0% found this document useful (0 votes)
275 views2 pages

Concreting Inspection Form - New

This inspection report details the pre-concreting activities for the Area A3 Development Project by Italian-Thai Development Public Co., Ltd. It includes various inspection criteria such as concrete mix design, formwork dimensions, and curing methods, along with the responsible parties for verification and approval. The document outlines specific acceptance criteria and testing frequencies to ensure compliance with construction standards.

Uploaded by

ralph
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views2 pages

Concreting Inspection Form - New

This inspection report details the pre-concreting activities for the Area A3 Development Project by Italian-Thai Development Public Co., Ltd. It includes various inspection criteria such as concrete mix design, formwork dimensions, and curing methods, along with the responsible parties for verification and approval. The document outlines specific acceptance criteria and testing frequencies to ensure compliance with construction standards.

Uploaded by

ralph
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

FM-CV-02

INSPECTION REPORT

FOR

PRE-CONCRETING ITALIAN-THAI DEVELOPMENT PUBLIC CO., LTD.

PROJECT : Area A3 Development Project, Laemchabang


OWNER : Hutchison Laemchabang Terminal Limited REPORT NO. :

EMPLOYER'S REPRESENTATIVE : Scott Wilson Kirkpatrick (Thailand) Ltd. (SW) DATE :

STRUCTURE NAME : INSPECTION TIME :

LOCATION : TYPE OF WORK :

CONCRETE MIX DESIGN NO. :

FOUNDATION BASE SLAB

GROUND BEAM BEAM

COLUMN WALL

SLAB OTHER ____________________

DESCRIPTION OF RESULT OF INSPECTION SIGNATURE FOR INSPECTION


REMARK
INSPECTION ACC. REP. N/A ITD SMC SW
SURVEY LOCATION

TOP LEAN CONCRETE ELEV.

RC. / STEEL PILE CONDITION

FORM WORK DIMENSION

STRENGTH OF FORMWORK

ALIGNMENT

CLEANLINESS

REBAR DIMENSION

REBAR SPLICING

SPACING AND COVERING

CHIPPING CONCRETE SURFACE

WATER STOPPER

CONSTRUCTION JOINT

EMBEDMENT

BLOCK OUT / SLEEVES

COMPACTION

EE WORK

ME WORK

MISCELLANEOUS

NOTE : ACC. : ACCEPTANCE / REP. : REPAIR / N/A : NOT APPLICABLE

COMMENT :

CHECKED BY : (ITD) DATE :

VERIFIED BY : (SMC) DATE :

APPROVED BY : (SW) DATE :


Page : 1

ITALIAN – THAI DEVELOPMENT PUBLIC COMPANY LIMITED Inspection & Test Plan

LAEM CHANGBANG PORT TERMINAL A3 PROJECT


DOC No.: ITP - C027 Construction Activity : Wet Lean Concrete Work For AR1 And Yard Pavement
Specification ref./ Acceptance Inspection / Test Authority Verifying
Item Description Frequency Remarks
Standard Criteria LAB SC ITD SMC SW Document
1 Placing concrete SMC 6.21
1.1 Material MIX DESIGN Mix design depending Each Month or Change of Source C C V V A Test report Before pouring concrete
1.2 Check slump MIX DESIGN Follow each mix design Check every truck C C V V A Test report Before pouring concrete
1.3 Check elapsed time SMC 6.17 Not exceed 45 minutes Check every truck C C V V A Test report Before pouring concrete
3 Cubes Mades from Each Sample one Cube to
BS5328 : Part 4 Required Srrength 90~110
1.4 Compressive strength of concrete specimens SMC (Section 9) Clause 1030 5 Sample Taken per 800 m2 C C V V A Test report be Tested at 7 days two Cube to Betested at 28
K.S.C (Cubes) at 28 days age.
days

2 Curing SMC 6.25.1 Used of an absorption cover kept Continue 7 day - - C V A -


continuously wet or Curing Compound

3 Form work SMC 6.33


3.1 Check form work dimension & Alignment SMC 6.33.13 ACI - 347-78 (R 84) Every Side - - C V A Inspection report FM - CV - 02
3.2 Strength of Form SMC 6.33 Visual Check Every Side - - C V A Inspection report FM - CV - 02
3.3 Cleanliness SMC 6.33 Visual Check Over all - - C V A Inspection report FM - CV - 02
3.4 Elev. Top of Concrete SMC 3.6 (3) EL. (+0/-50 mm) Every 10 m. in Terval - - C V A Survey Report FM - CV - 02 & Survey Report
4 In Situ Density SMC (Section 9) Clause 1030 Visual Check 3 Core per 1,200 m. and 3 Core per C C V V A Checking Report & Photo
Trial Length
5 Concrete Surface Finish SMC (Section 9) Sub-Clause 1026.5 Visual Check (Rougn Surface) as Trial Area Over all - - C V A -

Notes.
LAB-Laboratory /Test company ITD-ITALIAN-THAI A=Approval W=Withness
SC-Subcontractor /Supplier SMC- SINDTHU MAUNSELL V=Verification S=Survillance
SW-SCOTT WILSON C=Action

Prepared By : ITD Verified By : SMC Approved By : SW