinkler; [e.g.for control of dust at quarry/batching
D B440 10.2.1.4.1 plant using pumping system]. sum
10.2.2 SURFACE RUN-ON OR RUN-OFF CONTROL
Check Dam
Construction of check dam using rocks as specified and as
E B250 10.2.2.1 shown in the drawing or as directed by the S.O. m3
Sand Bags
Supply and lay gunny sack (or equivalent) size (35-50 mm x 60-
70 mm) filled with sand as specified and as shown in the
F B230 10.2.2.2 drawing nr
or as directed by the S.O.
Silt Fence
Construction of 1.0 m high silt fence including non-woven
G B210 10.2.2.3 geotextile and wooden post with dimension as specified and as m
per drawing or as directed by the S.O.
10.2.3 TEMPORARY DRAINAGE WORKS
Q100 Drain Excavation
Drain excavation shall be deemed to include preparation of
surfaces, double handling, disposal of surplus excavated
material, upholding sides of excavation, allowance for joints,
backfilling and removal of dead services and reinstatement of
original surface:
10.2.5 SEDIMENT CONTROL
10.2.5.1 Silt Trap
a) Excavation to form silt trap as per drawing including
B B271 10.2.5.1.1 backfilling and disposal of surplus material.
C B272.1 10.2.5.1.2 b) Sand bedding for silt traps. m3
D B272.2 10.2.5.1.3 c) Stone filling at inlet and outlet. m3
m3
Page Total Carried To Summary of Bill No.10
PHYSICAL WORK (cont'd)
10.2.6 MAINTENANCE
Items for maintenance shall be deemed to include disposal of
accumulated debris, sediment and silt to an approved site,
unless otherwise stated:
10.2.8 FUEL SPILLAGE MANAGEMENT
Containment Bund for Bulk Fuel Tank
Item for skid tank bund shall be deemed to include traps , oil
and grease separators, and its maintenance and removal upon
completion:
10.2.9 WASTE MANAGEMENT
Item for scheduled waste shall be deemed to include storage,
labelling and transportation from site by a licensed contractor
for disposal as per Department of Environment (DOE)
Regulation:
M B610 10.2.9.1 Scheduled wastes storage as per drawing and disposal sum
10.2.11 FLORA MANAGEMENT*
Conduct and prepare five (5) copies of Flora Survey Report as
A B711 10.2.11.1 specified by Jabatan Perhutanan or other relevant authorities. sum
10.2.12 WILDLIFE MANAGEMENT*
Conduct and prepare five (5) copies of Fauna Survey Report as
D B721 10.2.12.1 specified by Jabatan Perlindungan Hidupan Liar dan Taman sum
Negara (PERHILITAN) or other relevant authorities.
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
ENVIRONMENTAL OFFICER (E.O.)
Provision of 3 full time environmental officer (E.O.) for
environmental management works only, throughout the
contract period for the implementation of EIA and/or JKR
B B120 10.1.1.2 Sistem Pengurusan Alam Sekitar (SPAS) or project more than man-mth
RM 20 million including earthwork.
For EIA Project*
E.O. shall have a degree in Civil Engineering or Environmental
Science with minimum three (3) years of related experience in
environmental management works and must be certified as
CESSWI/CISEC/CePSWaM or equivalent.
i) . Turbidity meter no
ii) . Rain Gauge no
A Page Total Carried To Summary of Bill No. 10
B
C B350 10.1.2.2 Water Quality Sampling and Laboratory Testing
Water quality testing shall be deemed to include testing by
accredited laboratory:
Conduct monthly river/stream/other water body quality
monitoring
as specified and as shown in the drawing for the following
parameters or as directed by the S.O. throughout the contract
period :-
i. Total suspended solid (TSS).
ii. Biochemical oxygen demand (BOD).
B359.1 10.1.2.2.1 iii. Chemical oxygen demand (COD). sum
iv. Escherichia coli (E.coli).
v. Ammoniacal nitrogen.
vi. Oil and grease.
contract period.
Vibration measurement shall be deemed to include
monitoring by accredited sum
laboratory
a)Conduct vibration monitoring as specified or as directed by
the S.O. /P.D.
throughout the contract period.
B800 10.1.6 ENVIRONMENTAL MONITORING REPORT
Preparation of five (5) copies (per month) of the following
report
throughout the contract period :-
B819 10.1.6.1 Monthly environmental monitoring report. sum
10.1.7 ENVIRONMENTAL AUDIT
This audit where applicable shall be in accordance with DOE
requirements:
Conduct quarterly 3rd party audit as specified including
B820 10.1.7.1 preparation sum
of five (5) copies of Environmental Audit Report (per audit)
throughout
the contract period.
Page Total Carried To Summary of Bill No. 10
Conduct an environmental closure audit prior to issuance of
C B830 10.1.7.2 certificate of practical completion including preparation of five sum
(5) copies of the report.
Page Total Carried To Summary of Bill No. 10
10.2.1 DUST AND MUD CONTROL
10.2.1.1 Water Bowser Truck
Item for water bowser truck shall be deemed to include
provision and maintenance of vehicle, water supply and driver:
10.2.1.2 Tyre Washing Facilities
Item for tyre washing facilities shall be deemed to include
construction of tyre washing concrete platform, and provision
and maintenance of water supply and portable water jets:
10.2.1.3 Wash Trough
Provision, operation, maintenance and removal upon project
completion of wash trough including operators, water tank,
water supply and other necessary equipments as specified and
B420 10.2.1.3.1 as per drawing to clean vehicle tyres at various exits of the nr
worksites or as directed by the S.O.
10.2.4 Water Sprinkler
Item for water sprinkler shall be deemed to include provision
and maintenance of water sprinkler:
Water sprinkler; [e.g.for control of dust at quarry/batching
D B440 10.2.1.4.1 plant using pumping system]. sum
10.2.2 SURFACE RUN-ON OR RUN-OFF CONTROL
Check Dam
Construction of check dam using rocks as specified and as
E B250 10.2.2.1 shown in the drawing or as directed by the S.O. m3
Sand Bags
Supply and lay gunny sack (or equivalent) size (35-50 mm x 60-
70 mm) filled with sand as specified and as shown in the
F B230 10.2.2.2 drawing nr
or as directed by the S.O.
Silt Fence
Construction of 1.0 m high silt fence including non-woven
G B210 10.2.2.3 geotextile and wooden post with dimension as specified and as m
per drawing or as directed by the S.O.
10.2.3 TEMPORARY DRAINAGE WORKS
Q100 Drain Excavation
Drain excavation shall be deemed to include preparation of
surfaces, double handling, disposal of surplus excavated
material, upholding sides of excavation, allowance for joints,
backfilling and removal of dead services and reinstatement of
original surface:
10.2.5 SEDIMENT CONTROL
10.2.5.1 Silt Trap
a) Excavation to form silt trap as per drawing including
B B271 10.2.5.1.1 backfilling and disposal of surplus material.
C B272.1 10.2.5.1.2 b) Sand bedding for silt traps. m3
D B272.2 10.2.5.1.3 c) Stone filling at inlet and outlet. m3
m3
Page Total Carried To Summary of Bill No.10
PHYSICAL WORK (cont'd)
10.2.6 MAINTENANCE
Items for maintenance shall be deemed to include disposal of
accumulated debris, sediment and silt to an approved site,
unless otherwise stated:
10.2.8 FUEL SPILLAGE MANAGEMENT
Containment Bund for Bulk Fuel Tank
Item for skid tank bund shall be deemed to include traps , oil
and grease separators, and its maintenance and removal upon
completion:
10.2.9 WASTE MANAGEMENT
Item for scheduled waste shall be deemed to include storage,
labelling and transportation from site by a licensed contractor
for disposal as per Department of Environment (DOE)
Regulation:
M B610 10.2.9.1 Scheduled wastes storage as per drawing and disposal sum
10.2.11 FLORA MANAGEMENT*
Conduct and prepare five (5) copies of Flora Survey Report as
A B711 10.2.11.1 specified by Jabatan Perhutanan or other relevant authorities. sum
10.2.12 WILDLIFE MANAGEMENT*
Conduct and prepare five (5) copies of Fauna Survey Report as
D B721 10.2.12.1 specified by Jabatan Perlindungan Hidupan Liar dan Taman sum
Negara (PERHILITAN) or other relevant authorities.
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
ENVIRONMENTAL OFFICER (E.O.)
Provision of 3 full time environmental officer (E.O.) for
environmental management works only, throughout the
contract period for the implementation of EIA and/or JKR
B B120 10.1.1.2 Sistem Pengurusan Alam Sekitar (SPAS) or project more than man-mth
RM 20 million including earthwork.
For EIA Project*
E.O. shall have a degree in Civil Engineering or Environmental
Science with minimum three (3) years of related experience in
environmental management works and must be certified as
CESSWI/CISEC/CePSWaM or equivalent.
i) . Turbidity meter no
ii) . Rain Gauge no
A Page Total Carried To Summary of Bill No. 10
B
C B350 10.1.2.2 Water Quality Sampling and Laboratory Testing
Water quality testing shall be deemed to include testing by
accredited laboratory:
Conduct monthly river/stream/other water body quality
monitoring
as specified and as shown in the drawing for the following
parameters or as directed by the S.O. throughout the contract
period :-
i. Total suspended solid (TSS).
ii. Biochemical oxygen demand (BOD).
B359.1 10.1.2.2.1 iii. Chemical oxygen demand (COD). sum
iv. Escherichia coli (E.coli).
v. Ammoniacal nitrogen.
vi. Oil and grease.
contract period.
Vibration measurement shall be deemed to include
monitoring by accredited sum
laboratory
a)Conduct vibration monitoring as specified or as directed by
the S.O. /P.D.
throughout the contract period.
B800 10.1.6 ENVIRONMENTAL MONITORING REPORT
Preparation of five (5) copies (per month) of the following
report
throughout the contract period :-
B819 10.1.6.1 Monthly environmental monitoring report. sum
10.1.7 ENVIRONMENTAL AUDIT
This audit where applicable shall be in accordance with DOE
requirements:
Conduct quarterly 3rd party audit as specified including
B820 10.1.7.1 preparation sum
of five (5) copies of Environmental Audit Report (per audit)
throughout
the contract period.
Page Total Carried To Summary of Bill No. 10
Conduct an environmental closure audit prior to issuance of
C B830 10.1.7.2 certificate of practical completion including preparation of five sum
(5) copies of the report.
Page Total Carried To Summary of Bill No. 10
10.2.1 DUST AND MUD CONTROL
10.2.1.1 Water Bowser Truck
Item for water bowser truck shall be deemed to include
provision and maintenance of vehicle, water supply and driver:
10.2.1.2 Tyre Washing Facilities
Item for tyre washing facilities shall be deemed to include
construction of tyre washing concrete platform, and provision
and maintenance of water supply and portable water jets:
10.2.1.3 Wash Trough
Provision, operation, maintenance and removal upon project
completion of wash trough including operators, water tank,
water supply and other necessary equipments as specified and
B420 10.2.1.3.1 as per drawing to clean vehicle tyres at various exits of the nr
worksites or as directed by the S.O.
10.2.4 Water Sprinkler
Item for water sprinkler shall be deemed to include provision
and maintenance of water sprinkler:
Water sprinkler; [e.g.for control of dust at quarry/batching
D B440 10.2.1.4.1 plant using pumping system]. sum
10.2.2 SURFACE RUN-ON OR RUN-OFF CONTROL
Check Dam
Construction of check dam using rocks as specified and as
E B250 10.2.2.1 shown in the drawing or as directed by the S.O. m3
Sand Bags
Supply and lay gunny sack (or equivalent) size (35-50 mm x 60-
70 mm) filled with sand as specified and as shown in the
F B230 10.2.2.2 drawing nr
or as directed by the S.O.
Silt Fence
Construction of 1.0 m high silt fence including non-woven
G B210 10.2.2.3 geotextile and wooden post with dimension as specified and as m
per drawing or as directed by the S.O.
10.2.3 TEMPORARY DRAINAGE WORKS
Q100 Drain Excavation
Drain excavation shall be deemed to include preparation of
surfaces, double handling, disposal of surplus excavated
material, upholding sides of excavation, allowance for joints,
backfilling and removal of dead services and reinstatement of
original surface:
10.2.5 SEDIMENT CONTROL
10.2.5.1 Silt Trap
a) Excavation to form silt trap as per drawing including
B B271 10.2.5.1.1 backfilling and disposal of surplus material.
C B272.1 10.2.5.1.2 b) Sand bedding for silt traps. m3
D B272.2 10.2.5.1.3 c) Stone filling at inlet and outlet. m3
m3
Page Total Carried To Summary of Bill No.10
PHYSICAL WORK (cont'd)
10.2.6 MAINTENANCE
Items for maintenance shall be deemed to include disposal of
accumulated debris, sediment and silt to an approved site,
unless otherwise stated:
10.2.8 FUEL SPILLAGE MANAGEMENT
Containment Bund for Bulk Fuel Tank
Item for skid tank bund shall be deemed to include traps , oil
and grease separators, and its maintenance and removal upon
completion:
10.2.9 WASTE MANAGEMENT
Item for scheduled waste shall be deemed to include storage,
labelling and transportation from site by a licensed contractor
for disposal as per Department of Environment (DOE)
Regulation:
M B610 10.2.9.1 Scheduled wastes storage as per drawing and disposal sum
10.2.11 FLORA MANAGEMENT*
Conduct and prepare five (5) copies of Flora Survey Report as
A B711 10.2.11.1 specified by Jabatan Perhutanan or other relevant authorities. sum
10.2.12 WILDLIFE MANAGEMENT*
Conduct and prepare five (5) copies of Fauna Survey Report as
D B721 10.2.12.1 specified by Jabatan Perlindungan Hidupan Liar dan Taman sum
Negara (PERHILITAN) or other relevant authorities.
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
ENVIRONMENTAL OFFICER (E.O.)
Provision of 3 full time environmental officer (E.O.) for
environmental management works only, throughout the
contract period for the implementation of EIA and/or JKR
B B120 10.1.1.2 Sistem Pengurusan Alam Sekitar (SPAS) or project more than man-mth
RM 20 million including earthwork.
For EIA Project*
E.O. shall have a degree in Civil Engineering or Environmental
Science with minimum three (3) years of related experience in
environmental management works and must be certified as
CESSWI/CISEC/CePSWaM or equivalent.
i) . Turbidity meter no
ii) . Rain Gauge no
A Page Total Carried To Summary of Bill No. 10
B
C B350 10.1.2.2 Water Quality Sampling and Laboratory Testing
Water quality testing shall be deemed to include testing by
accredited laboratory:
Conduct monthly river/stream/other water body quality
monitoring
as specified and as shown in the drawing for the following
parameters or as directed by the S.O. throughout the contract
period :-
i. Total suspended solid (TSS).
ii. Biochemical oxygen demand (BOD).
B359.1 10.1.2.2.1 iii. Chemical oxygen demand (COD). sum
iv. Escherichia coli (E.coli).
v. Ammoniacal nitrogen.
vi. Oil and grease.
contract period.
Vibration measurement shall be deemed to include
monitoring by accredited sum
laboratory
a)Conduct vibration monitoring as specified or as directed by
the S.O. /P.D.
throughout the contract period.
B800 10.1.6 ENVIRONMENTAL MONITORING REPORT
Preparation of five (5) copies (per month) of the following
report
throughout the contract period :-
B819 10.1.6.1 Monthly environmental monitoring report. sum
10.1.7 ENVIRONMENTAL AUDIT
This audit where applicable shall be in accordance with DOE
requirements:
Conduct quarterly 3rd party audit as specified including
B820 10.1.7.1 preparation sum
of five (5) copies of Environmental Audit Report (per audit)
throughout
the contract period.
Page Total Carried To Summary of Bill No. 10
Conduct an environmental closure audit prior to issuance of
C B830 10.1.7.2 certificate of practical completion including preparation of five sum
(5) copies of the report.
Page Total Carried To Summary of Bill No. 10
10.2.1 DUST AND MUD CONTROL
10.2.1.1 Water Bowser Truck
Item for water bowser truck shall be deemed to include
provision and maintenance of vehicle, water supply and driver:
10.2.1.2 Tyre Washing Facilities
Item for tyre washing facilities shall be deemed to include
construction of tyre washing concrete platform, and provision
and maintenance of water supply and portable water jets:
10.2.1.3 Wash Trough
Provision, operation, maintenance and removal upon project
completion of wash trough including operators, water tank,
water supply and other necessary equipments as specified and
B420 10.2.1.3.1 as per drawing to clean vehicle tyres at various exits of the nr
worksites or as directed by the S.O.
10.2.4 Water Sprinkler
Item for water sprinkler shall be deemed to include provision
and maintenance of water sprinkler:
Water sprinkler; [e.g.for control of dust at quarry/batching
D B440 10.2.1.4.1 plant using pumping system]. sum
10.2.2 SURFACE RUN-ON OR RUN-OFF CONTROL
Check Dam
Construction of check dam using rocks as specified and as
E B250 10.2.2.1 shown in the drawing or as directed by the S.O. m3
Sand Bags
Supply and lay gunny sack (or equivalent) size (35-50 mm x 60-
70 mm) filled with sand as specified and as shown in the
F B230 10.2.2.2 drawing nr
or as directed by the S.O.
Silt Fence
Construction of 1.0 m high silt fence including non-woven
G B210 10.2.2.3 geotextile and wooden post with dimension as specified and as m
per drawing or as directed by the S.O.
10.2.3 TEMPORARY DRAINAGE WORKS
Q100 Drain Excavation
Drain excavation shall be deemed to include preparation of
surfaces, double handling, disposal of surplus excavated
material, upholding sides of excavation, allowance for joints,
backfilling and removal of dead services and reinstatement of
original surface:
10.2.5 SEDIMENT CONTROL
10.2.5.1 Silt Trap
a) Excavation to form silt trap as per drawing including
B B271 10.2.5.1.1 backfilling and disposal of surplus material.
C B272.1 10.2.5.1.2 b) Sand bedding for silt traps. m3
D B272.2 10.2.5.1.3 c) Stone filling at inlet and outlet. m3
m3
Page Total Carried To Summary of Bill No.10
PHYSICAL WORK (cont'd)
10.2.6 MAINTENANCE
Items for maintenance shall be deemed to include disposal of
accumulated debris, sediment and silt to an approved site,
unless otherwise stated:
10.2.8 FUEL SPILLAGE MANAGEMENT
Containment Bund for Bulk Fuel Tank
Item for skid tank bund shall be deemed to include traps , oil
and grease separators, and its maintenance and removal upon
completion:
10.2.9 WASTE MANAGEMENT
Item for scheduled waste shall be deemed to include storage,
labelling and transportation from site by a licensed contractor
for disposal as per Department of Environment (DOE)
Regulation:
M B610 10.2.9.1 Scheduled wastes storage as per drawing and disposal sum
10.2.11 FLORA MANAGEMENT*
Conduct and prepare five (5) copies of Flora Survey Report as
A B711 10.2.11.1 specified by Jabatan Perhutanan or other relevant authorities. sum
10.2.12 WILDLIFE MANAGEMENT*
Conduct and prepare five (5) copies of Fauna Survey Report as
D B721 10.2.12.1 specified by Jabatan Perlindungan Hidupan Liar dan Taman sum
Negara (PERHILITAN) or other relevant authorities.
Miscellaneous
Items not mentioned above but are necessary for the
completion of the Works (Contractor to list out, if any)
a)
b)
c)
ROUTINE MAINTENANCE WORKS DURING CONSTRUCTION
PERIOD (cont'd)
MAINTAIN THE EXISTING ROAD (cont'd)
D A351.4 11.1.3 Road Furnitures
The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a)Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineotor post
d) Traffic signal aspects
E A351.4 11.1.3 The works shall comprise of repainting works and shall be carried out 2 cycle
cycles/year of repainting of:
a) Barriers
b) Signages and traffic signal posts
c) Kilometer post and delineator post
d) Road kerbs
A A351.5 11.1.4 The works shall comprise of repainting works and shall be carried out 1 cycle
cycle/year of repainting of:
a) Concrete parapets/railings
b) Steel railings
Roadline Marking
B A351.6 11.1.5 The works shall comprise of repainting roadline marking when faded m2
ROUTINE MAINTENANCE WORKS DURING DEFECT LIABILITY
PERIOD
A359 11.3 MAINTAIN THE COMPLETED ROAD
Provision of all labour, equipments, tools material, transport
and whatever necessary to all the works stated below as per
standard JKR road specification:
Grass Cutting
A A359.1 11.3.1 The works shall comprise grass cutting, disposal of cut grass and km mth
debris. The frequency of grass cutting shall be carried out once a
month. The limit and extent as described below:
a) Road shoulder
b) Slope area
c) Berm drain, interceptor drain and all other types of drain on slopes
d) Median
e) Clear vegetation on paved surface
Road Furnitures
B A359.2 11.3.2 The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a) Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineator post
d) Traffic signal aspects
Page Total Carried To Summary of Bill No. 11
DESCRIPTION
NO. CODE NO. MOM UNIT
Bridges and Culverts
Provision of all labour, equipments, tools material, transport and whatever
necessary to all the works stated below as per standard JKR road
specification:
The works shall comprise of cleaning works and shall be carried out 4 cycles/year
of cleaning of:
a) Expansion joints
b) Weep holes
c) Parapets
d) Bearing shelves
A359.3 11.3.3 e) Grafiti and markings cycle
A
f) Waterway or culvert opening and bridge carriageway
g) Removal of vegetation and lubricating and greasing operation for steel
bearings.
