Fermator User Manual Vvvf4

1. The document provides commissioning and test procedures for a door control system. 2. It involves connecting power, setting dip switches according to specifications, initiating a learning procedure for the door to open and close, and testing door operations. 3. Final steps include connecting door command inputs from a lift controller and testing door operation by activating open and close commands.

Uploaded by

Damir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
628 views1 page

Fermator User Manual Vvvf4

1. The document provides commissioning and test procedures for a door control system. 2. It involves connecting power, setting dip switches according to specifications, initiating a learning procedure for the door to open and close, and testing door operations. 3. Final steps include connecting door command inputs from a lift controller and testing door operation by activating open and close commands.

Uploaded by

Damir
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

COMMISSIONING AND TEST PROCEDURE

1- Take the car to the landing level. Connect 220V AC to power supply input (5-7 terminals) of board. Do not forget to connect earth connection (terminal 6).
2- Set 4 dip-switches on the board according to door specifications.
D D
3- Switch ON supply and see OK led is flashing.
4- To start learninig procedure push program button (51). If door is open, door will close slowly and will open if door is close door will open slowly and will
R E close. This process must be completed succesfully. Otherwise system never works properly.
5- After completing Learninig process, push TEST button (50) shortly and test door's operations. Operational setting will be the same as normal operation.
PHOTOCELL 6- After completing Test process succesfully, connect door command inputs coming from lift control panel to input terminals (8-CLOSE, 10-COMMON,
12-OPEN). Inputs voltage must be 12V-220V AC/DC. Test door by activating door open and close commands from controller.

FOR MORE INFO, PLEASE READ FERMATOR VVVF-4+ USER MANUAL

C
DOOR OPEN C
13 V+ TEST SIGNAL INPUTS

SERIAL
52
14 TX PORT TEST BUTTON 50 CLOSE SPEED STATUS ....OK!
- +
15 RX
16 V- 41

PHOTOCELL
White AUTOADJUSTMENT 53 OBSTRUCTION 40

FOTOSEL
YELLOW 17 51
Black EMITTER (PROGRAM) OPEN SPEED 39
18 - +
Black
GREEN 19 38
White RECEIVER
20 DIP-SWITCH PHOTOCELL 37
ON 54 36
PRIORITY

23 +12V COM SAFETY


INPUTS

- +
25 SLOW CLOSE 35
OFF
21 RE-OPEN 1 2 3 4 CLOSED 34
26 FLOOR LEVEL 33

ON
POWER 32
B
SWITCH DIP-SWITCH SETTINGS OPENED 31
B

OFF
1 : ON Single Input Signal (8-10) 30
OFF Double Input Signal (8-10-12)
CLOSE 8 CLOSE
INPUTS

2 : ON Automatic Landing Door


SIGNAL 9 +12V 55
OFF Manual Landing Door
INPUTS COMMON 10 COMMON ENCODER
11 0V 3 : ON Left&Central Opening ENKODER
OPEN 12 OPEN OFF Right Opening
4 : ON Automatic Self Control (MASTER)
PHASE / L1-R 7 F OFF Manual Control (SLAVE)
SUPPLY

230V AC EARTH / PE 6 GND


VVVF-4+ MOTOR
56

NEUTRAL / N-Mp 5 N Fermator


A A

Title
FERMATOR VVVF-4+ DOOR BOARD
CONNECTION DIAGRAM
Size Number Revision
A3
Date: 16-Apr-2014 Sheet of
File: E:\PROJELER\PROTEL\OZEL\OZEL.ddb Drawn By: