Ergon Forma

This document is a form for requesting initial electrical connections, meter changes, or service alterations from Ergon Energy. It collects information about the customer, property address, electrical work details, and certification by an electrical mechanic. The mechanic certifies that the electrical installation complies with safety regulations and is ready for connection. Guidelines are provided on completing the form and lodging it with Ergon Energy.

Uploaded by

True Value Solar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
517 views2 pages

Ergon Forma

This document is a form for requesting initial electrical connections, meter changes, or service alterations from Ergon Energy. It collects information about the customer, property address, electrical work details, and certification by an electrical mechanic. The mechanic certifies that the electrical installation complies with safety regulations and is ready for connection. Guidelines are provided on completing the form and lodging it with Ergon Energy.

Uploaded by

True Value Solar
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

FORM A – 56 (3) For work completed under Office Use Only

Section 56 (3) of the Electrical Safety Act 2002. Service Order No


Ergon Energy will rely on the information provided by the Electrical NMI No.
Mechanic on this form as being provided on behalf of the customer. Date Received

Request for Initial Connection, Metering Change or Service Alteration


Electricity Act and Electricity Regulation 2006 and Electrical Safety Act and Regulation 2002
Use BLOCK LETTERS and indicate in appropriate boxes eg with a cross X. Fields marked with * are mandatory For Assistance see guidelines

Customer Details Request Details

*Name (Business Trading Name if applicable): *Date Work Ready for Connection / /

Appointment required Date: Time:

Supply Connection: O/H U/G

*Customer’s Retailer: Property Pole: Yes No

*Address of Electrical Installation (Location of Job) Meter Location: Outdoor Indoor

Unit /Shop No.: Lot No.: Plan No. (RP/SP): Main Switchboard Location: Outdoor Indoor

Street No.: Street: No. of Phases: 1 2 3

Locality: Postcode: Existing Meter Number:

Other directions to assist in locating address Distribution Services Fee

Charge Customer Charge Contractor

Nearest Cross Street: Other Request Comments

Other information:

*Reason for Request *Metering Required HV LV Unmetered

Initial Connection Permanent Temporary Builders Service Whole Current CT Photovoltaic

Meter Wiring changes Reseal Meter Meter Change Additional Embedded (net) Dedicated (gross)

Other Service Upgrade Point of Attachment Relocation Single Phase Poly Phase CT Ratio
2
Customer’s Mains Cable Size: mm Single rate Two rate No of meters

Maximum Demand: Amps/Phase No Relay 1 channel 2 Channel 3 Channel

Additional Information about request (eg Network availability, Pillar Uprate, additional phases required, Controlled Load - Off peak 8hrs 18 hrs
indication if reseal of meter or relay only is required i.e. no other work carried out, etc)

Un-metered Load Type:

Items being connected as Controlled Load

*Work Performed under Section 56 (3) (a) (1) of Electrical Safety Act 2002 and Tested By (please print details of Electrical Mechanic)

Electrical Mechanic Name: Address:

Electrical Workers Licence No.:

Phone / Mobile No.: ( ) Fax No.: ( ) Relationship to owner/occupier:

Certification (by Person Authorised Under the Electrical Safety Act 2002 to Perform and Test the Electrical Work)

I certify that I am authorised under the Electrical Safety Act 2002 (Qld) to perform electrical work and to connect the electrical installation on which I have
performed electrical work to a source of electricity.
I also state that the electrical installation will be completed in accordance with the requirements of the Electrical Safety Regulation 2002 (Qld), that tests
will be carried out in the way required under part 8 of the Electricity Safety Regulation 2002 (Qld) and that the electrical installation will be electrically safe
and ready for connection by the date work ready for connection stated above.
Note - If outgoing circuits are connected they must be tested.

Signature Date / /

Tariff type meter wiring installed


Domestic (11) Night rate - Super Economy (31) Demand LV - Time of use (43) Irrigation - Other (66)
General Supply (20) Controlled Supply–Economy (33) Demand HV - Time dependent (53) Other (Details to be provided below)
General Supply (21) Non-domestic heating–Time of use (37) Farm - time of use (62)
General Supply -Time of use (22) Demand LV - General supply (41) Irrigation – time of use (65)

Check this is the latest Process Zone version before use. Page 1 of 2 Form CS000500F111 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062


Ergon Energy Queensland Pty Ltd ABN 11 121 177 802
FORM A – 56 (3) For work completed under
Section 56 (3) of the Electrical Safety Act 2002.
Ergon Energy will rely on the information provided by the Electrical
Mechanic on this form as being provided on behalf of the customer.

Guidelines - Request for Initial Connection, Metering Change or Service Alteration

For work completed under Section 56 (3) of the Electrical Safety Act 2002

(i.e. Not as an electrical contractor)

Information and guidelines regarding completing Request for Initial Connection, Metering Change or Service Alteration Form

• This form is only to be used when the work has been completed by an electrical mechanic on their own installation or that of a close relative under
Section 56 (3) of the Electrical Safety Act 2002. It is not to be used by an electrical contractor.
• Please use a black pen and print in legible block letters
• The following mandatory information must be provided:
(a) Sufficient detail to identify the customer and to locate the premises and metering position on site. Note – In the address section
“Locality” heading refers to the city suburb, town, or local area in rural locations.
(b) Details of the connection and metering arrangements and/or requirements.
(c) Supply requirements (e.g. metering, No of Phases, etc) and network availability.
(d) Details of the Electrical Mechanic responsible for, and who tested the work. Note – If outgoing circuits are connected they must
have been tested.
• If a specific appointment time is required on the date that the work is ready for connection, this needs to be arranged directly with the local depot,
please indicate and Ergon Energy will contact you back to arrange a time - e.g. for a point of attachment change requiring electrical contractor to be
on site.
• Unmetered connection of load will only be permitted where the load type meets the relevant legislation and rules. These loads must be miniscule in
nature and have a predictable load pattern. Details are available from Ergon Energy.
• Service connection support brackets and steel service poles must have a minimum rating of 1kN for 25mm services or 3.5 kN for 50 and 95 mm
services. Timber service poles must have a minimum rating of 5 kN. (Refer to Ergon Energy Customer Connection and Metering Manual).
• If sufficient information is not provided, the Form will be returned unactioned.
• Illegible and mutilated forms will not be accepted.
• Customer’s retailer must be made aware of any alterations or additions.
• The Certification statement must be completed (Signed) by the Electrical Mechanic making the certification.

How to Lodge a Completed Form

This form should be delivered to or faxed to an authorised receiving Ergon Energy depot.

Enquiries
Ergon Energy
General Customer Service: New Applications, Point of Attachment Site Visits, Breaking Meter Seals – All Areas...... 13 10 46
Faults: - All Areas …… 13 22 96

Other Information
Notified Pricing Information can be found on the DME website http://www.energy.qld.gov.au/franchise_electricity_prices.cfm

Notified Pricing Information can be found on the DME website http://www.energy.qld.gov.au

Ergon Energy will rely on the information provided by the Electrical Mechanic on this form as being provided on behalf of the customer.

Check this is the latest Process Zone version before use. Page 2 of 2 Form CS000500F111 Ver 2

Ergon Energy Corporation Limited ABN 50 087 646 062


Ergon Energy Queensland Pty Ltd ABN 11 121 177 802