h) Water down pipe
Drainage
The works shall comprise of cleaning debries and desilting works and shall
be carried out 4 cycles/year:
a) Lined drains
B A359.4 11.3.4 b) Unlined drains
cycle
c) Sump
d) Culverts
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
ROUTINE MAINTENANCE WORKS DURING CONSTRUCTION
PERIOD (cont'd)
MAINTAIN THE EXISTING ROAD (cont'd)
D A351.4 11.1.3 Road Furnitures
The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a)Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineotor post
d) Traffic signal aspects
E A351.4 11.1.3 The works shall comprise of repainting works and shall be carried out 2 cycle
cycles/year of repainting of:
a) Barriers
b) Signages and traffic signal posts
c) Kilometer post and delineator post
d) Road kerbs
A A351.5 11.1.4 The works shall comprise of repainting works and shall be carried out 1 cycle
cycle/year of repainting of:
a) Concrete parapets/railings
b) Steel railings
Roadline Marking
B A351.6 11.1.5 The works shall comprise of repainting roadline marking when faded m2
ROUTINE MAINTENANCE WORKS DURING DEFECT LIABILITY
PERIOD
A359 11.3 MAINTAIN THE COMPLETED ROAD
Provision of all labour, equipments, tools material, transport
and whatever necessary to all the works stated below as per
standard JKR road specification:
Grass Cutting
A A359.1 11.3.1 The works shall comprise grass cutting, disposal of cut grass and km mth
debris. The frequency of grass cutting shall be carried out once a
month. The limit and extent as described below:
a) Road shoulder
b) Slope area
c) Berm drain, interceptor drain and all other types of drain on slopes
d) Median
e) Clear vegetation on paved surface
Road Furnitures
B A359.2 11.3.2 The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a) Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineator post
d) Traffic signal aspects
Page Total Carried To Summary of Bill No. 11
DESCRIPTION
NO. CODE NO. MOM UNIT
Bridges and Culverts
Provision of all labour, equipments, tools material, transport and whatever
necessary to all the works stated below as per standard JKR road
specification:
The works shall comprise of cleaning works and shall be carried out 4 cycles/year
of cleaning of:
a) Expansion joints
b) Weep holes
c) Parapets
d) Bearing shelves
A359.3 11.3.3 e) Grafiti and markings cycle
A
f) Waterway or culvert opening and bridge carriageway
g) Removal of vegetation and lubricating and greasing operation for steel
bearings.
h) Water down pipe
Drainage
The works shall comprise of cleaning debries and desilting works and shall
be carried out 4 cycles/year:
a) Lined drains
B A359.4 11.3.4 b) Unlined drains
cycle
c) Sump
d) Culverts
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
ROUTINE MAINTENANCE WORKS DURING CONSTRUCTION
PERIOD (cont'd)
MAINTAIN THE EXISTING ROAD (cont'd)
D A351.4 11.1.3 Road Furnitures
The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a)Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineotor post
d) Traffic signal aspects
E A351.4 11.1.3 The works shall comprise of repainting works and shall be carried out 2 cycle
cycles/year of repainting of:
a) Barriers
b) Signages and traffic signal posts
c) Kilometer post and delineator post
d) Road kerbs
A A351.5 11.1.4 The works shall comprise of repainting works and shall be carried out 1 cycle
cycle/year of repainting of:
a) Concrete parapets/railings
b) Steel railings
Roadline Marking
B A351.6 11.1.5 The works shall comprise of repainting roadline marking when faded m2
ROUTINE MAINTENANCE WORKS DURING DEFECT LIABILITY
PERIOD
A359 11.3 MAINTAIN THE COMPLETED ROAD
Provision of all labour, equipments, tools material, transport
and whatever necessary to all the works stated below as per
standard JKR road specification:
Grass Cutting
A A359.1 11.3.1 The works shall comprise grass cutting, disposal of cut grass and km mth
debris. The frequency of grass cutting shall be carried out once a
month. The limit and extent as described below:
a) Road shoulder
b) Slope area
c) Berm drain, interceptor drain and all other types of drain on slopes
d) Median
e) Clear vegetation on paved surface
Road Furnitures
B A359.2 11.3.2 The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a) Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineator post
d) Traffic signal aspects
Page Total Carried To Summary of Bill No. 11
DESCRIPTION
NO. CODE NO. MOM UNIT
Bridges and Culverts
Provision of all labour, equipments, tools material, transport and whatever
necessary to all the works stated below as per standard JKR road
specification:
The works shall comprise of cleaning works and shall be carried out 4 cycles/year
of cleaning of:
a) Expansion joints
b) Weep holes
c) Parapets
d) Bearing shelves
A359.3 11.3.3 e) Grafiti and markings cycle
A
f) Waterway or culvert opening and bridge carriageway
g) Removal of vegetation and lubricating and greasing operation for steel
bearings.
h) Water down pipe
Drainage
The works shall comprise of cleaning debries and desilting works and shall
be carried out 4 cycles/year:
a) Lined drains
B A359.4 11.3.4 b) Unlined drains
cycle
c) Sump
d) Culverts
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
ROUTINE MAINTENANCE WORKS DURING CONSTRUCTION
PERIOD (cont'd)
MAINTAIN THE EXISTING ROAD (cont'd)
D A351.4 11.1.3 Road Furnitures
The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a)Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineotor post
d) Traffic signal aspects
E A351.4 11.1.3 The works shall comprise of repainting works and shall be carried out 2 cycle
cycles/year of repainting of:
a) Barriers
b) Signages and traffic signal posts
c) Kilometer post and delineator post
d) Road kerbs
A A351.5 11.1.4 The works shall comprise of repainting works and shall be carried out 1 cycle
cycle/year of repainting of:
a) Concrete parapets/railings
b) Steel railings
Roadline Marking
B A351.6 11.1.5 The works shall comprise of repainting roadline marking when faded m2
ROUTINE MAINTENANCE WORKS DURING DEFECT LIABILITY
PERIOD
A359 11.3 MAINTAIN THE COMPLETED ROAD
Provision of all labour, equipments, tools material, transport
and whatever necessary to all the works stated below as per
standard JKR road specification:
Grass Cutting
A A359.1 11.3.1 The works shall comprise grass cutting, disposal of cut grass and km mth
debris. The frequency of grass cutting shall be carried out once a
month. The limit and extent as described below:
a) Road shoulder
b) Slope area
c) Berm drain, interceptor drain and all other types of drain on slopes
d) Median
e) Clear vegetation on paved surface
Road Furnitures
B A359.2 11.3.2 The works shall comprise of cleaning works and shall be carried out 4 cycle
cycles/year of cleaning of:
a) Guardnails and barriers
b) Signages and posts
c) Kilometer post and delineator post
d) Traffic signal aspects
Page Total Carried To Summary of Bill No. 11
DESCRIPTION
NO. CODE NO. MOM UNIT
Bridges and Culverts
Provision of all labour, equipments, tools material, transport and whatever
necessary to all the works stated below as per standard JKR road
specification:
The works shall comprise of cleaning works and shall be carried out 4 cycles/year
of cleaning of:
a) Expansion joints
b) Weep holes
c) Parapets
d) Bearing shelves
A359.3 11.3.3 e) Grafiti and markings cycle
A
f) Waterway or culvert opening and bridge carriageway
g) Removal of vegetation and lubricating and greasing operation for steel
bearings.
h) Water down pipe
Drainage
The works shall comprise of cleaning debries and desilting works and shall
be carried out 4 cycles/year:
a) Lined drains
B A359.4 11.3.4 b) Unlined drains
cycle
c) Sump
d) Culverts
Miscellaneous
Items not mentioned above but are necessary for the completion of the
Works (Contractor to list out, if any)
a)
b)
c)
CODE
NO. NO. MOM DESCRIPTION UNIT
ROAD LIGHTING SYSTEM
INTEGRATED SOLAR LED ROAD LIGHTING SYSTEM
Integrated Solar LED Road Lighting (Luminaire, component and
accessories)
12.1.1.1.1 Supply and install 120W integrated solar LED road lighting c/w nr
electronic controller, built in solar components (PV module ,
rechargeable deep cycle battery, solar charge controller)
CODE
NO. NO. MOM DESCRIPTION UNIT
ROAD LIGHTING SYSTEM
INTEGRATED SOLAR LED ROAD LIGHTING SYSTEM
Integrated Solar LED Road Lighting (Luminaire, component and
accessories)
12.1.1.1.1 Supply and install 120W integrated solar LED road lighting c/w nr
electronic controller, built in solar components (PV module ,
rechargeable deep cycle battery, solar charge controller)
CODE
NO. NO. MOM DESCRIPTION UNIT
ROAD LIGHTING SYSTEM
INTEGRATED SOLAR LED ROAD LIGHTING SYSTEM
Integrated Solar LED Road Lighting (Luminaire, component and
accessories)
12.1.1.1.1 Supply and install 120W integrated solar LED road lighting c/w nr
electronic controller, built in solar components (PV module ,
rechargeable deep cycle battery, solar charge controller)
CODE
NO. NO. MOM DESCRIPTION UNIT
ROAD LIGHTING SYSTEM
INTEGRATED SOLAR LED ROAD LIGHTING SYSTEM
Integrated Solar LED Road Lighting (Luminaire, component and
accessories)
12.1.1.1.1 Supply and install 120W integrated solar LED road lighting c/w nr
electronic controller, built in solar components (PV module ,
rechargeable deep cycle battery, solar charge controller)
Letter of Acceptance).
B A411.2 13.1.2 Preparation of Hazard Identification Risk Assessment and Risk Control sum
(HIRARC) for the activities carried out at site. (To be sequent submitted
Prepare and submit to the S.O/P.D of five (5) copies monthly safety & mth
injuries and deaths and the actions taken. The report may be
ground level.
A413.5 Protective gloves. pairs
A413.6 Safety goggles. pairs
A413.7 Safety jackets of reflective type. pcs
A413.8 Ear plugs and muffs. pairs
A413.9 Dust masks. pcs
A413.10 Head lamp. pcs
13.3.2 Provision and maintenance on the site during the duration of the works,
/ railing / screen / wire netting / toe board for maintaining safe working
Miscellaneous
Items not mentioned above but are necessary for the completion of the Works
(Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 13
Summary of Bill No. 13 : Occupational Safety & Health
Management (For Project Above RM 20M)
Page BQ13 - 1/4 Page BQ13 - 2/4 Page BQ13 - 3/4
Total of Bill No. 13 Carried to Summary of Tender
NO. CODE NO. MOM DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)
13.1 PLANNING FOR SAFETY & HEALTH MANAGEMENT SYSTEM
A A411.1 13.1.1 Preparation of five (5) copies site safety and health plan (S-Plan) as per sum
Letter of Acceptance).
B A411.2 13.1.2 Preparation of Hazard Identification Risk Assessment and Risk Control sum
(HIRARC) for the activities carried out at site. (To be sequent submitted
Prepare and submit to the S.O/P.D of five (5) copies monthly safety & mth
injuries and deaths and the actions taken. The report may be
ground level.
A413.5 Protective gloves. pairs
A413.6 Safety goggles. pairs
A413.7 Safety jackets of reflective type. pcs
A413.8 Ear plugs and muffs. pairs
A413.9 Dust masks. pcs
A413.10 Head lamp. pcs
13.3.2 Provision and maintenance on the site during the duration of the works,
/ railing / screen / wire netting / toe board for maintaining safe working
Miscellaneous
Items not mentioned above but are necessary for the completion of the Works
(Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 13
Summary of Bill No. 13 : Occupational Safety & Health
Management (For Project Above RM 20M)
Page BQ13 - 1/4 Page BQ13 - 2/4 Page BQ13 - 3/4
Total of Bill No. 13 Carried to Summary of Tender
NO. CODE NO. MOM DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)
13.1 PLANNING FOR SAFETY & HEALTH MANAGEMENT SYSTEM
A A411.1 13.1.1 Preparation of five (5) copies site safety and health plan (S-Plan) as per sum
Letter of Acceptance).
B A411.2 13.1.2 Preparation of Hazard Identification Risk Assessment and Risk Control sum
(HIRARC) for the activities carried out at site. (To be sequent submitted
Prepare and submit to the S.O/P.D of five (5) copies monthly safety & mth
injuries and deaths and the actions taken. The report may be
ground level.
A413.5 Protective gloves. pairs
A413.6 Safety goggles. pairs
A413.7 Safety jackets of reflective type. pcs
A413.8 Ear plugs and muffs. pairs
A413.9 Dust masks. pcs
A413.10 Head lamp. pcs
13.3.2 Provision and maintenance on the site during the duration of the works,
/ railing / screen / wire netting / toe board for maintaining safe working
Miscellaneous
Items not mentioned above but are necessary for the completion of the Works
(Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 13
Summary of Bill No. 13 : Occupational Safety & Health
Management (For Project Above RM 20M)
Page BQ13 - 1/4 Page BQ13 - 2/4 Page BQ13 - 3/4
Total of Bill No. 13 Carried to Summary of Tender
NO. CODE NO. MOM DESCRIPTION UNIT QTY RATE AMOUNT
(RM) (RM)
13.1 PLANNING FOR SAFETY & HEALTH MANAGEMENT SYSTEM
A A411.1 13.1.1 Preparation of five (5) copies site safety and health plan (S-Plan) as per sum
Letter of Acceptance).
B A411.2 13.1.2 Preparation of Hazard Identification Risk Assessment and Risk Control sum
(HIRARC) for the activities carried out at site. (To be sequent submitted
Prepare and submit to the S.O/P.D of five (5) copies monthly safety & mth
injuries and deaths and the actions taken. The report may be
ground level.
A413.5 Protective gloves. pairs
A413.6 Safety goggles. pairs
A413.7 Safety jackets of reflective type. pcs
A413.8 Ear plugs and muffs. pairs
A413.9 Dust masks. pcs
A413.10 Head lamp. pcs
13.3.2 Provision and maintenance on the site during the duration of the works,
/ railing / screen / wire netting / toe board for maintaining safe working
Miscellaneous
Items not mentioned above but are necessary for the completion of the Works
(Contractor to list out, if any)
a)
b)
c)
Page Total Carried To Summary of Bill No. 13
Summary of Bill No. 13 : Occupational Safety & Health
Management (For Project Above RM 20M)
Page BQ13 - 1/4 Page BQ13 - 2/4 Page BQ13 - 3/4
Total of Bill No. 13 Carried to Summary of Tender